Loading...
HomeMy WebLinkAbout20210607_Mine_MapsJ 1 F 3 rl 61 7 0 0 O O 10 Fol 1 oz 0 M -7 0 0 0 ----or 25 Ft. %% `\ h.l t AREA 4, n 9.25 ACRES 11 �\ �` I \ a 1I \ \% �.` —` ee_�— —, ,% --- IN AREA 3 N \� a a " 7,10 ACRES _.: ` o \ \ ` \♦ e AREA 1 j \ tt (PREVIOUSLY EXCAVATED x By PRIOR OWNER) / n f 1 I 4.48 ACREe / / 1 ♦♦ S\ ee /j 4REA 277 ACRES e f e I/ V/ / if `� ',• FOR PERMITTING PURPOSES ONLY �, I . ~"'"`i� x REVIMM/DD/-YRI NOTES: 1) 3:1 OR FLATTER SLOPES TO BE MAINTAINED ON ALL EXCAVATIONS 2) NCDOT PERMIT NO. D112-014-21-00002 3) NO FLOOD ZONES LOCATED AT THIS PROPERTY. 4) GREASY CREEK LOCATION DETERMINED FROM AERIAL PHOTOGRAPHY DATED 2017. / -J'0,00,- , I f ,. (CLIENT: 209 WALN UT ST. STATESVILLE NC 28677 I/ f r j ���•• �,.0 i, S .tee-• o. .F =z: r SEAL y: = _�•� 030430 r.z= �Q'4�` �\ N 0 100eo 1 Feet -� PROPERTY BOUNDARY — - 25' PROPERTY BUFFER — - — 50'STREAM BUFFER 300'STRUCTURE BUFFER ..x. LIMITS OF DISTURBANCE • DRAINAGE AREA —XX— SILT FENCE - - STREAM PARCEL BOUNDARIES -- - CONTOUR MAJOR CONTOUR MINOR APPLICANT: DAN WALL NAME OF MINE: HOOD CREEK SOILS COUNTY: CALDWELL DATE: 5/20/2021 PREPARED BY: JUSTIN FETZER SITE DRAINAGE AREAS MINING PERMIT HOOD CREEK SOILS CO. LENOIR, NC HOOD CREEK SOILS CO. HNA ENGINEERING COA#: SCALE: V= 100' DESCRIPTION I DWN BY I APP BY I It/// -,• \\\%` I INNOVAOVE WASTESOWTION5 6 7 PROJECT NO DWG: MININGPERMIT DATE: MAY 2021 SHEET NO.: 3--OF_10_ [_1 n 50 0 E 1 2 3 2 5 E. 1 2 J C! A N F 0 ■ A ?3 0 0 9 Fm— C? O ON O 1 0 r r----------1 f f rzE .. P«DPEMYwPEEn j J �3oor \ \ \ J f 17 AREA'4 to IT— \ \ o t BEOIMENi"}I \ , / %` \j JJJ a O 0 , \ ~ \ o1. A l ARE \ _. EXCAVATED o u (PREVIOUSLY \, �— \ \; \ _ By PRIOR OWNER)` I ry % '... NOTES: 1) 3:1 OR FLATTER SLOPES TO BE MAINTAINED ON ALL EXCAVATIONS 2) NCDOT PERMIT NO. D112-014-21-00002 3) TOTAL ROAD AREA: 1.96 ACRES 4) 18" DOWN DRAINS TO BE INSTALLED AS NEEDED AND WILL BE DIRECTED INTO A SEDIMENT BASIN. 5) NO FLOOD ZONES LOCATED AT THIS PROPERTY. 6) GREASY CREEK LOCATION DETERMINED FROM AERIAL PHOTOGRAPHY DATED 2017. ',sA \ 1, Ira.P %\ t __ ARE v / \ YFi. 81FfY1 AFFFP ✓� eCLi � J l \WRtEP '1 W1. L• / % . / OFlE48YgiEEK � / 411 \ ' 8F➢INEW Y91Nt NAIMENfiPAP. a/ !� op mxa i / 1 f 1""- 0000 �� '' \\ � � �\ i ���`=►��'\� \\.~ \ � .�~ 1 � � \ggqjjj ///\\\ ,/ !�l ' f � `-........�; �r � , ' { I� { � ryr ��l / /' ! \.. O. \.� < •� ` �_' �`' ��f ,�\mil.' \ , PRRtlNG i �� f wiEnuf ! mac' j+ / J `_„�' / " f J ~,.~ \ f 1100013 N 1 t 0 100 200 Feet LEGEND: PROPERTY BOUNDARY — — — 25PROPERTY BUFFER — 50 STREAM BUFFER — 300'STRUCTURE BUFFER LIMITS OF DISTURBANCE �_- DRAINAGE AREA —x—x— SILT FENCE }----- 18' PIPE cv GATE STORMWATER FLOW —' PATH -- STREAM PARCEL BOUNDARIES ------ CONTOUR MAJOR CONTOUR MINOR APPLICANT: DAN WALL NAME OF MINE: HOOD CREEK SOILS COUNTY: CALDWELL DATE: 5/2O/2021 PREPARED BY: JUSTIN FETZER S �•. ^,+.. ---- wrFULz .,. TITLE: &SC FEATURE `. 30T a` `"�\1•. 4 ��\_ \ 1f CwCPE1EPIPE 1 N . �, `r s �� ��� v - �`e..—`� ``►-��� ti arc PROJECT: MINING PERMIT HOOD CREEK SOILS CO. f -""- `�~` '�,. ",. �. �,...---,� •�_-- ice/ v LENOIR, NC CLIENT: -1k HOOD CREEK SOILS CO. 209 \��• - — `�\ �� �P� ST. HNA ENGINEERING STATESVILL\ NC 28677/ COA#: SCALE: 1" = 100' —E►.r.. -- �; S � 1 I � � � � >�I I f \\\�� �:� 5 $ j•�! //ems \\ =Z•� SEAL FOR PERMITTING PURPOSES ONLY =A•° 0304.30 �•�� ~ \ •�� \� lle� REV S 4 1 5 DESCRIPTION 6 DWN BY APP BY 7 INNOVATIVE WASTE SOLUTIONS E1 PROJECT NO DWG: MININGPERMIT DATE: MAY 2021 SHEET NO.: 4 OF 10 0 C ED 1-4 A 1 GENERAL NOTES Fq ,k] El 5 SEEDING PROCEDURES 7 ru, U C n E 1. SEEDING PRODUCTS SHOULD BE TRANSPORTED AND HANDLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. 2.GRASS SEED MIXTURE SHOULD BE DELIVERED IN SEALED CONTAINERS; DAMAGED PACKAGES WILL NOT BE ACCEPTED. 3.FERTILIZER SHOULD BE DELIVERED IN WATERPROOF BAGS SHOWING WEIGHT, CHEMICAL ANALYSIS, AND NAME OF MANUFACTURER. 4. PROMPTLY INSPECT SHIPMENTS TO ASSURE THAT PRODUCTS COMPLY WITH REQUIREMENTS, QUANTITIES ARE CORRECT, AND PRODUCTS ARE UNDAMAGED. 5. STORE AND PROTECT PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS, WITH SEALS AND LABELS INTACT AND LEGIBLE. 6. SITE REVIEW MEETINGS WILL BE HELD MONTHLY. THE MEETINGS WILL BE ATTENDED BY THE CONTRACTOR, SITE FOREMAN, AND OWNER OR OWNER'S REPRESENTATIVE. RESULT OF SITE REVIEWS WILL BE DOCUMENTED AND CIRCULATED TO THE MEETING ATTENDEES BY THE CONTRACTOR. 7. DURING CONSTRUCTION, THE RECORDING OF SEEDING MAINTENANCE DATA IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. AT THE END OF WORK, CONTRACTOR SHALL SUBMIT MAINTENANCE DATA TO OWNER TO ENABLE CONTINUING MAINTENANCE. MAINTENANCE DATA SHOULD INCLUDE MAINTENANCE INSTRUCTIONS, CUTTING METHOD, MAXIMUM GRASS HEIGHTS, TYPES, APPLICATION FREQUENCY, AND RECOMMENDED COVERAGE OF FERTILIZER. 8. THE CONTRACTOR WILL COMMUNICATE WITH THE OWNER OR HIS REPRESENTATIVE ON A MONTHLY BASIS TO SUMMARIZE WORK PERFORMED AND IMMEDIATELY NOTIFY THE PROJECT MANAGER OF ANY FAILURE OF THE SITE TO REMAIN STABILIZED. STABILIZATION TIMEFRAME A. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF THE SITE WHERE LAND -DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: 1. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 2. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. B. CONDITIONS - IN MEETING THE STABILIZATION REQUIREMENTS ABOVE, THE FOLLOWING CONDITIONS OR EXEMPTIONS SHALL APPLY: 1. EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE. 2. ALL SLOPES 50' IN LENGTH OR GREATER SHALL APPLY THE GROUND COVER WITHIN 7 DAYS EXCEPT WHEN THE SLOPE IS FLATTER THAN 4:1. SLOPES LESS THAN 50' SHALL APPLY GROUND COVER WITHIN 14 DAYS EXCEPT WHEN SLOPES ARE STEEPER THAN 3:1, THE 7 DAY REQUIREMENT APPLIES. 3. ANY SLOPED AREA FLATTER THAN 4:1 SHALL BE EXEMPT FROM THE 7-DAY GROUND COVER REQUIREMENT. 4. SLOPES 10' OR LESS IN LENGTH SHALL BE EXEMPT FROM THE 7-DAY GROUND COVER REQUIREMENT EXCEPT WHEN THE SLOPE IS STEEPER THAN 2:1. u 2 SEEDING MATERIALS 1. TOPSOIL MATERIAL SHALL BE EXCAVATED FROM SITE AND FREE OF WEEDS. 2. SEED MIXTURE: SEED MIXTURES SHOULD BE PROVIDED IN CONTAINERS SHOWING PERCENTAGE OF SEED MIX, YEAR OF PRODUCTION, NET WEIGHT, DATE OF PACKAGING, AND LOCATION OF PACKAGING. 3. MULCHING MATERIAL: MULCH SHOULD CONSIST OF OAT OR WHEAT STRAW, DRY, FREE FROM WEEDS AND OTHER FOREIGN MATTER DETRIMENTAL TO PLANT LIFE. 4. LIME: LIME SHALL COMPLY WITH APPLICABLE NORTH CAROLINA STATE LAWS AND SHALI. B.E DELIVERED IN UNOPENED BAGS OR OTHER CONVENIENT STANDARD CONTAINERS, EACH FULLY LABELED WITH THE MANUFACTURER'S GUARANTEED ANALYSIS. LIME SHALL BE GROUND LIMESTONE CONTAINING NOT LESS THAN 85 PERCENT TOTAL CARBONATES, AND SHALL BE GROUND TO SUCH FINENESS THAT 90 PERCENT BY WEIGHT WILL PASS THROUGH A NO. 20 MESH SIEVE AND 50 PERCENT BY WEIGHT WILL PASS THROUGH A NO. 100 MESH SIEVE. 5. FERTILIZER: FERTILIZER SHALL COMPLY WITH APPLICABLE NORTH CAROLINA STATE LAWS AND SHALL BE DELIVERED IN UNOPENED BAGS OR OTHER CONVENIENT STANDARD CONTAINER, EACH FULLY LABELED WITH THE MANUFACTURER'S GUARANTEED ANALYSIS. FERTILIZER SHALL CONTAIN NOT LESS THAN 10 PERCENT NITROGEN, 10 PERCENT AVAILABLE PHOSPHORIC ACID AND 10 PERCENT WATER SOLUBLE POTASH (N-P-K, 10-10-10). ANY FERTILIZER WHICH BECOMES CAKED OR OTHERWISE DAMAGED, MAKING IT UNSUITABLE FOR USE, WILL NOT BE ACCEPTABLE AND SHALL BE IMMEDIATELY REMOVED FROM THE JOB SITE. SEEDING SCHEDULE AND RATES PROVIDE TEMPORARY STABILIZATION IN ACCORDANCE WITH THE FOLLOWING SEEDING SCHEDULE AND APPLICATION RATES: SEASON SEEDING DATES SEEDING MIXTURE RATE (Ibs./acre) LATE WINTER AND EARLY JANUARY 1 - MAY RYE GRAIN 120 SPRING 1 KOBE LESPEDEZA 50 MAY 1 - AUGUST GERMAN MILLET 40 SUMMER 15 SUDANGRASS 50 AUGUST 15 - FALL RYE GRAIN 120 DECEMBER 30 PERMANENT SEEDING: PERMANENT STABILIZATION SHOULD BE PROVIDED IN ACCORDANCE WITH THE FOLLOWING SEEDING SCHEDULE AND APPLICATION RATES: SEASON SEEDING DATES SEEDING MIXTURE RATE (Ibs./acre) NURSE CROP (USE FOR AUGUST 15 - APRIL 15 RYE GRAIN 40 IMMEDIATE MAY 15 - AUGUST 15 GERMAN MILLET 10 STABILIZATION) MAY 1 - SEPTEMBER 1 KOBE K 10 LESPPEEDEEZAZA PRIMARY CROP: NON-NATIVE SPECIES (ONLY USE FOR SEPTEMBER 1 - MAY 1 SERICEA LESPEDEZA 15 LONG-TERM SEPTEMBER 1- APRIL 15 KY 31 TALL FESCUE 100 STABILIZATION IF APRIL 15 - JUNE 30 BERMUDA GRASS 25 NATIVE SPECIES ARE UNAVAILABLE) DECEMBER 1 - APRIL 1 DECEMBER 1 - APRIL 1 SWITCHGRASS 2.5 - 3.5 DECEMBER 1 - APRIL 1 BIG BLUESTEM 5.0 - 7.0 PRIMARY CROP: NATIVE MAY 1 - APRIL 1 SWEET WOODREED 1.5 - 2.5 SPECIES FEBRUARY 15 - APRIL 1; DEERTONGUE 4.0 - 6.0 AUGUST 15 - OCTOBER 15 INDIAN WOODOATS 1.5-2.5 DECEMBER 1- MAY 1• SEPT SOFT RUSH I 1.5 - 2.5 EMBER 1 1. AREAS WHERE TOPSOIL MATERIAL IS TO BE PLACED AND AREAS TO BE SEEDED INCLUDE ALL AREAS DISTURBED DURING CONSTRUCTION BEYOND THE LIMITS OF THE PROPOSED CELL WHICH ARE NOT TO BE PAVED. 2. VERIFY THAT PREPARED SOIL BASE IS READY TO RECEIVE WORK AND SEED ALL AREAS DISTURBED AS A RESULT OF CONSTRUCTION ACTIVITIES. 3. PREPARE SUBSOIL TO ELIMINATE UNEVEN AREAS AND LOW SPOTS. MAINTAIN LINES, LEVELS, PROFILES AND CONTOURS. MAKE CHANGES IN GRADE GRADUAL. BLEND SLOPES INTO LEVEL AREAS. 4. REMOVE DELETERIOUS MATERIALS, SUCH AS WEEDS, UNDESIRABLE PLANTS, AND THEIR ROOTS. REMOVE CONTAMINATED SUBSOIL, 5. SCARIFY SUBSOIL TO A DEPTH OF 3 INCHES WHERE TOPSOIL MATERIAL IS TO BE PLACED. REPEAT CULTIVATION IN AREAS WHERE EQUIPMENT USED FOR HAULING AND SPREADING TOPSOIL HAS COMPACTED SUBSOIL. 6. PLACE TOPSOIL MATERIAL DURING DRY WEATHER AND ON DRY UNFROZEN SUBGRADE 2 TO 3 WEEKS PRIOR TO SOWING SEED. 7. SPREAD TOPSOIL MATERIAL OVER AREA TO BE SEEDED. FINISHED THICKNESS OF TOPSOIL MATERIAL SHALL BE 3 INCHES MINIMUM AFTER SETTLING AND NOMINAL COMPACTION CAUSED BY SPREADING EQUIPMENT. 8. GRADE TO ELIMINATE ROUGH, LOW, OR SOFT AREAS, AND TO ENSURE POSITIVE DRAINAGE. 9. RAKE TOPSOIL MATERIAL AND REMOVE ROOTS, VEGETABLE MATTER, ROCKS, CLODS, AND OTHER NON -ORGANIC MATERIAL. 10. APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY LIME AT THE RATE OF 2,000 LBS. /ACRE AND 10-10-10 GRADE FERTILIZER AT THE RATE OF 750 LBS. /ACRE MIX THOROUGHLY INTO UPPER 4 - 6 INCHES OF TOPSOIL. LIGHTLY WATER TO AID THE DISSIPATION OF FERTILIZER AND LIME. 11. PREPARE SEEDBED TO A DEPTH OF 4 TO 6 INCHES. REMOVE LOOSE ROCKS, ROOT.iAW Di TylER OBSTRUCTIONS SO THAT THEY WILL NOT INTERFERE WITH THE ESTABLISHMENT AND MAINTENANCE OF VEGETATION. 12. TO AMEND SOIL, FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2000 LBS./ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LBS./ACRE 10-10-10 FERTILIZER. 13. APPLY MULCH AT A RATE OF 4,000 LBS./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. 14. RESEED, RE -FERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. 15. LIGHTLY COMPACT SEEDED AREAS BY MEANS OF A ROLLER OR OTHER APPROVED EQUIPMENT IMMEDIATELY AFTER SOWING. 16. DURING PERMANENT STABILIZATION, MULCH MUST COVER 80 % OF THE SOIL SURFACE AT A MINIMUM AND MUST BE ANCHORED BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. 17. REFERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. RESEED, REFERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. MAINTENANCE: THE FOLLOWING ITEMS, AT A MINIMUM, SHALL BE PART OF ROUTINE MAINTENANCE DURING CONSTRUCTION: 1. SEEDED AREAS SHALL BE INSPECTED REGULARLY TO ENSURE THAT A GOOD STAND OF VEGETATION IS MAINTAINED. AREAS WITHOUT ESTABLISHED VEGETATION SHALL BE FERTILIZED AND RESEEDED. 2. SEEDED AREAS WILL BE INSPECTED WITHIN 24 HOURS AFTER ANY STORM EVENT OF GREATER THAN 0.5 INCHES OF RAIN PER 24 HOUR PERIOD. 3. GRASS SHALL BE MOWED ON A REGULAR BASIS. TYPICAL MINIMUM MOWING HEIGHT SHALL BE 4 INCHES FOR WARM -SEASON TURF SPECIES AND 6 INCHES FOR COOL -SEASON SPECIES. 4. SITE OBSERVATIONS SHOULD BE PERFORMED MONTHLY TO CHECK FOR THE PRESENCE OF INVASIVE SPECIES. IF FOUND, INVASIVES SHOULD BE TREATED IMMEDIATELY WITH APPROPRIATE CULTURAL PRACTICES AND/OR BY THE USE OF SEASONALLY -APPROPRIATE AND SITE APPROPRIATE HERBICIDES. SEEDING SCHEDULE PROJECT: MINING PERMIT HOOD CREEK SOILS CO. LENOIR, NC CLIENT: HOOD CREEK SOILS CO. *Long term stabilization using native crops should be based on a seeding mixture using between 4 - 6 HNA ENGINEERING native seed species that have similar soil drainage adaptations (e.g. a mixture of Switchgrass, Big STn ESVILLE NC 2867lf Bluestem, Sweet Woodreed and Indian Woodoats seeds can be applied at rates specified in the table \����\\%AlC ; R o COA#: SCALE: above). Typical seed mixture should be in the range of 151bs./acre. z� o FOR PERMITTING PURPOSES ONLY 030�0 IN �ENG J;VtdC REV M/DD/V DESCRIPTION OWN BY APP BY 3 4 5 6 7 �u PROJECT NO DWG: MININGPERMIT DATE: MAY 2021 SHEET NO.: 8 OF 10 n 0 A 0 E 1.. A 1 0 I� 7 I✓ INLET SHALL BE PROTECTED (AS NEEDED) FROM EROSION ON RIPRAP T". •• ,^ OR EOUIVALE POROUS BAFFLE (TYF 6" PVC W c n TOP ELEVATION OF PERSPECTIVE VIEW GENERAL NOTES 18" FREEBOARD MIN. CAP TOP OF 6" PVC PIPE TOP OF BERM (USE 8" PIPE FOR DRAINAGES GREATER THAN 10 ACRES) xZ O SECTION THRU BASIN & FILTER 1. DRAW DOWN RISER & BARREL SHALL BE 6" SCH. 40 PVC WITH CLEAN -OUT CAP AND 3/4" HOLES. SEE NOTE i FOR NUMBER AND SPACING OF HOLES. 2. THE TARP USED TO PROTECT THE WEIR SHALL BE THE WIDTH SPECIFIED. THE LENGTH OF THE TARP SHALL BE ACCORDING TO AVAILABLE SUPPLY, IF MULTIPLE TARPS ARE TO BE USED, THEN TARPS SHALL BE OVERLAPPED AT LEAST 12 THE UPSTREAM 12" TARP SHALL OVERLAP THE DOWNSTREAM TARP. THE TARP SHALL BE 50 MIL. HEAVY DUTY SILVER TARPAULINS OR EQUIVALENT FOR U.Y. RESISTANCE. 3. MAIINTENANCE: SEDIMENT TO BE REMOVED AND PROPERLY DISPOSED OF WHEN BASIN IS HALF FULL. GRAVEL FILTER AROUND RISER SHOULD BE REPLACED AS NEEDED TO ENSURE DEWATERING. TARP EMBED TARP 12" 6" PVC (NO SLOTS) L—#5 WASHED STONE FILTER TARP EXTENDS TO TOP OF HOLES TOE OF BACK SEE NOTE I Rw wima SPECS TARP PROTECTION MIN 0' MIN WEIR LENGTH SECTION THRU WEIR NOTE 1 DITCH AND BURY TARP EDGE (MIN. 12") HOLE SPECS: DEWATERING HOLES WILL BE INSTALLED IN SETS OF HORIZONTAL RINGS. THE FIRST SET OF HOLES WILL BE SET 6 INCHES FROM THE BOTTOM OF THE RISER. RINGS WILL CONTINUE UP THE RISER IN INTERVALS OF 3 INCHES. HOLES WILL BE 3/4 INCH IN DIAMETER AND WILL BE SPACED EQUALLY AROUND THE RISER. THE NUMBER OF HOLES PER RING WILL EQUAL TO THE DRAINAGE AREA. E BAS AIN DRAINING 2.0 ACRES SHOULD HAVE 2 HOLES PER RING EVERY 3 INCHES ON THE RISER PIPE. THE FIRST RING (2 HOLES) WILL BE SET 6 INCHES FROM THE BOTTOM OF THE RISER, NOTE: ROUND DRAINAGE AREA TO THE NEAREST WHOLE NUMBER TO DETERMINE NUMBER OF HOLES. STANDARD CUSTOM BASIN -Y Y PLAN VIEW TARP t' MIN FREEBOARD BAFFLES \(\S1T�D) SKIMMER` MIN 0' MIN WEIR LENGTH SECTION THRU WEIR (�1�:171P NOTES: 1. PROVIDE ALL CALCULATIONS FOR ORIFICE DESIGN. 2. PROVIDE ANTI -FLOTATION BLOCK CALCULATIONS. CMP RISER PAINTED RED CLEANOUT MARK (PERFORATED) LOCATED HALFWAY UP RISER PIPE WATER LEVEL DURING STORM TF SEDIMENT STORAGE I .-AREA GRAVELFILTER 0< II I- ANTI -FLOTATION DEVICE ANTI -SEEP COLLAR CROSS SECTION EMERGENCY SPILLWAY CONSTRUCTED OVER UNDISTURBED GROUND AND ARMORED WITH RIP RAP — —' 1 \ \ SEDIMENT TRAP -.. r DISSIPATER PAD 4 y RIP RAP S N..v K OUTLET PIPE —'— - EARTH DAM PLAN VIEW TRASH RACK & ANTI -VORTEX DEVICE TPOFDAM — I ERGENCY SPILLWAY ELEVATION o o _— = o. O Oe. + .•� 7 MINIMUM SLOPES 2-1/2 1 T: -- EARTH DAM CMP OUTLET PIPE STANDARD RISER -BARREL SEDIMENT BASIN DISSIPATER PAD RIP RAP NOTES: TOP OF DAM — 1 1. BAFFLE MATERIAL SHOULD BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR SILT FENCE. 2. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE 1ST BAY, WHICH SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE. ' 70ITCHAND BURY TARP ' =' ! '! 3. PROVIDE 3 BAFFLES (USE TWO IF LESS THAN 20 FEET IN LENGTH). PROVIDE EDGE (MIN. 12") bn ,'"m ff 5 BAFFLES FOR DRAINAGE AREAS GREATER THAN 10 ACRES. i....,,," 4 4. BAFFLE SHALL BE 700 G/M2 COIR EROSION BLANKET. INI F ZONE OU l l 1" ZO- E 5. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS u ( 6. INSPECT BAFFLES FOR REPAIR ONCE A WEEK AND AFTER EACH RAINFALL na�m sn I �r: ar„ ! wutua u a �I ICROSS SECTION — —/ SUPPORT ROPE TO WIRE TO SUPPORT POST PREVENT 24" INTRO BOTTOM STAKE TO SAGGING OR SIDE SUPPORT WIRE DISSIPATER PAD RIP RAP INLET SHALL BE CROSS SECTION CMP OUTLET PIPE PROTECTED (AS NEEDED) FROM EROSION WTH RIPRAP, TARP, MATTING OR EQUIVALENT. NOTES: 1) BASIN SHOULD BE CLEANED OUT WHEN CAPACITY REACHES AN ELEVATION REPRESENTING THAT THE BASIN IS HALF -FULL. 2) THE TARP USED TO PROTECT THE WEIR SHALL BE THE WIDTH SPECIFIED. THE LENGTH OF THE TARP SHALL BE ACCORDING TO AVAILABLE SUPPLY. IF MULTIPLE TARPS ARE TO BE USED, THEN TARPS SHALL BE OVERLAPPED AT LEAST 12". THE UPSTREAM 12" TARP SHALL OVERLAP THE DOWNSTREAM TARP. THE TARP SHALL BE 50 MIL. HEAVY DUTY SILVER TARPAULINS OR EQUIVALENT FOR U.V. RESISTANCE. 3) PROVIDE A MINIMUM OF THREE POROUS BAFFLES TO EVENLY DISTRIBUTE FLOW ACROSS THE BASIN, REDUCING TURBULENCE. 4) BAFFLE MATERIAL MUST BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR A SILT FENCE. 5) MOST OF THE SEDIMENT WILL ACCUMULATE IN THE FIRST 'BAY, '50 THIS SHOULD BE READILY AVAILABLE FOR MAINTENANCE. 6) DURING THE CONSTRUCTION PHASE OF THE PROJECT, PERMANENT STORMWATER RISER SHALL ONLY DEWATER FROM THE TOP OF PIPE. 7) POND SHALL NOT BE CONVERTED FOR STORMWATER USE UNTIL APPROVED BY ENVIRONMENTAL ENGINEER. STANDARD SKIMMER BASIN 2 0 5 PLAN VIEW FENCE AND FABRIC BURIED IN TRENCH 6"X6" TRENCH, BACKFILLED AND COMPACTED REV STEEL POST SECTION VIEW AT OPENING STANDARD BAFFLES DETAIL FOR PERMITTING PURPOSES ONLY DESCRIPTION 6 OWN BY 1 APP BY COIR MESH OR SIMILAR, STAPLED OR TRENCHED INTO BOTTOM OR SIDE DETAILS PROJECT: MINING PERMIT HOOD CREEK SOILS CO. LENOIR, NC CLIENT: HOOD CREEK SOILS CO. M WALNUT ST. HNA ENGINEERING ;TATESVILLE NC 28677 SCALE: 7. -A•a 030430+`� �i1'O.4.G I N E+E4�� ENGINEERING 7 51 PROJECT NO DWG: MININGPERMIT DATE: MAY 2021 SHEET NO.: 9 OF 10 II� C ter: 1 2 d7 6 I 7 c E 1, TEMPORARY DIVERSION DITCH TO BE USED TO INTERCEPT FLOW AND/OR DIVERT TO A SEDIMENT CONTROL MEASURE OR BMP. 2. SILT SHALL BE REMOVED WHEN DITCH IS ONE—HALF FULL. 3. DITCH SHALL BE RECONSTRUCTED WHEN DAMAGED BY EQUIPMENT OR COVERED BY FILL. 4. STABILIZE DIVERSION DITCH BERM WITH TEMPORARY SEEDING, MULCH WITH TAC, AND/OR EROSION CONTROL NETTING, 11— WASTE MATERIAL —COMPACT SEED & MULCH AFTER C< S 0' VAR, 2' CONSTRUCTION OF DITCH - 1 VAR .III II— CROSS SECTIONAL VIEW STANDARD TEMPORARY DIVERSION DITCH MINIMUM 10 LINE WIRES NOTE: 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 2. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE. 50' MIN. NOTES' 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO BUT SUFFICIENT TO KEEP SEDIMENT ON SITE ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD .. '." ` r.. IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE .:.. STONE, THEN THE TIRES OF THE VEHICLES MUST BE WASHED •= 2"-3" STONE TO BE USED''••:''`. 25' OR WIDTH OF BEFORE ENTERING THE PUBLIC ROAD, EXISTING (SURGE STONE OR RAILROAD'," PROPOSED STREET, ROADWAY -: BALLAST)':•;.;"t:; " •.;'.;;:;.;'r:::; .;' :.. WHICHEVER IS 3. MAINTAIN GRAVEL PAD IN A CONDITION TO PREVENT MUD OR GREATER. SEDIMENT FROM LEAVING CONSTRUCTION SITE. ENTRANCE '; ': WILL REQUIRE PERIODIC REMOVAL OF SEDIMENT —LADEN STONE AND REPLACEMENT WITH FRESH STONE. PLAN VIEW � FABRIC UNDER STONE CROSS SECTION NEW CONSTRUCTION --� STANDARD CONSTRUCTION ENTRANCE 1 I � 3 12" MIN. e'-o' unm�uw IMUM 12-1/2 GAUGE RMEDIATE WIRES GRADE FRONT VIEW — STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC b z � r 3 FILL SLOPE n ADE `''8" MINIMUM COVER OVER SKIRT " ANCHOR SKIRT AS DIRECTED BY ENGINEER STANDARD TEMPORARY SILT FENCE r d W 00 2/3 W� _ d _ r j11=TTT_� 4" to 12" :r",=I I I ICI FILTER FABRIC OR GRAVEL BEDDING WATERWAY WITH STONE CENTER DRAIN SHAPED BY BULLDOZER) 18" W 6" —I i I I MITI- d =11= 4„ to 12„ =11i=j.rz--FILTER FABRIC OR = I It � I GRAVEL BEDDING V-SHAPED WATERWAY WITH STONE CENTER DRAIN (SHAPED BY MOTOR GRADER) 4i W THE LENGTH OF THE RIPRAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (INCHES). 3. IN A WELL—DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" (INCHES) ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. SECTION 'A=A' FABRIC STANDARD PIPE OUTLET TO WELL-DEFINED CHANNEL TYPICAL RIP RAP CHANNEL GRAVEL BEDDING TRAPEZOIDAL NOTES OUTLET END: CONNECTION TO OUTLET PIPE OR RISER —TO BE USED WHERE EXCESSIVE STORMWATER VELOCITIES PROHIBIT VEGETATIVE LININGS. —SIZE OF STONE MUST BE DETERMINED BY APPROPRIATE DESIGN PROCEDURE. —DIMENSIONS FOR d & W VARIES ACCORDING TO DESIGN. STANDARD RIP -RAP LINED CHANNELS REV FOR PERMITTI STANDARD SKIMMER DETAIL ""`m DETAILS PROJECT: MINING PERMIT HOOD CREEK SOILS CO. LENOIR, NC CLIENT: HOOD CREEK SOILS CO. 208 WALNUT ST. HNA ENGINEERING STATESVILLE N 28877 \ / ,��\N\ C A //// '".\moo o�ti5 S�O�. _ Zr� cjFJ1L Fi _ =Mer" 030430 COA#: SCALE: ✓ '0..-- �' GINI N • �� O, HNA ENGINEERING PL¢cDj•\\INNOVATIVE WASTHSOiUflONS OWN BY APP BV/,/�% 7 ?AT N. PROJECT NO DWG: MININGPERMIT DATE: MAY 2021 SHEET NO.: /� 10 OF 10 EO c