Loading...
HomeMy WebLinkAbout20210709_Mine_map■ HEIDELBERGCEMENTGroup HAN N AGGREGATES SOUTHEAST, LLC r � I WA wwww0wo i I f SHEET INDEX: COVER SHEET MINING & EROSION CONTROL PLAN M&ECP-1 ENLARGED PLANS M&ECP-2 RECLAMATION PLAN RP-1 CROSS -SECTIONS & DETAILS X-1 , X-29 X-31 X-49 X-5 3825 BARRE'R' DRIVE Suite 300 RALEIGH, NC 27609 Phone: (919) 380m261 O HOLLY SPRINGS QUARRY 7000 CASS HOLT ROAD Holly Springs, NC 27540 Wake County Phone: (919) 567-9512 Avent Femf Ra 3� Crossroedsa.. hex Rd N; v DUnc VICINITY MAP NO SCALE MINING PERMIT No: 92m 13 PERMIT MODIFICATION W"908d 9NINiH AilivnoGNWI 17016 0 Inr aEIni3a3�3 LAT. 36.60700 N LONG:-78.68200 W w JUNE 2021 HAJIg1 MNG5_WAR I Ill NEW N/F Sheila M. Stinson & Theora Irene s. Johnson - N/F Red Rock Disposal LLC C/O waste Ind. USA Inc. 3 0 i LANDFILL DRIVE? _ _ r Hanson y Property 22.74 AC \\._i i;iii li N/F Red\ROCk Disposal C/o waste Ind. USA,] a �R (� I 29, MATCH r NE N/F DUKE ENBR Y PROGRESS T, C. iS \®"�L 3edirt)ent W Basin #6 Existino� L j } I 7 .- F' rL q W Ln X w Se me t �xEU Q B in �,. (E ' tin �t to \ w v I fB N/F Ph • � Laru SEDIMEN BASIN 2 '?o 11 Existing 2-54" RCP \\Vv /J N/F'v EDIMENT/ P lip . & ru P BAST, N 22, Li 5 - Too Pki i �- \ U , sting Visual a erm Sta In yeast ion. 1/ - - oB DIM 3so 36 r so oB-3 ASI Q i CC ieu �. niei - PERMANENT SLOPE o DRAIN �/ Ime sin #8 i�i�� � SEE X-5 See Details OpOSe ° xo (Exi /` / DIVERSIONSheet X-5 � ove den �e Area Existing ,.- .-: DITCH \-••r>,♦ ♦ �..1 3qp \�'�'`�. `\ Pipes 5-72" CMP EDIMENTOB-4 j. 1 .� 3&'Z / O'. ♦ 5��� �\ ASIN WEST I� 350 DIVERSION �j �. ENTRY ROAD @ 10% ti n., ° : t x,�", ,..: - w.�.. . I DITf++'68-_. GRADE Existing Dirt Road R ".v, I " 3:1 OVERBURDEN - Sediment Trap #1 ,33r. �, EXi Sti n '� i I SLOPES._�� - ` �= 6 0 p g ACCESS POINT '^ (Existing) I ;:,.a i I •� /e` . � • � �- o rass 340 - Water R Existing ti G - - -- Retention �m J, Pipe 18" ' Channel F ��Y / ,.rr�- _ EXISTING �1 1�, Existin g � � Pond #1 NANT'SH Tank ISediment Trap #4 - 330 ?ucr.�_,c.; rlr,� TENANT'S HOT ( g) 3�0 - 320 J �', MIX ASPHAL- Check Dam o / h I (Existing) Silt o / � i ( � \ PLANT � EXISt1ng I ♦ 32 lli•� SILT FENCE 0 1 ' Sediment \ ' (Existing) i�� I r 3ao 3a Pipe No,1 SDO # P PRoaosEo P Basin #4 I � _ SEDIMENT t �� (:i- TE 2-42"a RCP - �����IiI(Existing) �� Existin aASIN se 20 TEN �1 N (l i' o �. RCP Pipe ��� 4Ix L 39 �f �I H _TA G j Hanson �.�_ % Property- RRENTRCP +s 3 r t"*1-�% ',EXISTING RIP -RAP / Existing- -�PITLIMITS ,,.1�axr. cHaNNe� C105.75 AC RCP Pipe J \ , \ Rock /' t ° x \\\ li ,/ %Sediment rap #2 / EXISTING GRAS ♦ / � EXl i ing�-- ,, SDO #4 P 3go 0 , <, , Check Gam \ ( 9) FUTURE PI? LIMITS ti CHANNEL E J�C, Io Existin M // SDG #3 �✓� e r =-. � �._ � � ttxistingji �/ `�f-ice &' jar � .,.� Fxi sti n9 - / ! / sale \ shop \ s,90 #2 ti t , ff i '' � j �f-� DIV,ERSI��N `rC�'A.. � �, � Rip -Rap l i 'fa''. - \• // / o°^ate I_` `DIT,'1 o ®,�` _ S Channel( g o - > i / , i i^Pcoa _ \ I nture stockpile (Existing) Sediment Trap//; r do ckpi 1 e s��,. y / / Area V / Existin / #3 Existin - �� Hanson o 9 f Pi t stockpi 1 e 5 3' RCP Pipe ��. \. Property Area �L PROPOSED MINE --- \ ` LIMITS EXPANSI N ' -EXp ` 68.49 AC Hanson 1, J A Property// I ° I ,' �/9� f Fx 30.09 Ac; 1 \ u - - - � � / Future If1EArea i F•3 it ontai m ient \ \ o � \� 324' ~ stockpile ,..\ . 3 Roekt� Aredi v �xsti ng SDO 51 G E11800, Q. E ab \ 'J Is /r o ' - Existing Exi sti n / r @ elev. 29& 33 \ ` g Plant +raining `ry I) 3 a� Sedlm t I EOp G� �l. �� / x�„ � �_, �� �" �o � •-' ` �� _ _ _ Cent Try (Pr opos �,r IExistingl .--� i ...-_ j Tailings40 m Pl1-e._ ; m ��o A Exi stT ng �/ o Existing 0 ro /" �, Pit ��sa �° �� /'� �Tai ng �} 1� II Ln RCP Pipe e, �, �° Sop p pile . f _ stockpi /I a �310 330. z. 1 s' % i o �/ I (S st ( Soo °° �o . ral' �� l c�9 ?\ a Lo 1 _ r II � �1u � '. ,.� 'tit w >'° \ / j90 �i r = r ��: AIDE ROCK _ 29 ,. _ F � .- / �9 '>4'�/ � �� �__ o; �ISPDES ,.,:a€ g PR �OS� Y�3} «✓ _ SCHARGE BAFFLE = ��0 J \�hg t �9 \ Je��/ 4001 / CP Zit XPANSION 3EPOOL I 320 Rip -Rap Channel 1 1st1n 330 a� - tockp� fiLPOND ��F m %� _ ` \ TILE tt ate RETLNrioN oNPOND#4 --- NDS #2 AND\ `ao \\' .�M l-I Area C\ _.7. \ #3 TO BE REPLACED BY - -- ^/! ._.. _ ) 9_. 4n _ Retention RETENTION - 20 WIDCK BAO LEA 3, ROAD o ) I FUture PlanLocation ..� _ 7 .� 1. f - - Basi^ I Pond _ DURING PIT EXPANSION 3go\ [ / Ex,Str1 j1 'go '; f Plant a Waste St DRAW DOWN \i ' "- Proposed / Existing Visual Barrier Berm 06.8] d 3 1 1- p (Existing):...._ xi sti n Wate 3 HisER olio OB-2 Fl U tih Fi 1 o _Stabilized with vegetation.� Q Ex, st�� a ?G o� - '> II F P, e 10 UAL 36' CMP 360 -- o Retention PIPES, SLOPE ChpnnelH sed rases o ��� AT2/ SLOPE r o' RCnipin 4 Pond #2 � � 3go N/F\ John, Emmie, Nick & Marea Ilicipoulos s t Hanson , 1 obert y� I ° / �Lij (( >(-- 6 rN7 F y d Y ` \ Margaret I. -- See Enlarged Plan, Sheet X-4 N/F John, Emmie, - L{ Nick & MWa 4- Iliopouos m Ln e SDO #7 r u N7 F Ervi r�)Y� R 'JUd ( �` i I1i N/'� �e-z Ervin YIfF � Budd% N Yueli Wang / - = 8" Na ral Gas Line Hanson Property 0.86 Ac yu n Existing _c - Entrance With Gate ti /� g9p mVchael & Ci ruy JohnsT r i m 0 Ogg a �eZ-A C N� �-!�( R 00 7 R lu S MN 6'F�LL C C 2 0Z H z w C v W W m J W Z .0 NINE ■o■ ■N■ J N >� oc = an t� 0 O � a N CIO 3: LU, Arm W ~ L Z O N t9 N J a U) a J� N = _ a See Enlarged Plans, d� 31-1 /N/F Sheet M&ECP-2 N Z J `N/F Terry R. V Betty Bejster M I L Q J 0 Iurdrog LEGEND: �sacins Permit Boundar N g Z 12'WIDE ROCK�.- N/F 00 BAFFLE �' o �,'�Z c Ca�vya E. •fnerlt 't�A , - - K�' c� 90 N/F n#� t �' � � �; e�� o� � o F Perkins carol i na �. . _ A e C? � ,,�d/ �� � Existl g Visual airier( '� ��. PERMANENT Eistin Ipe Yj ` N, 8 O ya E. Power and -_ �` I Berm Stabilizedlyith' ��, � ��`- IMPACT wETLAND-� �i o 'Ierkins Light i PERMANENT AREA 1 - 0.06AC L ~� vegetation. Utilize Channel 1 G 1 �t O o i 1 T ngs/ COmpdny/ IMPACT STREAM E /� Cross See on PERMANENT �/ r �wo �v .rbu rde��� 328LF- 0.03AC - IMPACT STREAM C 7 ARMOR ! ,. 171 LF 0.02AC 1 6 r SB 10 TO BE INSTALLED --- Sediment / 1i DRAINAGE AROUND BENDWAY PROTECTION AT I� OUTLET PRIOR To WORK IN THIS Bain #1 AREA AND SHALL REMAIN IN f �y e"y�a�m"m..rh� D PLACE UNTIL RETENTION O 330 \ POND OUTLET _ POND 4 IS COMPLETE AND . ` FUNCTIONING GRAPHICES SCALE: I� w 93 Ett5 HORIZONTAL SCALE: 1" = 200' �I 200 0 200 600 REV NO: DESCRIPTION OF REVISION: DATE: aO MINE MODIFICATION 6.29.21 Q ADDED INSET 2 AND NOTES REVISIONS 12.20.16 < MINE MODIFICATION 11.1.16 1 p€.g--F'dRM W •S 9- 5-08 -- _ N i."Ist;ng EMERGENCY NOTES: _moo `I ipe No.i 1. BASE TOPOGRAPHY PREPARE BY: ----- l%', RCP SPILLWAY TO /31'I CONTINENTAL AERIAL SURVEYS, INC. N/F i� OUTLET INTO 3356 REGAL DRIVE Fred & �- DRAINAGE ALCOA, TN 37701 Shirley Burt CHANNEL (865) 970-3115 2 BOUNDARY INFORMATION FROM WAKE COUNTY TAX MAP. 3. EXISTING MINING PERMIT NO. 92-13 HOLLY SPRINGS QUARRY 7000 CASS HOLT ROAD HOLLY SPRINGS, INC 27540 g (919) 567-9512 TOBY LEE, GENERAL MANAGER NC SALES AND OPERATIONS N/F William & Sharon Wilson \\ 4. THE INFORMATION SHOWN HAS BEEN COMPILED FROM PREVIOUSLY N/F WatsOrt Adcock LLC �• ` j APPROVED PERMIT RENEWALS AND/OR MODIFICATIONS. N/F William & Sharon Wilson 5. FOR MORE SPECIFIC DETAILS, SEE PREVIOUSLY APPROVED PLANS. i 6. UNLESS OTHERWISE NOTED, THIS SITE WILL MAINTAIN A N/F Fred & Shirley Burt 50-FOOT UNDISTURBED BUFFER ALONG PERMITTED BOUNDARY. 6 9. ALL SEDIMENT REMOVAL FROM DETENTION PONDS SHALL BE DISPOSED IN AN/a AREA DRAINING To THE PIT OR TO A CONSTRUCTED SEDIMENT REMOVAL DEVICE. tap ✓ "`- w o N/F Bri an it Smi th & Jamie o]b�, M. S . o yGc�� Terhune \ Phy N/F Existing Pipe No.6 18" RCP n N/F Goldie M. Judd 380 Q� .�% N/F N/F Jerry & Kenneth Jerry & Deborah & Marion Marie Taylor Taylor Brown Raymond & Sarah Judd Hanson Aggregates Southeast LLC Holly Springs Quarry Current Permit Modified Permit Tailings/Sediment Ponds 32.8 32.4 _ _ Stockpiles 34.3 38.5 Wastepiles 26.0 90.1 Processing/Haul Roads 17.2 18.0 Mine Excavation 56.8 99.4 Other Areas Permitted for Disturbance: Asphalt Plant, etc 11.5 11.5 Total Area to be Affected 178.6 2868 Other: Buffers, Wetlands, etc 21.6 104.4 Total Mine Permitted Acres 286.32 394.22 B C= -----1� J Y Property Line Existing Pit Pit Limits R������� Buffer JUL 091011 Treel i ne LARD QUALITY' Berm - Existin b11NING PROGRA; Berm (to be built based Film W L W a F. W m a � Z iC L Z 0 O y LU on overburden supply) --- - ---- - Contour Index DESIGNED: LAB -- Contour intermediate DRAWN: LAB CHECKED: LAB O Structure ® Road Paved DATE: NOVEMBER 2014 7­777-_1 Road Access REGION: SOUTH Body of water O sediment Basin/Trap as noted LOCATION: HOLLY SPRINGS HA-HOLLYSPRINGS-M&ECP-1 Energy Dissipater DWG FILE: SCALE: Pipe -�-�� Diversion Ditch Temporary HORIZONTAL: 1' = 200' �- Diversion Ditch Permanent VERTICAL: Draina e Direction creek O stockpile Existing Former Monitoring Wells \\\\ . Jf 1 "11 \ \� \\\\\\\\ I I I! � \ l \\\V�\\\\\ I �� `_���_ �----��,` �\� ` � -�•�'��`��\\\\�.�\\ - ..- 1 � `\ , \ \ �l ,t 11 ill ! I I \..i-�-_.-1� ! I Illlli, � \ .� \� \`\ \\ \ \\i I 1 \ \ \ \\\ \ \ \\ \\\ �1 �111I `\ \ \ \ \ \ ( �- _ .�f —✓\.. \,�\ V \ \ t 1 I ! ! f I \ I t I LEGEND: >\ .\� \\ \ \> (\ � i \ \ \ \• ` \\ t � 1 e .\� \ � � �\ \ �1 1 \.�� \ \\\J/� .�\\J------���\~`\\` NODES: %I�III//l� 1. BERMS MAY EXPAND DUE TO MINE NEEDS, ANY ��-� Permit Boundary FUTURE IMPACTS TO WETLANDS OR STREAMS WILL I \\ i I / •\`�, '.�.� �a\ \�\-� �\ �,�IV1 I� ` f`y \\�\� \ �Il \' BE PERMITTED THROUGH THE PROPER AUTHORITIES. • !iI i�1. %%jr� Property Line \\2. FENCING TO BE INSTALLED BEHIND SCREENING f i1 BERM ALONG PROPERTY WITH EXISTING SOCCER \\` `\ \ i `\\\`• V� \\ \\ �\� \V ' �� S 4 \\� FIELD TO PROTECT CHILDREN FROM ENTERING THE ® Existing Pit / \ MINE SS T t-'\ r Pit Limits ( - \ ` \ 1 Buffer � ! fa=_Z' ,\\�� Treel i ne / Berm - Existing ! \ ��\�\ \\ �\ `I �\ i 0 \\ \ \ \ 50 UNDISTURBED 1 Hanson Aggregates Southeast LLC HollySprings Quarry Current Permit Modified Permit Tailings/Sediment Ponds 32.8 32.4 Stoc iles 34.3 38.5 Wastepiles 26.0 90.1 Processing/Haul Roads 17.2 18.0 Mine Excavation 56.8 99.4 Other Areas Permitted for Disturbance: Asphalt Plant, etc 11.5 11.5 Total Area to be Affected 178.6 289.8 Other: Buffers, Wetlands, etc 21.6 104.4 Total —Mine Permitted Acres 286.32 394.22 \ l �— -� Berm �\ // \ (to be built based \~ ��\\.�\\\�`. �\\ c �\ \\ \\\� \ \ / ! 1' on overburden supply)�\ \ i) l�� BUFFER / /cif Contour Index ( - \\'v� l v�vv 1, 8 Contour intermediate II(`\—_�\\�� \ \� 50WIDE TALL \ I'' f �:.'._�-� \\\\t\`��\ \ \��. ..\ /' j/ \\ \ �// �j�/ 1 < I �% l % ``.�-`_ -� /_"`` \ �`.. \�� \\` \'.` `\ \ \ l• / O Structure PLANTED Road Paved v VA�V lIilt, SCREENING I �, N/F Road Access \�� v�1\V A ti/ BERM WAKE COUNTY ��/ l� t J/ /�/ / �l t � 111 I � �'\ \ { 1�� 1 �� / BOARD OF �-�/s �,\�} ^ \ �` `. `\� � Body of water J'' / ✓ �- M ��\ V 1° v EDUCATION -4 Sediment Basin/Trap as noted \� (� ��-1� \ /1 \' \ \ \ �\ / �\ O Energy Dissipater Pipe ��� �\ Vy A I i / � / (II J /�� ` \ \ v • y ��\v X\ Vv`�vJ` Diversion Ditch Temporary \ � �; I i I I � N/F ! �t � `� �, wA\\�A —F—E-- v���-� / vR R�AP� . / )� ! i i ' �; 1 _� TowN o oLLY �j/ i EXtSting i �_ - -�'� I: 1 LA RUE M POWELL- rr �� f �/ _ Diversion Ditch Permanent - / / _ - --- �\ \ �� , f J EPidE A nr \/�\ �/i \\ JJ Entrance / �\ - '�/ 1 SPRINGS \ l ' � I ._.ram �_ "'---•_ =— r � - J i �� J \\ \ Drainage Direction-W� th Gat : f \ -"- -� - -- ` H L A j . Creek \fir / <�'� '��' �// } -' 1 stockpile Existing . ��` _-----� / wetlandsseDIMEN' _ - �/ % - - U N✓� i ��� /J/ yA� i :� i• _ / i / 1 _ BASIT Y ER f \ f/ �'y HERP� L T L � N 27 ) All Ift >0 wo Z SED M BASIN :U / \ 4 Z lit�C� ® / l sAMUEN/JO P �`� —= ��}� } � AM BEV W -\ ��i�\ I lI \ ( �1,r• N/F \\ ✓ s — a I `DUKE ENERGY '� ' i �) r �� fI \ / / AND SHANJIN PROGRESS IN - / �/ II �� V I .� 1 / I ROBERTSON --�\ \ i ;/ / %� ! ! \, ` �.�L"�ji N V W �� L/ _ �� 1 \\\��p``Ilil /%I'l[ `i 1/// I �/ %, �/ % / e~. _�\\ i/�'a\ I �•�� // ' ('' /J�f W ~ �'r Z in /! ETCH, L � � � � 'III I� \�� ////� /� � /// F EDrMENT P 1 i p & ru P 1 �`�\_ i _ J ` � r � l � ® d' �\� �l e--- - �: I - /i, ✓ � ,� Phi' l BASIN Li s To PL(i _ aru h 1 " � DUKE ENER Y � S di t I� I //( �� /' Ir�!' n 3 N/ J � - PROGRESS INC. � \ `. M - 60 1 � �� . ' �- / PRO Exi�tln \\ 'I a PO i1 \� i J%h�i Etllmie, ® J / _ v r ' y = r I (� A� 1 � / i� f%1` � 1 � � I��\ � � I �V �i'%i i,��� � A0 �V'�. •"�' � 1 �_ N%C k\&- Marea < � � � 0 X Z erm phI_l.._'�o\po.uiI os3� Sta :zu ASIN MENP 3ZBASIN ue Existing \ (E tin ��� 2 54" RCP 40 0 0 so /•. 9o.rz / / - SEDIMENT 5 I - y- �/ (t,SIN 25 BASIN ■ / i �+__� _-\��,•� / /1 /// / / / ("I,�EDI NT 3 �0 �10 ■ A�� J� L octing PERMANENT SLOPE %�J � � � \�� � �. -�-.A�(,` � �r t / DRAIN x �\ `, 1 o me sin #8 r-5 See Details op - DIVERSION se ( - u\ \�`.`- -� ' ( I� I V..-'l \ ` �t H% 3N0 SEE i Sheet X-5 Ove den ( ati ;r ! �/- ',,A / / ! 0_ DITCH i-`- 1/ l 1 i ® 0 11 VV�� > / / / / EDIMENTJ 300 I. �—'--_ I ��` 3q\. Margaret Q I / N F %\� 1% V �\ // 5 MPS ✓ i¢ASIN j 3ti dgo-3 g I r Sheila M. Stinson & 1 �`\J f/� /j �• / �\ � / J /�.. � y/. '\,� ��, '- :J":, a /f% ' � -� �-,._- l .. 406MUM 1 l �5 & Theora Irene S. Johnson __� \J �� //` �I- -_ % Gf/ S(i,tevi350 -- See Enl ar yed Plan Sheet x-4 F Red Rock Disposal LLC�DIVERszoN EN ROAD a 10% )i'C++--�B GRADE y ° . (I 0 Waste Ind. USA Inca, I �vv i r pos 1 o N F %� f / \ OVE tJRDEN Sediment 1 „ rap #1 __. �---- ,.3,. _, o A ,1� 1 SLOPE'S 339_\ ...f •c-�-�- �� - �j 39 � � '. � \ V `\ � ��i i •. ` M.. / - , .A ;.`.-,��... ro;. �...� AS'Go OINT J �15 <'A.� Nick & M d --A Q ?oo,.'` /� v ✓ r o �� ACE........ Grass --v-Q \ f _ TA Pipe 18 Channel F y `'-- — _-_ ji j 1 3$o S PS44paa Il i opOU t o v „ �._: \ (Existin) -- 'a3o -� Gam- / - > b \a Tank v \ L`_ ✓ r I Sediment Trap #4 \ Silt r . - " o-;,,,lI ... "' I J\ o\ - S i ( !r r Existin f c \ i ! r \� - �� I ED ��,1 \`-' _ \ems � -iI . r ---� • ,_. _. 20 ,. xsn.a xtrts r. �� I� Check Dar /--s (i x' v_ Existing \ i edlment i • 3 �� SILT FENCE 0 l� / ✓ ( / SDb # (Existing) / % p •� _� I Basin #4 -_�_ 1 � Existin \ - g "; 2-42" RCP Q 'C� g) Z _ ram` � SEDIMENT 9 r, I ' a, ,� DESIGNED: ,— — �':�"-`Existin s N 2 � , �.0 .. RCPiPlp6.�� _ Ir �f HdY150'n , � Property,/ 22.74 AC d Rock Disposal LLC ✓ ' \� \ aste Ind. USA Inc. r ` N/F Alice Naomi R. Jenkins, �. Jack Rogers & Eva R. Weldon REV NO: DESCRIPTION OF REVISION: s �+ MINE MODIFICATION a ADDED INSET 2 AND NOTES REVISIONS < MINE MODIFICATION 0 ADDED FORMER MONITORING WELLS /,1� x2693 DATE: 6.29.21 12.20.16 11.1.16 9-15-08 G CURRENT vv J �\ - xss.: o �.,._. i '<t0i:}. $S R).23->] t VI T Existing •E S ING RIP -RAP / .-- �u� � RCP Pie PIT LIMITS J �ii.vNNEL c �, aa v ZZSC(DO #4Sediment /cap #2 P /�,_ 331! i exISTIN GRABA ckk DamO #3 (Existing) FUTURE PIT LIMITS ` CHANNEL E \ \ -,, SDO #2 / ! /� iFxistjng) / p�^d J `... / DIVERSION .DII H-_a'r.,tr%� ,,,a, \ , / i l gie 1 m l s a r w r ent Trapav` #3 (Existing) / �,. af. 3ti° J ` - y •� // Existing - RCP -- �. - -____/ Pipe. - e PROPOSED MINE -"..... : - _. _-�.� d:. . I %� c •. O / -� 90 I A _ � � P - LIMITS EXPANSIN' „ x l l / Future ir,Area \\ \ _� , 310, 320 SA - B r O ' `' c UI - s/ / . y ;9 s 11 / sedimept 30 <./; / / 4 � � .: <1".•w. ♦�... d M. rvw:. �.r;. ,ter - b.....a+r,-..�-:a:�:-tsC...' _. ,.'. ... .:i .... . Y a .: _ 'n::. £! e. `v .Arv.. b. e. J. , Y/,.".:,a _ _ A - � �1� /AT --� ! DRAWN: -- SD0 #7 , o-ti �_f<i CHECKED: DATE: NOVEMBER ❑ Er ! J� 9�\./��f'7� J i REGION: M/ LOCATION. HOLLY S HA-HOLLYSPRINGS-M&ECP 4�� l`� 1 • ���'r-''/ !//'I )��I I \, �_ DWG FILE: N/F �� Eryin SCALE: if SCALE: HORIZONTAL: 1' = 200' i VERTICAL: Yuel i �, I i �� �i,ilf.jiG%/Ij��) �y\� SHEET No.: ry I (�.1 wan ralGaiiin ` v\\���� �\����, M&ECF / 4 — ' Hanson. I( ,\�,\\\\\\\`\��� LAB 2014 GRAPHIC SCALE: HORIZONTAL SCALE: 1" = 300' 900 300 1 300 911 -- — ; N/F Red Rock Disposal LLC C/O waste Ind. USA Inc. N/F Red Rock Disposal LLC C/O waste Ind. USA Inc. 1 REV NO: DESCRIPTION OF REVISION: DATE: I 1 U (MINE MODIFICATION 16.29.21 1 N/F N/F Carolina Sheila M. Stinson Power and & Therora Irene S. Light Johnson Company Existing Entrance with Gate RO-o Fex .,,e r a � z 0 W O � W H < S Q J W H � � tq iL Y� J Sediment v> Basin to Remai n `9p BasA/ o a to L Swel 1 lip T/ \ 330 Re r{ + y� XI ST3a. °`5D PLANT,QU 370 3o & STOJKPILE A -ID, 6E WITH SERICA ac _5 Opp ' + + BERM UDAG++S r$ rr } + } y Pans Il ♦ a lineProp AC 000 i To Remain F HIGH \ V / I ;r`— ♦ - CHAIN u-NI< M jt �*4� .+ �\\ r.,' \ r4 / )�✓r j/" �'/'� FENCE ,'.° sc:?"a .:'� 3' y_'y,.y/ "��_ ( X .S TN:I CF'_iCE, lf,D r I OOP (AS iA T AWI) J / o a�},E i ENTRANCE, \ _ ft o � T 4 fin E . 32C TOC +I RfA B@' , 1\ 4c .0 1. SEEd�� A "� ''i AG SIC/Oft+ AM&DRASS "w + : + + + +' o ++ �0 N/F i' �2 y=�fF..' ��n-.,+ +�Q+ + ,. sa° FMJvc D�ANO_� Alice Naomi R. Jenkins, } _. ° I+ tz-i T ArPROVED �I - Jack Rogers & Eva R. a ,o � a0p } "/ Di IOSAL/TREATumNT Weldon ,� o� ''t o FA. -E Y <� 3 0o T - - soa -/`/--.� Z90 rryN i . 310 .iyo Xf� ae.�iRAINr 'a .ic i LD,9o» I �o ( + s�;x1i + " _ /f N/F - N vs - ++Carolina -++ +d+ r % Power and 290 Base �9e >: j7e '.* �\ + + + \ + / Light 290 [ Remr. .t Sot z _. - s + + g Company — ,(( 0 To Pa'nJ ir, 'L� „0 � V i; i ° 36a 360 320 r- s n 11 to ...Ja `��� ���� Jbe I t O ya E h -o c0 l >. r� ( N/F M Etta 1 Estes �A e 1 1` \ Brian ' - �� ° 1 "to Smith & 1 JM i e 1360330 / (� O . 4 O Terhune N/F Raymond & Sarah Judd N/F .Jud ✓ / N/F Kennet -1\ MArion �\ \ NBrown \ \Jerry & Marie Taylor \ V N/F Y William N/F �\ o & Sharon Jerry & a Wilson'` Deborah a Taylor N/F 00 � William m \ & Sharon s i Wilson z z \\ i E. ins t aoo I N/F Terry R. Bejster N/F John, Emmie, Nick & Maria Iliopoulos s 6� P,O Mxr,aret 1. MUilias & ^.N� nevi.. N/F r, a, hn 551. r, x .;a O IN Property 0.86 AC OFFICE, ROAD /LOOP(ASPHLAT $ CRUSHED STONE PAVING) AND GATE AT ENTRANCE TO REMAIN LEGEND: — Permit Boundary Property Line Areas to Be Regraded and + + + + + + + Grassed with vegetation + Beneficial To Wildlife (In Accordance with Approved vegetation Plan) Water Surface upon Reclamation Treeline Berm - Existing Contour Index -- -- — — Contour Intermediate OStructure ® Road Paved )' Road Access Sediment Basin Energy Dissipater Pipe — Diversion Ditch Permanent creek RECEIVED JUL 0 9 2021 LAND QUALITY MINING PROGRAM OTES: 1. THE INFORMATION SHOWN HAS BEEN COMPILED FROM PREVIOUSLY APPROVED PERMIT RENEWALS AND/OR MODIFICATIONS. 2. FOR MORE SPECIFIC DETAILS, SEE PREVIOUSLY APPROVED PLANS. 3. UNLESS OTHERWISE NOTED, THIS SITE WILL MAINTAIN A 50-FOOT UNDISTURBED BUFFER ALONG PERMITTED BOUNDARY. 4. NO NEW LAND AND/OR NEW EROSION AND SEDIMENT CONTROL MEASURES ARE PROPOSED WITH THIS RENEWAL. SEE PREVIOUSLY APPROVED PLANS AND DETAILS FOR CONSTRUCTION DIMENSIONS. 5. THE RECLAMATION PLAN REFLECTS THE INTERIM 10 YEAR RECLAMATION PLAN. 6. ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL REMAIN IN PLACE AND BE MAINTAINED UNTIL RECLAMATION HAS BEEN COMPLETED. 7. ALL EXISTING STRUCTURES ARE TO BE REMOVED UNLESS DESIGNATED TO REMAIN. 8. ALL UNPAVED AREAS ABOVE WATER LEVEL (I.E. ROAD SHOULDERS, BERMS, DAMS, ETC.) TO BE STABILIZED WITH VEGETATION. IF SUFFICIENT COVER DOES NOT EXIST, OVERSEED AS IN SEEDING SCHEDULE. 9. AFTER SEEDING AS PER SEEDING SCHEDULE, BERMS AND SLOPES BEYOND ROAD SHOULDERS OUTSIDE THE OFFICE AREA SHALL BE NOT MOWED AND ALLOWED TO REVERT TO NATURAL VEGETATION. 10. BERMS ARE TO BE BUILT AS MATERIAL BECOMES AVAILABLE. THE EXTENT OF THE BERMS SHOWN C1N THIS PLAN ARE ANTICIPATED; FINAL DIMENSIONS MAY VARY. J J N A t O N y O pOlO R y •'c awn C N N N m 0 VNW �GZMM Q m°'ma� 0 C a NY S q�qJX MNCF� C n 2 0z z Hw Ccc �m I _° t RN! own RAR J y � � _ 4O a O Zoo 0 co Wtn3 F Z Z w W d Z Nov NR t7 CL U)J U) Z 0J O Q U) W c.i M ~ Z Ice 0 cL Z a Z W a H 0 J, L a V W W L F` W m DESIGNED: LAB DRAWN: LAB CHECKED: LAB DATE: NOVEMBER 2014 REGION: MIDEAST LOCATION: HOLLY SPRINGS H A-H OLLYSPRINGS-M &ECP-1 DWG FILE: SCALE: HORIZONTAL: 1' = 300, VERTICAL: SHEET NO.: RP-1 OF: 10 Haul/Access Road Detail Notes Notes: 1. Haul or Access Roads shall be constructed with a 4' minimum height safety berm on downgradient side of road. As field circumstances dictate, a safety berm may be constructed on both sides of the roadway. 2. In order to control sediment, rock outlets shall be installed at natural low points in the road alignment and every 2001Bear feet at a minimum. Additional outlets may be installed as necessary to control discharge. 3. Rock dam shall be constructed of Class B Rip Rap and a 1 foot thick #57 stone filter layer installed on the upgradient side of the outlet. 4. Maintenance: a. Inspect Rock outlets weekly and after each significant (1/2 inch or greater) rainfall event and repair immediately. b. Restore outlets to the original design dimensions. c. Replace #57 stone filter layer as clogging occurs. COMPACTED SOIL SAFETY BERM =1I H - Ill-III�II � I -I � I -III -I 1 -Tl-lil=lil ±4 - WIDTH VARIES - PROFILE VIEW ROCK OUTLET IN NATURAL LOW POINT L IN ROAD ALIGNMENT (MIN. EVERY 200 LF) FLOW +6 HAUL OR ACCESS ROAD DETAIL NO SCALE SEDIMENT TRAP SCHEDULE Structure No. Disturbed Area (Acres) Drainage Area (Acres) Sediment Storage - fi Basin Dimensions L' x W' x D' (Average) Wei ST-I up to 0.2 up to 0.2 720 261 x 13'W x4'D ST-2 up to 0.2 up to 0.2 720 261 x IYW x TD, ST-3 up to 0.2 up to 0.2 720 261, x IYW x 4'D ST-4 up to 0.2 up to 0.2 720 261 x IYW x 4'D ST-5 up to 2.6 up to 2.6 1 9,360 1 881 x 44' W x TID ST-6 up to 2.2 up to 2.2 7,920 82T x 4VW x 4'D SEDIMENT TRAP DIMENSIONS NUMBER DURATION SURFACE WIDTH SURFACE LENGTH SURFACE ELEVATION BOTTOM ELEVATION WEIR LENGTH FABRIC BAFFLE SPACING INLET ZONE 1ST & 2ND CELLS OUTLE"i ZONE ST 7 LONG-TERM 53' 106, 277 273.5 12' ST 8 LONG-TERM 55, 110, 276 272.5 12' stone Baffles ST 9 LONG-TERM 49' 98, 277 273.5 10, ST 10 SHORT-TERM ill 22' 275 272.5 4' 8' 5' 4' ST 11 SNORT -TERM 11' 25' 277 273.5 4' 9' 6' 4' 5T 12 SHORT-TERM 16, 42' 273 269.5 4' 15 10' 1 4' ST 13 SHORT-TERM 17' 41' 273 269..5 4' 8' S' 7' ST 14 LONG-TERM 35' 101, 277 273 8' Stone Baffles ST 15 LONG-TERM 35' 105, 302 298.5 10' ST 16 LONG-TERM 54' 115, 318 314.5 12' ST 17 SHORT-TERM 10, 20' 322 320 4' 7' 5' 3' ST 18 SHORT-TERM 10' 1 20' 1 322 1 320 1 4' 7' 5' 33 ST 19 Si'-RT-TERM 10' 1 23' 1 322 1 320 1 4 9' S' ST 20 ';. -.T-TERM 10' 20' 322 1 320 1 4' 7' 5' 12" MIN. ,/� SEDIMENT O �� PIT (-50Cf) 2 CLASS B 2 1 RIPRAP 1 SLOPE / _- ROCK OUTLET DETAIL NO SCALE 4' min. square Mound � ''- I I -III III-III-ITir Hotd-down StakesEach Side @ We, c I-III-III=1 -III-I I I= Coaugated Plastic Pipe I I- - - - I 111=III- 45°Bend Wye Branch Stabilize - I MaII-III-I I 1 -I I ondet SECTION T min. level section PLAN Construction Specifications A common failure of slope drains is caused by water saturating the soil and seeping along the pipe. This creates voids from consolidation and piping and causes washouts. - achieve firm contact between the a and the soil at In 6 inch lifts to ac it material and hand compacting pipe Proper backfilling around and under the pipe 'haunches"with stable so a p g all points will eliminate this type of failure. 1. Place slope drains on undisturbed soil or well compacted fill at locations and elevations shown on the plan. 2. Slightly slope the section of pipe under the dike toward its outlet. 3. Hand tamp the soil under and around the entrance section in lifts not to exceed 6 inches. 4. Ensure that fill over the drain at the top of the slope has minimum dimensions of 1.5 feet depth, 4 feet top width, and 3:1 side slopes. 5. Ensure that all slope drain connections are watertight. 6. Ensure that all fill material is well -compacted. Securely fasten the exposed section of the drain with grommets or stakes spaced no more than 10 feet apart. 7. Extend the drain beyond the toe of the slope, and adequately protect the outlet from erosion. 8. Make the settled, compacted dike ridge no less than 1 feet above the top of the pipe at every paint. 9. Immediately stabilize all disturbed areas following construction. Maintenance Inspect the slope drain and supporting diversion after every rainfall, and promptly make necessary repairs. When the protected area has been permanently stabilized, temporary measures may be removed, materials disposed of properly, and all disturbed areas stabilized appropriately. SLOPE DRAIN DETAIL N.T.S. EXISTING HAUL ROAD NOTE: CHANNEL SLOPE 6.8% TEMPORARY CHANNEL, TO BE FILLED AFTER SLOPE ABOVE HAS BEEN STABILIZED 23' 6' 6' 2' 3' 12' 1-27 1 1 -- 10" THICK #57 STONE CHANNEL I DETAIL (LOOKING UPSTREAM) N.T.S. PROPOSED FLUSH FILL[ CL DITCH 4ft. 4ft. Sft. SHOULDER EXISTING GRADE ,.�li-n.;.,/ft r_311- " Dimension may be less Construction Specifications for short-term traps 1. Clear, grub, and strip the area under the embankment of all vegetation and root mat. Remove all surface soil containing high amounts of organic Weir Length class B matter, and stockpile ordispose of it properly. Haul all objectionable material to the designated disposal area. Erosion Top of Be rim 1 ONGITUDINAL SECTION 2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill in See Table Control Stone lifts not to exceed 9 inches, and machine compact it. Over fill the embankment 6 inches to allow for settlement. 2 - 2 -1 3. Construct the outlet section in the embankment. Protect the connection between the riprap and the soil from piping by using filter fabric or a -Q1 in 1� keyway cutoff trench between the riprap structure and soil. E -I Place the filter fabric between the riprap and the soil. Extend the fabric across the spillway foundation and sides to the top of the dam; or CROSS SECTION AT SPILLWAY 1/4in./ft. I 30' ROADWAY NOTES: 1) Roadway shoulders and side line ditches shall be vegetated or otherwise stabilized. 2) Roadway must be stabilized (with stone or pavement). Upstream stone or i gravel facing i ft, thick 2 ft. Min. 11 2 1 8 ft. Max. Cut -Off Trench 2ft. Deep min. 2ft. wide min. Excavate a keyway trench along the center line of the spillway foundation extending up the sides to the height of the dam. The trench should be I at least 2 feet deep and 2 feet wide with 1:1 side slopes. - 4. Clear the pond area below the elevation of the crest of the spillway to facilitate sediment cleanout. - -Filter Fabric 5. All cut and fill slopes should be 2:1 or flatter. I- 6. Ensure that the stone (drainage) section of the embankment has a minimum bottom width of 3 feet and maximum side slopes of 1:1 that extend to the bottom of the spillway section. TEMPORARY SEDIMENT TRAP 7. Construct the minimum finished stone spillway bottom width, as shown on the plans, with 2:1 side slopes extending to the top of the over filled embankment. Keep the thickness of the sides of the spillway outlet structure at a minimum of 21 inches. The weir must be level and constructed to grade to assure design capacity. N.T.S. 8. Material used in the stone section should be a well -graded mixture of stone with a d50 size of 9 inches (class B erosion control stone is recommended) and a maximum stone size of 14 inches. The stone may be machine placed and the smaller stones worked into the voids of the larger stones. The stone should be hard, angular, and highly weather -resistant. 9. Discharge inlet water into the basin in a manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency (References: Runoff Control Measures and Outlet Protection), 10. Ensure that the stone spillway outlet section extends downstream past the toe of the embankment until stable conditions are reached and outlet velocity is acceptable for the receiving stream. Keep the edges of the stone outlet section flush with the surrounding ground, and shape the center to confine the outflow stream (References: Outlet Protection). CL DITCH 9. Direct emergency bypass to natural, stable areas. Locate bypass outlets so that flow will not damage the embankment. Sft. 4ft. 4ft. 10. Stabilize the embankment and all disturbed areas above the sediment pool and downstream from the trap immediately after construction (References: Surface Stabilization). SHOULDER 11. Show the distance from the top of the spillway to the sediment cleanout level (1/2 the design depth) on the plans and mark it in the field. 14. Install porous baffles as specified in Practice 6.65, Porous Baffles. 1/4i n . /ft . li n . /ft. EXISTING GRAD Maintenance: Inspect temporary sediment traps at least weekly and after each significant ('h inch or greater) rainfall event and repair immediately. Remove -�-+,- 3 3 sediment, and restore the trap to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the _71 lr- sediment that is removed in the designated disposal area, and replace the part of the gravel facing that is impaired by sediment. -III I I iTl I I I I I I I I I I: I I I- I Check the structure for damage from erosion or piping. Periodically check the depth of the spillway to ensure it is a minimum of 1.5 feet below the I'-'ITI low point of the embankment. Immediately fill any settlement of the embankment to slightly above design grade. Any riprap displaced from the - TRAFFIC SURFACE spillway must be replaced immediately. 8i n . ABC After all sediment -producing areas have been permanently stabilized, remove the structure and all unstable sediment. Smooth the area to blend with the adjoining areas, and stabilize properly. Notes: 1) Sediment traps are sized for the total drainage area with 1 clean -out per year 21 Weir dimensions are minimum reauirements from NCESCPDM (Table 6.60a) SITE ACCESS ROAD - TYPICAL SECTION Weir 10 ft. Min. 24 ft. Min. Front View 5 ft. Min. _ Rock abutment 3 1 1:1A !/ 1:1 side view Filter Fabric Structure No. Disturbed Area (Acres) Drainage Area (Acres) Sediment Storage - ftA3 Surface Area ftA2 Weir Elevation Weir Min. Width ST-1 up to 8.0 up to 8.0 28,800 11,800 1 298' to, SB 11 21.46 23.84 25,150 32,700 1 325' 27' N.T.S. Key in 2 ft. Min. -I- Min . I spillway Rock Apron ,- abric 4 ft. min. 1.5 ft. min. Construction Specifications 1. CLEAR THE AREAS UNDER THE EMBANKMENT AND STRIP OF ROOTS AND OTHER OBJECTIONABLE MATERIAL. DELAY CLEANING THE RESERVOIR AREA UNTIL THE DAM IS IN PLACE. 2. COVER THE FOUNDATION AREA INCLUDING THE ABUTMENTS WITH EXTRA -STRENGTH FILTER FABRIC BEFORE BACKFILLING WITH ROCK. IF A CUTOFF TRENCH IS REQUIRED, EXCAVATE AT CENTER LINE OF DAM, EXTENDING ALL THE WAY UP THE EARTH ABUTMENTS. APPLY FILTER FABRIC UNDER THE ROCKFILL EMBANKMENT FROM THE UPSTREAM EDGE OF THE DAM TO THE DOWNSTREAM EDGE OF THE APRON. OVERLAP FILL MATERIAL A MINIMUM OF 1 FOOT AT ALL JOINTS, WITH THE UPSTREAM STRIP LAID OVER THE DOWNSTREAM STRIP. 3. CONSTRUCT THE EMBANKMENT WITH WELL -GRADED ROCK AND GRAVEL TO THE SIZE AND DIMENSIONS SHOWN ON THE DRAWINGS. IT IS IMPORTANT THAT ROCK ABUTMENTS BE AT LEAST 2 FEET HIGHER THAN THE SPILLWAY CREST AND AT LEAST 1 FOOT HIGHER THAN THE DAM, ALL THE WAY TO THE DOWNSTREAM TOE, TO PREVENT SCOUR AND EROSION AT THE ABUTMENTS. 4. SEDIMENT -LADEN WATER FROM THE CONSTRUCTION SITE SHOULD BE DIVERTED INTO THE BASIN RESERVOIR AT THE FURTHEST AREA FROM THE DAM.. 5. CONSTRUCT THE ROCK DAM BEFORE THE BASIN AREA IS CLEARED TO MINIMIZE SEDIMENT YIELD FROM CONSTRUCTION OF THE BASIN. IMMEDIATELY STABILIZE ALL AREAS DISTURBED DURING THE CONSTRUCTION OF THE DAM EXCEPT THE SEDIMENT POOL (REFERENCES: SURFACE STABILIZATION). 6. SAFETY --SEDIMENT BASINS SHOULD BE CONSIDERED DANGEROUS BECAUSE THEY ATTRACT CHILDREN. STEEP SIDE SLOPES SHOULD BE AVOIDED. FENCES WITH WARNING SIGNS MAY BE NEEDED IF TRESPASSING IS LIKELY. ALL STATE AND LOCAL REQUIREMENTS MUST BE FOLLOWED. 7. MAINTENANCE: Check sediment basins after each rainfall. Remove sediment and restore original volume when sediment accumulates to about one-half the design volume. Sediment should be placed above the basin and adequately stabilized. Check the structure for erosion, piping, and rock displacement weekly and after each significant (% inch or greater) rainstorm and repair immediately. Remove the structure and any unstable sediment immediately after the construction site has been permanently stabilized. Smooth the basin site to blend with the surrounding arga and stabilize. All water and sediment should be removed from the basin prior to dam removal. Sediment should be placed in designated disposal (areas and not allowed to flow into streams or drainage ways during structure removal. ROCK DAM N.T.S. CHANNEL N0. SIDE SLOPES BOTTOM WIDTH MINIMUM CHANNEL DEPTH CHANNEL E 3:1 15, 2.5' CHANNEL F 3:1 50' 3' CHANNEL H 3:1 12' 3' DEPTH VARIES (SEE CHART ABOVE) 1 L 3 1 Maintenance: Inspect permanent diversion ditches after every rainfall during the construction operation. Immediately remove an P Y Y obstructions from the flow area and e. repair the diversion ridge. 9 Check outlets, and make timely repairs as needed. Maintain WIDTH VARIES the vegetation in a vigorous, healthy condition at all times. (SEE CHART ABOVE) GRASS LINED CHANNEL N.T.S. / I 1 3 CHANNEL NO. SIDE SLOPES BOTTOM WIDTH MINIMUM CHANNEL DEPTH STONE SIZE THICKNESS CHANNEL C 3:1 10, 1' CLASS B 30" CHANNEL G EXISTING EXISTING EXISTING CLASS 2 42r' CHANNEL J 1 3;1 12' 1' CLASS 1 1 27" THICKNESS 3 maintenance: Inspect permanent diversion ditches after every rainfall during the construction operation. Immediately remove any obstructions from the flow area, and repair the diversion ridge. check outlets, and make timely repairs as needed. maintain the vegetation in a vigorous, healthy condition at all times. WIDTH VARIES (SEE CHART ABOVE) DEPTH VARIES (SEE CHART ABOVE) 10" - #57 STONE FILTER LINING RIP -RAP LINED CHANNEL N.T.S. RECEIVED JUL 0 91011 LAND QUALITY MINING PROGRAM v J J N d d J: a d N d 00, c PO;N y A NNN 0 of Uom a ".pZ RO 001 O m M m Of W d N d'- L dJX S MNCFCLL a 0 ® Z H Z �w U z C W J W :C DATE: J �J vi Q F Z 0 1W._ r � � U n ® Q Y o-3a N C9 car N W 12 U) 0 H Z Z Q Q F" d f/% U) 0 W :1 ® J Z ^tD V L Q � Z J ® 2 N Z TQ i W u M u 1 W r NINE W a LU ii Z LU a Iris H W m DESIGNED: LAB DRAWN: LAB CHECKED: LAB DATE: NOVEMBER 2014 REGION: LOCATION: HOLLY SPRINGS HA-HOLLYSPRINGS-X-1 DWG FILE: SCALE: HORIZONTAL: AS NOTED VERTICAL: AS NOTED SHEET NO.: XM I OF: GROUND ELEV. 333± !n F- H H J l7 Z H Z H 350 300 250 150 100 -50 0+00 2+00 GROUND ELEV. 306± l7 GROUND ELEV. 344± HZI Z H 350 I EXISTING GRADE (�- P - FINAL WATER EL. W ATHERED R CK 275 __EXSSTSNG PIT ABC 235 B ACTIVE MINE REA & FUTURE PIT 155 BENC 115 BENCH 5 BENCH 35 BENCH -15 FO T LEVEL - INAL FLOOR ELEV. - BENCH 4+00 BENCH 300 ENCH 250 4CH GROUND ELEV. 316± 400 1 350 300 250 ,00 200 150 150 100 100 50 50 0 0 u H H J Z Z H GROUND ELEV. 370± -1 H 400 , a H I J l9 Z H z OVERBURDEN 315 _ FINAL TER EL. 291 WEATHERED ROCK 275 BE 235 BEN EXISTI G PIT ABC 155 BENCH 15 BENCH 75 BENCH BENCH 35 -5 BENCH -15 FOOT LEVEL - FINAL FLOOR ELEV. -50 -50 6+00 8+00 10+00 12+00 14+00 16+00 16+00 18+00 20+00 0+00 SECTION A' -Al- a NOTE: 1" -200 HORIZONTAL ALL BENCH FACES ARE TO BE MINED ON I TO 1 SLOPE WITH = 1"-50 VERTICAL FACE HEIGHTS OF 35 FT AND BENCH WIDTHS OF 15 FEET. SLOPES EXCAVATED IN UNCONSOLIDATED MATERIALS (OVERBURDEN) WILL BE LAID BACK ON 2 TO 1 GRADES. PLANT WATER POND SILT POND EL. 387± aoD WATER EL. 379± WATER_ _., 400 390 390 1 Sao 1 380 1 1 ,1 1 370 310 360 _ __ __ _ 1360 D+00 0+50 1+'a 1+11 2+01 2+10 3+01 3+11 4+10 4+11 EXISTING PLANT WATER & SILT PONDS SECTION C'-C' 1if=50' HORIZONTAL 1if=10' VERTICAL 400 400 :SILT ;POND 'WATE EL. 80± 390 390 1 1 380 380 1 1 370 370 360 360 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 EXISTING SILT PONDS SECTION D'-D' 1"=50' HORIZONTAL 1"=10' VERTICAL 2+00 4+00 6+00 8+00 10+00 12+00 SECTION B'-B' 1 if=200 HORIZONTAL 1if=50' VERTICAL 7' QUARRY SIDE DIVERSION '� ,1 OUTSIDE BERM 6" SLOPE DRAIN ILMI'VKART UIVLI<WVN GHANNtl. JL`✓ I IIN laMrvrtnrti uivcrt.nvn �.nr+n nc� 14+00 16+00 18+00 20+00 22+00 DIVERSION BERM y O 1:1 1:1 4:1 4:1 2:1 1/4" PER 2:1 4:1 4:1 2:1 FOOT o v 6" SLOPE DRAIN TO BE INSTALLED AT ALL #67 STONE CHECK DAM TO LOW POINTS AND AT BE LOCATED JUST DOWNSTREAM 400 FT. INTERVALS FROM EACH SLOPE DRAIN. (TYP.) VISUAL BARRIER BERM N.T.S. IUTSIDE I BENCH 350 :NCH 300 CH 250 H 200 150 M -50 24+00 1.5 ft. min beynd ditch bank 9 inch. min. below 0 natural ground level 0 O O 0pp00 00 0 600 00 � 0 0000 O Channel Width varies Plan view of Check Dam 1.5 ft. Min Class B Ri prop 12" of NCDOT #5 or #57 Washed stone 2 �1 2 ft. max. at center Filter Fabric cross -Section view of Check Dam Length is the distance such that points A and B 0 0000 are of equal elevations 00 0 O O A Length B O 00 O 00 000000 00000 O Spacing for Check Dams Construction Specifications: 1. Place stone to the lines and dimensions shown in the plan on a filter fabric foundation. 2. Keep the center stone section at least 9 inches below natural ground level where the dam abuts the channel banks. 3. Extend stone at least 1.5 feet beyond the ditch bank to keep water from cutting around the ends of the check dam. 4. Set spacing between dams to assure that the elevation at the top of the lower dam is the same as the tow elevation of the upper dam. 5. Protect the channel after the lowest check dam from heavy flow that could cause erosion 6. Make sure that the channel reach above the most upstream dam is stable. 7. Ensure that other areas of the channel, such as culvert entrances below the check dams, are not subject to damage or blockage from displaced stones. Maintenance'. Inspect check dams and channels at least weekly and after each significant (112 inch or greater) rainfall event and repair immediately. Clean out sediment, straw, limbs, or other debris that Could clog the channel when needed Anticipate submergence and deposition above the check dam and erosion from high flows around the edges of the dam. Correct all damage immediately. Remove sediment accumulated behind the dams as needed to prevent damage to channel vegetation, allow the channel to drain through the stone check dam, and prevent large flows from carrying sediment over the dam. Add stones to dams as needed to maintain design height and cross section. TEMPORARY ROCK CHECK DAM N.T.S. RECEIVED JUL 0 9 2011 LAND QUALITY MINING PRO; RAM 12 Gauge 4 ft.x4 ft. or 2 ft.x 2ft. welded wire hooked on to preformed channels on metal posts. ultraviolet resistant geotextile fabric or IIequivalent, secured to wire with metal clips or wire at 8 in. on centers. Max. sediment storage level is 112 height. Remove sediment when this level is reached or as directed by the Conservation Inspector. 2 ft. _ Sheet drainage only F Natural Grade 8 in.W-,Ilmetal Carry 12 inches of fabric into trench, cover with soil, tamp and backfill. 8 18 in. inches down and 4inches horizontal. rry 6 in. of wire to trench. posts at 8 ft. AX. 4 in. Note: Silt Fence should not be used at pipe 8 ft, outlets or in areas of concentrated flaw O.C. -I (Creek, Ditch lines, Swards, Etc.) Max. Silt Fence 1 r. �- Note: Flow should not run f 5edi merit along silt fence, use Storage Pit_ diversion ditches instead. Flow To increase storage capacity and Flow prolong the life of the silt Fence, it is generally advisable to dig a sediment pit in front of the Silt Fence whenever possible. Construction Specifications: MATERIALS I in r polyester, which is Certifed b the 1. Use a synthetic filter fabric of at least 95 % by weight of polyp of s o p y y manufacturer or supplier as conforming to the requirements in ASTM D 6461. Synthetic filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 1200 F. 2. Ensure that posts for sediment fences are 1.33 ID/linear ft steel with a minimum length of 5 feet. Make sure that steel posts have projections to facilitate fastening the fabric. 3. For reinforcement of standard strength filter fabric, use wire fence with a minimum 14 gauge and a maximum mesh spacing of 6 inches. CONSTRUCTION 1. Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2. Ensure that the height of the sediment fence does not exceed 24 inches above the ground surface. (Higher fences may impound volumes of water sufficient to cause failure of the structure.) 3. Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with 4 feet minimum overlap to the next post. 4. Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the fence post. Wire or plastic zip ties should have minimum 50 pound tensile strength. 5. When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Support posts should be driven securely into the ground a minimum of 24 inches. 6. Extra strength filter fabric with 6 feet post spacing does not require wire mesh support fence. Securely fasten the filter fabric directly to posts. Wire or plastic zip ties should have minimum 50 pound tensile strength. 7. Excavate a trench approximately 4 inches wide and 8 inches deep along the proposed line of posts and upslope from the barrier. 8. Place 12 inches of the fabric along the bottom and side of the trench. 9. Backfll the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfill is critical to silt fence performance. 10. Do not attach filter fabric to existing trees. SEDIMENT FENCE INSTALLATION USING THE SLICING METHOD Instead of excavating a trench, placing fabric and then backfilling trench, sediment fence may be installed using specially designed equipment that inserts the fabric into a cut slicer) in the ground with a disc. Installation Specifications: 1. The base of both end posts should be at least one foot higher than the middle of the fence. Check with a level if necessary. 2. Install posts 4 feet apart in critical areas and 6 feet apart on standard applications. 3. Install posts 2 feet deep on the downstream side of the silt fence, and as close as possible to the fabric, enabling posts to support the fabric from upstream water pressure. 4. Install posts with the nipples facing away from the silt fabric. 5. Attach the fabric to each post with three lies, all spaced within the top 8 inches of the fabric. Attach each tie diagonally 45 degrees through the fabric, with each puncture at least 1 inch vertically apart. Also, each tie should be positioned to hang on a post nipple when tightened to prevent sagging. 6. Wrap approximately 6 inches of fabric around the end posts and secure with 3 ties. 7. No more than 24 inches of a 36 inch fabric is allowed above ground level. 8. The installation should be checked and Corrected for any deviations before compaction. 9. Compaction is vitally important for effective results. Compact the soil immediately next to the silt fence fabric with the front wheel of the tractor, skid steer, or roller exerting at least 60 pounds per square inch. Compact the upstream side first, and then each side twice for a total of 4 trips. Maintenance: Inspect sediment fences at least once a week and after each rainfall. Make any required repairs immediately. Should the fabric of a sediment fence Collapse, tear, decompose or become ineffective, replace it promptly. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleancut. Remove all fenglhg material and unstable sediment deposits and bring the area to grade and stabilize it after the conthibUting drainage area has been properly stabilized. SEDIMENT FENCE DETAIL N.T.S. r; J r N W e i M Q� N « > to m W •: Nan G NN « o p NU co CGZMM 4 O mN mm� m�(( n « •d R I W W Q 9N41- 0 C2 F- z ® Z w u W m W W ru DATE: U J J w N a H Z W F Z � 0 p Q Y 0) t7 °' 3 y W Z H a :C Z W Z a y = 0) J Z p N Z a 2 U) W M ~ r L N J z W Q 0 W li 14 Z W L F N W m DESIGNED: LAB DRAWN: LAB CHECKED: LAB DATE: NOVEMBER 2014 REGION: LOCATION: HOLLY SPRINGS HA-HOLLYSPRINGSJ(-1 DWG FILE: SCALE: HORIZONTAL: 1' = 200' VERTICAL: SHEET NO.: X=2 OF: Lo STONE CLASS OUTLET PIPE °q CLASS "1" = 5 To 200 lbs °$d CLASS "2" = 25 To 250 lbs paDdo a °o °. Sao. .. CLASS "A" = 2" To 6" adDo4o aop,n 00: o W CLASS "B" = 5" TO 15" 9goo. d = 1.5 times the maximum stone PLAN diameter but not less than 6" la = length of riprap apron RIP -RAP LINING de.'q' T FS-2 FILTER STONE SUBLAYER SECTION 6" BEDDING THICKNESS APRON NO. do La W STONE DIA, d LINING LINING THICK. LINING DIA. 1 2-42" 44' 60' CLASS 2 58" YES 12" CLASS A 2 1-36" 30' 39' CLASS 2 68" YES 12" CLASS A 3 2-54" 56.25 76' CLASS 2 64" YES 12" CLASS A 4 5-72" 60' 110' CLASS 2 30" YES 10" CLASS A 5 1-18" 12' 16.5' CLASS 2 60" YES 12" CLASS A 6 1 1-18" 9' 13.5' CLASS B 18" NO 6" #57 7 1-18" 12' 16.5' CLASS 2 40" YES 12" CLASS A 8 1-36" 24' 27' CLASS 2 48" YES 12" CLASS A 9 1-30" 26' 28.5' CLASS 2 15" YES 15" 15" 10 1-30" 24' 26.5' CLASS 1 21" YES 21" 15" Construction Specifications: 1. Ensure that the subgrade for the fitter and riprap follows the required lines and grades shown in the plan. Compact any till required In the subgrade Ito the density of the surrounding undisturbed material. Low areas in the subgrade on undisturbed soil may also be filled by increasing the riprap !thickness. 2. The riprap and gravel filter must conform to the specified grading limits shown on the plans. 3. Filter cloth, when used, must meet design requirements and be properly protected from punching or tearing during installation. Repair any damage by removing the riprap and placing another piece of filter cloth over the damaged area. All connecting joints should overlap so the top layer is above the downstream layer a minimum of 1 foot. If the damage is extensive, replace the entire filter cloth. 4. Riprap may be placed by equipment, but take care to avoid damaging the filter. 5. The minimum thickness of the riprap should be 1.5 times the maximum stone diameter. 6. Riprap may be field stone or rough quarry stone. It should be hard, angular, highly weather -resistant and well graded. 7. Construct the apron on zero grade with no overfill at the end. Make the top of the riprap at the downstream end level with the receiving area or slightly below it. 8. Ensure that the apron is properly aligned with the receiving stream and preferably straight throughout its length. If a curve is needed to fit site conditions, place it in the upper section of the apron. 9. Immediately after construction, stabilize all disturbed areas with vegetation.. Maintenance: Inspect riprap outlet structures weekly and after significant (112 inch or greater) rainfall events to see if any erosion around or below the riprap has taken place, or if stones have been dislodged. Immediately make all needed repairs to prevent further damage. ENERGY DISSIPATER DETAIL N.T.S. NATURAL GROUND TOP OF BERM %Tbtt1 TOP ELEV. MAX LEVEL OF SEDIMENT COLLECTED CLEAN BASIN WHEN LEVEL IS REACHED Maintenance: Inspect sediment basins at least weekly and after each significant (% inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions when it accumulates to one-half the design depth. Place removed sediment in an area with sediment controls. check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool area. TYPE "A" SEEDING SCHEDULE FOR STABILIZATION GRASS DATE TYPE PLANTING RATE MAR. 15 - MAY 15 PERRENNIAL SEED MIX 10 LBS/ACRE N.C. WILDLIFE RESOURCES COMMISSION MAR. 1 - JUN. 1 SERICEA LESPEDEZA (SCARIFIED) 50 LBS/ACRE & (MAR. 1 - APR. 15) ADD TALL FESCUE 120 LBS/ACRE (MAR. 1 - JUN. 30) OR ADD WEEPING LOVEGRASS 10 LBS/ACRE (MAR. 1 - JUN. 30 OR ADD HULLED COMMON BERMUDAGRASS 25 LBS/ACRE JUN. 1 - SEP 1 *** TALL FESCUE AND 120 LBS/ACRE *** BROWNTOP MILLET 35 LBS/ACRE *"* OR SORGHUM - SUDAN HYBRIDS 30 LBS/ACRE SEP. 1 - MAR. 1 SERICEA LESPEDEZA (UNHULLED - UNSCARIFIED) 70 LBS/ACRE AND TALL FESCUE 120 LBS/ACRE (NOV.1 - MAR 1) AND ABRUZZI RYE 25 LBS/ACRE TYPE "B" SEEDING SCHEDULE SHOULDERS, SIDE DITCHES, SLOPES (MAX. 3:1) DATE TYPE PLANTING RATE AUG. 15 - NOV. 1 TALL FESCUE 300 LBS/ACRE NOV. 1 - MAR. 1 TALL FESCUE 300 LBS/ACRE & ABRUZZI RYE 25 LBS/ACRE MAR. 1 - APR. 15 TALL FESCUE 300 LBS/ACRE APR. 15 - JUN. 30 HULLED COMMON BERMUDAGRASS 25 LBS/ACRE JUL. 1 - AUG. 15 TALL FESCUE AND 120 LBS/ACRE *** BROWNTOP MILLET 35 LBS/ACRE *** OR SORGHUM - SUDAN HYBRIDS 30 LBS/ACRE SLOPES (3:1 TO 2:1) MAR. 1 - JUN. 1 SERICEA LESPEDEZA (SCARIFIED) 50 LBS/ACRE (MAR. 1 - APR. 15) ADD TALL FESCUE 120 LBS/ACRE (MAR. 1 - JUN. 30) OR ADD WEEPING LOVERGRASS 10 LBS/ACRE (MAR. 1 - JUN. 30) OR ADD HULLED COMMON BERMUDAGRASS 25 LBS/ACRE JUN. 1 - SEP. 1 *** TALL FESCUE AND 120 LBS/ACRE *** BROWNTOP MILLET 35 LBS/ACRE *** OR SORGHUM - SUDAN HYBRIDS 30 LBS/ACRE SEP. 1 - MAR. 1 SERICEA LESPEDEZA (UNHULLED - UNSCARIFIED) 70 LBS/ACRE AND TALL FESCUE 120 LBS/ACRE NOV. 1 - MAR. 1 ADD ABRUZZI RYE 25 LBS/ACRE SEEDING SCHEDULE FOR REVEGETATION BENEFICIAL TO WILDLIFE DATE TYPE PLANTING RATE FEB. 1 - APR. 1 KOBE LESPEDEZA 20-40 LBS/ACRE FEB. 1 - APR. 15 ORCHARD GRASS 15-25 LBS/ACRE MAR. - APR. SHRUB LESPEDEZA 16 LBS/ACRE MAR. - APR. SWITCHGRASS 6-8 LBS/ACRE APR. - MAY BAHIA GRASS 25-35 LBS/ACRE APR. 15 - JUN. 15 LOVEGRASS 4-5 LBS/ACRE CONSULT CONSERVATION ENGINEER, SOIL CONSERVATION SERVICE OR WILDLIFE BIOLOGIST FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGE- TATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS, OTHER SEEDING COMBINATIONS AND SEEDING RATES ARE POSSIBLE. "' TEMPORARY -- RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12" IN HEIGHT BEFORE MOWING,OTHERWISE FESCUE MAY BE SHADED OUT. 1. Chisel compacted areas and spread topsoil 2 inches deep over adverse soil conditions, if available. *Apply: 2.Rip the entire area to 6 inches depth. Agricultural Limestone - 2 tons/acre 3. Remove all loose rock, roots, and other obstructions leaving surface reasonable smooth and uniform. or 3 tons/acre In clay soils 4. Apply agricultural lime, fertilizer, and super phosphate uniformly and mix with soil (sea below*). Fertilizer - 1000 Ibs/acre (10-10-10) 5. Continue tillage until a well - pulverized, form, reasonable uniform seedbed is prepared 4 to 6 inches deep. Super phosphate - 500 Ibs/acre (205) 6. Seed on a freshly prepared seedbed and cover seed lightly with seeding equipment or cultipack after Mulch - 2 tons/acre (small grain straw) seeding. Anchor - Asphalt emulsion at 450 gal/acre 7. Mulch immediately after seeding and anchor mulch. 8. Inspect all seeded areas and make necessary repairs or reseedings within the planting season, if possible. If stand should be over 60%damaged reestablished following original lime, fertilizer and seeding rates. 9. Consult conservation inspector on maintenance treatment and fertilization after permanent cover is established. SEEDBED PREPARATION CARRY RIP -RAP UP----, SIDES OF SPILLWAY F•• FLOOD STORAGE ZONE N. #57 WASHED STONE 11 "G" (SEDIMENT STORAGE ZONE) M TOTAL BASIN CAPACITY "D" 1 „E„ MAX. SEDIMENT DEPTH ��•�SHI IM KEY WAY "C', 5' (20' WIDE) SECTION THRU SEDIMENT BASIN CARR SIDE CLASS B KEYWAY � v � SECTION THRU BERM & FILTER SEDIMENT BASIN DIMENSIONS ©mom = • ��� - • � . • ��®®a�� .. . �o NOTE: SEE SEDIMENT BASIN DETAIL, SHEET X-4, FOR SEDIMENT BASINS SIR 9, SIR 10 & SB 12. Ripr Crushed Stone CONTROL SECTION MIN. 2%_-, I I -I 11= - - - --- - - - - _ -I�,- EXISTING CHANNEL -MATCH EXISTING GRADE ... -,11= 20' LEVEL -1 - i!- T OR GREATER APPROACH - - 1- CHANNEL RIP -RAP DOWN STREAM SIDE II- PROFILE , 3 12" 1 F- IT =11 � lit=III• , lil {I ,�I TI=L,�I I ,�11 I11-III„III, 11EgIl, ,IIII I -,III,,, 1 l„� �iii1,,, 1,�=T1�11� 20' CROSS SECTION EMERGENCY SPILLWAY DETAIL N.T.S. CONSTRUCTION SEQUENCE: 1. Construct berm by placement of overburden. 2. Prior to placement of materials for berm formation, cut vegetation nearly flush with ground (if applicable). 3. Compact materials in 1 foot lifts by construction traffic. NOTES: 1. NO end dumping of overburen shall occur during berm construction. 2. Slopes will be tracked during construction to aid in the establishment of vegetative cover. OVERBURDEN AREA - not to scale MAX WATER LEVEL EL. 323.85 @ #1 60" @ #1 EL. 313.00 @ #2 30" @ #2 CONSERVATION WATER LEVEL EL. 294.00 @ #3 15" @ #3 EL. 311.25 @ #2 EL. 329.00 @ #4 30" @ #4 EL. 292.00 @ #3 EL. 326.00 @ #4 SEE DETAIL B I r RISER STEM--------- CM RISER PIPE - SEE DETAIL B - 12" SLIDE GATE - SEE DETAIL C SEE DETAIL 2 IMPERVIOUS FILL MATERIAL 1 ANTI -SEEP COLLARS--7 - EMERGENCY SPILLWAY EL. 321.50 @ #1 EL. 312.19 @ #2 EL. 292.94 @ #3 EL. 328.00 @ #4 CREST EL. 325.00 @ #1 EL. 315.00 @ #2 EL. 295.00 @ #3 EL. 330.00 @ #4 \` 42" CONDUIT PIPE 1 / bD:�. OUTLET EL. 289.0 @ #2 o.ao OUTLET EL. 283.0 @ #3 OUTLET EL. 310.0 @ #4 ° OUTLET PROTECTION 4 l 4' R O:D:R:. (SEE DETAIL) - ��- ZSTRIP EXISTING GRADE CUT OFF 8"-12" BENEATH DAM TRENCH FOUNDATION AREA POND #1 = #1 POND #2 = #2 POND #3 = #3 POND #4 = #4 rlF-Tr- AITTIIAI MARA T-%,/r)T!"AI CCf-r-r"Al-rUDnlIii DDTMADV (ZDTI I IAIAV Place material from excavation on downhill side of flow. use additional fill to achieve specified height 2' min. Lam_ and width. + F7o_� 1 max •;•.1 ma seed and mulch diversion channel and dike immediately after construction. varies choose appropriate seeding mixture 3' min. from the seeding schedule. Construction Specifications: 1) Remove and properly dispose of all trees, brush, stumps, and other objectionable material. 2) Ensure that the minimum constructed cross section meets all design requirements. 3) Ensure that the top of the dike is not lower at any point than the design elevation plus the specified settlement. 4) Provide sufficient oom around diversion to permit machine regarding and cleanout. 5) Vegetate the ridge immediately after construction, unless it will remain in place less than 30 working days. Maintenance: Inspect temporary diversions once a week and after every rainfall. Immediately remove sediment from the flow area and repair the diversion ridge. Check outlets, and make timely repairs as needed. When the area protected is permanently stabilized, remove the ridge and the channel to blend with the natural ground level and appropriately stabilize it. TEMPORARY DIVERSION DITCH N.T.S. N.T.S. CONDUIT PIPE (SEE NOTE) " @ #2,4 42 42" @ #3 2000 PSI CONCRETE 48" @ #2,4 91, 54" @ #3 91, COVER TOP OF TRASH RACK WITH EXPANDED METAL SCREEN (12 GAGE) RISER PIPE 1 4 4' 6'-6" SQ. DETAIL A ATTACH TRASH RACK WITH - THREE 1"X 11" STEEL STRAPS SPACED 12" APART. STRAPS CAN BE WELDED OR BOLTED TO TRASH BACK AND RISER PIPE. N.T.S. NOTE: THE RISER PIPE TO OUTLET CONDUIT CONNECTION SHALL BE MADE WITH CONNECTING BANDS CONFORMING TO ASTM-A-444 AND SHALL BE FITTED WITH THICK CIRCULAR RUBBER GASKET EQUAL TO THE WIDTH OF THE BAND. THE BAND SHALL BE DRAWN TOGETHER WITH SUITABLE BOLTS THROUGH THE USE OF A BAR AND STRAP HARNESS ASSEMBLY TO PROVIDE A STRUCTURALLY SOUND AND TIGHT CONNECTION, THE RISER PIPE SHALL BE FITTED WITH A "TEE" CONNECTION AT THE BOTTOM SUITABLE TO RECEIVE AND CONNECT THE OUTLET CONDUIT. 1'-3 3/8' 0 3 o a J a . I SLIDE GATE DETAIL C N.T.S. NOTE: TRASH RACK TO BE 54" @ #2,4 FULLY BITUMINOUS 60 @ #3 COATED. CORRUGATED METAL PIPE (16 GAGE MIN.) 48" @ #2 4 54" @ #3 DETAIL B N.T.S. RISER PIPE RECEiVE JUL 0 9 ?02I LAND QUALITY MINING PROGRAM M 00 5 i0 n 000, N t] rNN a NCO M y ZMro s mote m C N= E J X m w�mw4 S Mal ad b 0� r z U C C9 w rA U w S DATE: J J Q Z W F Z >• 0 ®� W 0 U) Q (A W �ZZ v i- a = a Vf I= ca t9 0: ® J J d" d CD (Aj Q Z J 0 = Z ai W V M ~ 0 r Z W `Q F W a W Z W 4% L W m DESIGNED: LAB DRAWN: LAB CHECKED: LAB DATE: NOVEMBER 2014 REGION: LOCATION: HOLLY SPRINGS HA-HOLLYSPRINGS-X-1 DWG FILE: SCALE: HORIZONTAL: 1' = 200' VERTICAL: SHEET NO.: Xm3 OF: In t�--cr1� O N - Fw- w �oILLIw� d-www QwQ 12wU 0n_ O Q _ (D N CAPACITY OF 36" RCP CULVERTS = 133.8 CFS ELEVATION EARTH FILL COVERED BY LARGE ANGULAR ROCK FILTER CLOTH K PARTIAL PLAN AT STREAM CROSSINGS SCALE. V = 20' COIR WATTLES PLACED 32' OFF OF SILT FENCE ROW AREA BETWEEN SILT FENCE AND STAKED COIR WATTLES TO BE MATTED AND SEEDED WITH ANNUAL RYE(TEMPORARY) AND A WETLAND MIX (PERMANENT) SILT FENCE, PLACED AT HIGH WATER MARK COIR WATTLES PLACED 32' OFF OF SILT FENCE ROW NOTE: LESS THAN OR EQUAL TO 40 LINEAR FEET OF RIPARIAN EXISTING HAUL ROAD TO BE REMOVED EXISTING HAUL ROAD TO BE REMOVED STREAM AND WETLAND RESTORATION DETAIL 50' STREAM 22 26 irregular 297 299 27 irregular 337 339 28 irregular 315 317 Emerg. Anti- Anti - Sediment Top of Spillway Top of Riser Barrel Skimmer Orifice Flotation Flotation Riprap Riprap Elevation Riser Elev. Dam Diameter Diameter Diameter Diameter Ixw depth Wu Riprap WI Length 340 341 342 344 36 24 4 no plate 4.5 1 6 22 20 336 337 338 339 48 24 2.5 no plate 4.5 1.5 6 28 24 332 334 335 336 36 18 2.5 2.1 4.5 1 4.5 25 22 330 332 333 334 36 18 2 2.0 4.5 1 4.5 21 18 298 299 300 301 36 18 2.5 2.0 4.5 1 4.5 22 19 308 309 310 311 18 15 2 1.5 4.5 1 3.75 17.5 16 298 299 300 301 60 36 3 no plate 6 1.5 9 29 24 338 339 340 341 18 15 1.5 1.4 4.5 1 3.75 13.5 12 316 317 318 319 36 18 2.5 2.0 5 2 4.5 23 20 Top of Dam Elevation Trash Rack Bottom Elev. Class B Erosion (see detail) of Spillway Control Stone Baffle Top Elev. Floating 8' of Pool Skimmer Riser Barrel .. Bottom Elev. Sediment Anti -Seep Co at of Pool Storage Anti -Flotation see detail Cuttoff Trench: Device ( ) 2'deep Rip -Rap Outlet Ybottom (see outlet detail) 2:1side slopes Top of Dam 6" min. Width Elevation Riprap #4 bar Layout Shown is' suggested: Freeboard However, other layouts may be 1' used provided openings are 64" Line with grass according 1 -- t square in area to Seeding Schedule 3 Filter Fabric TRASH RACK DETAIL \-Compacted Bottom Elev. Class B Riprap Apron Subgrade of Spillway 1.5 8. thick CPP Barrel Concrete RIP -RAP OUTLET DETAIL SPILLWAY CROSS SECTION ANTI -FLOTATION DEVICE Construction Specifications: 1. Site preparations --Clear, grub, and strip topsoil from areas under the embankment to remove trees, vegetation, roots, and other objectionable material. Delay clearing the pool area until the dam is complete and then remove brush, trees, and other objectionable materials to facilitate sediment cleanout. Stockpile all topsoil or soil containing organic matter for use on the outer shell of the embankment to facilitate vegetative establishment, Place temporary sediment control measures below the basin as needed, 2. Cut-off trench --Excavate a cut-off trench along the center line of the earth fill embankment. Cut the trench to stable soil material, but in no case make it less than 2 feet deep. The cut-off trench must extend into both abutments to at least the elevation of the riser crest. Make the minimum bottom width wide enough to permit operation of excavation and compaction equipment, but in no case less than 2 feet, Make side slopes of the trench no steeper than 1.1. Compaction requirements are the same as those for the embankment. Kee the trench d during backfillin and compaction operations. P P P q P dry 9 9 P P 3. Embankmenb-Take till material from the approved areas shown on the plans. It should be clean mineral soil, tree of roots, woody vegetation, rocks, and other objectionable material. Scarify areas on which fill is to be laced before placing fill, The fill material must contain sufficient moisture so it can be formed b hand into a ball without crumbling. If water can be squeezed out of the ball it is too wet for p p g fo me y a d g q proper compaction. Place fill material in 6 to 8 inch continuous layers over the entire length of the fill area and compact it. Compaction may be obtained by routing the construction hauling equipment over the fill so that the entire surface of each layer is traversed b t least n eat o t sad track of heavy tl Construct the embankment n elevation 0 percent ay y a ea one wheat r r a a y equipment, or a compactor may be used, Co ruc km [o a lev 1 p nt higher than the design height to allow for settling. 4. Conduit spillways --Securely attach the riser to the barrel or barrel stub to make a watertight structural connection. Secure all connections between barrel sections by approved watertight assemblies. Place the barrel and riser on a firm, smooth foundation of impervious soil, Do not use pervious material such as sand, gravel, or crushed stone as backfill around the pipe or anti -seep collars. Place the fill material around the pipe spillway in 4-inch layers, and compact it under and around the pipe to at least the same density as the adjacent embankment. Care must be taken not to raise the pipe from firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2 feet of compacted backfill over the pipe spillway before creasing it with construction equipment. Anchor the riser in place by concrete or other satisfactory means to prevent flotation. In no case should the a conduit be installed b cutting a trench through the dam after the embankment is complete. PP Y 9 9 P 5. Emergency spillway --Install the emer enc s spillway in undisturbed soil. The achievement of tanned elevations rode design width and entrance and exit channel slopes are critical to the successful 9 Yemergency P Y P �9 9 P operation of the emergency spillway. 6. Inlets --Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency. 7. Erosion control --Construct the structure so that the disturbed area is minimized. Divert surface water awe from bare areas. Complete the embankment before the area is cleared. Stabilize the y p emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction. 8. Install porous baffles. 9. Safety --Sediment basins may attract children and can be dangerous. Avoid steep side slopes, and fence and mark basins with warning signs if trespassing is likely. Follow all slate and local requirements. Maintenance: Inspect sediment basins at least weekly and after each significant (�/z inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions when it accumulates to one-half the design depth. Place removed sediment in an area with sediment controls. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool area, RISER & BARREL SEDIMENT BASIN DETAIL 5' 1' Line with 2' Class 1 riprap _NON -WOVEN GEOTEXTILE PERMANENT SLOPE DRAIN DETAIL SCALE: 1" = 20' F ""F "-'�u "^"� ""^" Basin Number width Riprap Size Riprap Thickness SB 10 6' Class B 1'-6" s6 zb s class B r-�^ A s 5 0 N a ; oom m 0) O NNN 0LO m y ZM00 m zMM o m C N`��JX M Opp Rlu Z e'1111 it I-LL V J J w N � �Z � a = Z go D U O O � Y Q y W Z_Z �. N V a J J J J H = _ Z a U) W V M u N Z J C IN W a G W ce Z W L H W m DESIGNED: LAB DRAWN: LAB CHECKED: LAB DATE: NOVEMBER 2014 REGION: SOUTH LOCATION: HOLLY SPRINGS HA_HOLLYSPRI NGS-M&ECP-1 DWG FILE: SCALE: HORIZONTAL: 1' = 300' VERTICAL: SHEET NO.: X-4 OF: 62.5 to a SEDIMENT BASIN 20 PLAN VIEW TT SCALE 1" = 30' Construction Specifications: 1. Site preparations --Clear, grub, and strip topsoil from areas under the embankment to remove trees, vegetation, roots, and other objectionable material. Delay clearing the pool area until the dam is complete and then remove brush, trees, and other objectionable materials to facilitate vegetative establishment. Place temporary sediment con es below the basin as needed. facilitate sediment cleanout. Stockpile all topsoil or soil containing organic matter for use on the outer shell of the embankment to fa II g p y control measures 2 C t- ff t h--Excavate scut -off trench alon the center line of the earth fill embankment. Cut the trench to stable soil material, but in no case make it less than 2 feet deep. The cut-off trench must extend into both abutments to at least the elevation of the riser crest. Concrete Grout I Riser Concrete Basin Dimensions #20 5'-611 X 5'-611 x 3'-0" ) 3' min. � 5min I� - I ANTI -FLOTATION DEVICE Top of Dam 327.0' 20' Freeboard Max. Depth of Flow for 25-yr. Storm Line with grass according to Seeding' Compacted Bottom of Spillway Subgrade 326.0' Riser Min. Max. Bottom Elev. Top of Max. Depth of Flow Basin Slope Slope of Spillway Dam Elev. Width for 25-yr. Storm Freeboard #20 L0'�o 1.0% 1 326.0' 1 327.0' 1 20' 1 0.66' .34' SPILLWAY (cross section) �12 ------ 1-2 2 / \ �' SHOT ROCK �_ 2 STONE BAFFLE DETAIL NO SCALE Stone Baffle Construction and Maintenance Notes: 1. Stone baffles shall be embedded a minimum of 2 feet into embankments to prevent wash around. 2. Top of baffle shall be level and within 6-inches of permanent pool elevation or at elevation specified on sediment basin detail. 3. Class B Rip Rap filter blanket shall be installed on upgradient side of baffle. 4. Maintenance: a. Class B Rip Rap filter blanket shall be removed and replaced during sediment removal activities in the sediment basin or detention pond cleanout. Refer to sediment basin maintenance specifications. b. Filter blanket should be removed and replaced if clogging occurs. c. Filter blanket should be inspected after each rain event. d. Any erosions of embankment around stone baffle embedment shall be repaired immediately. e. Top of the rock baffle shall be maintained level. u o rent 9 Make the minimum bottom width wide enough to permit operation of excavation and compaction equipment, but in no case less than 2 feet. Make side slopes of the trench no steeper than 1:1. Compaction requirements are the some as those for the embankment. Keep the trench HOPE OR PVC END dry during backfilling and compaction operations. CAP 3. Embankment --Take fill material from the approved areas shown on the plans. It should be clean mineral soil, free of roots, woody vegetation, rocks, and other objectionable material. Scarify areas on which fill is to be placed before placing fill. The fill material must contain sufficient moisture so it can be formed by hand into a ball without crumbling. If water can be squeezed out of the ball, it is too wet for proper compaction. Place fill material in 6 to 8 inch continuous layers over the entire length of the fill area and compact it. Compaction may be obtained by routing the construction hauling equipment over the fill so that the entire surface of each layer is traversed by at least one wheel or tread track of heavy equipment, or a compactor may be used. Construct the embankment to an elevation 10 percent higher than the design he . height to allow for settling. 9 all connections between barrel sections b approved watertight assemblies. Place the barrel and riser on a firm smooth foundation of impervious soil. Do i ht structural connection. Securee . a a watert sPP P makeY 9 barrel or barrel stub tom 9 attach the riser to the 4. Conduit spillways --Securely - it a t the same densit as the adjacent embankment. - material around the pipe spillway in 4 inch layers, and compact under and around the pipe to at least not use pervious material such as sand, gravel, or crushed stone as backfill around the pipe or anti seep collars. Place the fill mate p p p y ye p p p Y 1 Care must be taken not to raise the pipe from firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2 feet of compacted backfill over the pipe spillway before crossing it with construction equipment. Anchor the riser in place by concrete or other satisfactory means to prevent flotation. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5. Emergency spillway --Install the emergency spillway in undisturbed soil. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the emergency spillway. HDPE OR PVC TEE 6. Inlets --Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to Improve basin troy efficiency. 7. Erosion control --Construct the structure so that the disturbed area is minimized. Divert surface water away from bare, areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction. 8. Install porous baffles. 9. Safety --Sediment basins may attract children and can be dangerous. Avoid steep side slopes, and fence and mark basins with warning signs if trespassing is likely. Follow all state and local requirements. Maintenance: Inspect sediment basins at least weekly and after each significant (112 inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions when It accumulates to one-half the design depth. Place removed sediment in an area with sediment controls. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool area. SEDIMENT BASIN DLTAILS AND SPECIFICATIONS LINE DIVERSION 3 CLASS B ROCK DONUT CHANNEL WITH 0 LL O� 12" TALL CLASS B RIPRAP �� LL �� W 5' TYP. DIVERSION BERM CLASS B DIVERSION ROCK DONUT BERM PROFILE VIEW J W Z z 0 Q w= Z u H Z J H Y Q V El 0� Ww 0 V) PLAN VIEW REV NO: DESCRIPTION OF REVISION: DATE: ROCK LINED PERMANENT SLOPE DRAIN o INLET PROTECTION DETAIL Q MINE MODIFICATION 6.29.21 Qz REVISED PER COMMENT 12.20.16 MINE MODIFICATION 11.1.16 Top of Pool 325.0' 3.1 Bottom of Pool 323.0' Stone Baffle 12' wide top elev.:326.0 Trash Rack (see detail) Floating Skimmer 1 Sediment Storage Bottom of Riser Inv of barrel 322.0' HDPE OR PVC ELBOW HDPE OR PVC END CAP HOPE OR PVC PIPE 1/2' HOLES IN UNDERSIDE FLEXIBLE HOSE -7 iPE OR PVC PIPE -\ I WATER SURFACE HDPE OR PVC PIPE HOPE OR PVC VENT PIPE END VIEW FRONT VIEW ILLUSTRATION OF SKIMMER Bottom of Spillway 326.0' Riser 325.0' OR PVC TEE Line with 2' Class 1 riprap 5' GEOTEXTILE PERMANENT SLOPE DRAIN DETAIL #4 bar Layout Shown is suggested: However, other layouts may be used provided openings are 64" f square in area I TRASH RACK DETAIL I Rip -Rap Outlet Pipe Outlet Starting Ending Length Depth d50 Size /Class Width Width SB 920* 15 ft. 26 ft 22 ft. L5 11_ 9 inch. = Class B PIPE 111 18 ft. 39 ft. 30 ft. 2 IF 9 inch. = Class B ' RIP RAP PROTECTION TO BE USED FOR BOTH BASIN INLETS AND BASIN OUTLET RIP -RAP OUTLET DETAIL HDPE OR PVC PIPE ORIFICE PLATE Top of Dam Elevation 327.0' silt fence ± 20' from waters edge 3.1- - - - - - - I �- 43 LF OF 36" CMP @ 2.0% SLOPE Install riser 4' from toe of slope Anti -Seep Collar Cuttoff Trench: 2'deep, 3'bottom 2:1side slopes Anti -Flotation L Device (see detail) Bottom:319.0' SEDIMENT BASIN 20 PROFILE NO SCALE NO SCALE PERSPECTIVE VIEW Approximately waters edge Inv Out:321.14 22' Rip -Rap Outlet (see outlet detail) "C" ENCLOSURE IER ENTRY UNIT RECEIVED JUL 0 9 2U21 LAND QUALITY MINING PROGRAM Y N d cc N Y % O 0 L r b n ` C NON m ueo$ a toz^M C N A S MNKFLL v J J N i' H W � 2 14 = 0 O 0 CY uW i 44 W N �' N UJ Z Z W ~ 0. Z 19 0 N H 14 JJ Z 0 p N :C _ Z 14 H W V M v 1 0. N �* W a C W ~ G W Z IL W m DESIGNED: LAB DRAWN: LAB CHECKED: LAB DATE: NOVEMBER 2014 REGION: SOUTH LOCATION: HOLLY SPRINGS HA-HOLLYSPRINGS-M&ECP-1 DWG FILE: SCALE: HORIZONTAL: 1'=30' VERTICAL: SHEET NO.: X-5 OF: