Loading...
HomeMy WebLinkAbout1---01112021Cover-LetterWake Stone Corporation www.wakestonecorp.com Quarry Phone Numbers: Locations: 919/266-9266 - Knightdale 6811 Knightdale Blvd., Knightdale, N.C. 919/677-0050 - Triangle 222 Star Lane, Cary, N.C. 919/775-7349 - Moncure 9725 Stone Quarry Rd., Moncure, N.C. 252/985-4411 - Nash County 7379 North Halifax Rd., Battleboro, N.C. 843/756-3400 - N. Myrtle Beach 3990 Hwy 9 Business East, Loris, S.C. January 11, 2021 By Hand Delivery Mr. David Miller State Mining Engineer NC DEMLR 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Subject. Wake Stone Corporation Triangle Quarry Mining Permit No. 92-10 Permit Modification —Supplemental Information Mr. Miller: Business Office Address: P.O. Box 190 6821 Knightdale Blvd. Knightdale, N.C. 27545 919/266-1100 Fax: 919/266-1149 Herewith are duplicate printed copies and a USB flash drive containing Adobe PDF versions of supplemental information pertinent to our pending Mining Permit Modification Application for expansion of the Triangle Quarry onto the lease held RDUAA Odd Fellows tract. Specifically, this data submittal provides Wake Stone Corporation's responses to Question 20 of your "ADI" letter of July 23, 2020. These revised plans have been prepared after an August 24, 2020 site meeting and consultation with the Raleigh Regional Office staff during which we obtained clarification on the plan revisions being requested. Due to greater than 60-day delay occurring prior to Wake Stone Corporation obtaining NCDEMLR approval of the required noise study protocol, it appears unlikely we will be able to provide a response to Question 13 from the July 23, 2020 "ADI" letter prior to the expiration of the 180-day period provided pursuant to 15A NCAC 513 .0113. We respectfully request that the period provided for supplemental data submittal be extended by a minimum of 60 days to provide ample time for our noise consultant (WSP) to complete compilation and analysis of the noise data collected and prepare their summary report for submittal to the NCDEMLR. We further request written confirmation Mr. David Miller, State Mining Engineer January 11, 2021 Page 2 of Director Wrenn's approval of this requested 60-day extension pursuant to 15A NCAC 5B .0113. In completing the accompanying revised E&SC and Site Plans, we believe we have adequately addressed the issues raised by Question 20 of the July 23, 2020 ADI letter. We further believe the forthcoming noise study report will adequately address potential noise impacts from the proposed quarry expansion. Should you require additional information during your review of these supplemental application materials, please do not hesitate to contact us via phone or email. Sincerely, Wake Stone Corporation Davi . Lee Head Geologist/Environmental Supervisor Attachments: • 2 printed copies of revised E&SC Plan drawings • 2 printed copies of revised Site Plan drawings • USB flash drive containing digital (PDF) files cc: Mr. Brian Wrenn, Director — NCDEMLR (cover letter only)