Loading...
HomeMy WebLinkAboutLQS Regional Mine Permit Checklist 2020LAND QUALITY SECTION REGIONAL OFFICE MINING PERMIT APPLICATION REVIEW CHECKLIST APPLICATION/PERMIT NO.: 61-13 1 ACTION: New Modification Transfer Release APPLICANT NAME: Vulcan Construction Materials LLC ❑ 0 ❑ ❑ MINE NAME: Spruce Pine Quarry COUNTY: Mitchell Administrative Issues Yes No Explain A. Is the site currently under NOV? X B. Is an NPDES permit needed? X C. Is an NPDES permitting existing? ® NCG020511 D. I Is an 0 & M Plan needed? X FieldYes A. Are potential wetlands and watercourses properly No indicated on the Mine Map? X ❑ B. Are the proposed buffer zones adequate? X LILI C. Do all occupied dwellings within 300 feet of the mine excavation appear to be indicated? ❑X ❑ D. Do all water supply wells within 500 feet of the mine excavation appear to be indicated? ❑X E. Is visual screening needed? I ❑X existing vegetation has been maintained on all sides of the quarry to screen the quarry from public view. F. Are the proposed erosion and sedimentation control measures properly located to prevent offsite sedimentation? ❑X ❑ G. Is the proposed revegetation/reclamation plan acceptable? I X * Date Inspected: Erosion and Sedimentation Control Plan Review It is the responsibility of the Regional Office staff to verify the adequacy of the E&S measures. Please provide any concerns or comments: Other applicationWho was the Division of Air Quality: Armo Ali Date 3/31/21 Division of Water Resources (Surface Water Protection Section): Amy Annino 3/31/21 Other: Inspector/Reviewer's Name: I 'Ehawlra &�PlMe 04/13/21 Rev: Sept 2020 r0