Loading...
HomeMy WebLinkAbout20210719_DWR_CommentsReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 14-14 Project Acti!7t OUT BY DEIVILR Modification Transfer Release Applicant Name: Hood Creek Soils Company, LLC Applicant's Email: rhoffman@hna-engineering.com County: Caldwell Project Name: Hood Creek Soils YES NO Date Commencing Have land disturbing activities started?? X Latitude: 35.9208 Longitude: -81.5736 Please return comments to (at DEMLR CO): Jenna Spencer jenna.spencer@ncdenr.gov Comments due by: 06/30/2021 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? ✓ Is the RO concerned that the operation, as proposed, would violate standards of water quality? F I I ✓ Comments: The Division is concerned that surface waters my be impacted by the proposed sediment basin. The Division does not have enough information to determine if a 401 certification is required. Does this mine (or previous owner) have DWR back fees to pay? Ll./ (If Yes, amount): Watershed/Stream Name & Classification: Greasy Creek (Class C) DWR Compliance Status of Mine: No record of non-compliance 401 Wetland Cert. required? 401 Wetland Cert. existing? ❑ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑ No Is a Pumping Operation & Monitoring (OM) Plan needed? Are wetlands disturbed at this site? I ❑ ❑ Does DWR RO suspect or know of nearby wetlands to the site? I ❑ 1 ❑ Is a wetland delineation required prior to DWR issuing the permit? JD Consultant Onsite ❑El Offsite ❑ ❑ Stream Determination Needed? ❑✓ ❑ Stream Determination Completed? ❑ ❑✓ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑✓ ❑ Buffer Determination Needed? ❑ ✓ Buffer Determination Completed? ❑ ❑✓ Recycle system permit existing? ❑ 1 ❑✓ (If Yes, Permit #): New Recycle System permit required? F-1 ✓ Enough information to determine?�—I El I Rev. April 2021 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? ✓ (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? ✓ 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ Has Violation ❑ 1 EL I O&M Requirements ❑ 1 ❑ HQW/7Q10 Concerns Pay back fees or renew DWR permit ❑ Other ❑ I ❑ Please describe the reason to hold the permit: RO contact: 7 Hold Until: Mine must wait to dewater until an O&M plan is approved? Reviewed b Central Office Date Regional Office Date DWR RO Surface Water Amy Annino 07/01/2021 RO Aquifer Protection Section Rev. April 2021