Loading...
HomeMy WebLinkAbout20210527_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 10-A01 Project Acti!7t OUT BY DEIVILR Modification Transfer Release Applicant Name: Jones Holdings NC, LLC Applicant's Email: County: Brunswick Project Name: Mirasol Farms Mine YES NO Date Commencing Have land disturbing activities started?? X Latitude: 33.9706 Longitude: -78.0972 Please return comments to (at DEMLR CO): Jenna Spencer jenne,spencer@ncdenr,gov Comments due by: 06/03/2021 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? W Is the RO concerned that the operation, as proposed, would violate standards of water quality? W Comments: DWR has concerns regarding wells on site map completed by USACE. DWR recommends a SCAGGS model be completed to address lateral effects and potential buffers. The permit application provided a JD from the USACE completed 02/2019, and states there will be no dewatering. Does this mine (or previous owner) have DWR back fees to pay? (If Yes, amount): Watershed/Stream Name & Classification: Beaverdam Swamp UT to Beaverdam Creek Stream Index 18-88-9-1-(0.5) Class SC;Sw HQW from source to mouth of Polly Gully Creek. DWR Compliance Status of Mine: N/A 401 Wetland Cert. required? ✓ 401 Wetland Cert. existing? ❑ ✓ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑✓ I ❑ Is an 0 & M Plan needed? ✓ Are wetlands disturbed at this site? I ❑ ❑✓ Does DWR RO suspect or know of nearby wetlands to the site? I ❑✓I ❑ Is a wetland delineation required prior to DWR issuing the permit? ✓ JD Completed February 2019 SAW-2013-00677 JD Consultant Onsite ❑ Offsite ❑ ❑ Stream Determination Needed? ❑ ❑✓ Stream Determination Completed? ❑ ❑✓ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ Buffer Determination Needed? ❑ ✓ Buffer Determination Completed? ❑ ❑✓ Recycle system permit existing? ❑ ❑✓ (If Yes, Permit #): New Recycle System permit required? F-1 ✓ Enough information to determine? Rev. December 2020-2020rl Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? LI I 1,(I (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? 7Q10 Flow: Unknown Permittee must determine Permitee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ ❑✓ Has Violation O&M Requirements LI HQW/7Q10 Concerns El Pay back fees or renew DWR permit Other ❑ Please describe the reason to hold the permit: RO contact: I Hold Until: Mine must wait to dewater until an O&M plan is approved? O&M Plan Approved Reviewed by Central Office Date Regional Office Z Date DWR RO Surface Water Megan Faulkner & Holley Snider 05/27/2021 RO Aquifer Protection Section Rev. December 2020-2020r1