Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20210709_Eros_Sedm_Cont-Mod_92-13
EROSION & SEDIMENT CONTROL MODIFICATIONS HOLLY SPRINGS QUARRY HANSON AGGREGATES, LLC SOUTH REGION Mining Permit 92-13 WAKE COUNTY NORTH CAROLINA ISSUED BY DRAPER ADEN ASSOCIATES Project R14315N-01G N JUNE 2021 -.• - 041595 .92 f06.29.21 ; v © PAP Draper Aden Associates Cngincerin4 • Sur%e%ing ♦ I.m ironmental Sen ice, 114 Edinburgh South Drive, Suite 200 — Cary, North Carolina 27511 Phone: 919-873-1060 -Fax: 919-873-1074 — www.daa.com License No. F-1429 NARRATIVE The calculations attached are for erosion and sediment control measures in connections with an expansion of the existing mining area, additional overburden piles, and associated screening. The revisions and modifications now shown are as follows: • Added overburden piles in permit area expansion to the North. • Expanded the pit limits north and southwest. • Planned for a new retention pond (#4) which will replace #2 and #3. SEDIMENT BASIN SB 21 (Riser and Barrel) Project: Hanson Aggregates Holly Springs Quarry �`in—Jr, Drap F.ner Aden Associates R Sun -eying • EnWivnmenra( Servk e, Project #: R14315N-01G Date: Janua 1, 2020 By:By:J APM Basin Sizing Area = 13.67 ac Drainage basin 21 C= 0.4 10-year runoff, Q10: 40.63 113/sec Disturbed area: 13.67 acres Volume required = 1800 ft3 per acre disturbed area =1800 X 13.67 = 24,606 W Surface area required = 325 fe per ft3/sec 010 =325 X 40.62724 = 13,204 ft` Basin is Irregular Surface elevation: 337 Bottom elevation: 335 Ponding depth: 2 ft Side slope ratio: 2 h : 1 v Surface width: 72 ft Surface length: 147 it Surface area = 22,245 W Bottom area = 15025 ft` ADEQUATE Ponding volume = 37,270 ft' ADEQUATE Spillway Design Principal Spillway Risers & barrels, C.M.P Basin Bottom Elevation: 335.0 Principal Spillway Crest Elevation 337.0 Riser Diameter: 48 in Riser Circumference = 13 it Riser Capacity @ 1.0 it head = 55.88 ft3/sec Barrel Diameter: 24 in Barrel Area, A = 3.142 ft' Wetted Perimeter = 6.283 it Hydraulic Radius, R = 0.50 ft Roughness Coefficient, n: 0.012 Barrel Slope, S: 0.020 ft/ft Velocity, V=1.49/nxexS12`: 11.04 ft/sec Barrel Capcity = 69.34 ft3/sec Principal Spillway Capacity = 55.88 ft3/sec Required Capacity= 44,89 Conclusion ADEQUATE 10 yr i= 7.43 25 yr i= 8.21 25-year runoff, Q25: Skimmer Sizing 44.89 ft3/sec Maximum water volume: 24,606 ft3 Max. Dewatering Time: 120 hrs Minimum Skimmer Size: 2.5 in Factor to drain in 4 days: 5080 Orifice area = 4.844 in` Orifice diameter = 2.48 in Emergency Spillway not required Trapezoidal channel Emergency Spillway Crest Elev.: Emergency Spillway Width: It Side Slope Ratio: it Wit v Water Depth: 0.50 it Area, A: 0.00 ft Wetted Perimeter: 1.00 it Hydraulic Radius, R: 0.000 it VR: 0.00 Roughness Coeffiicient, n: 0.050 RipRap Slope, S: 0.030 tuft Velocity, V=1.49/nxR2"xS12: 0.00 ft/sec Emergency Spillway Capacity=VxA: 0.00 113/sec Required Capacity, 025: 44.89 W/sec SEDIMENT BASIN SB 22 (SKIMMER SEDIMENT BASIN) Project: Hanson Aggregates Holly Springs Quarry�` Draper Aden Associates Project#: R14315N-01G ,,,/7 Engineering Survevin V X X ' X ' Envimnmenml Sen iec, Date: January 1 2020 By:By:J APM Basin Sizing Area = 9.68 ac Drainage basin 22 C= 0.4 10-year runoff, Q10: 28.77 ft3/sec Disturbed area: 9,68 acres Volume required = 1800 ft' per acre disturbed area =1800 X 9.68 = 17,424 ft' Surface area required = 325 fe per ft3/sec Qra =325 X 28.76896 = 9,350 ft' Basin is Irregular 10 yr i= 7.43 25 yr i= 8.21 25-year runoff, Q25: Surface elevation: 334 Bottom elevation: 331 Ponding depth: 3 ft Side slope ratio: 2 h : 1 v Surface width: 72 ft Surface length: 147 ft Surface area = 13,626 W ADEQUATE Bottom area = 5237 W Ponding volume = 24,287 ft' ADEQUATE Spillway Design Skimmer Sizing Principal Spillway Risers & barrels, CPP Basin Bottom Elevation: 331.0 Principal Spillway Crest Elevation 334.0 Riser Diameter: 36 in Riser Circumference = 9 it Riser Capacity @ 1.0 It head = 41.91 ft3/sec Barrel Diameter: 18 in Barrel Area, A = 1.767 ft' Wetted Perimeter = 4.712 it Hydraulic Radius, R = 0.38 it Roughness Coefficient, n: 0.012 Barrel Slope, S: 0.020 ft/ft Velocity, V=1.49/nxRmxS"2-: 9.10 ft/sec Barrel Capcity = 32.17 ft3/sec Principal Spillway Capacity = 32.17 ft3/sec Required Capacity= 31.79 Conclusion ADEQUATE Maximum water volume: Max. Dewatering Time: Minimum Skimmer Size: Factor to drain in 4 days: Orifice area = Orifice diameter = 31.79 ft3/sec 17,424 ft3 120 hrs 2.5 in 5080 3.430 in 2.09 in Ur SEDIMENT BASIN SB 23 (SKIMMER SEDIMENT BASIN) Project: Hanson Aggregates Holly S rin s Quarry �` Draper Aden Associates Project #: R14315N-01 G �j Eggineering • Surnrring • Environmenrol Se"kve V Date: January1, 2020 By: APM Basin Sizing Area = 8.22 ac Drainage basin 23 C= 0.4 10-year runoff, 0,0: 24.43 ft3/sec Disturbed area: 8.22 acres Volume required = 1800 ft3 per acre disturbed area =1800 X 8.22 = 14,796 ft3 Surface area required = 325 ft' per ft3/sec Q,0 =325 X 24.42984 = 7,940 ft` Basin geometry. 220x15 Surface elevation: 332 Bottom elevation: 329 Ponding depth: 3 ft Side slope ratio: 3 h : 1 v Surface width: 31 ft Surface length: 227 ft Surface area = 8,014 W ADEQUATE Bottom area = 5032 ft` Ponding volume = 17,445 ft3 ADEQUATE Spillway Design Principal Spillway Risers & barrels, C.M.P Basin Bottom Elevation: 329.0 Principal Spillway Crest Elevation 332.0 Riser Diameter: 36 in Riser Circumference = 9 ft Riser Capacity @ 1.0 ft head = 41.91 ft3/sec Barrel Diameter: 18 in Barrel Area, A = 1.767 ft' Wetted Perimeter = 4.712 ft Hydraulic Radius, R = 0.38 ft Roughness Coefficient, n: 0.012 Barrel Slope, S: 0.020 Wit Velocity, V=1.49/nxR"'xS12-: 9.10 ft/sec Barrel Capcity = 32.17 113/sec Principal Spillway Capacity = 32.17 113/sec Required Capacity-- 26.99 Conclusion ADEQUATE 10 yri= 7.43 25 yr i= 8.21 25-year runoff, 025: Skimmer Sizing Maximum water volume: Max. Dewatering Time: Minimum Skimmer Size: Factor to drain in 4 days: Orifice area = Orifice diameter = 26.99 ft3/sec 14,796 ft3 120 hrs 2 in 4492 3.294 in 2.05 in Ur SEDIMENT BASIN SB 24 (SKIMMER SEDIMENT BASIN) Project: Hanson Aggregates Holly Springs Quarry Draper Aden Associates Project#: R14315N-01G �/�j Engineering • Surveying • ErrrimnmemalSenire, Date: January 1, 2020 B : APM Basin Sizing Area = 8.49 ac Drainage basin 24 C= 0.4 10-year runoff, Q,o: 25.23 tt3/sec Disturbed area: 8.49 acres Volume required = 1800 ft3 per acre disturbed area =1800 X 8.49 = 15,282 ft3 Surface area required = 325 ft3 per ft3/sec Q10 =325 X 25.23228 = 8,200 ttr Basin is Irregular. Surface elevation: 299 Bottom elevation: 297 Ponding depth: 2 It Side slope ratio: 2 h : 1 v Surface width: na ft Surface length: na ft Surface area = 19,292 ft` ADEQUATE Bottom area = 8393 V Ponding volume = 33,297 113 ADEQUATE Spillway Design Principal Spillway Risers & barrels, C.M.P Basin Bottom Elevation: 297.0 Principal Spillway Crest Elevation 299.0 Riser Diameter: 36 in Riser Circumference = 9 it Riser Capacity @ 1.0 it head = 41.91 ft3/sec Barrel Diameter: 18 in Barrel Area, A = 1.767 ft' Wetted Perimeter = 4.712 ft Hydraulic Radius, R = 0.38 it Roughness Coefficient, n: 0.012 Barrel Slope, S: 0.020 ft/ft Velocity, V=1.49/nxRmxS72-: 9.10 ft/sec Barrel Capcity = 32.17 ft3/sec Principal Spillway Capacity = 32.17 ft3/sec Required Capacity= 27.88 Conclusion ADEQUATE 10 yr i= 7.43 25 yr i= 8.21 25-year runoff, Q25: Skimmer Sizing Maximum water volume: Max. Dewatering Time: Minimum Skimmer Size: Factor to drain in 4 days: Orifice area = Orifice diameter = 27.88 ft3/sec 15,282 ft3 120 We 2.5 in 5080 3.008 in 1.96 in Ur SEDIMENT BASIN SB 25 (SKIMMER SEDIMENT BASIN) Project: Hanson Aggregates Holly Springs Quarryp �' Dra er Aden Associates Project #:I R14315N-01 G .� Engineering • Sanvi-ing Enrironmenla! Serrire, Date: January 1, 2020 By] APM Basin Sizing Area = 4.54 ac 10 yr i= 7.43 Drainage basin 25 C= 0.4 25 yr i= 8.21 10-year runoff, Q,o: 13.49 ft3/sec 25-year runoff, Q25: Disturbed area: 4.54 acres Volume required = 1800 113 per acre disturbed area =1800 X 4.54 = 8,172 ft3 Surface area required = 325 ft' per ft3/sec Q10 =325 X 13.49288 = 4,385 ft` Basin is Irregular. Surface elevation: 309 Bottom elevation: 307 Ponding depth: 2 ft Side slope ratio: 2 h : 1 v Surface width: 72 ft Surface length: 147 ft Surface area = 5,800 W ADEQUATE Bottom area = 3828 W Ponding volume = 9,040 W ADEQUATE Spillway Design Skimmer Sizing Principal Spillway Maximum water volume: Risers & barrels, C.M.P. Max. Dewatering Time: Basin Bottom Elevation: 307.0 Minimum Skimmer Size: Principal Spillway Crest Elevation 309.0 Factor to drain in 4 days: Riser Diameter: 18 in Orifice area = Riser Circumference = 5 ft Orifice diameter = Riser Capacity @ 1.0 ft head = 20.95 ft'/sec Barrel Diameter: 15 in Barrel Area, A = 1.227 ft' Wetted Perimeter = 3.927 ft Hydraulic Radius, R = 0.31 It Roughness Coefficient, n: 0.012 Barrel Slope, S: 0.020 Wit Velocity, V=1.49/nxRmxS'/'": 8.06 ft/sec Barrel Capcity = 19.77 ft3/sec Principal Spillway Capacity = 19.77 ft?/sec Required Capacity= 14.91 Conclusion ADEQUATE 14.91 ft3/sec 8,172 ft3 120 hrs 2 in 4492 1.819 in 1.52 in Ur SEDIMENT BASIN SB 26 (Riser & Barrel) Project: Hanson Aggregates Holly Springs Quarry raper Aden Associates Project #J R14315N-01 G Q Engineering • Swveying • Emlmnmenlal Service, DateJ January 1, 2020 B : APM Basin Sizing Area = 22.49 ac 10 yr i= 7.43 Drainage basin 26 C= 0.4 25 yr i= 8.21 10-year runoff, Q1e: 66.84 ft3/sec 25-year runoff, Q25: 73.86 ft3/sec Disturbed area: 22.49 acres Volume required = 1800 ft' per acre disturbed area =1800 X 22.49 = 40,482 ft' Surface area required = 325 ft3 per ft3/sec 0,0 =325 X 66.84028 = 21,723 ft` Skimmer Sizing Basin is Irregular. Surface elevation: 299 Maximum water volume: 40,482 ft3 Bottom elevation: 297 Max. Dewatering Time: 120 hrs Ponding depth: 2 ft Minimum Skimmer Size: 3 in Side slope ratio: 3 h : 1 v Factor to drain in 4 days: 5528 Surface width: 72 ft Orifice area = 7.323 in` Surface length: 147 ft Orifice diameter = 3.05 in Surface area = 25,231 ft` ADEQUATE Bottom area = 17132 W Ponding volume = 42,363 ft3 ADEQUATE Principal Spillway Trapezoidal channel Risers & barrels, C.M.P. Emergency Spillway Crest Elev.: 300.0 Basin Bottom Elevation: 297.0 Emergency Spillway Width: 5.0 ft Principal Spillway Crest Elevation 299.0 Side Slope Ratio: 3.0 ft h/ft v Riser Diameter: 60 in Riser Circumference = 16 ft Riser Capacity @ 1.0 ft head = 69.85 ft3/sec Water Depth: 0.50 ft Barrel Diameter: 36 in Area, A: 3.25 ft' Barrel Area, A = 7.069 ft' Wetted Perimeter: 8.16 ft Wetted Perimeter = 9.425 ft Hydraulic Radius, R: 0.398 ft Hydraulic Radius, R = 0.75 ft VR: 1.11 Roughness Coefficient, n: 0.012 Roughness Coefficient, n: 0.050 RipRap Barrel Slope, S: 0.020 ft/ft Slope, S: 0.030 ft/ft Velocity, V=1.49/nxRmxS1 ": 14.48 ft/sec Velocity, V=1.49/nxR23xS12: 2.78 ft/sec: Barrel Capcity = 204.73 ft3/sec Emergency Spillway Capacity=VXA: 9.05 ft3/sec Principal Spillway Capacity = 69.85 ft'/sec Required Capacity, Q35: 4.01 ft'/sec Required Capacity= 73.86 Conclusion ADEQUATE Conclusion SPILLWAY Ur SEDIMENT BASIN SB 27 (SKIMMER SEDIMENT BASIN) Project: Hanson Aggregates Holly Springs Quarry raper Aden Associates Pro'ect #71 R14315N-01G „tj Fngineering • Suneving, • Emdronmenm/Semieex Date:1 January 1 2020 By: I APM Basin Sizing Area = 3.09 ac Drainage basin 27 C= 0.4 10-year runoff, Qio: 9.18 ft3/sec Disturbed area: 3.09 acres Volume required =1800 ft3 per acre disturbed area =1800 X 3.09 = 5,562 ft3 Surface area required = 325 ft' per ft3/sec Q10 =325 X 9.18348 = 2,985 ft` Basin is Irregular 10 yr i= 7.43 25 yr i= 8.21 25-year runoff, Q25: Surface elevation: 339 Bottom elevation: 337 Ponding depth: 2 ft Side slope ratio: 2 h : 1 v Surface width: 72 ft Surface length: 147 ft Surface area = 8,671 W ADEQUATE Bottom area = 6495 W Ponding volume = 15,166 ft3 ADEQUATE Spillway Design Skimmer Sizing Principal Spillway Risers & barrels, C.M.P Basin Bottom Elevation: 337.0 Principal Spillway Crest Elevation 339.0 Riser Diameter: 18 in Riser Circumference = 5 ft Riser Capacity @ 1.0 it head = 20.95 ft3/sec Barrel Diameter: 15 in Barrel Area, A = 1.227 fe Wetted Perimeter= 3.927 ft Hydraulic Radius, R = 0.31 it Roughness Coefficient, n: 0.012 Barrel Slope, S: 0.020 ft/ft Velocity, V=1.49/nxFtmxS12-: 8.06 ft/sec Barrel Capcity = 19.77 ft3/sec Principal Spillway Capacity = 19.77 ft3/sec Required Capacity= 10.15 Conclusion ADEQUATE Maximum water volume: Max. Dewatering Time: Minimum Skimmer Size: Factor to drain in 4 days: Orifice area = Orifice diameter = 10.15 ft3/sec 5,562 ft3 120 hrs 1.5 in 3840 1.448 in 1.36 in Ur SEDIMENT BASIN SB 28 (SKIMMER SEDIMENT BASIN) Project: Hanson Aggregates Holly Springs Quarry Draper Aden Associates Project #: R14315N-01 G Q Engineering • Sun -eying • Environmenrol Services Date: Janua 1 2020 By: APM Basin Sizing Area = 8.81 ac 10 yr i= 7.43 Drainage basin 27 C= 0.4 25 yr i= 8.21 10-year runoff, Q10: 26.18 ft3/sec 25-year runoff, 025: Disturbed area: 8.81 acres Volume required = 1800 ft3 per acre disturbed area =1800 X 8.81 = 15,858 W Surface area required = 325 fe per ft3/sec 010 =325 X 26.18332 = 8,510 W Basin is Irregular. Surface elevation: 317 Bottom elevation: 315 Ponding depth: 2 ft Side slope ratio: 3 h : 1 v Surface width: 72 ft Surface length: 147 ft Surface area = 13,016 W ADEQUATE Bottom area = 5981 ft` Ponding volume = 18,989 ft3 ADEQUATE Spillway Design Skimmer Sizing Principal Spillway Maximum water volume: Risers & barrels, C.M.P. Max. Dewatering Time: Basin Bottom Elevation: 315.0 Minimum Skimmer Size: Principal Spillway Crest Elevation 317.0 Factor to drain in 4 days: Riser Diameter: 36 in Orifice area = Riser Circumference = 9 ft Orifice diameter = Riser Capacity @ 1.0 ft head = 41.91 ft3/sec Barrel Diameter: 18 in Barrel Area, A = 1.767 ft' Wetted Perimeter = 4.712 ft Hydraulic Radius, R = 0.38 ft Roughness Coefficient,n: 0.012 Barrel Slope, S: 0.020 ft/ft Velocity, V=1.49/nxFl"xS1'-: 9.10 ft/sec Barrel Capcity = 32.17 ft3/sec Principal Spillway Capacity = 32.17 ft3/sec Required Capacity= 28.93 Conclusion ADEQUATE 28.93 ft'/sec 15,858 ft3 120 hrs 2.5 in 5080 3.122 in 1.99 in Ur