DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
SECTIONTHIS FILLED OUT
61-13 Project Action New
Modification Transfer Release
Applicant Name:
Vulcan Construction Materials LLC
X
Applicant's Email:
johnsonto@vmcmail.com
County:
Mitchell
Project Name:
Spruce Pine Quarry
YES
NO
Date Commencing
Have land disturbing activities started??
09/05/1978
Latitude:
35.9762
Longitude:
-82.0894
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: 04/12/2021
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS? NCG02 DEMLR
Fx
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
El
I Ea�
Comments: No immediate concerns based on historical compliance with NCG02 permit and no known recent WQ violations
Does this mine (or previous owner) have DWR back fees to pay?
x
(If Yes, amount):
Watershed/Stream Name & Classification:
I French Broad / LIT to Bear Creek (Class C; Tr)
DWR Compliance Status of Mine:
N / A
401 Wetland Cert. required?
x
401 Wetland Cert. existing?
171
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
x
Is an 0 & M Plan needed?
x
Are wetlands disturbed at this site?
x
Does DWR RO suspect or know of nearby wetlands to the site?
x
Is a wetland delineation required prior to DWR issuing the permit?
x
JD
Consultant
Onsite
Offsite
Stream Determination Needed?
X
Stream Determination Completed?
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
❑
Buffer Determination Needed?
X
Buffer Determination Completed?
Recycle system permit existing?
x
(If Yes, Permit #):
New Recycle System permit required?
x
Enough information to determine?
x
-FFI
Rev. December 2020-2020r1
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
X
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
X
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
0
Has Violation
O&M Requirements
HQW/7Q10 Concerns
Li
Pay back fees or renew DWR permit
Other
LI
Please describe the reason to hold the permit:
RO contact:
I
Hold Until:
Mine must wait to dewater until an O&M plan is approved? Li I Li
Reviewed by
Central Office Date Regional Office Date
DWR RO Surface Water Amy Annino 4-9-2021