HomeMy WebLinkAbout20210719_DWR_CommentsReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE
14-14 Project Acti!7t
OUT BY DEIVILR
Modification Transfer Release
Applicant Name:
Hood Creek Soils Company, LLC
Applicant's Email:
rhoffman@hna-engineering.com
County:
Caldwell
Project Name:
Hood Creek Soils
YES
NO
Date Commencing
Have land disturbing activities started??
X
Latitude:
35.9208
Longitude:
-81.5736
Please return comments to (at DEMLR CO):
Jenna Spencer
jenna.spencer@ncdenr.gov
Comments due by: 06/30/2021
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
✓
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
F I
I
✓
Comments: The Division is concerned that surface waters my be impacted by the proposed sediment basin.
The Division does not have enough information to determine if a 401 certification is required.
Does this mine (or previous owner) have DWR back fees to pay?
Ll./
(If Yes, amount):
Watershed/Stream Name & Classification:
Greasy Creek (Class C)
DWR Compliance Status of Mine:
No record of non-compliance
401 Wetland Cert. required?
401 Wetland Cert. existing?
❑
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
❑
No
Is a Pumping Operation & Monitoring (OM) Plan needed?
Are wetlands disturbed at this site?
I
❑
❑
Does DWR RO suspect or know of nearby wetlands to the site?
I
❑
1
❑
Is a wetland delineation required prior to DWR issuing the permit?
JD
Consultant
Onsite
❑El
Offsite
❑
❑
Stream Determination Needed?
❑✓
❑
Stream Determination Completed?
❑
❑✓
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑✓
❑
Buffer Determination Needed?
❑
✓
Buffer Determination Completed?
❑
❑✓
Recycle system permit existing?
❑
1
❑✓
(If Yes, Permit #):
New Recycle System permit required?
F-1
✓
Enough information to determine?�—I
El
I
Rev. April 2021
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
✓
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
✓
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
Has Violation
❑
1
EL
I
O&M Requirements
❑
1
❑
HQW/7Q10 Concerns
Pay back fees or renew DWR permit
❑
Other
❑
I
❑
Please describe the
reason to hold the
permit:
RO contact: 7
Hold Until:
Mine must wait to dewater until an O&M plan is approved?
Reviewed b
Central Office Date Regional Office
Date
DWR RO Surface Water
Amy Annino
07/01/2021
RO Aquifer Protection Section
Rev. April 2021