Loading...
HomeMy WebLinkAboutDesign Summary and CalculationsDesign & Calculation Summary — 3M SPPP Project Date: 4/11/21 Engineer of Record: Trevor Crawford, PE, 3M IMPD Area 1: Basin 4 Background: Basin 4 is to be added to the site as an enhanced best management practice (BMP) to the general aggregate processing area, in addition to the current adjacent rock dams. Generally, the whole west side of quarry plant area will drain to this new basin. 3M's stormwater outfall 006 will be relocated to the outlet of this new basin. Basin 4 is designed to meet the general design standards for a Sediment Basin in the Stormwater Design Manual and is designed to be permanent. This design criteria exceeds the requirements under the North Carolina Erosion and Sediment Control Planning and Design Manual. There is a culvert planned upstream of basin 4, which will divert a quarry equipment maintenance area to basin 4 The general design criteria for sizing (Basin 4): • Drainage Area: 22.03 ac • Percent Impervious: 64% • Sediment storage required: 1,800 cubic feet per acre = 39,654 cubic feet required o Designed sediment storage: ■ Approximately 138,636 cubic feet provided above the inlet invert elevation ■ Additional sediment storage in permanent pool: 74,374 cubic feet ■ Conclusion: the designed basin storage conservatively exceeds requirement. • Surface Area requirements: 435 square feet per cfs of Q10 peak inflow: o Q10 inflow = 78.46 cfs o Required surface area: (435) x (78.46) = 34,130 sf ■ Surface area of Basin 4 at 439.00' msl = 31,429 sf ■ Forebay 1 surface area = 5,118 sf ■ Forebay 2 surface area = 2,609 sf ■ Forebay 3 surface area = 1,541 ■ Total Surface area = 40,697 sf ■ Conclusion: the designed surface area meets requirement • Permanent Pool Depth: 5 feet, meets minimum depth of 2 feet. • Length to Width ratio: approximately 2:1 • No baffles are included due to the permanent pool design. The permanent pool will provide the same goals as the baffles. Flow & Outlet Structure Summ The following parameters for flow calculations are the following: Parameter Remarks Stormwater Calculation Methodology SCS TR-20 Stormwater Software HydroCAD Version 10 Precipitation Quantity NOAA Atlas 14, Moncure, NC Station 1-year 2.96" 2-year 3.57" 5- year 4.47" 10-year 5.18" 25-year 6.13" 100-year 7.67" Precipitation duration 24 hours Precipitation distribution SCS Type II Water Quality target drawdown time 3 days targeted The outlet structure is designed with a Faircloth Skimmer with an overflow weir. This structure is to be constructed at the inlet of an existing 54" RCP culvert. Skimmer sizing was completed using resources at Faircloth Skimmers (www.fairclothskimmer.com). Skimmer Summary: • Volume of water to treat: 138,636 cubic feet* • Draw down time: 3 days • Output: o Skimmer size: 6" o Orifice radius: 2.8" o Orifice diameter: 5.7" • 6" skimmer flow capacity: 51,840 cf/day = 0.60 CFS *elevation 434.00' (permanent pool) to elevation 439.50 (top of box structure) Flow summary table: Storm (year) - 24 hour, type II distribution Precipitation (inches) Q - Pre- development (cfs) Q-in Post Development (cfs) Q-out Post Development (cfs) Elevation (ft. msl) 1 2.96 7.1 30.56 0.60 437.09 2 3.57 11.7 43.06 0.60 438.41 5 4.47 19.4 62.55 1.92 439.57 10 5.18 26.1 78.46 7.05 439.69 25 6.13 35.7 100.15 22.95 439.93 100 7.67 51.93 135.82 43.78 440.17 Emergency/Peak Capacity: • The low -point along the existing access road adjacent to the outlet structure has been surveyed to be approximately 441.40' msl. • This basin will be able to pass the 25yr-24hr event with over 12" of freeboard. • The existing 54" RCP culvert will effectively pass the 100yr-24hr storm event, with 12" of freeboard. • The proposed 24" culvert diversion will pass the 25yr-24hr and larger storm events. Conclusions: • This proposed basin meets sizing requirements under the North Carolina Erosion and Sediment Control Planning Manual. • This basin's capacity is greatly oversized to provide additional treatment through traditional wet detention settling. • This area is currently draining to several existing rock dams and then discharging off -site. These rock dams provide little attenuation to off -site peak flow discharges. This proposed pond will reduce off -site flows from this drainage area and will be more in -line with historic pre - development conditions. • The skimmer outlet structure was chosen to be the most effective primary outlet since it will be discharging water from the surface and allowing for properly designed drawdown times (3 days). • Storm events through the 2yr-24hr storm will be routed 100% through the skimmer without discharging over the overflow weir • Storm events 5yr-24hr and above will discharge through the overflow weir at peak stage (for a very short period). Area 2: Upgraded Channel Diversion Background: The "Area 2" portion of the project will add additional drainage area to 3M's main stormwater basin system and outfall. Approximately 18.47 acres of Luck Stone's aggregate processing area is planned to be diverted to existing Basin 3 which will flow to existing Basin 2, ultimately to 3M's outfall 002. This proposed diversion will eliminate the need for Rock Dam Q-3 and it will be removed. Since additional stormwater is being designed to flow to 3M's existing Basin system, calculations were done to verify the downstream BMPs are suitably designed for this additional 18.47 acres. Specifically, Basin 2 and Basin 3 were analyzed, summary is below. There is an old non-functioning diversion that is directly below the planned diversion at the bottom of the slope that is thought to once serve this purpose, however it is unknown due to the age and condition of the site. The general design criteria for sizing (existing Basin 2): • Drainage Area: 53.86 ac (Current drainage area = 35.39 ac, planned additional area = 18.47 ac) • Sediment storage required: 1,800 cubic feet per acre = 96,948 cubic feet required o Designed sediment storage: ■ Approximately 544,587 cubic feet provided above the inlet invert elevation ■ Conclusion: the designed basin storage conservatively exceeds requirement. • Surface Area requirements: 435 square feet per cfs of Q10 peak inflow: o Q10 inflow = 103.38 cfs o Required surface area: (435) x (103.38) = 44,970 sf ■ Surface area of Basin 4 at 439.00' msl = 107,550 sf ■ Conclusion: the designed surface area conservatively meets requirement Flow & Outlet Structure Summary (Basin 2): General structure configuration: • %" perforated holes (7 rows of 20 each) starting at low elevation 391.001, rows spaced at 6" • Top of box structure, weir overflow at elevation 396.00' • Emergency spillway at elevation 397.00' • Top of embankment at elevation 400.00' Flow summary table: Storm (year) - 24 hour, type II distribution Precipitation (inches) Q-in Post Development (cfs) Q-out Post Development (cfs) Elevation (ft. msl) 1 2.96 25.50 0.98 393.94 2 3.57 40.24 1.38 394.89 5 4.47 73.10 3.12 396.07 10 5.18 103.38 8.13 396.19 25 6.13 108.86 25.10 396.44 100 7.67 121.30 57.71 396.80 Emergency/Peak Capacity: • The proposed diversion channel (upstream of Basin 3) will pass the 25yr-24hr storm. • Basin 3 will pass the 25yr-24hr storm event with over 12" of freeboard, to Basin 2: o Peak Elevation: 400.58' o Top of embankment: 402.00 • Basin 2 will pass the 100yr-24hr event with a considerable amount of freeboard under normal unrestricted flow conditions: o 3.2 ft of freeboard • Basin 2 was modeled with the outlet structure plugged, to verify the performance of the emergency overflow spillway. If the main discharge piping becomes clogged or restricted, flows out of the emergency overflow spillway will occur. o Peak elevation (100yr-24hr): 397.70' o Freeboard: 2.3 ft o Peak flowrate: 47.30 cfs Conclusions: • The proposed diversion will adequately flow demands. • Basin 3 is suitable for this additional drainage area and will pass the additional flow adequately. • The existing Basin 2 meets sizing requirements under the North Carolina Erosion and Sediment Control Planning Manual very conservatively. • Basin 2 appears to have been designed to handle even more surface area than is currently or planned to flow to it. o Using the Q10 flowrate as a general guide for basin sizing, possibly up to double the surface area could be routed to this pond. Additional evaluation should take place if additional flow is to be directed here. Area 3: Basin 5 Background: Basin 5 is planned to take place of the existing "Rock Dam Q-9" via modification to this rock dam. Essentially, the existing rock dam will be transformed into a skimmer sediment basin. Several areas will be diverted into this basin via surface grading, or culverting. This will allow for removal of two existing temporary Rock Dams and one silt trap. Basin 5 is designed to meet the general design standards for a Sediment Basin in the Stormwater Design Manual. The general design criteria for sizing (Basin 5): • Drainage Area: 16.75 ac • Percent Impervious: 52% • Sediment storage required: 1,800 cubic feet per acre = 30,150 cubic feet required o Designed sediment storage: ■ Approximately 76,578 cubic feet provided above the inlet invert elevation ■ Additional sediment storage in permanent pool: 75,260 cubic feet ■ Conclusion: the designed basin storage conservatively exceeds requirement. • Surface Area requirements: 435 square feet per cfs of Q10 peak inflow: o Q10 inflow = 59.82 cfs o Required surface area: (435) x (59.82) = 26,021 sf ■ Surface area of Basin 5 at 399.00' msl = 23,286 sf ■ Channel Extension at 399.00' msl = 3,200 sf ■ Forebay 1 surface area = 4,535 sf ■ Total Surface area = 31,021 sf ■ Conclusion: the designed surface area meets requirement • Permanent Pool Depth: 5 feet, meets minimum depth of 2 feet. • Length to Width ratio: approximately 2:1 • No baffles are included due to the permanent pool design. The permanent pool will provide the same goals as the baffles. Flow & Outlet Structure Summary: See table in section 1, same parameters used for this basin. The outlet structure is designed with a Faircloth Skimmer with an overflow riser and discharge pipe. Skimmer sizing was completed using resources at Faircloth Skimmers (www.fairclothskimmer.com). Skimmer Summary: • Volume of water to treat: 76,578 cubic feet* • Draw down time: 3 days • Output: o Skimmer size: 5" o Orifice radius: 2.2" o Orifice diameter: 4.5" • 5" skimmer flow capacity: 32,832 cf/day = 0.38 CFS *elevation 395.50 (permanent pool) to elevation 399.00 (top of box structure) Flow summary table: Storm (year) - 24 hour, type II distribution Precipitation (inches) Q-in Post Development (cfs) Q-out Post Development (cfs) Elevation (ft. msl) 1 2.96 22.79 0.38 379.80 2 3.57 32.41 0.38 398.90 5 4.47 47.48 3.16 399.14 10 5.18 59.82 10.70 399.34 25 6.13 76.71 22.69 399.67 100 7.67 104.82 43.69 400.28 Emergency/Peak Capacity: • The proposed outlet structure discharge pipe (24") will allow for flows up through the 10yr-24 hour storm event. • This basin will be able to pass the 25yr-24hr event with over 12" of freeboard. • The proposed 24" culvert from Rock Dam Q-13 will pass the 25yr-24hr event. Conclusions: • This proposed basin meets sizing requirements under the North Carolina Erosion and Sediment Control Planning Manual. • This basin's capacity is greatly oversized to provide additional treatment through traditional wet detention settling. • The skimmer outlet structure was chosen to be the most effective primary outlet since it will be discharging water from the surface and allowing for properly designed drawdown times (3 days). • Storm events through the 2yr-24hr storm will be routed 100% through the skimmer without discharging over the overflow riser. Storm events 5yr-24hr and above will discharge through the overflow riser at peak stage or the emergency spillway (for short period). 4S-C LS Ma'nt Area 4 R-A 24" C Ivert 4R-B Channel 1 - culy to forey A Forebay - old RD - OF006 Channel 2A - forebay to pond Subcat Reach Pon Link 4S-B LS Proces 3ing Area - Direct o Pond 2F Forebay - of RD - East of ne pond 4R-D Channel 2B - forebay to pond 46 4S-A LS Entry Area & Basin 4 - Direct to Pond Basin 4 - skimmer discharge Basin 4 Pre -development BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 2 Summary for Subcatchment 4-pre: Basin 4 Pre -development Runoff = 7.10 cfs @ 12.65 hrs, Volume= 1.271 af, Depth= 0.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (ac) CN Description 22.030 70 Woods, Good, HSG C 22.030 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 33.5 150 0.0130 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 22.1 1,393 0.0440 1.05 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 55.6 1,543 Total N V 3 0 LL Subcatchment 4-pre: Basin 4 Pre -development Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff MAN ON rdA ' O : 1 PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/11/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 4S-A: LS Entry Area & Basin 4 - Direct to Pond Runoff = 11.55 cfs @ 11.97 hrs, Volume= 0.543 af, Depth= 0.93" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (ac) CN Description 0.529 82 Dirt roads, HSG B 0.562 82 Dirt roads, HSG B 0.459 98 Water Surface, HSG C 0.122 98 Water Surface, HSG C 5.295 71 Meadow, non -grazed, HSG C 6.967 75 Weighted Average 6.386 91.66% Pervious Area 0.581 8.34% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, min toc 0 3 0 LL Subcatchment 4S-A: LS Entry Area & Basin 4 - Direct to Pond Hydrograph X 2 i >>sscrs ' f ---------------------------- t iYP ! ---------r. -}---------.r...._.. W.- f +, 24 r rainfall.=2. 9.�,,..,.. Syr 0 ! i 9 ` ' �.. nOffra=5.957 sac _...__......_.(_.._._...... 8 ....._..�,._.._.....+......... ..........F.._.._.._. j ._.._.._..(... _.._..._F_.._ _............ _ _ _ _...._.... _...._...... _ _ _ _. _ ._.._.. I j Runpff Volun e=0.543fof I -� - F- -- --------4--------- ! ! -�- -�-- ._.. ._....._ _ _.._. i u o De.93 R f Depth —! r ...... - ,------- r r , ._....._....._ ..., .... ._..... 'UZ --_! M 5 '' I ( i i I i i i I i I i i I I .I ! i 4- i t i — 3 i I , i--------- 2 i —i — .... r— — —� — i — — —�— ; i — — i — — r — —�— — —i — t-------- ----------r r — — i — — —fi— — — i 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 4 Summary for Subcatchment 4S-B: LS Processing Area - Direct to Pond Runoff = 17.54 cfs @ 11.96 hrs, Volume= 0.811 af, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (ac) CN Description 6.964 82 Dirt roads, HSG B (used B because of the larger stockpiles in the area) 0.189 77 Brush, Poor, HSG C 0.066 98 Water Surface, HSG C 7.219 82 Weighted Average 7.153 99.09% Pervious Area 0.066 0.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, min toc 1 1 1 1 1 1 1 1 u " 1 3 0 LL Subcatchment 4S-B: LS Processing Area - Direct to Pond Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 5 Summary for Subcatchment 4S-C: LS Maint Area Runoff = 7.28 cfs @ 12.35 hrs, Volume= 0.839 af, Depth= 1.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (ac) CN Description 2.137 76 Woods/grass comb., Fair, HSG C 0.349 76 Woods/grass comb., Fair, HSG C 0.078 98 Roofs 0.060 98 Roofs 0.120 98 Roofs 0.032 98 Roofs 0.018 98 Roofs 5.053 82 Dirt roads, HSG C 7.847 81 Weighted Average 7.539 96.07% Pervious Area 0.308 3.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.7 150 0.0150 0.08 Sheet Flow, woods Woods: Light underbrush n= 0.400 P2= 3.54" 1.4 60 0.0208 0.72 Shallow Concentrated Flow, woods Woodland Kv= 5.0 fps 1.8 220 0.0160 2.04 Shallow Concentrated Flow, agg area to ditch Unpaved Kv= 16.1 fps 3.0 635 0.0470 3.49 Shallow Concentrated Flow, side of road ditch Unpaved Kv= 16.1 fps 37.9 1,065 Total MAN ON r,A ' O : 1 PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/11/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 6 Subcatchment 4S-C: LS Maint Area w 0 LL Hydrograph — r — —. — — -- — — ........................... -- -r- 728cfs----: 7 --+------�----�-------i-------}-------}---�---- a-1T- Yp - �� ---- —; -- ;-------; - ; - ; ----�yra r- infalt-=- 6 , R4�noff Area=''.8#7 ac ; ____ un�e O.g39 5 nOff ; o of 4 i Flow Length=1,0$5' I 3Iin Tic=�7.9 M -------- i i i i -� ;---t---; -- -- - --- i 2 1 --- i 1 t 0 0 5 10 15 20 25 30 35 40 45 50 55 60 85 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 7 Summary for Reach 4R-A: 24" Culvert Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 1.28" for lyr-24hr event Inflow = 7.28 cfs @ 12.35 hrs, Volume= 0.839 of Outflow = 7.28 cfs @ 12.36 hrs, Volume= 0.839 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 10.51 fps, Min. Travel Time= 0.2 min Avg. Velocity = 4.16 fps, Avg. Travel Time= 0.6 min Peak Storage= 98 cf @ 12.36 hrs Average Depth at Peak Storage= 0.54' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.87 cfs 24.0" Round Pipe n= 0.011 Concrete pipe, straight & clean Length= 142.0' Slope= 0.0282 '/' Inlet Invert= 468.00', Outlet Invert= 464.00' In 3 0 LL ds • _ . 7.28 I 1 • I 1 • 1 1 L=142 1 �� 1 i • /%iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii ------------- [ Inflow ❑ Outflow PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/11/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 8 Summary for Reach 4R-13: Channel 1 - culv to forebay Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 1.28" for lyr-24hr event Inflow = 7.28 cfs @ 12.36 hrs, Volume= 0.839 of Outflow = 7.28 cfs @ 12.36 hrs, Volume= 0.839 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 6.54 fps, Min. Travel Time= 0.2 min Avg. Velocity = 2.39 fps, Avg. Travel Time= 0.6 min Peak Storage= 100 cf @ 12.36 hrs Average Depth at Peak Storage= 0.40' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 188.65 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 10.00' Length= 89.8' Slope= 0.0891 T Inlet Invert= 460.00', Outlet Invert= 452.00' 8 7 6 5 w g 4 0 LL 3 2 Reach 4R-13: Channel 1 - culy to forebay Hydrograph �1 �! Inflow,i // • Flow D' • I/ • • i • i • • I� • i i • ■ Inflow ■ outflow BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paoe 9 Summary for Reach 4R-C: Channel 2A - forebay to pond Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 1.28" for lyr-24hr event Inflow = 7.28 cfs @ 12.36 hrs, Volume= 0.839 of Outflow = 7.28 cfs @ 12.36 hrs, Volume= 0.839 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.62 fps, Min. Travel Time= 0.4 min Avg. Velocity = 2.06 fps, Avg. Travel Time= 1.0 min Peak Storage= 157 cf @ 12.36 hrs Average Depth at Peak Storage= 0.45' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 152.02 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 121.0' Slope= 0.0579 '/' Inlet Invert= 449.00', Outlet Invert= 442.00' N V 3 0 LL Reach 4R-C: Channel 2A - forebay to pond Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 10 Summary for Reach 4R-D: Channel 213 - forebay to pond Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 1.28" for lyr-24hr event Inflow = 7.28 cfs @ 12.36 hrs, Volume= 0.839 of Outflow = 7.28 cfs @ 12.36 hrs, Volume= 0.839 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 10.54 fps, Min. Travel Time= 0.0 min Avg. Velocity = 3.80 fps, Avg. Travel Time= 0.1 min Peak Storage= 14 cf @ 12.36 hrs Average Depth at Peak Storage= 0.27' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 374.86 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 10.00' Length= 19.9' Slope= 0.3518 '/' Inlet Invert= 442.00', Outlet Invert= 435.00' w 3 0 LL forebay to pond . .. .. Inflow• • Flow ® • I /I • • • • %///////////////////////////////////////////////////////////////////� ■ Inflow ■ outflow BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 11 Summary for Pond 1 F: Forebay - old RD - OF006 Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 1.28" for lyr-24hr event Inflow = 7.28 cfs @ 12.36 hrs, Volume= 0.839 of Primary = 7.28 cfs @ 12.36 hrs, Volume= 0.839 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs N 3 0 LL Pond 1 F: Forebay - old RD - OF006 Hydrograph ...................... --..... ..... -..--...-------- ..... ..... -..... ..... ..... -... ----. ---- $ 7.28 cfs t-- - - a +-- --i- t - ....-------------- 7.28 cfs i --- ' ... i ,, - T a- 7 r now, re ._ ac I I I I i I i i I I i I I i I i i g � i i i I 5 --------^....... ,---t---; ---r----t----i-----t---t----i---i----t-t----t---t----i---- 4 3 - +.......---------- ---------- a ---- --- -t ------ a ---- --- ----- ------ ---- ---- E --- + ----- 2 I i I i i I I I I i I i 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Primary BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 12 Summary for Pond 2F: Forebay - old RD - East of new pond Inflow Area = 7.219 ac, 0.91% Impervious, Inflow Depth = 1.35" for 1yr-24hr event Inflow = 17.54 cfs @ 11.96 hrs, Volume= 0.811 of Primary = 17.54 cfs @ 11.96 hrs, Volume= 0.811 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs 1 1 1 1 1 1 1 1 3 0 LL Pond 2F: Forebay - old RD - East of new pond Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Primary BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 13 Summary for Pond 4B: Basin 4 - skimmer discharge Inflow Area = 22.033 ac, 4.33% Impervious, Inflow Depth = 1.19" for lyr-24hr event Inflow = 30.56 cfs @ 11.96 hrs, Volume= 2.192 of Outflow = 0.60 cfs @ 11.90 hrs, Volume= 2.192 af, Atten= 98%, Lag= 0.0 min Primary = 0.60 cfs @ 11.90 hrs, Volume= 2.192 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 437.09' @ 21.04 hrs Surf.Area= 25,612 sf Storage= 68,481 cf Flood Elev= 441.00' Surf.Area= 50,000 sf Storage= 197,490 cf Plug -Flow detention time= 1,177.3 min calculated for 2.192 of (100% of inflow) Center -of -Mass det. time= 1,177.0 min ( 2,032.3 - 855.3 ) Volume Invert Avail.Storage Storage Description #1 434.00' 197,490 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 434.00 17,707 0 0 435.00 21,269 19,488 19,488 436.00 23,279 22,274 41,762 437.00 25,363 24,321 66,083 438.00 28,009 26,686 92,769 439.00 30,867 29,438 122,207 440.00 34,849 32,858 155,065 441.00 50,000 42,425 197,490 Device Routing Invert Outlet Devices #1 Primary 433.55' 36.0" Round Culvert L= 71.5' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 433.55' / 431.01' S= 0.0355 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 439.50' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #3 Device 1 434.00' 0.600 cfs Constant Flow/Skimmer Phase -In= 0.47' Primary OutFlow Max=0.60 cfs @ 11.90 hrs HW=434.59' (Free Discharge) L1=Culvert (Passes 0.60 cfs of 7.54 cfs potential flow) �__3=Constant 2=Sharp-Crested Rectangular Weir (Controls 0.00 cfs) Flow/Skimmer (Constant Controls 0.60 cfs) BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 14 Pond 4B: Basin 4 - skimmer discharge Hydrograph i i i i 34 30.56 cfs —+ — —� — — — — — — {------- — — ------- --- ----- --- ---- 32 30 ���������� 26 i l i l l l eak...-..Lies 43:0�' ... . -- - -�- -- -- - -- ... . 26 i i i i i ---- +-{-----�----�------,-----�------�-----t------ ;----, forage=C8;4B1-icf 24 i i i i i i i 22 i i i i i i 20 i I I I I I I I I_ I__ I i I I i I I I I i I I i 18 16 14 12 10 8 6 I I I ......... ................... ................................ 4 f' 2 0.60 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Primary BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 15 Summary for Subcatchment 4-pre: Basin 4 Pre -development Runoff = 11.68 cfs @ 12.63 hrs, Volume= 1.931 af, Depth= 1.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (ac) CN Description 22.030 70 Woods, Good, HSG C 22.030 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 33.5 150 0.0130 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 22.1 1,393 0.0440 1.05 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 55.6 1,543 Total Subcatchment 4-pre: Basin 4 Pre -development Hydrograph i I i I i i I i I i I i I I 13 i i i i i 12 i 11.68 cfs I ---------- --------- --- 4--------- t---------- ---------; ? E + E I aI'��pe -11-i 4 i Car -------i---------1-------- �1 - ' 24lr 1ft1 109 il ea=2 RU -------iI - ----------i ---- -- ------ si alI -- - 8 i i i i n , urne� ;a -- - - --t- - ---t------- ------- ---...... - -- �----- - -- _ .. 7 i ; i i —I --}- ..-}----i—t—�-- --F--a —r-u -° - ep h -� - 3 6 i ° -- -. - --} - -- - } - -�- - a-- �- -j-- Faw Length=' 543' LL i i i i i I I I I I , I I 5 - -I ........------------------------i i i i - - -T+�_ �� n 4 i I i i =I-0.. i i i i I 3 i 2 1 I I I I fi fi-- I I---1 -r—.............. . --1—--; 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 16 Summary for Subcatchment 4S-A: LS Entry Area & Basin 4 - Direct to Pond Runoff = 16.92 cfs @ 11.96 hrs, Volume= 0.785 af, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (ac) CN Description 0.529 82 Dirt roads, HSG B 0.562 82 Dirt roads, HSG B 0.459 98 Water Surface, HSG C 0.122 98 Water Surface, HSG C 5.295 71 Meadow, non -grazed, HSG C 6.967 75 Weighted Average 6.386 91.66% Pervious Area 0.581 8.34% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, min toc Subcatchment 4S-A: LS Entry Area & Basin 4 - Direct to Pond Hydrograph ■ Runoff Time (hours) BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 17 Summary for Subcatchment 4S-B: LS Processing Area - Direct to Pond Runoff = 23.86 cfs @ 11.96 hrs, Volume= 1.107 af, Depth= 1.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (ac) CN Description 6.964 82 Dirt roads, HSG B (used B because of the larger stockpiles in the area) 0.189 77 Brush, Poor, HSG C 0.066 98 Water Surface, HSG C 7.219 82 Weighted Average 7.153 99.09% Pervious Area 0.066 0.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, min toc 1 1 Subcatchment 4S-B: LS Processing Area - Direct to Pond Hydrograph I r 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 18 Summary for Subcatchment 4S-C: LS Maint Area Runoff = 10.17 cfs @ 12.35 hrs, Volume= 1.154 af, Depth= 1.77" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (ac) CN Description 2.137 76 Woods/grass comb., Fair, HSG C 0.349 76 Woods/grass comb., Fair, HSG C 0.078 98 Roofs 0.060 98 Roofs 0.120 98 Roofs 0.032 98 Roofs 0.018 98 Roofs 5.053 82 Dirt roads, HSG C 7.847 81 Weighted Average 7.539 96.07% Pervious Area 0.308 3.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.7 150 0.0150 0.08 Sheet Flow, woods Woods: Light underbrush n= 0.400 P2= 3.54" 1.4 60 0.0208 0.72 Shallow Concentrated Flow, woods Woodland Kv= 5.0 fps 1.8 220 0.0160 2.04 Shallow Concentrated Flow, agg area to ditch Unpaved Kv= 16.1 fps 3.0 635 0.0470 3.49 Shallow Concentrated Flow, side of road ditch Unpaved Kv= 16.1 fps 37.9 1,065 Total BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 19 z w 6- 3 = 0 LL 5- Subcatchment 4S-C: LS Maint Area Hydrograph ---- - pan �r5 — — --- ---- ---- ---- i i t i i i I I i I I �— ---- � --- � ---- � ---'------ — � --- Type ' 4-h_-r - _ 5' y4hr RaInf 11=3.-- --ri---- _. -I-I aAre= .847 cR�nfI ' Runoff ;Volume:1.154af 1 --------- -------- ----- -------------------- -------- ----------1 un pep h=1.71 - --- -- ----- - ----- ------r------;------ -- -- fqw erigth=130 5' i i i i i i i I i i i ■ Runoff BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 20 Summary for Reach 4R-A: 24" Culvert Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 1.77" for 2yr-24hr event Inflow = 10.17 cfs @ 12.35 hrs, Volume= 1.154 of Outflow = 10.16 cfs @ 12.35 hrs, Volume= 1.154 af, Atten= 0%, Lag= 0.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 11.55 fps, Min. Travel Time= 0.2 min Avg. Velocity = 4.47 fps, Avg. Travel Time= 0.5 min Peak Storage= 125 cf @ 12.35 hrs Average Depth at Peak Storage= 0.65' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.87 cfs 24.0" Round Pipe n= 0.011 Concrete pipe, straight & clean Length= 142.0' Slope= 0.0282 '/' Inlet Invert= 468.00', Outlet Invert= 464.00' I N V 3 0 LL Reach 4R-A: 24" Culvert Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) C' Inflow ❑ Outflow BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 21 Summary for Reach 4R-13: Channel 1 - culv to forebay Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 1.77" for 2yr-24hr event Inflow = 10.16 cfs @ 12.35 hrs, Volume= 1.154 of Outflow = 10.16 cfs @ 12.35 hrs, Volume= 1.154 af, Atten= 0%, Lag= 0.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.21 fps, Min. Travel Time= 0.2 min Avg. Velocity = 2.57 fps, Avg. Travel Time= 0.6 min Peak Storage= 126 cf @ 12.35 hrs Average Depth at Peak Storage= 0.48' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 188.65 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 89.8' Slope= 0.0891 T Inlet Invert= 460.00', Outlet Invert= 452.00' I 0 N V 3 0 LL Reach 4R-B: Channel 1 - culy to forebay Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) n Inflow ❑ Outflow BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 22 Summary for Reach 4R-C: Channel 2A - forebay to pond Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 1.77" for 2yr-24hr event Inflow = 10.16 cfs @ 12.35 hrs, Volume= 1.154 of Outflow = 10.16 cfs @ 12.36 hrs, Volume= 1.154 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 6.18 fps, Min. Travel Time= 0.3 min Avg. Velocity = 2.23 fps, Avg. Travel Time= 0.9 min Peak Storage= 199 cf @ 12.36 hrs Average Depth at Peak Storage= 0.54' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 152.02 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 121.0' Slope= 0.0579 '/' Inlet Invert= 449.00', Outlet Invert= 442.00' N U 3 0 E Reach 4R-C: Channel 2A - forebay to pond Hydrograph ' -----�----•- I 1 i-1 - 10.16cfs ( I I I I I ( I I cs- - - I - i - .....--..--...i _..._T r ....._ _..--._ ....-- __.....--..._..i_ ..._...._.. i__...__....--....-_ ; ; nfloV1' A'=1..847 1c .. 10.16 0------- ...... ..— -I— - ;- I �------� �_A�g�_..FI�v� .5►4' 9 -- - -- ---4------�- - _Depfih= i 8 i i i i i 1 �MI ax i I I 1! I I VeI-- .-1$ -fs- 7 i } t - t- t - - } - - t - - -+, - - - - - - 4- ....._.....11......_.....1L1.,_V_...1LJ._....... I i i 0. I 5 I I I I I I I I i i i i i i i i i _ +--+---{ 4 ---.---i /=� ��0�--cfs-t pae- {i it.......... -_ 3- -------4----t------l----i---+-------- -- --- --- -- —---- --- --- +--------- 2 --------- -}— - 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow 0 Outflow BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 23 Summary for Reach 4R-D: Channel 213 - forebay to pond Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 1.77" for 2yr-24hr event Inflow = 10.16 cfs @ 12.36 hrs, Volume= 1.154 of Outflow = 10.16 cfs @ 12.36 hrs, Volume= 1.154 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 11.69 fps, Min. Travel Time= 0.0 min Avg. Velocity = 4.08 fps, Avg. Travel Time= 0.1 min Peak Storage= 17 cf @ 12.36 hrs Average Depth at Peak Storage= 0.33' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 374.86 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 19.9' Slope= 0.3518 '/' Inlet Invert= 442.00', Outlet Invert= 435.00' I 0 N V 3 0 LL Reach 4R-D: Channel 213 - forebay to pond Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) n Inflow ❑ Outflow BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 24 Summary for Pond 1 F: Forebay - old RD - OF006 Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 1.77" for 2yr-24hr event Inflow = 10.16 cfs @ 12.35 hrs, Volume= 1.154 of Primary = 10.16 cfs @ 12.35 hrs, Volume= 1.154 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs w 3 0 LL .... . ------------- 1 Ill 1 1 1 1 �1 1 •1 1 :1 •1 ❑ Inflow ❑ Primary BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 25 Summary for Pond 2F: Forebay - old RD - East of new pond Inflow Area = 7.219 ac, 0.91 % Impervious, Inflow Depth = 1.84" for 2yr-24hr event Inflow = 23.86 cfs @ 11.96 hrs, Volume= 1.107 of Primary = 23.86 cfs @ 11.96 hrs, Volume= 1.107 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs w 3 O LL Pond 2F: Forebay - old RD - East of new pond Hydrograph 26 ' .---.---...--,- 23.86 ' 23.86 ds cfs------7'---_--)--..�----(--�--_—�--i'---_-_"i.--_---_—^'-_---_--_�-_---.---_.i'-_---_�—_--------------i--_--_---T-__---...... � � � � ' .---.........--.r--... -.---.- -_--- I nil ow...Area=7:�-19-. aE . 22 ..... i i i i i i i -- - - -*- - -20 i I I i I I I I i I i I i I I i ; : 18 i i i i i i i i i I __ _ ' I i 14 ..... --!------- +--------------- ------- -----;- - - - ----+------F - - - - - —F i- 10 ------...--.... .. I I I I I i I i I I I i + - --------- i - + - - - �-------�- - - -------+------i------t------ i------- .._....._....._.. i I I --_--_-_I-_--_--_---_--__---_--_--..--------8 i _ -_---_ Fi --_--_-----_--_--_- _---_--`-_---_--_r _----- _ _ -_-- _ -- _--_- -- -iI -- _--_-- 6-1 q' ---f -- — -- -- ------ -- -- -- -- -- -- -- -- -- 2- 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Primary BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 26 Summary for Pond 4B: Basin 4 - skimmer discharge Inflow Area = 22.033 ac, 4.33% Impervious, Inflow Depth = 1.66" for 2yr-24hr event Inflow = 43.06 cfs @ 11.96 hrs, Volume= 3.046 of Outflow = 0.60 cfs @ 11.80 hrs, Volume= 3.046 af, Atten= 99%, Lag= 0.0 min Primary = 0.60 cfs @ 11.80 hrs, Volume= 3.046 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 438.41' @ 24.04 hrs Surf.Area= 29,182 sf Storage= 104,500 cf Flood Elev= 441.00' Surf.Area= 50,000 sf Storage= 197,490 cf Plug -Flow detention time= 1,680.6 min calculated for 3.046 of (100% of inflow) Center -of -Mass det. time= 1,680.5 min ( 2,526.2 - 845.7 ) Volume Invert Avail.Storage Storage Description #1 434.00' 197,490 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 434.00 17,707 0 0 435.00 21,269 19,488 19,488 436.00 23,279 22,274 41,762 437.00 25,363 24,321 66,083 438.00 28,009 26,686 92,769 439.00 30,867 29,438 122,207 440.00 34,849 32,858 155,065 441.00 50,000 42,425 197,490 Device Routing Invert Outlet Devices #1 Primary 433.55' 36.0" Round Culvert L= 71.5' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 433.55' / 431.01' S= 0.0355 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 439.50' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #3 Device 1 434.00' 0.600 cfs Constant Flow/Skimmer Phase -In= 0.47' Primary OutFlow Max=0.60 cfs @ 11.80 hrs HW=434.56' (Free Discharge) L1=Culvert (Passes 0.60 cfs of 7.09 cfs potential flow) �__3=Constant 2=Sharp-Crested Rectangular Weir (Controls 0.00 cfs) Flow/Skimmer (Constant Controls 0.60 cfs) BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 27 w 0 3 0 LL Pond 4B: Basin 4 - skimmer discharge Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Primary BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 28 Summary for Subcatchment 4-pre: Basin 4 Pre -development Runoff = 19.41 cfs @ 12.60 hrs, Volume= 3.034 af, Depth= 1.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (ac) CN Description 22.030 70 Woods, Good, HSG C 22.030 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 33.5 150 0.0130 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 22.1 1,393 0.0440 1.05 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 55.6 1,543 Total N V 3 0 LL Subcatchment 4-pre: Basin 4 Pre -development Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff MAN ► rdA ' O : 1 PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/11/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 4S-A: LS Entry Area & Basin 4 - Direct to Pond Runoff = 25.46 cfs @ 11.96 hrs, Volume= 1.177 af, Depth= 2.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (ac) CN Description 0.529 82 Dirt roads, HSG B 0.562 82 Dirt roads, HSG B 0.459 98 Water Surface, HSG C 0.122 98 Water Surface, HSG C 5.295 71 Meadow, non -grazed, HSG C 6.967 75 Weighted Average 6.386 91.66% Pervious Area 0.581 8.34% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, min toc Subcatchment 4S-A: LS Entry Area & Basin 4 - Direct to Pond Hydrograph ■ Runoff Time (hours) BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 30 Summary for Subcatchment 4S-B: LS Processing Area - Direct to Pond Runoff = 33.51 cfs @ 11.96 hrs, Volume= 1.570 af, Depth= 2.61" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (ac) CN Description 6.964 82 Dirt roads, HSG B (used B because of the larger stockpiles in the area) 0.189 77 Brush, Poor, HSG C 0.066 98 Water Surface, HSG C 7.219 82 Weighted Average 7.153 99.09% Pervious Area 0.066 0.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, min toc 3 -L LL Subcatchment 4S-B: LS Processing Area - Direct to Pond Hydrograph 36 34 32 i i r, --------'--------- ------ '------r---------r---------r--------------------r---------r---------r----------r-- -r---------r-- r-------- . - ;I I = -----r- 30---------------- -------------------------------- ;I --------- ;--------�yr�24hr ga-�r-vf4t1-=4-47!! 28 28----------------!------ }--------------E--------F-------- + F-+- + --- ---ri no raa= ---� -- ---! --t--a-R 26 ------�------------------------------- - ----�--- -- a 24- -------t' ---t i t - -! - it ri- a — lu-n-of-4% 22 ! ! 20 RU ' -- i —r- — --------i--- ' - -;— f 1 18 i i I- I--' i -- - -}- - --+-- ------ t-----+------ r- ---4- - r- -,- - r— ; - +-- T. 16 i i ! ! j i i i i i ! i i �• 14 -- i- ---- --- -+ + - - - - -� - - i - - i --F------- -- --- --- i 4-- --- --- --+------ - - { IN 12 --------- +----- ..... ! ! ! - -i-.- i i i i ---------------- 4 ------ - -------- 10 i I ! I ! — I I I 8-_-_-_-L--_--.......-J. ------ ------- _-- L-_--_--1.-_-_--_I L_---_L------ -L-_-_---_--_--_-1---_-_-- .�------- ------ J._------L-------L- I I I I I I I I I I I I I 6 i -_-_-_-;------.......--t_--_-_;---_-_-'f'--_--_--'•-_--_-_---4--_--_--1-_---4_---_.7--_-_---4-_-_---;----_--_-.4----_-_--;--4-------F-------I-- 4 i 2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 k 75 80 85 90 95 Time (hours) ■ Runoff BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 31 Summary for Subcatchment 4S-C: LS Maint Area Runoff = 14.64 cfs @ 12.34 hrs, Volume= 1.649 af, Depth= 2.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (ac) CN Description 2.137 76 Woods/grass comb., Fair, HSG C 0.349 76 Woods/grass comb., Fair, HSG C 0.078 98 Roofs 0.060 98 Roofs 0.120 98 Roofs 0.032 98 Roofs 0.018 98 Roofs 5.053 82 Dirt roads, HSG C 7.847 81 Weighted Average 7.539 96.07% Pervious Area 0.308 3.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.7 150 0.0150 0.08 Sheet Flow, woods Woods: Light underbrush n= 0.400 P2= 3.54" 1.4 60 0.0208 0.72 Shallow Concentrated Flow, woods Woodland Kv= 5.0 fps 1.8 220 0.0160 2.04 Shallow Concentrated Flow, agg area to ditch Unpaved Kv= 16.1 fps 3.0 635 0.0470 3.49 Shallow Concentrated Flow, side of road ditch Unpaved Kv= 16.1 fps 37.9 1,065 Total BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 32 Subcatchment 4S-C: LS Maint Area Hydrograph 6 i 4.64 cfs 5 i � ' � i i i � � 4 "QTTT f i i i i i i i i p i 3 i—i Xr e r n --_-�,A - —i — ....... F-- r---i----- $ —7 •---i----, -r 2 i A , ...................._.+._.._....r_.._..-...._.._..-;.._.._..-..-.._.._..F...._.._..4---.._.._--------._:.._Rrya .84 Iunp Vo un{ie 4-1494f� -- --- �— I I t 9114 rill — { 8- 4: r 7 i i i l i i i w =� 506.5 -_-_-i-_--_-�.-_--_-_ ------- _-- s f 7 ..--_-{---_--4--------- --------- F---------- ---------- 4---_--_---b--_--_--_-4----_--_-a- ---------- 4--_--_--_1----- --- -- ---_-- ---_-- _l ... .......- i I ' 5 : i i i i i i i I i .._.._.I�.. I 4 i � 1177T � : 1 OL ........ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 33 Summary for Reach 4R-A: 24" Culvert Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 2.52" for 5yr-24hr event Inflow = 14.64 cfs @ 12.34 hrs, Volume= 1.649 of Outflow = 14.64 cfs @ 12.34 hrs, Volume= 1.649 af, Atten= 0%, Lag= 0.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 12.77 fps, Min. Travel Time= 0.2 min Avg. Velocity = 4.81 fps, Avg. Travel Time= 0.5 min Peak Storage= 163 cf @ 12.34 hrs Average Depth at Peak Storage= 0.79' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.87 cfs 24.0" Round Pipe n= 0.011 Concrete pipe, straight & clean Length= 142.0' Slope= 0.0282 '/' Inlet Invert= 468.00', Outlet Invert= 464.00' 1 1 1 1 1 1 N 1 3 0 LL Reach 4R-A: 24" Culvert Hydrograph I r, - i to- • I • I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 34 Summary for Reach 4R-13: Channel 1 - culv to forebay Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 2.52" for 5yr-24hr event Inflow = 14.64 cfs @ 12.34 hrs, Volume= 1.649 of Outflow = 14.64 cfs @ 12.35 hrs, Volume= 1.649 af, Atten= 0%, Lag= 0.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 8.01 fps, Min. Travel Time= 0.2 min Avg. Velocity = 2.80 fps, Avg. Travel Time= 0.5 min Peak Storage= 164 cf @ 12.35 hrs Average Depth at Peak Storage= 0.58' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 188.65 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 89.8' Slope= 0.0891 T Inlet Invert= 460.00', Outlet Invert= 452.00' Reach 4R-B: Channel 1 - culy to forebay Hydrograph ■ Inflow ■ outflow 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 35 Summary for Reach 4R-C: Channel 2A - forebay to pond Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 2.52" for 5yr-24hr event Inflow = 14.64 cfs @ 12.35 hrs, Volume= 1.649 of Outflow = 14.64 cfs @ 12.35 hrs, Volume= 1.649 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 6.85 fps, Min. Travel Time= 0.3 min Avg. Velocity = 2.42 fps, Avg. Travel Time= 0.8 min Peak Storage= 258 cf @ 12.35 hrs Average Depth at Peak Storage= 0.65' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 152.02 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 121.0' Slope= 0.0579 '/' Inlet Invert= 449.00', Outlet Invert= 442.00' Reach 4R-C: Channel 2A - forebay to pond Hydrograph ■ Inflow ■ outflow 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 36 Summary for Reach 4R-D: Channel 213 - forebay to pond Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 2.52" for 5yr-24hr event Inflow = 14.64 cfs @ 12.35 hrs, Volume= 1.649 of Outflow = 14.64 cfs @ 12.35 hrs, Volume= 1.649 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 13.05 fps, Min. Travel Time= 0.0 min Avg. Velocity = 4.46 fps, Avg. Travel Time= 0.1 min Peak Storage= 22 cf @ 12.35 hrs Average Depth at Peak Storage= 0.40' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 374.86 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 19.9' Slope= 0.3518 7' Inlet Invert= 442.00', Outlet Invert= 435.00' Reach 4R-D: Channel 213 - forebay to pond Hydrograph ■ Inflow ■ outflow 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 37 Summary for Pond 1 F: Forebay - old RD - OF006 Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 2.52" for 5yr-24hr event Inflow = 14.64 cfs @ 12.35 hrs, Volume= 1.649 of Primary = 14.64 cfs @ 12.35 hrs, Volume= 1.649 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs 1 1 1 1 1 1 N 1 3 0 LL '• • • -•. • • • 11. . .. . . I� I� I ❑ Inflow ❑ Primary BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 38 Summary for Pond 2F: Forebay - old RD - East of new pond Inflow Area = 7.219 ac, 0.91% Impervious, Inflow Depth = 2.61" for 5yr-24hr event Inflow = 33.51 cfs @ 11.96 hrs, Volume= 1.570 of Primary = 33.51 cfs @ 11.96 hrs, Volume= 1.570 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs 3 0 LL Pond 2F: Forebay - old RD - East of new pond Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Primary BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 39 Summary for Pond 4B: Basin 4 - skimmer discharge Inflow Area = 22.033 ac, 4.33% Impervious, Inflow Depth = 2.39" for 5yr-24hr event Inflow = 62.55 cfs @ 11.96 hrs, Volume= 4.396 of Outflow = 1.92 cfs @ 16.20 hrs, Volume= 4.385 af, Atten= 97%, Lag= 254.6 min Primary = 1.92 cfs @ 16.20 hrs, Volume= 4.385 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 439.57' @ 16.20 hrs Surf.Area= 33,120 sf Storage= 140,307 cf Flood Elev= 441.00' Surf.Area= 50,000 sf Storage= 197,490 cf Plug -Flow detention time= 1,917.7 min calculated for 4.383 of (100% of inflow) Center -of -Mass det. time= 1,917.4 min ( 2,752.5 - 835.1 ) Volume Invert Avail.Storage Storage Description #1 434.00' 197,490 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 434.00 17,707 0 0 435.00 21,269 19,488 19,488 436.00 23,279 22,274 41,762 437.00 25,363 24,321 66,083 438.00 28,009 26,686 92,769 439.00 30,867 29,438 122,207 440.00 34,849 32,858 155,065 441.00 50,000 42,425 197,490 Device Routing Invert Outlet Devices #1 Primary 433.55' 36.0" Round Culvert L= 71.5' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 433.55' / 431.01' S= 0.0355 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 439.50' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #3 Device 1 434.00' 0.600 cfs Constant Flow/Skimmer Phase -In= 0.47' Primary OutFlow Max=1.92 cfs @ 16.20 hrs HW=439.57' (Free Discharge) L1=Culvert (Passes 1.92 cfs of 72.33 cfs potential flow) �__3=Constant 2=Sharp-Crested Rectangular Weir (Weir Controls 1.32 cfs @ 0.84 fps) Flow/Skimmer (Constant Controls 0.60 cfs) MAN ON r,A ' O : 1 PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/11/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 40 Pond 4B: Basin 4 - skimmer discharge Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 41 Summary for Subcatchment 4-pre: Basin 4 Pre -development Runoff = 26.10 cfs @ 12.58 hrs, Volume= 3.985 af, Depth= 2.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (ac) CN Description 22.030 70 Woods, Good, HSG C 22.030 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 33.5 150 0.0130 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 22.1 1,393 0.0440 1.05 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 55.6 1,543 Total w 3 0 LL Subcatchment 4-pre: Basin 4 Pre -development Hydrograph 28 i i i i i i i i ............--__ ...... 26.10 cfs--- -_--_-_'f._--_--_--.1'-_--_-^-_--_--_-1------- _-r------- T------- }_-_--_-f— ----- T----------- --------- ?------ _--- -_--_--_}-_-_-__-_-_--f'-_-_--"I-- 26 i i i } i +I i i I t I I 24 i i i i l i l i i p i 22 I I i I I i i I i 20 I I OTOM AY021--_2-Zi 0c 18 unOff Yoh-urrie3.85iaf R -- -..... -- -- - ---- - - -- - -- --t— r — 7 16 - ------- i 41 —a i :--------- 14 i 12 -_--_---_-!_--_--..............._..-...---.-1_--_--_--i--_--_-_:--_--_--_-!-_--_--__:.---_--_---1.--_--_---:-.---_--_-.L---_--_--1--_--_--_;--.--_---_-L�i_--J-- 10 i i iiC�` .fT.1R n i ' ' i J �7 - - 1 f r - t t- --fi------- r ;---------t - - +; - - --C+ - - - $ ; ; - -L 1- - - -----------E------------------ ------- --- --L------ -------;------N = 0 a 6 i i i i i i t + 1 t t---------I----------t ---------; t t +, t ± t fi--------1 4 i i i i i i —}— .... I............. ..... .. —} - — —} — + —} - 2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 42 Summary for Subcatchment 4S-A: LS Entry Area & Basin 4 - Direct to Pond Runoff = 32.52 cfs @ 11.96 hrs, Volume= 1.507 af, Depth= 2.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (ac) CN Description 0.529 82 Dirt roads, HSG B 0.562 82 Dirt roads, HSG B 0.459 98 Water Surface, HSG C 0.122 98 Water Surface, HSG C 5.295 71 Meadow, non -grazed, HSG C 6.967 75 Weighted Average 6.386 91.66% Pervious Area 0.581 8.34% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, min toc Subcatchment 4S-A: LS Entry Area & Basin 4 - Direct to Pond Hydrograph 36 ....... ..... ! i ! ... - - } - - + - - +------' +........... .:............ 34 32_ .. 32.52 cfs - ------- --_-_--r--_--_--ti-_--_-_;_-_--_-r-------------- t------ --_-_--Y-_-_--------------- 1----.---...--i.--_--_-_t-_-_-_;_-_-_�-_-- -- i i i ! tII i ! i i i _...----' ----------------t---------+---------F-------�------F------+---------F-------------+---------�----------t----- :/ e...1.1... 4 30 : 1 Qyr Zir Rainfall:1 26 - -- -----rt-------T------------------- - - - .....--...-....-Rtnoff Area=6.967 ac.. 24 `J ! ! ! ! ! ! --t------ -----t - -+- -----t - -f- - - r - - t - - - .. a .......................... I Runoff liolune=1.507 af" i I i ; 22 ! ! - - — - - - r - - r - - - ...--...- .. ...--...--.. - ...--...;-.....-......_......:....................................._:...-.....-..... { r - --r------ t------- - - - - - —' 20` 18 J ! 14 i i i i i i i i i i i i i ....... ..._ ........ ..... :. 12= ; 8 ; 64. 4 !..... ..... :-...--...--...--!..--...--...-...--...--...- ...--... ! ...--... .:..... ...... ..... ... -..... ..... -;.--... ...--.-!-... ...--...!... _!.--... ...--.;.... 2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 43 Summary for Subcatchment 4S-B: LS Processing Area - Direct to Pond Runoff = 41.26 cfs @ 11.95 hrs, Volume= 1.949 af, Depth= 3.24" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (ac) CN Description 6.964 82 Dirt roads, HSG B (used B because of the larger stockpiles in the area) 0.189 77 Brush, Poor, HSG C 0.066 98 Water Surface, HSG C 7.219 82 Weighted Average 7.153 99.09% Pervious Area 0.066 0.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, min toc Subcatchment 4S-B: LS Processing Area - Direct to Pond Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 44 Summary for Subcatchment 4S-C: LS Maint Area Runoff = 18.29 cfs @ 12.34 hrs, Volume= 2.057 af, Depth= 3.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (ac) CN Description 2.137 76 Woods/grass comb., Fair, HSG C 0.349 76 Woods/grass comb., Fair, HSG C 0.078 98 Roofs 0.060 98 Roofs 0.120 98 Roofs 0.032 98 Roofs 0.018 98 Roofs 5.053 82 Dirt roads, HSG C 7.847 81 Weighted Average 7.539 96.07% Pervious Area 0.308 3.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.7 150 0.0150 0.08 Sheet Flow, woods Woods: Light underbrush n= 0.400 P2= 3.54" 1.4 60 0.0208 0.72 Shallow Concentrated Flow, woods Woodland Kv= 5.0 fps 1.8 220 0.0160 2.04 Shallow Concentrated Flow, agg area to ditch Unpaved Kv= 16.1 fps 3.0 635 0.0470 3.49 Shallow Concentrated Flow, side of road ditch Unpaved Kv= 16.1 fps 37.9 1,065 Total MAN ON r,A ' O : 1 PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/11/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 45 Subcatchment 4S-C: LS Maint Area Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 46 Summary for Reach 4R-A: 24" Culvert Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 3.14" for 10yr-24hr event Inflow = 18.29 cfs @ 12.34 hrs, Volume= 2.057 of Outflow = 18.28 cfs @ 12.34 hrs, Volume= 2.057 af, Atten= 0%, Lag= 0.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 13.55 fps, Min. Travel Time= 0.2 min Avg. Velocity = 5.04 fps, Avg. Travel Time= 0.5 min Peak Storage= 192 cf @ 12.34 hrs Average Depth at Peak Storage= 0.89' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.87 cfs 24.0" Round Pipe n= 0.011 Concrete pipe, straight & clean Length= 142.0' Slope= 0.0282 '/' Inlet Invert= 468.00', Outlet Invert= 464.00' N V 3 0 LL Reach 4R-A: 24" Culvert Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) [ Inflow ❑ Outflow BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 47 Summary for Reach 4R-13: Channel 1 - culv to forebay Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 3.14" for 10yr-24hr event Inflow = 18.28 cfs @ 12.34 hrs, Volume= 2.057 of Outflow = 18.28 cfs @ 12.34 hrs, Volume= 2.057 af, Atten= 0%, Lag= 0.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 8.52 fps, Min. Travel Time= 0.2 min Avg. Velocity = 2.96 fps, Avg. Travel Time= 0.5 min Peak Storage= 193 cf @ 12.34 hrs Average Depth at Peak Storage= 0.65' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 188.65 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 89.8' Slope= 0.0891 T Inlet Invert= 460.00', Outlet Invert= 452.00' N V 3 0 LL Reach 4R-B: Channel 1 - culy to forebay Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ outflow BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 48 Summary for Reach 4R-C: Channel 2A - forebay to pond Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 3.14" for 10yr-24hr event Inflow = 18.28 cfs @ 12.34 hrs, Volume= 2.057 of Outflow = 18.28 cfs @ 12.35 hrs, Volume= 2.057 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.28 fps, Min. Travel Time= 0.3 min Avg. Velocity = 2.55 fps, Avg. Travel Time= 0.8 min Peak Storage= 304 cf @ 12.35 hrs Average Depth at Peak Storage= 0.73' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 152.02 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 121.0' Slope= 0.0579 '/' Inlet Invert= 449.00', Outlet Invert= 442.00' N V 3 0 LL Reach 4R-C: Channel 2A - forebay to pond Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ outflow BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 49 Summary for Reach 4R-D: Channel 213 - forebay to pond Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 3.14" for 10yr-24hr event Inflow = 18.28 cfs @ 12.35 hrs, Volume= 2.057 of Outflow = 18.28 cfs @ 12.35 hrs, Volume= 2.057 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 13.93 fps, Min. Travel Time= 0.0 min Avg. Velocity = 4.70 fps, Avg. Travel Time= 0.1 min Peak Storage= 26 cf @ 12.35 hrs Average Depth at Peak Storage= 0.45' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 374.86 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 19.9' Slope= 0.3518 '/' Inlet Invert= 442.00', Outlet Invert= 435.00' N V 3 0 LL Reach 4R-D: Channel 213 - forebay to pond Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ outflow BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 50 Summary for Pond 1 F: Forebay - old RD - OF006 Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 3.14" for 10yr-24hr event Inflow = 18.28 cfs @ 12.34 hrs, Volume= 2.057 of Primary = 18.28 cfs @ 12.34 hrs, Volume= 2.057 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs N V 3 0 LL Pond 1 F: Forebay - old RD - OF006 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Primary BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 51 Summary for Pond 2F: Forebay - old RD - East of new pond Inflow Area = 7.219 ac, 0.91 % Impervious, Inflow Depth = 3.24" for 10yr-24hr event Inflow = 41.26 cfs @ 11.95 hrs, Volume= 1.949 of Primary = 41.26 cfs @ 11.95 hrs, Volume= 1.949 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs 3 0 U. Pond 2F: Forebay - old RD - East of new pond Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Primary BASIN 4 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 52 Summary for Pond 4B: Basin 4 - skimmer discharge Inflow Area = 22.033 ac, 4.33% Impervious, Inflow Depth = 3.00" for 10yr-24hr event Inflow = 78.46 cfs @ 11.96 hrs, Volume= 5.513 of Outflow = 7.05 cfs @ 13.23 hrs, Volume= 5.502 af, Atten= 91 %, Lag= 76.2 min Primary = 7.05 cfs @ 13.23 hrs, Volume= 5.502 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 439.69' @ 13.23 hrs Surf.Area= 33,611 sf Storage= 144,424 cf Flood Elev= 441.00' Surf.Area= 50,000 sf Storage= 197,490 cf Plug -Flow detention time= 1,551.1 min calculated for 5.502 of (100% of inflow) Center -of -Mass det. time= 1,549.8 min ( 2,378.4 - 828.7 ) Volume Invert Avail.Storage Storage Description #1 434.00' 197,490 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 434.00 17,707 0 0 435.00 21,269 19,488 19,488 436.00 23,279 22,274 41,762 437.00 25,363 24,321 66,083 438.00 28,009 26,686 92,769 439.00 30,867 29,438 122,207 440.00 34,849 32,858 155,065 441.00 50,000 42,425 197,490 Device Routing Invert Outlet Devices #1 Primary 433.55' 36.0" Round Culvert L= 71.5' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 433.55' / 431.01' S= 0.0355 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 439.50' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #3 Device 1 434.00' 0.600 cfs Constant Flow/Skimmer Phase -In= 0.47' Primary OutFlow Max=7.05 cfs @ 13.23 hrs HW=439.69' (Free Discharge) L1=Culvert (Passes 7.05 cfs of 73.31 cfs potential flow) �__3=Constant 2=Sharp-Crested Rectangular Weir (Weir Controls 6.45 cfs @ 1.42 fps) Flow/Skimmer (Constant Controls 0.60 cfs) MAN ON r,A ' O : 1 PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/11/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 53 Pond 4B: Basin 4 - skimmer discharge Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 54 Summary for Subcatchment 4-pre: Basin 4 Pre -development Runoff = 35.65 cfs @ 12.57 hrs, Volume= 5.340 af, Depth= 2.91" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (ac) CN Description 22.030 70 Woods, Good, HSG C 22.030 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 33.5 150 0.0130 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 22.1 1,393 0.0440 1.05 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 55.6 1,543 Total N V 3 0 LL Subcatchment 4-pre: Basin 4 Pre -development Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff MAN ► rdA ' O : 1 PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/11/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment 4S-A: LS Entry Area & Basin 4 - Direct to Pond Runoff = 42.25 cfs @ 11.96 hrs, Volume= 1.970 af, Depth= 3.39" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (ac) CN Description 0.529 82 Dirt roads, HSG B 0.562 82 Dirt roads, HSG B 0.459 98 Water Surface, HSG C 0.122 98 Water Surface, HSG C 5.295 71 Meadow, non -grazed, HSG C 6.967 75 Weighted Average 6.386 91.66% Pervious Area 0.581 8.34% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, min toc Subcatchment 4S-A: LS Entry Area & Basin 4 - Direct to Pond Hydrograph ■ Runoff Time (hours) BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 56 Summary for Subcatchment 4S-B: LS Processing Area - Direct to Pond Runoff = 51.70 cfs @ 11.95 hrs, Volume= 2.471 af, Depth= 4.11" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (ac) CN Description 6.964 82 Dirt roads, HSG B (used B because of the larger stockpiles in the area) 0.189 77 Brush, Poor, HSG C 0.066 98 Water Surface, HSG C 7.219 82 Weighted Average 7.153 99.09% Pervious Area 0.066 0.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, min toc 3 -L LL Subcatchment 4S-B: LS Processing Area - Direct to Pond Hydrograph 1 , I 55 i st.�o its ----- +--- ¢---------+- --- ---------- F------------------ +----------- ----------�---fig --� n 50 1 i i i � I 1 - 45 1 i i yr r a n =. i i i i i i i i 40 35 i i i i R�r� �� jr� urns 2.01 of i i i i i 30 I I I I I u " o pep1=4:'I" 1 l i l i l i i i l i l l I 1 i � i � I� I I 1 � • I 20 I25 , 15 --------i iI ------------------iI i iI i -ti iI liI iI - i iI iI I - - -i 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 57 Summary for Subcatchment 4S-C: LS Maint Area Runoff = 23.24 cfs @ 12.34 hrs, Volume= 2.617 af, Depth= 4.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (ac) CN Description 2.137 76 Woods/grass comb., Fair, HSG C 0.349 76 Woods/grass comb., Fair, HSG C 0.078 98 Roofs 0.060 98 Roofs 0.120 98 Roofs 0.032 98 Roofs 0.018 98 Roofs 5.053 82 Dirt roads, HSG C 7.847 81 Weighted Average 7.539 96.07% Pervious Area 0.308 3.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.7 150 0.0150 0.08 Sheet Flow, woods Woods: Light underbrush n= 0.400 P2= 3.54" 1.4 60 0.0208 0.72 Shallow Concentrated Flow, woods Woodland Kv= 5.0 fps 1.8 220 0.0160 2.04 Shallow Concentrated Flow, agg area to ditch Unpaved Kv= 16.1 fps 3.0 635 0.0470 3.49 Shallow Concentrated Flow, side of road ditch Unpaved Kv= 16.1 fps 37.9 1,065 Total MAN ON r,A ' O : 1 PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/11/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 58 Subcatchment 4S-C: LS Maint Area Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 59 Summary for Reach 4R-A: 24" Culvert Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 4.00" for 25yr-24hr event Inflow = 23.24 cfs @ 12.34 hrs, Volume= 2.617 of Outflow = 23.24 cfs @ 12.34 hrs, Volume= 2.617 af, Atten= 0%, Lag= 0.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 14.40 fps, Min. Travel Time= 0.2 min Avg. Velocity = 5.33 fps, Avg. Travel Time= 0.4 min Peak Storage= 229 cf @ 12.34 hrs Average Depth at Peak Storage= 1.02' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.87 cfs 24.0" Round Pipe n= 0.011 Concrete pipe, straight & clean Length= 142.0' Slope= 0.0282 '/' Inlet Invert= 468.00', Outlet Invert= 464.00' N V 3 0 LL Reach 4R-A: 24" Culvert Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) C-' Inflow ❑ Outflow BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 60 Summary for Reach 4R-13: Channel 1 - culv to forebay Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 4.00" for 25yr-24hr event Inflow = 23.24 cfs @ 12.34 hrs, Volume= 2.617 of Outflow = 23.24 cfs @ 12.34 hrs, Volume= 2.617 af, Atten= 0%, Lag= 0.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 9.10 fps, Min. Travel Time= 0.2 min Avg. Velocity = 3.14 fps, Avg. Travel Time= 0.5 min Peak Storage= 229 cf @ 12.34 hrs Average Depth at Peak Storage= 0.74' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 188.65 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 89.8' Slope= 0.0891 T Inlet Invert= 460.00', Outlet Invert= 452.00' N V 3 0 LL Reach 4R-B: Channel 1 - culy to forebay Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ Outflow BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 61 Summary for Reach 4R-C: Channel 2A - forebay to pond Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 4.00" for 25yr-24hr event Inflow = 23.24 cfs @ 12.34 hrs, Volume= 2.617 of Outflow = 23.23 cfs @ 12.34 hrs, Volume= 2.617 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.77 fps, Min. Travel Time= 0.3 min Avg. Velocity = 2.72 fps, Avg. Travel Time= 0.7 min Peak Storage= 362 cf @ 12.34 hrs Average Depth at Peak Storage= 0.82' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 152.02 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 121.0' Slope= 0.0579 '/' Inlet Invert= 449.00', Outlet Invert= 442.00' N V 3 0 LL Reach 4R-C: Channel 2A - forebay to pond Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ Outflow BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 62 Summary for Reach 4R-D: Channel 213 - forebay to pond Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 4.00" for 25yr-24hr event Inflow = 23.23 cfs @ 12.34 hrs, Volume= 2.617 of Outflow = 23.24 cfs @ 12.34 hrs, Volume= 2.617 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 14.93 fps, Min. Travel Time= 0.0 min Avg. Velocity = 5.00 fps, Avg. Travel Time= 0.1 min Peak Storage= 31 cf @ 12.34 hrs Average Depth at Peak Storage= 0.51' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 374.86 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 19.9' Slope= 0.3518 '/' Inlet Invert= 442.00', Outlet Invert= 435.00' N V 3 0 LL Reach 4R-D: Channel 213 - forebay to pond Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ Outflow MAN ON rdA ' • : 1 PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/11/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 63 Summary for Pond 1 F: Forebay - old RD - OF006 Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 4.00" for 25yr-24hr event Inflow = 23.24 cfs @ 12.34 hrs, Volume= 2.617 of Primary = 23.24 cfs @ 12.34 hrs, Volume= 2.617 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs 16- 10- Pond 1 F: Forebay - old RD - OF006 Hydrograph I// (/I I /------------------------ Time (hours) ❑ Inflow ❑ Primary BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 64 Summary for Pond 2F: Forebay - old RD - East of new pond Inflow Area = 7.219 ac, 0.91 % Impervious, Inflow Depth = 4.11" for 25yr-24hr event Inflow = 51.70 cfs @ 11.95 hrs, Volume= 2.471 of Primary = 51.70 cfs @ 11.95 hrs, Volume= 2.471 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs .... . C ------------ ® • W. a c • ❑ Inflow ❑ Primary BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 65 Summary for Pond 4B: Basin 4 - skimmer discharge Inflow Area = 22.033 ac, 4.33% Impervious, Inflow Depth = 3.84" for 25yr-24hr event Inflow = 100.16 cfs @ 11.96 hrs, Volume= 7.058 of Outflow = 22.95 cfs @ 12.59 hrs, Volume= 7.046 af, Atten= 77%, Lag= 38.2 min Primary = 22.95 cfs @ 12.59 hrs, Volume= 7.046 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 439.93' @ 12.59 hrs Surf.Area= 34,582 sf Storage= 152,734 cf Flood Elev= 441.00' Surf.Area= 50,000 sf Storage= 197,490 cf Plug -Flow detention time= 1,222.8 min calculated for 7.046 of (100% of inflow) Center -of -Mass det. time= 1,221.8 min ( 2,043.4 - 821.6 ) Volume Invert Avail.Storage Storage Description #1 434.00' 197,490 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 434.00 17,707 0 0 435.00 21,269 19,488 19,488 436.00 23,279 22,274 41,762 437.00 25,363 24,321 66,083 438.00 28,009 26,686 92,769 439.00 30,867 29,438 122,207 440.00 34,849 32,858 155,065 441.00 50,000 42,425 197,490 Device Routing Invert Outlet Devices #1 Primary 433.55' 36.0" Round Culvert L= 71.5' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 433.55' / 431.01' S= 0.0355 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 439.50' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #3 Device 1 434.00' 0.600 cfs Constant Flow/Skimmer Phase -In= 0.47' Primary OutFlow Max=22.91 cfs @ 12.59 hrs HW=439.93' (Free Discharge) L1=Culvert (Passes 22.91 cfs of 75.20 cfs potential flow) �__3=Constant 2=Sharp-Crested Rectangular Weir (Weir Controls 22.31 cfs @ 2.15 fps) Flow/Skimmer (Constant Controls 0.60 cfs) BASIN 4 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 66 Pond 4B: Basin 4 - skimmer discharge Hydrograph ■ Inflow ■ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 67 Summary for Subcatchment 4-pre: Basin 4 Pre -development Runoff = 51.93 cfs @ 12.56 hrs, Volume= 7.678 af, Depth= 4.18" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (ac) CN Description 22.030 70 Woods, Good, HSG C 22.030 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 33.5 150 0.0130 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 22.1 1,393 0.0440 1.05 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 55.6 1,543 Total 3 -L LL Subcatchment 4-pre: Basin 4 Pre -development Hydrograph 55 I I - - i 51.93 I I I i I - - --------...- -------- - - - - i j � — -- I I I I I I I I I 50 cfs I i i i i ly- i 45 i I i lay=2irnfrt1 T. I I i I i R rlf f 2.0 40 I I I I i j i i W i uyloff V11.1 V7/ 0 'n' 35 i L%Cp� ��`F� 30 25 i l L t f i i iowfL = i t �1 20 i 7 i I I i i i i i I i t I t I I I I I i I I• i -_--_--_-!-_--_--__:_--_--_--4--_--_--_:-_-_--_.L--_--_--1---------=----------1---_-_--i-_-_ I 15 i I I i i i i i I I i I I 10 I I I I I I I I 1,01,10,0/.♦��II//////////////iiiiiiiiiiiiiiii////////////////////; 1000 _1//////// 0 ■ Runoff MAN ON rdA ' O : 1 PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/11/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 68 Summary for Subcatchment 4S-A: LS Entry Area & Basin 4 - Direct to Pond Runoff = 58.39 cfs @ 11.96 hrs, Volume= 2.755 af, Depth= 4.74" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (ac) CN Description 0.529 82 Dirt roads, HSG B 0.562 82 Dirt roads, HSG B 0.459 98 Water Surface, HSG C 0.122 98 Water Surface, HSG C 5.295 71 Meadow, non -grazed, HSG C 6.967 75 Weighted Average 6.386 91.66% Pervious Area 0.581 8.34% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, min toc N 0, 3 0 E Subcatchment 4S-A: LS Entry Area & Basin 4 - Direct to Pond Hydrograph 65 i i i i i 60 ' S839 cfs 'I, ii f _...__.-. ••-- _.._-...- .. iiii .........I'i .._ .._.._ ....._.._.. ..._.._...ii .;.. 4h.r4._.._..... --..-..-..( ._...ii; TYy .._.._.._.�ii;i 55 I; . �---- : � ---------- Oyr=24hrRfnfafF 7.�1 50 api : 7 ac 45 ' Ru 66ff f ffil e- 5-i of i 40 35 i i i i i i i i i ,Ruolln...ep h-4. 4'rrr i i I i i i i �---------------F------ ...--...;-.........--......-'-�C.c..........'.n 30 J -' I T------- ----_--T-_--_-_ -- I i i I i i i i i CN=75 25 i I i I i I i i I i 20 I I i I i I i------ 4--------- +--------- ..........---------- }---------- t...._.._..4---------- t......... a.......... .......... .;............. --------- }---------- }--------- 4 ---------- 1.--------- .;_.. 15 - + i i i i -------� --------- + + - - - - +----------F-------a - - - - --+-------}-------- 10 i i i i i i i i i i i---fi--- -- - - r-- -�-- -i -- r-- ---- r-- r-- 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 69 Summary for Subcatchment 4S-B: LS Processing Area - Direct to Pond Runoff = 68.68 cfs @ 11.95 hrs, Volume= 3.337 af, Depth= 5.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (ac) CN Description 6.964 82 Dirt roads, HSG B (used B because of the larger stockpiles in the area) 0.189 77 Brush, Poor, HSG C 0.066 98 Water Surface, HSG C 7.219 82 Weighted Average 7.153 99.09% Pervious Area 0.066 0.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, min toc Subcatchment 4S-B: LS Processing Area - Direct to Pond Hydrograph I i i i i i I 70 i ! 68.68 cfs t ! : : .......:..... r { 4-------._ ... f T.. ...i... 65 ' i Yp ; ! ! -.. .... ....,.. ,.,......--... 1OY.. r-2hrl Jinfff=77, 60 = ! 55..... ------� -.. I -- ............-- ................. ...... ..... I t p /� off /`' lief. 07..21.9.--a.C--' I---...--..Ilr:.u..n 50 i - -- i ! i i i i i u�off..u��ur�n-337..af.. - - -- --t- - -------f -- -�--+-------F-- R e : 45 I I I I I ! i i -; I I i i i i i -�- rt , - - �Depth= --- 40 _!_.._._..... i I i ._... ................... ._..._.._.....i............... ........................... _ _C' .T 35 i I i._.._.._..'...._.._..i.._.._.._.'....._.._...._.._..i.....-...--...-...-.-...--...-...__..._.... ! J 5 rain 1------------------- i ; I I I -- ---.ti►2- 25 — -..... } I ! i i i i i I I —+- - —E- - - — - — - — +— +---- --- --- }--- --- --- +-- t- - -- , — - 20 ; ---------- -+..... + + - + - ± - F + F - + + + + _ - - - - -+ 15 i 10 5 ' 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 70 Summary for Subcatchment 4S-C: LS Maint Area Runoff = 31.37 cfs @ 12.33 hrs, Volume= 3.552 af, Depth= 5.43" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (ac) CN Description 2.137 76 Woods/grass comb., Fair, HSG C 0.349 76 Woods/grass comb., Fair, HSG C 0.078 98 Roofs 0.060 98 Roofs 0.120 98 Roofs 0.032 98 Roofs 0.018 98 Roofs 5.053 82 Dirt roads, HSG C 7.847 81 Weighted Average 7.539 96.07% Pervious Area 0.308 3.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.7 150 0.0150 0.08 Sheet Flow, woods Woods: Light underbrush n= 0.400 P2= 3.54" 1.4 60 0.0208 0.72 Shallow Concentrated Flow, woods Woodland Kv= 5.0 fps 1.8 220 0.0160 2.04 Shallow Concentrated Flow, agg area to ditch Unpaved Kv= 16.1 fps 3.0 635 0.0470 3.49 Shallow Concentrated Flow, side of road ditch Unpaved Kv= 16.1 fps 37.9 1,065 Total BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 71 Subcatchment 4S-C: LS Maint Area Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 72 Summary for Reach 4R-A: 24" Culvert Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 5.43" for 100yr-24hr event Inflow = 31.37 cfs @ 12.33 hrs, Volume= 3.552 of Outflow = 31.36 cfs @ 12.33 hrs, Volume= 3.552 af, Atten= 0%, Lag= 0.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 15.44 fps, Min. Travel Time= 0.2 min Avg. Velocity = 5.74 fps, Avg. Travel Time= 0.4 min Peak Storage= 288 cf @ 12.33 hrs Average Depth at Peak Storage= 1.23' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.87 cfs 24.0" Round Pipe n= 0.011 Concrete pipe, straight & clean Length= 142.0' Slope= 0.0282 '/' Inlet Invert= 468.00', Outlet Invert= 464.00' N V 3 0 LL Reach 4R-A: 24" Culvert Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) P Inflow ❑ Outflow BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 73 Summary for Reach 4R-13: Channel 1 - culv to forebay Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 5.43" for 100yr-24hr evenl Inflow = 31.36 cfs @ 12.33 hrs, Volume= 3.552 of Outflow = 31.36 cfs @ 12.34 hrs, Volume= 3.552 af, Atten= 0%, Lag= 0.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 9.86 fps, Min. Travel Time= 0.2 min Avg. Velocity = 3.42 fps, Avg. Travel Time= 0.4 min Peak Storage= 285 cf @ 12.34 hrs Average Depth at Peak Storage= 0.86' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 188.65 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 89.8' Slope= 0.0891 T Inlet Invert= 460.00', Outlet Invert= 452.00' N V 3 0 LL Reach 4R-B: Channel 1 - culy to forebay Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ Outflow BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 74 Summary for Reach 4R-C: Channel 2A - forebay to pond Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 5.43" for 100yr-24hr evenl Inflow = 31.36 cfs @ 12.34 hrs, Volume= 3.552 of Outflow = 31.36 cfs @ 12.34 hrs, Volume= 3.552 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 8.42 fps, Min. Travel Time= 0.2 min Avg. Velocity = 2.95 fps, Avg. Travel Time= 0.7 min Peak Storage= 450 cf @ 12.34 hrs Average Depth at Peak Storage= 0.95' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 152.02 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 121.0' Slope= 0.0579 '/' Inlet Invert= 449.00', Outlet Invert= 442.00' N V 3 0 LL Reach 4R-C: Channel 2A - forebay to pond Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ outflow BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 75 Summary for Reach 4R-D: Channel 213 - forebay to pond Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 5.43" for 100yr-24hr evenl Inflow = 31.36 cfs @ 12.34 hrs, Volume= 3.552 of Outflow = 31.36 cfs @ 12.34 hrs, Volume= 3.552 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 16.24 fps, Min. Travel Time= 0.0 min Avg. Velocity = 5.43 fps, Avg. Travel Time= 0.1 min Peak Storage= 38 cf @ 12.34 hrs Average Depth at Peak Storage= 0.60' Bank -Full Depth= 2.00' Flow Area= 12.0 sf, Capacity= 374.86 cfs 2.00' x 2.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 10.00' Length= 19.9' Slope= 0.3518 7' Inlet Invert= 442.00', Outlet Invert= 435.00' N V 3 0 LL Reach 4R-D: Channel 213 - forebay to pond Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ outflow BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 76 Summary for Pond 1 F: Forebay - old RD - OF006 Inflow Area = 7.847 ac, 3.93% Impervious, Inflow Depth = 5.43" for 100yr-24hr event Inflow = 31.36 cfs @ 12.34 hrs, Volume= 3.552 of Primary = 31.36 cfs @ 12.34 hrs, Volume= 3.552 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs '• • • -•. • • • 11. . .. . . (/I I� ❑ Inflow ❑ Primary BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 77 Summary for Pond 2F: Forebay - old RD - East of new pond Inflow Area = 7.219 ac, 0.91 % Impervious, Inflow Depth = 5.55" for 100yr-24hr evenl Inflow = 68.68 cfs @ 11.95 hrs, Volume= 3.337 of Primary = 68.68 cfs @ 11.95 hrs, Volume= 3.337 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Pond 2F: Forebay - old RD - East of new pond Hydrograph 75 68.68 i — ds 70 — 68.68 ds — — — --j---_-mot f1� v i- G j 7 211V dC. 65 ..._....._..........a--. ..... ......... ..... ...... ......... .... ... ......... ! ..............-...._.__ ..._....._.....__i.. _ ._--.. ..._ _ .._....._. _..._- F 60 ---------'--. I _......------'+-------'�'-------+-------+------- i i -------*--- —----- F---------+---------_------''--------- +--------F-------+--------+---------T--------...... 55 I +---------a --- --------- + 1 i i I i i ! -{---------- 4 I i i i i ! ! i i i i 50 t -- — r r —r--r! --r.. 45 I i i i I i I i I i i I i ! 40 35 - ... .......-_--_.L---_-.L---.�---1-_-- ! ! ! ----._-----L---_--�.--_-J.--_----L--_-.L--_---_---1----_ ... ! ! ! ! ! 30 25 20 15 10 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Primary BASIN 4 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/11/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 78 Summary for Pond 4B: Basin 4 - skimmer discharge Inflow Area = 22.033 ac, 4.33% Impervious, Inflow Depth = 5.25" for 100yr-24hr event Inflow = 135.83 cfs @ 11.96 hrs, Volume= 9.644 of Outflow = 43.79 cfs @ 12.37 hrs, Volume= 9.632 af, Atten= 68%, Lag= 25.0 min Primary = 43.79 cfs @ 12.37 hrs, Volume= 9.632 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 440.17' @ 12.37 hrs Surf.Area= 37,448 sf Storage= 161,265 cf Flood Elev= 441.00' Surf.Area= 50,000 sf Storage= 197,490 cf Plug -Flow detention time= 905.2 min calculated for 9.632 of (100% of inflow) Center -of -Mass det. time= 904.4 min ( 1,717.2 - 812.7 ) Volume Invert Avail.Storage Storage Description #1 434.00' 197,490 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 434.00 17,707 0 0 435.00 21,269 19,488 19,488 436.00 23,279 22,274 41,762 437.00 25,363 24,321 66,083 438.00 28,009 26,686 92,769 439.00 30,867 29,438 122,207 440.00 34,849 32,858 155,065 441.00 50,000 42,425 197,490 Device Routing Invert Outlet Devices #1 Primary 433.55' 36.0" Round Culvert L= 71.5' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 433.55' / 431.01' S= 0.0355 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 439.50' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #3 Device 1 434.00' 0.600 cfs Constant Flow/Skimmer Phase -In= 0.47' Primary OutFlow Max=43.69 cfs @ 12.37 hrs HW=440.17' (Free Discharge) L1=Culvert (Passes 43.69 cfs of 77.02 cfs potential flow) �__3=Constant 2=Sharp-Crested Rectangular Weir (Weir Controls 43.09 cfs @ 2.68 fps) Flow/Skimmer (Constant Controls 0.60 cfs) MAN ON r,A ■ O : 1 PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/11/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 79 Pond 4B: Basin 4 - skimmer discharge Hydrograph 1 1 1 _ 11 :1 1 .1 I, 1 1//////////////////////////////////// 1 1 1 1 1 1 .1 1 :1 •1 ❑ Inflow ❑ Primary 1S-B 1A-B To Basin 1A Existing Bz sin 1A (low lying gre qnspace) 1S-A 41R 1A-R To Basin 1A Existing Basin 1 24" Pipe Subcat Reach Pon Link Pot d 3 2S-A Direct to 2\ 1 B-R\\\\YYY 26 36" Pipe 36" Pipe to 2P 2P To Outfall 002 iC LS area Pond 3 5R Chan 8A-1 3A-R Chant-2 3B-R Chan 8A-3 Channel 8A-4 BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 2 Summary for Subcatchment 1S-A: To Basin 1A Runoff = 36.56 cfs @ 12.03 hrs, Volume= 2.131 af, Depth= 1.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (ac) CN Description 4.327 98 Paved roads w/curbs & sewers, HSG C 0.180 98 Paved roads w/curbs & sewers, HSG C 0.502 98 Water Surface, HSG C 0.683 77 Woods, Poor, HSG C 0.242 77 Woods, Poor, HSG C 0.584 77 Woods, Poor, HSG C 0.045 74 >75% Grass cover, Good, HSG C 0.098 74 >75% Grass cover, Good, HSG C 0.051 74 >75% Grass cover, Good, HSG C 0.128 86 <50% Grass cover, Poor, HSG C 0.529 74 >75% Grass cover, Good, HSG C 6.353 87 Dirt roads, HSG C 13.722 89 Weighted Average 8.713 63.50% Pervious Area 5.009 36.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.8 150 0.0260 0.52 Sheet Flow, sheet from LS stockpile Fallow n= 0.050 P2= 3.54" 3.8 675 0.0330 2.92 Shallow Concentrated Flow, Concentrated from stockpile Unpaved Kv= 16.1 fps 0.3 125 0.0100 6.22 7.63 Pipe Channel, 15" rcp culv 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.011 Concrete pipe, straight & clean 1.5 260 0.0310 2.83 Shallow Concentrated Flow, culvert to ditch Unpaved Kv= 16.1 fps 0.8 218 0.0180 4.73 23.65 Trap/Vee/Rect Channel Flow, ditch to culv Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.2 250 0.0480 17.06 41.03 Pipe Channel, Final pipe 21.0" Round Area= 2.4 sf Perim= 5.5' r= 0.44' n= 0.011 Concrete pipe, straight & clean 11.4 1,678 Total MAIMOMMUMMOTCY1 PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 3 Subcatchment 1S-A: To Basin 1A Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 4 Summary for Subcatchment 1S-B: To Basin 1A Runoff = 25.19 cfs @ 12.07 hrs, Volume= 1.640 af, Depth= 1.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (ac) CN Description 0.169 74 >75% Grass cover, Good, HSG C 1.793 98 Paved roads w/curbs & sewers, HSG C 0.632 98 Roofs, HSG C 0.053 98 Roofs, HSG C 0.956 74 >75% Grass cover, Good, HSG C 0.355 98 Water Surface, HSG C 6.600 87 Dirt roads, HSG C 10.558 89 Weighted Average 7.725 73.17% Pervious Area 2.833 26.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.4 150 0.0200 0.47 Sheet Flow, stkpile area Fallow n= 0.050 P2= 3.54" 0.5 66 0.0200 2.28 Shallow Concentrated Flow, sktpile area Unpaved Kv= 16.1 fps 0.6 110 0.0360 2.85 Shallow Concentrated Flow, grass after stkpile Grassed Waterway Kv= 15.0 fps 3.3 518 0.0270 2.65 Shallow Concentrated Flow, Unpaved areas around bldg 12 Unpaved Kv= 16.1 fps 0.4 193 0.0240 8.83 10.84 Pipe Channel, Stm pipe 1st leg 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 Concrete pipe, finished 0.2 127 0.0260 10.38 18.35 Pipe Channel, 2nd leg of pipe 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.012 Concrete pipe, finished 0.9 280 0.0040 4.93 15.50 Pipe Channel, 3rd leg stm pipe 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 3.6 265 0.0300 1.21 Shallow Concentrated Flow, grassed area within lowlying area Short Grass Pasture Kv= 7.0 fps 14.9 1,709 Total MAIMOMMUMMOTCY1 PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 5 Subcatchment 1S-B: To Basin 1A Hydrograph 28 -----t------------t-------'r-------t------'r------t-------t------- 1 --t- - - r 26 25 19 cfs I ! I i I i ( iType 11 ( I 24 i 22 I ; L= .96"r } r+ 4 r...Rainfall .. 1-1 1 1 1 1 1 1 1 1 20 I e = t i F F -u -off eat .5 8_ c 18 1 1 Rklnb Any 16 i 1 i 1 i 1 i i i i -. - -- -- 14 12 10 .LLLL2 c__- 4i 8 �` IN= ----------j----- +----- 6 4 2 r 0 0 5 45 50 55 60 65 70 75 80 85 90 95 10 1� �O 25 30 35 40 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 6 Summary for Subcatchment 2S-A: Direct to 2P Runoff = 13.48 cfs @ 11.96 hrs, Volume= 0.626 af, Depth= 1.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (sf) CN Description 66,516 98 Water Surface, HSG C 83,461 74 >75% Grass cover, Good, HSG C 60,505 87 Dirt roads, HSG C 210,482 85 Weighted Average 143,966 68.40% Pervious Area 66,516 31.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum TOC Subcatchment 2S-A: Direct to 2P Hydrograph 15 14 I 13.cfs 48 -- -... i i i i i ---+---------- - f---------}---------------------------L------- -- + a---------- f 13 ! i i ! i ! I I ! 11 L�hr fi 12 i i 1 i i i yr+ n �i ' i J'-r- , -_--_--L--_--.- ; .-...--1.------ L------ - ---- ;L-_--_-1-_---_L_-_-.{�- /�-i �_n_- ! Q -J-- ;of 'Y 0 M1,1 e i g 4----------4--------- - -} - ' + ' - -+ - - -�' - ' ii a I i I 1 u OOfae h-1.5 --� - - �- ---- ------ - L------a------ ---� -- -- t- t-- - - --; a - I Q:--j I 1 ; 1 1 I 1 � I t 1 T 6 ....._..._........ ..._..L.......... i..................i.._.._.._........... L.......... .L.......... L.......... 1..._.._...L.._.._.._i......_.._. ..._.._..i.._..._.._i....__ 5 i ------------- i 1 i i i i i i 1 i i i ..._ _--_-_1---_-_--_--_-y.-_--_-_ _-_- _- I---------- -- -.�-_-_---..--.---.---_ - - 4 i I I i i T 1 3 _{............. I I F 1 L 1- L a !-_---_--_-� 5--_---_-- 1 ...---r---------- ---------r .--------- r -------I - ------ r 2 i ( i I ''/// 60 65 70 75 80 85 90 95 ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 7 Summary for Subcatchment 3S-B: To Pond 3 Runoff = 14.11 cfs @ 12.07 hrs, Volume= 0.934 af, Depth= 1.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (sf) CN Description 11,911 98 Water Surface, HSG C 25,046 77 Woods, Poor, HSG C 31,514 98 Roofs, HSG C 820 98 Roofs, HSG C 204,485 87 Dirt roads, HSG C 273,776 88 Weighted Average 229,531 83.84% Pervious Area 44,245 16.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 150 0.0050 0.27 Sheet Flow, Sheet flow in NE direection from bldg 12 Fallow n= 0.050 P2= 3.54" 1.8 142 0.0070 1.35 Shallow Concentrated Flow, "flat" conc flow Unpaved Kv= 16.1 fps 4.4 791 0.0350 3.01 Shallow Concentrated Flow, Flow to pond 3 Unpaved Kv= 16.1 fps 15.5 1,083 Total BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 8 w 0 U. Subcatchment 3S-B: To Pond 3 Hydrograph i i i i i 5 -----_-..<... 14.11 cfs ..- ---- ----- - ---- ----- ---- ------ ------.---. --- 'i-- -- -i'- — i- i- -I'- -I t- }'-- 4 LT - i 3 i i ,l ----- t i Iil 'ii -- il ---- --------lyr$i4hfi - n 2--.---.----- -.--------------F---- --_--_--_- ------- _ Ii _....--f-----,-----,--E--,.--,---,---r------f----f------rs-auno,-------------- 0 -- fi-- AU. i i i ,i � f ep� A Ti — i 9 --------- -h-i 7 ... -..... ..... .C7o ------- -..--t------------- +------- --------- t------- i--------- ------a---------�L7-w 083 _ ; i i i i I I 5 i i i µ 4 i ' i - ------- ---------- --------- -�- 3 I _!_.._._..... 1........... _........ 1.......... i.......... l.......... i........... .._.._.._i....._.._.1..._.._..1.._.._.._i.......... 1..._.._..i.......... !--------- .......... i........... i.. 2 .........- 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 9 Summary for Subcatchment 3S-C: LS area to Pond 3 Runoff = 29.67 cfs @ 12.18 hrs, Volume= 2.506 af, Depth= 1.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (ac) CN Description 18.466 86 excludes recirc ponds 18.466 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 150 0.0400 0.62 Sheet Flow, sheet flow NW corner Fallow n= 0.050 P2= 3.54" 20.2 3,152 0.0260 2.60 Shallow Concentrated Flow, Flow thru LS plant to pond 3 Unpaved Kv= 16.1 fps 24.3 3,302 Total Subcatchment 3S-C: LS area to Pond 3 Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 10 Summary for Reach 1A-R: 36" Pipe Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth > 1.20" for lyr-24hr event Inflow = 10.15 cfs @ 12.26 hrs, Volume= 2.421 of Outflow = 10.15 cfs @ 12.26 hrs, Volume= 2.421 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.63 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.19 fps, Avg. Travel Time= 2.3 min Peak Storage= 303 cf @ 12.26 hrs Average Depth at Peak Storage= 0.91' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 51.09 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 168.0' Slope= 0.0050 T Inlet Invert= 392.52', Outlet Invert= 391.68' f E N U 3 0 LL Reach 1A-R: 36" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 11 Summary for Reach 1 B-R: 36" Pipe to 2P Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth > 1.20" for lyr-24hr event Inflow = 10.15 cfs @ 12.26 hrs, Volume= 2.421 of Outflow = 10.15 cfs @ 12.27 hrs, Volume= 2.421 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 4.32 fps, Min. Travel Time= 0.3 min Avg. Velocity = 0.90 fps, Avg. Travel Time= 1.4 min Peak Storage= 176 cf @ 12.27 hrs Average Depth at Peak Storage= 1.10' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 35.40 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 75.0' Slope= 0.0024 '/' Inlet Invert= 391.68', Outlet Invert= 391.50' 9 8 7 N 6 3 ° 5 LL 4 3 2 1 0 0 Reach 1 B-R: 36" Pipe to 2P Hydrograph 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 12 Summary for Reach 1 R: 24" Pipe Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth > 1.86" for lyr-24hr event Inflow = 10.15 cfs @ 12.25 hrs, Volume= 2.123 of Outflow = 10.15 cfs @ 12.26 hrs, Volume= 2.123 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 11.42 fps, Min. Travel Time= 0.4 min Avg. Velocity = 2.30 fps, Avg. Travel Time= 2.1 min Peak Storage= 253 cf @ 12.26 hrs Average Depth at Peak Storage= 0.65' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.18 cfs 24.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 285.0' Slope= 0.0325 '/' Inlet Invert= 402.60', Outlet Invert= 393.34' f E N U 3 0 LL Reach 1 R: 24" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 13 Summary for Reach 3A-R: Channel 8A-2 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 1.63" for lyr-24hr event Inflow = 29.62 cfs @ 12.19 hrs, Volume= 2.506 of Outflow = 29.62 cfs @ 12.19 hrs, Volume= 2.506 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.61 fps, Min. Travel Time= 0.1 min Avg. Velocity = 1.63 fps, Avg. Travel Time= 0.2 min Peak Storage= 97 cf @ 12.19 hrs Average Depth at Peak Storage= 0.71' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 440.38 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 18.3' Slope= 0.0268 '/' Inlet Invert= 417.53', Outlet Invert= 417.04' N U 3 0 LL Reach 3A-R: Channel 8A-2 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow 0 Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 14 Summary for Reach 313-11: Channel 8A-3 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 1.63" for lyr-24hr event Inflow = 29.62 cfs @ 12.19 hrs, Volume= 2.506 of Outflow = 29.61 cfs @ 12.20 hrs, Volume= 2.506 af, Atten= 0%, Lag= 0.5 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 4.32 fps, Min. Travel Time= 0.8 min Avg. Velocity = 1.26 fps, Avg. Travel Time= 2.6 min Peak Storage= 1,351 cf @ 12.20 hrs Average Depth at Peak Storage= 0.88' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 301.20 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 197.2' Slope= 0.0125 T Inlet Invert= 417.04', Outlet Invert= 414.57' 32 30 28 26 24 22 20 18 c 16 LL 14 12 10 8 6 4 2 Reach 313-R: Channel 8A-3 Hydrograph ® IIII IIIII�III IIIIIIII IIII III III�IIII IIIIII III • • • ' • • ac Avg. Flow Depth.=.0.88 I Max Vel=4.32 I I! .e • I� -K 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75:1 •1 ■ Inflow 0 Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 15 Summary for Reach 3C-R: Channel 8A-4 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 1.63" for lyr-24hr event Inflow = 29.61 cfs @ 12.20 hrs, Volume= 2.506 of Outflow = 29.62 cfs @ 12.20 hrs, Volume= 2.506 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 12.61 fps, Min. Travel Time= 0.1 min Avg. Velocity = 3.70 fps, Avg. Travel Time= 0.2 min Peak Storage= 102 cf @ 12.20 hrs Average Depth at Peak Storage= 0.35' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 1,493.79 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 43.3' Slope= 0.3081 T Inlet Invert= 414.57', Outlet Invert= 401.23' N U 3 0 LL Reach 3C-R: Channel 8A-4 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow 0 Outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 16 Summary for Reach 5R: Channel 8A-1 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 1.63" for lyr-24hr event Inflow = 29.67 cfs @ 12.18 hrs, Volume= 2.506 of Outflow = 29.62 cfs @ 12.19 hrs, Volume= 2.506 af, Atten= 0%, Lag= 0.9 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.80 fps, Min. Travel Time= 1.2 min Avg. Velocity = 1.63 fps, Avg. Travel Time= 4.2 min Peak Storage= 2,088 cf @ 12.19 hrs Average Depth at Peak Storage= 0.76' Bank -Full Depth= 3.00' Flow Area= 27.0 sf, Capacity= 324.01 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 1.0 '/' Top Width= 12.00' Length= 409.2' Slope= 0.0256 '/' Inlet Invert= 428.00', Outlet Invert= 417.53' N V 3 0 LL Reach 5R: Channel 8A-1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 17 Summary for Pond 1A-B: Existing Basin 1A (low lying greenspace) Inflow Area = 10.558 ac, 26.83% Impervious, Inflow Depth = 1.86" for lyr-24hr event Inflow = 25.19 cfs @ 12.07 hrs, Volume= 1.640 of Outflow = 0.51 cfs @ 18.11 hrs, Volume= 0.298 af, Atten= 98%, Lag= 362.3 min Primary = 0.51 cfs @ 18.11 hrs, Volume= 0.298 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 405.09' @ 18.11 hrs Surf.Area= 22,925 sf Storage= 60,389 cf Plug -Flow detention time= 576.8 min calculated for 0.298 of (18% of inflow) Center -of -Mass det. time= 425.1 min ( 1,244.5 - 819.4 ) Volume Invert Avail.Storage Storage Description #1 400.00' 154,571 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 2,623 0 0 402.00 9,204 11,827 11,827 404.00 17,449 26,653 38,480 406.00 27,541 44,990 83,470 408.00 43,560 71,101 154,571 Device Routinq Invert Outlet Devices #1 Primary 405.00' 6.3' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=0.51 cfs @ 18.11 hrs HW=405.09' TW=392.86' (Dynamic Tailwater) L1=Sharp-Crested Rectangular Weir (Weir Controls 0.51 cfs @ 0.95 fps) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 18 Pond 1A-B: Existing Basin 1A (low lying greenspace) Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 19 Summary for Pond 1 B: Existing Basin 1 Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 1.86" for lyr-24hr event Inflow = 36.56 cfs @ 12.03 hrs, Volume= 2.131 of Outflow = 10.15 cfs @ 12.25 hrs, Volume= 2.123 af, Atten= 72%, Lag= 13.4 min Primary = 10.15 cfs @ 12.25 hrs, Volume= 2.123 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 402.60' Surf.Area= 24,334 sf Storage= 53,379 cf Peak Elev= 404.06' @ 12.25 hrs Surf.Area= 28,807 sf Storage= 92,242 cf (38,862 cf above start) Plug -Flow detention time= 527.4 min calculated for 0.898 of (42% of inflow) Center -of -Mass det. time= 145.1 min ( 961.3 - 816.2 ) Volume Invert Avail.Storage Storage Description #1 400.00' 230,133 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 16,836 0 0 401.00 19,630 18,233 18,233 402.00 22,539 21,085 39,318 403.00 25,530 24,035 63,352 404.00 28,610 27,070 90,422 405.00 31,721 30,166 120,588 406.00 34,929 33,325 153,913 407.00 38,193 36,561 190,474 408.00 41,125 39,659 230,133 Device Routing Invert Outlet Devices #1 Primary 402.60' 24.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=10.14 cfs @ 12.25 hrs HW=404.06' TW=403.25' (Dynamic Tailwater) L1=Orifice/Grate (Orifice Controls 10.14 cfs @ 4.12 fps) ATIRMOMMUMMOTCY1 PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 20 Pond 1 B: Existing Basin 1 Hydrograph ■ Inflow ■ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 21 Summary for Pond 2B: 2P Inflow Area = 53.863 ac, 19.28% Impervious, Inflow Depth = 1.44" for lyr-24hr event Inflow = 25.50 cfs @ 12.47 hrs, Volume= 6.483 of Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 391.00' Surf.Area= 1.718 ac Storage= 4.603 of Peak Elev= 394.38' @ 96.00 hrs Surf.Area= 2.125 ac Storage= 11.086 of (6.483 of above start) Flood Elev= 400.00' Surf.Area= 2.869 ac Storage= 25.105 of (20.502 of above start) Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 388.00' 25.105 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 388.00 1.345 0.000 0.000 389.00 1.471 1.408 1.408 390.00 1.600 1.536 2.943 391.00 1.718 1.659 4.603 392.00 1.833 1.775 6.378 393.00 1.955 1.894 8.272 394.00 2.077 2.016 10.288 395.00 2.204 2.140 12.428 396.00 2.340 2.272 14.701 397.00 2.469 2.404 17.105 398.00 2.599 2.534 19.639 399.00 2.732 2.665 22.304 400.00 2.869 2.800 25.105 Device Routing Invert Outlet Devices #1 Primary 390.50' 54.0" Round Culvert X 0.00 L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 390.50' / 382.00' S= 0.0850 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 15.90 sf #2 Device 1 391.00' 0.5" Vert. Orifice/Grate X 20.00 columns X 7 rows with 6.0" cc spacing C= 0.600 #3 Device 1 396.00' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #4 Secondary 397.00' 30.0' long x 28.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 22 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L1=Culvert ( Controls 0.00 cfs) �2=Orifi ce/G rate ( Controls 0.00 cfs) 3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) N U 3 0 LL Pond 2B: 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ Outflow ❑ Primary ❑ Secondary BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 23 Summary for Pond 3B: Pond 3 Inflow Area = 24.751 ac, 4.10% Impervious, Inflow Depth = 1.67" for 1yr-24hr event Inflow = 40.10 cfs @ 12.15 hrs, Volume= 3.439 of Outflow = 15.10 cfs @ 12.51 hrs, Volume= 3.436 af, Atten= 62%, Lag= 21.6 min Primary = 15.10 cfs @ 12.51 hrs, Volume= 3.436 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 394.90' Surf.Area= 10,695 sf Storage= 22,165 cf Peak Elev= 398.73' @ 12.51 hrs Surf.Area= 36,365 sf Storage= 75,811 cf (53,645 cf above start) Flood Elev= 402.00' Surf.Area= 42,976 sf Storage= 173,109 cf (150,943 cf above start) Plug -Flow detention time= 224.0 min calculated for 2.926 of (85% of inflow) Center -of -Mass det. time= 114.1 min ( 952.9 - 838.8 ) Volume Invert Avail.Storage Storage Description #1 391.00' 15,607 cf Chamber 2 (outlet) (Prismatic) Listed below (Recalc) #2 392.00' 7,643 cf Chamber 1 (inlet) (Prismatic) Listed below (Recalc) #3 396.00' 225,420 cf Combined Chambers (Prismatic) Listed below (Recalc) 248,669 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 391.00 1,446 0 0 392.00 2,583 2,015 2,015 393.00 3,801 3,192 5,207 394.00 5,119 4,460 9,667 395.00 6,761 5,940 15,607 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 392.00 1,032 0 0 393.00 1,971 1,502 1,502 394.00 3,048 2,510 4,011 395.00 4,215 3,632 7,643 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 396.00 13,953 0 0 397.00 17,143 15,548 15,548 398.00 22,159 19,651 35,199 399.00 26,581 24,370 59,569 400.00 30,000 28,291 87,860 402.00 32,000 62,000 149,860 404.00 43,560 75,560 225,420 BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 24 Device Routing Invert Outlet Devices #1 Primary 394.90' 36.0" Round Culvert L= 265.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 394.90' / 391.60' S= 0.0125 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 394.90' 8.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 397.90' 5.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 399.50' 20.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=15.06 cfs @ 12.51 hrs HW=398.73' TW=391.78' (Dynamic Tailwater) L1=Culvert (Passes 15.06 cfs of 51.94 cfs potential flow) P4=S =Orifice/Grate (Orifice Controls 3.14 cfs @ 9.00 fps) =Sharp -Crested Rectangular Weir (Weir Controls 11.92 cfs @ 2.98 fps) harp -Crested Rectangular Weir ( Controls 0.00 cfs) Pond 3B: Pond 3 Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 25 Summary for Subcatchment 1S-A: To Basin 1A Runoff = 47.04 cfs @ 12.03 hrs, Volume= 2.769 af, Depth= 2.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (ac) CN Description 4.327 98 Paved roads w/curbs & sewers, HSG C 0.180 98 Paved roads w/curbs & sewers, HSG C 0.502 98 Water Surface, HSG C 0.683 77 Woods, Poor, HSG C 0.242 77 Woods, Poor, HSG C 0.584 77 Woods, Poor, HSG C 0.045 74 >75% Grass cover, Good, HSG C 0.098 74 >75% Grass cover, Good, HSG C 0.051 74 >75% Grass cover, Good, HSG C 0.128 86 <50% Grass cover, Poor, HSG C 0.529 74 >75% Grass cover, Good, HSG C 6.353 87 Dirt roads, HSG C 13.722 89 Weighted Average 8.713 63.50% Pervious Area 5.009 36.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.8 150 0.0260 0.52 Sheet Flow, sheet from LS stockpile Fallow n= 0.050 P2= 3.54" 3.8 675 0.0330 2.92 Shallow Concentrated Flow, Concentrated from stockpile Unpaved Kv= 16.1 fps 0.3 125 0.0100 6.22 7.63 Pipe Channel, 15" rcp culv 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.011 Concrete pipe, straight & clean 1.5 260 0.0310 2.83 Shallow Concentrated Flow, culvert to ditch Unpaved Kv= 16.1 fps 0.8 218 0.0180 4.73 23.65 Trap/Vee/Rect Channel Flow, ditch to culv Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.2 250 0.0480 17.06 41.03 Pipe Channel, Final pipe 21.0" Round Area= 2.4 sf Perim= 5.5' r= 0.44' n= 0.011 Concrete pipe, straight & clean 11.4 1,678 Total MAIMOMMUMMOTCY1 PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 26 Subcatchment 1S-A: To Basin 1A Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 27 Summary for Subcatchment 1S-B: To Basin 1A Runoff = 32.48 cfs @ 12.07 hrs, Volume= 2.131 af, Depth= 2.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (ac) CN Description 0.169 74 >75% Grass cover, Good, HSG C 1.793 98 Paved roads w/curbs & sewers, HSG C 0.632 98 Roofs, HSG C 0.053 98 Roofs, HSG C 0.956 74 >75% Grass cover, Good, HSG C 0.355 98 Water Surface, HSG C 6.600 87 Dirt roads, HSG C 10.558 89 Weighted Average 7.725 73.17% Pervious Area 2.833 26.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.4 150 0.0200 0.47 Sheet Flow, stkpile area Fallow n= 0.050 P2= 3.54" 0.5 66 0.0200 2.28 Shallow Concentrated Flow, sktpile area Unpaved Kv= 16.1 fps 0.6 110 0.0360 2.85 Shallow Concentrated Flow, grass after stkpile Grassed Waterway Kv= 15.0 fps 3.3 518 0.0270 2.65 Shallow Concentrated Flow, Unpaved areas around bldg 12 Unpaved Kv= 16.1 fps 0.4 193 0.0240 8.83 10.84 Pipe Channel, Stm pipe 1st leg 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 Concrete pipe, finished 0.2 127 0.0260 10.38 18.35 Pipe Channel, 2nd leg of pipe 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.012 Concrete pipe, finished 0.9 280 0.0040 4.93 15.50 Pipe Channel, 3rd leg stm pipe 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 3.6 265 0.0300 1.21 Shallow Concentrated Flow, grassed area within lowlying area Short Grass Pasture Kv= 7.0 fps 14.9 1,709 Total MAIMOMMUMMOTCY1 PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 28 Subcatchment 1S-B: To Basin 1A w c+. 0 LL Hydrograph -- 36 ---�------------;------i-----F------+------F------+------;------------'------1----4----�----'---f----�-- 34 -- i 32.48 ds i 32 30 ! -- - -- - r 11 yr+2aln 28 - - - - ...... )------------ )------- 4--4------- {------- i------- 4------- 4------ ------------*----- ------ {-------{ ------a - 26 _ 24 ! !ff i RiunOff i o M. 2: 11:11 iaf 22 --- - ... t- -- --t- - - --r-- .. ------t-- -r-- --- t — -- -- r---'--- r-- y 20 ! ! ! !n 18 16 - - - ..... �- - - - - - - - --}------- ------ �-------i------ i--------— W— -e� 14 12 _-_--L--..... �_--_-_-_--_--_--_-__-_--_-L-_--_-1-_-_--_L_-_--_L-_-_--1-_-_---_-_--_- ------------ _-_-_-_1_-_-_--L---� 10 _....---4--------- i--- --—7.--_--_--_4_----------------;---_--_-}-----!--_- - i $ ....--';.--------- ------.?'--_----'!.-----_--!'.---_--_--'?.--_--_--_i'------------ --_----{---------- ?----_--{_-_- --!._-_--_--'--_- 6 I I ! I ! ! I I I I I ! I ! ! I I I 4 ! 2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 29 Summary for Subcatchment 2S-A: Direct to 2P Runoff = 17.86 cfs @ 11.96 hrs, Volume= 0.837 af, Depth= 2.08" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (sf) CN Description 66,516 98 Water Surface, HSG C 83,461 74 >75% Grass cover, Good, HSG C 60,505 87 Dirt roads, HSG C 210,482 85 Weighted Average 143,966 68.40% Pervious Area 66,516 31.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum TOC Subcatchment 2S-A: Direct to 2P Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 30 Summary for Subcatchment 3S-B: To Pond 3 Runoff = 18.35 cfs @ 12.07 hrs, Volume= 1.222 af, Depth= 2.33" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (sf) CN Description 11,911 98 Water Surface, HSG C 25,046 77 Woods, Poor, HSG C 31,514 98 Roofs, HSG C 820 98 Roofs, HSG C 204,485 87 Dirt roads, HSG C 273,776 88 Weighted Average 229,531 83.84% Pervious Area 44,245 16.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 150 0.0050 0.27 Sheet Flow, Sheet flow in NE direection from bldg 12 Fallow n= 0.050 P2= 3.54" 1.8 142 0.0070 1.35 Shallow Concentrated Flow, "flat" conc flow Unpaved Kv= 16.1 fps 4.4 791 0.0350 3.01 Shallow Concentrated Flow, Flow to pond 3 Unpaved Kv= 16.1 fps 15.5 1,083 Total BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 31 Subcatchment 3S-B: To Pond 3 Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 32 Summary for Subcatchment 3S-C: LS area to Pond 3 Runoff = 39.44 cfs @ 12.17 hrs, Volume= 3.325 af, Depth= 2.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (ac) CN Description 18.466 86 excludes recirc ponds 18.466 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 150 0.0400 0.62 Sheet Flow, sheet flow NW corner Fallow n= 0.050 P2= 3.54" 20.2 3,152 0.0260 2.60 Shallow Concentrated Flow, Flow thru LS plant to pond 3 Unpaved Kv= 16.1 fps 24.3 3,302 Total Subcatchment 3S-C: LS area to Pond 3 Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 33 Summary for Reach 1A-R: 36" Pipe Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 1.75" for 2yr-24hr event Inflow = 13.83 cfs @ 12.25 hrs, Volume= 3.550 of Outflow = 13.83 cfs @ 12.25 hrs, Volume= 3.550 af, Atten= 0%, Lag= 0.4 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 6.14 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.26 fps, Avg. Travel Time= 2.2 min Peak Storage= 378 cf @ 12.25 hrs Average Depth at Peak Storage= 1.07' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 51.09 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 168.0' Slope= 0.0050 T Inlet Invert= 392.52', Outlet Invert= 391.68' 1 1 1 1 1 1 N U 3 0 LL Reach 1A-R: 36" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 34 Summary for Reach 1 B-R: 36" Pipe to 2P Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 1.75" for 2yr-24hr event Inflow = 13.83 cfs @ 12.25 hrs, Volume= 3.550 of Outflow = 13.83 cfs @ 12.25 hrs, Volume= 3.550 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 4.70 fps, Min. Travel Time= 0.3 min Avg. Velocity = 0.95 fps, Avg. Travel Time= 1.3 min Peak Storage= 221 cf @ 12.25 hrs Average Depth at Peak Storage= 1.30' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 35.40 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 75.0' Slope= 0.0024 7' Inlet Invert= 391.68', Outlet Invert= 391.50' 1 1 1 1 1 1 N U 3 0 LL Reach 1 B-R: 36" Pipe to 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 35 Summary for Reach 1 R: 24" Pipe Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 2.41" for 2yr-24hr event Inflow = 13.82 cfs @ 12.24 hrs, Volume= 2.761 of Outflow = 13.83 cfs @ 12.25 hrs, Volume= 2.761 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 12.43 fps, Min. Travel Time= 0.4 min Avg. Velocity = 2.40 fps, Avg. Travel Time= 2.0 min Peak Storage= 317 cf @ 12.25 hrs Average Depth at Peak Storage= 0.77' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.18 cfs 24.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 285.0' Slope= 0.0325 '/' Inlet Invert= 402.60', Outlet Invert= 393.34' 1 1 1 1 1 1 N V 3 0 LL Reach 1 R: 24" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 1_ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 36 Summary for Reach 3A-R: Channel 8A-2 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.16" for 2yr-24hr event Inflow = 39.31 cfs @ 12.19 hrs, Volume= 3.325 of Outflow = 39.31 cfs @ 12.19 hrs, Volume= 3.325 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 6.13 fps, Min. Travel Time= 0.0 min Avg. Velocity = 1.75 fps, Avg. Travel Time= 0.2 min Peak Storage= 117 cf @ 12.19 hrs Average Depth at Peak Storage= 0.84' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 440.38 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 18.3' Slope= 0.0268 '/' Inlet Invert= 417.53', Outlet Invert= 417.04' N U 3 0 LL Reach 3A-R: Channel 8A-2 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow G outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 37 Summary for Reach 313-11: Channel 8A-3 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.16" for 2yr-24hr event Inflow = 39.31 cfs @ 12.19 hrs, Volume= 3.325 of Outflow = 39.30 cfs @ 12.20 hrs, Volume= 3.325 af, Atten= 0%, Lag= 0.5 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 4.72 fps, Min. Travel Time= 0.7 min Avg. Velocity = 1.36 fps, Avg. Travel Time= 2.4 min Peak Storage= 1,643 cf @ 12.20 hrs Average Depth at Peak Storage= 1.03' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 301.20 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 197.2' Slope= 0.0125 T Inlet Invert= 417.04', Outlet Invert= 414.57' N U 3 0 LL Reach 313-R: Channel 8A-3 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow 0 outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 38 Summary for Reach 3C-R: Channel 8A-4 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.16" for 2yr-24hr event Inflow = 39.30 cfs @ 12.20 hrs, Volume= 3.325 of Outflow = 39.30 cfs @ 12.20 hrs, Volume= 3.325 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 13.91 fps, Min. Travel Time= 0.1 min Avg. Velocity = 3.97 fps, Avg. Travel Time= 0.2 min Peak Storage= 122 cf @ 12.20 hrs Average Depth at Peak Storage= 0.41' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 1,493.79 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 43.3' Slope= 0.3081 T Inlet Invert= 414.57', Outlet Invert= 401.23' N U 3 0 LL Reach 3C-R: Channel 8A-4 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ outnow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 39 Summary for Reach 5R: Channel 8A-1 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.16" for 2yr-24hr event Inflow = 39.44 cfs @ 12.17 hrs, Volume= 3.325 of Outflow = 39.31 cfs @ 12.19 hrs, Volume= 3.325 af, Atten= 0%, Lag= 0.8 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 6.38 fps, Min. Travel Time= 1.1 min Avg. Velocity = 1.75 fps, Avg. Travel Time= 3.9 min Peak Storage= 2,521 cf @ 12.19 hrs Average Depth at Peak Storage= 0.89' Bank -Full Depth= 3.00' Flow Area= 27.0 sf, Capacity= 324.01 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 1.0 7' Top Width= 12.00' Length= 409.2' Slope= 0.0256 T Inlet Invert= 428.00', Outlet Invert= 417.53' N U 3 0 LL Reach 5R: Channel 8A-1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 40 Summary for Pond 1A-B: Existing Basin 1A (low lying greenspace) Inflow Area = 10.558 ac, 26.83% Impervious, Inflow Depth = 2.42" for 2yr-24hr event Inflow = 32.48 cfs @ 12.07 hrs, Volume= 2.131 of Outflow = 1.72 cfs @ 13.61 hrs, Volume= 0.789 af, Atten= 95%, Lag= 92.6 min Primary = 1.72 cfs @ 13.61 hrs, Volume= 0.789 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 405.19' @ 13.61 hrs Surf.Area= 23,458 sf Storage= 62,836 cf Plug -Flow detention time= 359.5 min calculated for 0.789 of (37% of inflow) Center -of -Mass det. time= 235.7 min ( 1,047.7 - 812.0 ) Volume Invert Avail.Storage Storage Description #1 400.00' 154,571 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 2,623 0 0 402.00 9,204 11,827 11,827 404.00 17,449 26,653 38,480 406.00 27,541 44,990 83,470 408.00 43,560 71,101 154,571 Device Routinq Invert Outlet Devices #1 Primary 405.00' 6.3' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=1.72 cfs @ 13.61 hrs HW=405.19' TW=393.26' (Dynamic Tailwater) L1=Sharp-Crested Rectangular Weir (Weir Controls 1.72 cfs @ 1.43 fps) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 41 Pond 1A-B: Existing Basin 1A (low lying greenspace) Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 42 Summary for Pond 1 B: Existing Basin 1 Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 2.42" for 2yr-24hr event Inflow = 47.04 cfs @ 12.03 hrs, Volume= 2.769 of Outflow = 13.82 cfs @ 12.24 hrs, Volume= 2.761 af, Atten= 71 %, Lag= 12.7 min Primary = 13.82 cfs @ 12.24 hrs, Volume= 2.761 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 402.60' Surf.Area= 24,334 sf Storage= 53,379 cf Peak Elev= 404.42' @ 12.24 hrs Surf.Area= 29,930 sf Storage= 102,839 cf (49,460 cf above start) Plug -Flow detention time= 393.5 min calculated for 1.536 of (55% of inflow) Center -of -Mass det. time= 128.4 min ( 937.2 - 808.7 ) Volume Invert Avail.Storage Storage Description #1 400.00' 230,133 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 16,836 0 0 401.00 19,630 18,233 18,233 402.00 22,539 21,085 39,318 403.00 25,530 24,035 63,352 404.00 28,610 27,070 90,422 405.00 31,721 30,166 120,588 406.00 34,929 33,325 153,913 407.00 38,193 36,561 190,474 408.00 41,125 39,659 230,133 Device Routing Invert Outlet Devices #1 Primary 402.60' 24.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=13.81 cfs @ 12.24 hrs HW=404.42' TW=403.37' (Dynamic Tailwater) L1=Orifice/Grate (Orifice Controls 13.81 cfs @ 4.60 fps) MAIMOMMUMMOTCY1 PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 43 Pond 1 B: Existing Basin 1 Hydrograph u Inflow O Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 44 Summary for Pond 2B: 2P Inflow Area = 53.863 ac, 19.28% Impervious, Inflow Depth = 1.98" for 2yr-24hr event Inflow = 40.24 cfs @ 12.41 hrs, Volume= 8.909 of Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 391.00' Surf.Area= 1.718 ac Storage= 4.603 of Peak Elev= 395.48' @ 96.00 hrs Surf.Area= 2.270 ac Storage= 13.511 of (8.909 of above start) Flood Elev= 400.00' Surf.Area= 2.869 ac Storage= 25.105 of (20.502 of above start) Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 388.00' 25.105 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 388.00 1.345 0.000 0.000 389.00 1.471 1.408 1.408 390.00 1.600 1.536 2.943 391.00 1.718 1.659 4.603 392.00 1.833 1.775 6.378 393.00 1.955 1.894 8.272 394.00 2.077 2.016 10.288 395.00 2.204 2.140 12.428 396.00 2.340 2.272 14.701 397.00 2.469 2.404 17.105 398.00 2.599 2.534 19.639 399.00 2.732 2.665 22.304 400.00 2.869 2.800 25.105 Device Routing Invert Outlet Devices #1 Primary 390.50' 54.0" Round Culvert X 0.00 L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 390.50' / 382.00' S= 0.0850 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 15.90 sf #2 Device 1 391.00' 0.5" Vert. Orifice/Grate X 20.00 columns X 7 rows with 6.0" cc spacing C= 0.600 #3 Device 1 396.00' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #4 Secondary 397.00' 30.0' long x 28.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 45 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L1=Culvert ( Controls 0.00 cfs) �2=0 rifi ce/G rate ( Controls 0.00 cfs) 3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) N V 3 0 LL Pond 2B: 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow r' Outflow ❑ Primary ❑ Secondary BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 46 Summary for Pond 3B: Pond 3 Inflow Area = 24.751 ac, 4.10% Impervious, Inflow Depth = 2.20" for 2yr-24hr event Inflow = 53.13 cfs @ 12.15 hrs, Volume= 4.546 of Outflow = 25.41 cfs @ 12.43 hrs, Volume= 4.522 af, Atten= 52%, Lag= 17.0 min Primary = 25.41 cfs @ 12.43 hrs, Volume= 4.522 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 394.90' Surf.Area= 10,695 sf Storage= 22,165 cf Peak Elev= 399.16' @ 12.43 hrs Surf.Area= 38,120 sf Storage= 87,245 cf (65,079 cf above start) Flood Elev= 402.00' Surf.Area= 42,976 sf Storage= 173,109 cf (150,943 cf above start) Plug -Flow detention time= 186.7 min calculated for 4.011 of (88% of inflow) Center -of -Mass det. time= 97.3 min ( 927.9 - 830.6 ) Volume Invert Avail.Storage Storage Description #1 391.00' 15,607 cf Chamber 2 (outlet) (Prismatic) Listed below (Recalc) #2 392.00' 7,643 cf Chamber 1 (inlet) (Prismatic) Listed below (Recalc) #3 396.00' 225,420 cf Combined Chambers (Prismatic) Listed below (Recalc) 248,669 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 391.00 1,446 0 0 392.00 2,583 2,015 2,015 393.00 3,801 3,192 5,207 394.00 5,119 4,460 9,667 395.00 6,761 5,940 15,607 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 392.00 1,032 0 0 393.00 1,971 1,502 1,502 394.00 3,048 2,510 4,011 395.00 4,215 3,632 7,643 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 396.00 13,953 0 0 397.00 17,143 15,548 15,548 398.00 22,159 19,651 35,199 399.00 26,581 24,370 59,569 400.00 30,000 28,291 87,860 402.00 32,000 62,000 149,860 404.00 43,560 75,560 225,420 BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 47 Device Routing Invert Outlet Devices #1 Primary 394.90' 36.0" Round Culvert L= 265.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 394.90' / 391.60' S= 0.0125 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 394.90' 8.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 397.90' 5.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 399.50' 20.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=25.34 cfs @ 12.43 hrs HW=399.16' TW=392.07' (Dynamic Tailwater) L1=Culvert (Passes 25.34 cfs of 56.56 cfs potential flow) P4=S =Orifice/Grate (Orifice Controls 3.33 cfs @ 9.54 fps) =Sharp -Crested Rectangular Weir (Weir Controls 22.01 cfs @ 3.67 fps) harp -Crested Rectangular Weir ( Controls 0.00 cfs) Pond 3B: Pond 3 Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 48 Summary for Subcatchment 1S-A: To Basin 1A Runoff = 62.56 cfs @ 12.03 hrs, Volume= 3.735 af, Depth= 3.27" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (ac) CN Description 4.327 98 Paved roads w/curbs & sewers, HSG C 0.180 98 Paved roads w/curbs & sewers, HSG C 0.502 98 Water Surface, HSG C 0.683 77 Woods, Poor, HSG C 0.242 77 Woods, Poor, HSG C 0.584 77 Woods, Poor, HSG C 0.045 74 >75% Grass cover, Good, HSG C 0.098 74 >75% Grass cover, Good, HSG C 0.051 74 >75% Grass cover, Good, HSG C 0.128 86 <50% Grass cover, Poor, HSG C 0.529 74 >75% Grass cover, Good, HSG C 6.353 87 Dirt roads, HSG C 13.722 89 Weighted Average 8.713 63.50% Pervious Area 5.009 36.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.8 150 0.0260 0.52 Sheet Flow, sheet from LS stockpile Fallow n= 0.050 P2= 3.54" 3.8 675 0.0330 2.92 Shallow Concentrated Flow, Concentrated from stockpile Unpaved Kv= 16.1 fps 0.3 125 0.0100 6.22 7.63 Pipe Channel, 15" rcp culv 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.011 Concrete pipe, straight & clean 1.5 260 0.0310 2.83 Shallow Concentrated Flow, culvert to ditch Unpaved Kv= 16.1 fps 0.8 218 0.0180 4.73 23.65 Trap/Vee/Rect Channel Flow, ditch to culv Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.2 250 0.0480 17.06 41.03 Pipe Channel, Final pipe 21.0" Round Area= 2.4 sf Perim= 5.5' r= 0.44' n= 0.011 Concrete pipe, straight & clean 11.4 1,678 Total BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 49 Subcatchment 1S-A: To Basin 1A Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 50 Summary for Subcatchment 1S-B: To Basin 1A Runoff = 43.28 cfs @ 12.06 hrs, Volume= 2.874 af, Depth= 3.27" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (ac) CN Description 0.169 74 >75% Grass cover, Good, HSG C 1.793 98 Paved roads w/curbs & sewers, HSG C 0.632 98 Roofs, HSG C 0.053 98 Roofs, HSG C 0.956 74 >75% Grass cover, Good, HSG C 0.355 98 Water Surface, HSG C 6.600 87 Dirt roads, HSG C 10.558 89 Weighted Average 7.725 73.17% Pervious Area 2.833 26.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.4 150 0.0200 0.47 Sheet Flow, stkpile area Fallow n= 0.050 P2= 3.54" 0.5 66 0.0200 2.28 Shallow Concentrated Flow, sktpile area Unpaved Kv= 16.1 fps 0.6 110 0.0360 2.85 Shallow Concentrated Flow, grass after stkpile Grassed Waterway Kv= 15.0 fps 3.3 518 0.0270 2.65 Shallow Concentrated Flow, Unpaved areas around bldg 12 Unpaved Kv= 16.1 fps 0.4 193 0.0240 8.83 10.84 Pipe Channel, Stm pipe 1st leg 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 Concrete pipe, finished 0.2 127 0.0260 10.38 18.35 Pipe Channel, 2nd leg of pipe 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.012 Concrete pipe, finished 0.9 280 0.0040 4.93 15.50 Pipe Channel, 3rd leg stm pipe 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 3.6 265 0.0300 1.21 Shallow Concentrated Flow, grassed area within lowlying area Short Grass Pasture Kv= 7.0 fps 14.9 1,709 Total BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 51 Subcatchment 1S-B: To Basin 1A Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 52 Summary for Subcatchment 2S-A: Direct to 2P Runoff = 24.45 cfs @ 11.95 hrs, Volume= 1.160 af, Depth= 2.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (sf) CN Description 66,516 98 Water Surface, HSG C 83,461 74 >75% Grass cover, Good, HSG C 60,505 87 Dirt roads, HSG C 210,482 85 Weighted Average 143,966 68.40% Pervious Area 66,516 31.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum TOC 1 1 Subcatchment 2S-A: Direct to 2P Hydrograph I r 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 53 Summary for Subcatchment 3S-B: To Pond 3 Runoff = 24.66 cfs @ 12.07 hrs, Volume= 1.659 af, Depth= 3.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (sf) CN Description 11,911 98 Water Surface, HSG C 25,046 77 Woods, Poor, HSG C 31,514 98 Roofs, HSG C 820 98 Roofs, HSG C 204,485 87 Dirt roads, HSG C 273,776 88 Weighted Average 229,531 83.84% Pervious Area 44,245 16.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 150 0.0050 0.27 Sheet Flow, Sheet flow in NE direection from bldg 12 Fallow n= 0.050 P2= 3.54" 1.8 142 0.0070 1.35 Shallow Concentrated Flow, "flat" conc flow Unpaved Kv= 16.1 fps 4.4 791 0.0350 3.01 Shallow Concentrated Flow, Flow to pond 3 Unpaved Kv= 16.1 fps 15.5 1,083 Total MAIMOMMUMMOTCY1 PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 54 Subcatchment 3S-B: To Pond 3 Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 55 Summary for Subcatchment 3S-C: LS area to Pond 3 Runoff = 54.07 cfs @ 12.17 hrs, Volume= 4.579 af, Depth= 2.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (ac) CN Description 18.466 86 excludes recirc ponds 18.466 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 150 0.0400 0.62 Sheet Flow, sheet flow NW corner Fallow n= 0.050 P2= 3.54" 20.2 3,152 0.0260 2.60 Shallow Concentrated Flow, Flow thru LS plant to pond 3 Unpaved Kv= 16.1 fps 24.3 3,302 Total 60 55 50 45 40 35 3 30 LL 25 20 15 10 5 0 0 Subcatchment 3S-C: LS area to Pond 3 Hydrograph i i 54.07 cfs I i ..........y_.._.._�.. I .._..._.._._}_.._.....:.... ..... .._.._.._.ifIIi I I i i I i ....._.._.+ ..._.._-...._.._.._:;! ._..._.._.III ...._.._...tiiIiIiIiii .._.._.._:fiiij!Ii�ii ._.._.._..iEiij�i!i�ii I .................... I i I I .r_. .1._......._; _.�.._.._..tiIii !!!e!! .......... ' ! ! i a1 i — n r -----Ra-'fAte=#34 41c- I . ! :: @ t�#fi�i _�ii 2' 1iIIi ttiIi i ;. i ; i i i ; i 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 56 Summary for Reach 1A-R: 36" Pipe Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 2.60" for 5yr-24hr event Inflow = 24.77 cfs @ 12.40 hrs, Volume= 5.260 of Outflow = 24.75 cfs @ 12.41 hrs, Volume= 5.260 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.17 fps, Min. Travel Time= 0.4 min Avg. Velocity = 1.34 fps, Avg. Travel Time= 2.1 min Peak Storage= 580 cf @ 12.41 hrs Average Depth at Peak Storage= 1.47' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 51.09 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 168.0' Slope= 0.0050 T Inlet Invert= 392.52', Outlet Invert= 391.68' N V 3 0 LL Reach 1A-R: 36" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 57 Summary for Reach 1 B-R: 36" Pipe to 2P Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 2.60" for 5yr-24hr event Inflow = 24.75 cfs @ 12.41 hrs, Volume= 5.260 of Outflow = 24.76 cfs @ 12.41 hrs, Volume= 5.260 af, Atten= 0%, Lag= 0.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.42 fps, Min. Travel Time= 0.2 min Avg. Velocity = 1.01 fps, Avg. Travel Time= 1.2 min Peak Storage= 343 cf @ 12.41 hrs Average Depth at Peak Storage= 1.85' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 35.40 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 75.0' Slope= 0.0024 7' Inlet Invert= 391.68', Outlet Invert= 391.50' N V 3 0 LL Reach 1 B-R: 36" Pipe to 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 58 Summary for Reach 1 R: 24" Pipe Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 3.26" for 5yr-24hr event Inflow = 17.60 cfs @ 12.25 hrs, Volume= 3.727 of Outflow = 17.60 cfs @ 12.25 hrs, Volume= 3.727 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 13.26 fps, Min. Travel Time= 0.4 min Avg. Velocity = 2.54 fps, Avg. Travel Time= 1.9 min Peak Storage= 378 cf @ 12.25 hrs Average Depth at Peak Storage= 0.88' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.18 cfs 24.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 285.0' Slope= 0.0325 '/' Inlet Invert= 402.60', Outlet Invert= 393.34' 1 1 1 1 1 1 1 1 w 1 3 0 LL Reach 1 R: 24" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 59 Summary for Reach 3A-R: Channel 8A-2 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.98" for 5yr-24hr event Inflow = 53.89 cfs @ 12.18 hrs, Volume= 4.579 of Outflow = 53.90 cfs @ 12.18 hrs, Volume= 4.579 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 6.75 fps, Min. Travel Time= 0.0 min Avg. Velocity = 1.91 fps, Avg. Travel Time= 0.2 min Peak Storage= 146 cf @ 12.18 hrs Average Depth at Peak Storage= 1.00' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 440.38 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 18.3' Slope= 0.0268 '/' Inlet Invert= 417.53', Outlet Invert= 417.04' Reach 3A-R: Channel ;. ..... .1 I 1 1 0 1 1 1 1 �1 1 .1 1 :1 •1 Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 60 Summary for Reach 313-11: Channel 8A-3 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.98" for 5yr-24hr event Inflow = 53.90 cfs @ 12.18 hrs, Volume= 4.579 of Outflow = 53.89 cfs @ 12.19 hrs, Volume= 4.579 af, Atten= 0%, Lag= 0.5 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.18 fps, Min. Travel Time= 0.6 min Avg. Velocity = 1.48 fps, Avg. Travel Time= 2.2 min Peak Storage= 2,050 cf @ 12.19 hrs Average Depth at Peak Storage= 1.23' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 301.20 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 197.2' Slope= 0.0125 T Inlet Invert= 417.04', Outlet Invert= 414.57' N U 3 0 LL Reach 313-R: Channel 8A-3 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 61 Summary for Reach 3C-R: Channel 8A-4 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.98" for 5yr-24hr event Inflow = 53.89 cfs @ 12.19 hrs, Volume= 4.579 of Outflow = 53.89 cfs @ 12.19 hrs, Volume= 4.579 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 15.49 fps, Min. Travel Time= 0.0 min Avg. Velocity = 4.31 fps, Avg. Travel Time= 0.2 min Peak Storage= 151 cf @ 12.19 hrs Average Depth at Peak Storage= 0.50' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 1,493.79 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 43.3' Slope= 0.3081 T Inlet Invert= 414.57', Outlet Invert= 401.23' N U 3 0 LL Reach 3C-R: Channel 8A-4 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 62 Summary for Reach 5R: Channel 8A-1 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.98" for 5yr-24hr event Inflow = 54.07 cfs @ 12.17 hrs, Volume= 4.579 of Outflow = 53.89 cfs @ 12.18 hrs, Volume= 4.579 af, Atten= 0%, Lag= 0.7 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.06 fps, Min. Travel Time= 1.0 min Avg. Velocity = 1.92 fps, Avg. Travel Time= 3.6 min Peak Storage= 3,120 cf @ 12.18 hrs Average Depth at Peak Storage= 1.08' Bank -Full Depth= 3.00' Flow Area= 27.0 sf, Capacity= 324.01 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 1.0 7' Top Width= 12.00' Length= 409.2' Slope= 0.0256 T Inlet Invert= 428.00', Outlet Invert= 417.53' N U 3 0 LL Reach 5R: Channel 8A-1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 63 Summary for Pond 1A-B: Existing Basin 1A (low lying greenspace) Inflow Area = 10.558 ac, 26.83% Impervious, Inflow Depth = 3.27" for 5yr-24hr event Inflow = 43.28 cfs @ 12.06 hrs, Volume= 2.874 of Outflow = 7.87 cfs @ 12.46 hrs, Volume= 1.532 af, Atten= 82%, Lag= 23.7 min Primary = 7.87 cfs @ 12.46 hrs, Volume= 1.532 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 405.53' @ 12.46 hrs Surf.Area= 25,152 sf Storage= 70,994 cf Plug -Flow detention time= 257.2 min calculated for 1.532 of (53% of inflow) Center -of -Mass det. time= 145.6 min ( 949.1 - 803.5 ) Volume Invert Avail.Storage Storage Description #1 400.00' 154,571 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 2,623 0 0 402.00 9,204 11,827 11,827 404.00 17,449 26,653 38,480 406.00 27,541 44,990 83,470 408.00 43,560 71,101 154,571 Device Routinq Invert Outlet Devices #1 Primary 405.00' 6.3' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=7.85 cfs @ 12.46 hrs HW=405.53' TW=393.99' (Dynamic Tailwater) L1=Sharp-Crested Rectangular Weir (Weir Controls 7.85 cfs @ 2.37 fps) PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 64 Pond 1A-B: Existing Basin 1A (low lying greenspace) Hydrograph ■ Inflow ■ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 65 Summary for Pond 1 B: Existing Basin 1 Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 3.27" for 5yr-24hr event Inflow = 62.56 cfs @ 12.03 hrs, Volume= 3.735 of Outflow = 17.60 cfs @ 12.25 hrs, Volume= 3.727 af, Atten= 72%, Lag= 13.1 min Primary = 17.60 cfs @ 12.25 hrs, Volume= 3.727 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 402.60' Surf.Area= 24,334 sf Storage= 53,379 cf Peak Elev= 404.95' @ 12.25 hrs Surf.Area= 31,579 sf Storage= 119,146 cf (65,767 cf above start) Plug -Flow detention time= 305.6 min calculated for 2.501 of (67% of inflow) Center -of -Mass det. time= 114.1 min ( 914.3 - 800.2 ) Volume Invert Avail.Storage Storage Description #1 400.00' 230,133 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 16,836 0 0 401.00 19,630 18,233 18,233 402.00 22,539 21,085 39,318 403.00 25,530 24,035 63,352 404.00 28,610 27,070 90,422 405.00 31,721 30,166 120,588 406.00 34,929 33,325 153,913 407.00 38,193 36,561 190,474 408.00 41,125 39,659 230,133 Device Routing Invert Outlet Devices #1 Primary 402.60' 24.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=17.60 cfs @ 12.25 hrs HW=404.95' TW=403.48' (Dynamic Tailwater) L1=Orifice/Grate (Orifice Controls 17.60 cfs @ 5.60 fps) PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 66 Pond 1 B: Existing Basin 1 Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 67 Summary for Pond 2B: 2P Inflow Area = 53.863 ac, 19.28% Impervious, Inflow Depth = 2.74" for 5yr-24hr event Inflow = 73.10 cfs @ 12.36 hrs, Volume= 12.320 of Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 391.00' Surf.Area= 1.718 ac Storage= 4.603 of Peak Elev= 396.93' @ 96.00 hrs Surf.Area= 2.459 ac Storage= 16.922 of (12.320 of above start) Flood Elev= 400.00' Surf.Area= 2.869 ac Storage= 25.105 of (20.502 of above start) Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 388.00' 25.105 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 388.00 1.345 0.000 0.000 389.00 1.471 1.408 1.408 390.00 1.600 1.536 2.943 391.00 1.718 1.659 4.603 392.00 1.833 1.775 6.378 393.00 1.955 1.894 8.272 394.00 2.077 2.016 10.288 395.00 2.204 2.140 12.428 396.00 2.340 2.272 14.701 397.00 2.469 2.404 17.105 398.00 2.599 2.534 19.639 399.00 2.732 2.665 22.304 400.00 2.869 2.800 25.105 Device Routing Invert Outlet Devices #1 Primary 390.50' 54.0" Round Culvert X 0.00 L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 390.50' / 382.00' S= 0.0850 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 15.90 sf #2 Device 1 391.00' 0.5" Vert. Orifice/Grate X 20.00 columns X 7 rows with 6.0" cc spacing C= 0.600 #3 Device 1 396.00' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #4 Secondary 397.00' 30.0' long x 28.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 68 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L1=Culvert ( Controls 0.00 cfs) �2=0 rifi ce/G rate ( Controls 0.00 cfs) 3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) N U 3 0 LL Pond 2B: 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow ■ Primary ■ Secondary BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 69 Summary for Pond 3B: Pond 3 Inflow Area = 24.751 ac, 4.10% Impervious, Inflow Depth = 3.02" for 5yr-24hr event Inflow = 72.73 cfs @ 12.15 hrs, Volume= 6.238 of Outflow = 45.94 cfs @ 12.36 hrs, Volume= 5.900 af, Atten= 37%, Lag= 12.6 min Primary = 45.94 cfs @ 12.36 hrs, Volume= 5.900 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 394.90' Surf.Area= 10,695 sf Storage= 22,165 cf Peak Elev= 399.70' @ 12.36 hrs Surf.Area= 39,946 sf Storage= 102,224 cf (80,058 cf above start) Flood Elev= 402.00' Surf.Area= 42,976 sf Storage= 173,109 cf (150,943 cf above start) Plug -Flow detention time= 161.2 min calculated for 5.391 of (86% of inflow) Center -of -Mass det. time= 71.1 min ( 892.4 - 821.4 ) Volume Invert Avail.Storage Storage Description #1 391.00' 15,607 cf Chamber 2 (outlet) (Prismatic) Listed below (Recalc) #2 392.00' 7,643 cf Chamber 1 (inlet) (Prismatic) Listed below (Recalc) #3 396.00' 225,420 cf Combined Chambers (Prismatic) Listed below (Recalc) 248,669 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 391.00 1,446 0 0 392.00 2,583 2,015 2,015 393.00 3,801 3,192 5,207 394.00 5,119 4,460 9,667 395.00 6,761 5,940 15,607 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 392.00 1,032 0 0 393.00 1,971 1,502 1,502 394.00 3,048 2,510 4,011 395.00 4,215 3,632 7,643 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 396.00 13,953 0 0 397.00 17,143 15,548 15,548 398.00 22,159 19,651 35,199 399.00 26,581 24,370 59,569 400.00 30,000 28,291 87,860 402.00 32,000 62,000 149,860 404.00 43,560 75,560 225,420 BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 70 Device Routing Invert Outlet Devices #1 Primary 394.90' 36.0" Round Culvert L= 265.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 394.90' / 391.60' S= 0.0125 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 394.90' 8.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 397.90' 5.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 399.50' 20.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=45.74 cfs @ 12.36 hrs HW=399.70' TW=392.52' (Dynamic Tailwater) L1=Culvert (Passes 45.74 cfs of 61.79 cfs potential flow) P4=S =Orifice/Grate (Orifice Controls 3.55 cfs @ 10.17 fps) =Sharp -Crested Rectangular Weir (Weir Controls 36.52 cfs @ 4.38 fps) harp -Crested Rectangular Weir (Weir Controls 5.67 cfs @ 1.45 fps) Pond 3B: Pond 3 Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 71 Summary for Subcatchment 1S-A: To Basin 1A Runoff = 74.78 cfs @ 12.03 hrs, Volume= 4.511 af, Depth= 3.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (ac) CN Description 4.327 98 Paved roads w/curbs & sewers, HSG C 0.180 98 Paved roads w/curbs & sewers, HSG C 0.502 98 Water Surface, HSG C 0.683 77 Woods, Poor, HSG C 0.242 77 Woods, Poor, HSG C 0.584 77 Woods, Poor, HSG C 0.045 74 >75% Grass cover, Good, HSG C 0.098 74 >75% Grass cover, Good, HSG C 0.051 74 >75% Grass cover, Good, HSG C 0.128 86 <50% Grass cover, Poor, HSG C 0.529 74 >75% Grass cover, Good, HSG C 6.353 87 Dirt roads, HSG C 13.722 89 Weighted Average 8.713 63.50% Pervious Area 5.009 36.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.8 150 0.0260 0.52 Sheet Flow, sheet from LS stockpile Fallow n= 0.050 P2= 3.54" 3.8 675 0.0330 2.92 Shallow Concentrated Flow, Concentrated from stockpile Unpaved Kv= 16.1 fps 0.3 125 0.0100 6.22 7.63 Pipe Channel, 15" rcp culv 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.011 Concrete pipe, straight & clean 1.5 260 0.0310 2.83 Shallow Concentrated Flow, culvert to ditch Unpaved Kv= 16.1 fps 0.8 218 0.0180 4.73 23.65 Trap/Vee/Rect Channel Flow, ditch to culv Bot.W=2.00' D=1.00' Z= 3.0 7' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.2 250 0.0480 17.06 41.03 Pipe Channel, Final pipe 21.0" Round Area= 2.4 sf Perim= 5.5' r= 0.44' n= 0.011 Concrete pipe, straight & clean 11.4 1,678 Total BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 72 Subcatchment 1S-A: To Basin 1A Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 73 Summary for Subcatchment 1S-B: To Basin 1A Runoff = 51.79 cfs @ 12.06 hrs, Volume= 3.470 af, Depth= 3.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (ac) CN Description 0.169 74 >75% Grass cover, Good, HSG C 1.793 98 Paved roads w/curbs & sewers, HSG C 0.632 98 Roofs, HSG C 0.053 98 Roofs, HSG C 0.956 74 >75% Grass cover, Good, HSG C 0.355 98 Water Surface, HSG C 6.600 87 Dirt roads, HSG C 10.558 89 Weighted Average 7.725 73.17% Pervious Area 2.833 26.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.4 150 0.0200 0.47 Sheet Flow, stkpile area Fallow n= 0.050 P2= 3.54" 0.5 66 0.0200 2.28 Shallow Concentrated Flow, sktpile area Unpaved Kv= 16.1 fps 0.6 110 0.0360 2.85 Shallow Concentrated Flow, grass after stkpile Grassed Waterway Kv= 15.0 fps 3.3 518 0.0270 2.65 Shallow Concentrated Flow, Unpaved areas around bldg 12 Unpaved Kv= 16.1 fps 0.4 193 0.0240 8.83 10.84 Pipe Channel, Stm pipe 1st leg 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 Concrete pipe, finished 0.2 127 0.0260 10.38 18.35 Pipe Channel, 2nd leg of pipe 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.012 Concrete pipe, finished 0.9 280 0.0040 4.93 15.50 Pipe Channel, 3rd leg stm pipe 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 3.6 265 0.0300 1.21 Shallow Concentrated Flow, grassed area within lowlying area Short Grass Pasture Kv= 7.0 fps 14.9 1,709 Total BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 74 55 50 45 40 35 30 0 LL 25 20 15 10 5 0 Subcatchment 1S-B: To Basin 1A Hydrograph i i i , i -------i-------a-- i i 51.79 ds i 1---------- +i ------------------ ----------11---------- Gi ----------ii ----------Li -----i -------- --------- Ii r i i VP ._ ...... ----------- ------ ----------i-------- ------- a i —1— -- G� — PYr1 4 i r — — an — TF=1 a uof - c O�UM-1 �.o ,3. TO of _ _.._._.... i i..........j_.._.._..1...................l._.._..__ ; I I ...........1.._.._.._ i ; ....._.._...._.._.. -.;-....._.....--. i i u 110 ... . U e p i _h...-_�-. 9 L H..J.. qHj engt _4.V nj"' i 91 , --------- -� ------ -- ` I ------+- - - i + - - + 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 75 Summary for Subcatchment 2S-A: Direct to 2P Runoff = 29.68 cfs @ 11.95 hrs, Volume= 1.423 af, Depth= 3.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (sf) CN Description 66,516 98 Water Surface, HSG C 83,461 74 >75% Grass cover, Good, HSG C 60,505 87 Dirt roads, HSG C 210,482 85 Weighted Average 143,966 68.40% Pervious Area 66,516 31.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum TOC Subcatchment 2S-A: Direct to 2P Hydrograph G- 32 — +---a—�—+ —+—+-- —----+-----+-----+— i t zssa 30 i i i ;. i 28 i i i_ �� 26 i 1 yr' 24 r anfl l .1 ' ----------i------- y -- - �----------- -��-- 24 .2-it nn --_-_----- -_-1_--_-_- -L-_-_--_- A 22J-- ------�--------4-------------'--f'-"__....._...i._...._"__...-{--------�------+-------F-- .�-. +.--.....- i-- 20 i ' R n�ff/ofi.42:afi ----- -- .;-..--.-- �u une 18 I I I I I " t Iu�-o I —r —r- — --i — - --- i-----i-- - r 16 14 t -------------}-------!--------}--------- - - ?—�—�-{— --+ - — 12 ..... i -..._--{ ------ }---------_-----I-_-----i-_----i -_--- i-_-_---i_-_--- i ?---_--. ........ _--_i— i — 10 ; 8 ------ ^------' - ' I - j I I I i I I I -i I I I I I 6 } i i i i , 4 ..... ....... ......_........_.....__...__.___........... .......... .....__. .............. ...... ..... _ ............ ............... .............. ..... --.......... ....--... 2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 76 Summary for Subcatchment 3S-B: To Pond 3 Runoff = 29.64 cfs @ 12.07 hrs, Volume= 2.011 af, Depth= 3.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (sf) CN Description 11,911 98 Water Surface, HSG C 25,046 77 Woods, Poor, HSG C 31,514 98 Roofs, HSG C 820 98 Roofs, HSG C 204,485 87 Dirt roads, HSG C 273,776 88 Weighted Average 229,531 83.84% Pervious Area 44,245 16.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 150 0.0050 0.27 Sheet Flow, Sheet flow in NE direection from bldg 12 Fallow n= 0.050 P2= 3.54" 1.8 142 0.0070 1.35 Shallow Concentrated Flow, "flat" conc flow Unpaved Kv= 16.1 fps 4.4 791 0.0350 3.01 Shallow Concentrated Flow, Flow to pond 3 Unpaved Kv= 16.1 fps 15.5 1,083 Total BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 77 Subcatchment 3S-B: To Pond 3 Hydrograph 32 29.64cfs — 30 -- 1 28 26 ih 99 i n i 24 ! i ! TJ 22 - ;- — --f ! ! ! ! ! ! - -- -� - --IunpffourMe2:'I'C";a 20 18 i ; I i I i i i i i i i ' ' 16 ! I i i i i i i i i 14 12 .......--_-i_--_-_...... i ..............._-L--_"..... ....._"1-_--_---.-i----------------- ---------------------t.---_--_--1--_--_--_-t-.---_--_-1---_--_--1---------------------- ---_--_--i--_---_--_ ; i I i I i i I rti Jll A .....-"1-_--_--_ f--_-_----_--_--_i--_--_--_" - L-_--_--1--_--_--_-i-.---_--_-1"-"_--_--1-_-_--1_-_--_- --_-" .— --_--_ _ aa" "-" " - .�..n.--J-- --i i t f---- t� i ! i 10 I —b Q i 8 ._.._..._t------ ..... _.t._.._.....+.--------- 1............ +..........---------- r...._.._..I.._.._.._.r.......... t..._.._..t.._.._.._,...... .... .".------------------...i_....._.............;......_....._.....__i._-...------- .. 6 4 — — ...""..... ------i-- ' —T —�- —i- —t - - -- - —i -- ' i— t r i i-- -� i 2 . 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 78 Summary for Subcatchment 3S-C: LS area to Pond 3 Runoff = 65.71 cfs @ 12.17 hrs, Volume= 5.594 af, Depth= 3.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (ac) CN Description 18.466 86 excludes recirc ponds 18.466 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 150 0.0400 0.62 Sheet Flow, sheet flow NW corner Fallow n= 0.050 P2= 3.54" 20.2 3,152 0.0260 2.60 Shallow Concentrated Flow, Flow thru LS plant to pond 3 Unpaved Kv= 16.1 fps 24.3 3,302 Total N 3 0 LL Subcatchment 3S-C: LS area to Pond 3 Hydrograph 70 --_-- ... 65.71 cfs—t----t------f------F----------F------f------F----i------i --- i------t----------- .--...---.---_i--.---.---.-1------------- :.---.---.---.'-- 65 ; - ;--------+ --------- ------- ...--......-.... f-.... -..... -...-t....... Ty 1.1....2.4.-h.r..---- i: 60 -------t---- fi-----�----�---�--j--r----�----�----.�..Q-�r�24h�..�a1n#a11=1-�---.. 55 i --_--_----.-'`I_--_---_--1ii --_--_--'—I-_--_--_-Ii i--_--_--_- r ----..R---.. . Ruboff. -...- ..A 1 50 -...-....--..-..-...-...--.;. -...- .....-..._................ a --------}---......}----r- ---------- fon45 nOYe=5 59Oaf 40 i i i i i i.u._o..ff.....De.p.h.....—...*...f 4.._..... a 35 } i I i i — ;_.._._.+._.._....+..................F.._.._.._.._.._.._.:F..._.._..+.._.._.._F...._.._.+....-_.... 1a.>�...j_e.nath_.3-3.p2_-... i i I I i i i i =r... TIC 25 i i i i i Mi - -------------- ..---.. CIN 20 861 _..i _ -------}-------------------L--------------------------------------- r - --- -- -.- 15 ....-...------ — — -- T---------r -r-------- 1---------T-----------------r---------- ---------i 10 -- — ..... ...--...--...... -- + -- f --+ -- F — + --F +------} — — -------} — +--------} — 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 79 Summary for Reach 1A-R: 36" Pipe Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 3.28" for 10yr-24hr event Inflow = 35.84 cfs @ 12.31 hrs, Volume= 6.631 of Outflow = 35.88 cfs @ 12.31 hrs, Volume= 6.631 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.82 fps, Min. Travel Time= 0.4 min Avg. Velocity = 1.39 fps, Avg. Travel Time= 2.0 min Peak Storage= 770 cf @ 12.31 hrs Average Depth at Peak Storage= 1.85' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 51.09 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 168.0' Slope= 0.0050 T Inlet Invert= 392.52', Outlet Invert= 391.68' N U 3 0 LL Reach 1A-R: 36" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 80 Summary for Reach 1 B-R: 36" Pipe to 2P Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 3.28" for 10yr-24hr event Inflow = 35.88 cfs @ 12.31 hrs, Volume= 6.631 of Outflow = 35.89 cfs @ 12.32 hrs, Volume= 6.631 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.71 fps, Min. Travel Time= 0.2 min Avg. Velocity = 1.05 fps, Avg. Travel Time= 1.2 min Peak Storage= 472 cf @ 12.32 hrs Average Depth at Peak Storage= 2.50' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 35.40 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 75.0' Slope= 0.0024 '/' Inlet Invert= 391.68', Outlet Invert= 391.50' N U 3 0 LL Reach 1 B-R: 36" Pipe to 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 81 Summary for Reach 1 R: 24" Pipe Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 3.94" for 10yr-24hr event Inflow = 20.09 cfs @ 12.25 hrs, Volume= 4.502 of Outflow = 20.10 cfs @ 12.26 hrs, Volume= 4.502 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 13.73 fps, Min. Travel Time= 0.3 min Avg. Velocity = 2.63 fps, Avg. Travel Time= 1.8 min Peak Storage= 417 cf @ 12.26 hrs Average Depth at Peak Storage= 0.95' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.18 cfs 24.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 285.0' Slope= 0.0325 '/' Inlet Invert= 402.60', Outlet Invert= 393.34' N U 3 0 LL Reach 1 R: 24" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 82 Summary for Reach 3A-R: Channel 8A-2 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 3.64" for 10yr-24hr event Inflow = 65.50 cfs @ 12.18 hrs, Volume= 5.594 of Outflow = 65.51 cfs @ 12.18 hrs, Volume= 5.594 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.16 fps, Min. Travel Time= 0.0 min Avg. Velocity = 2.02 fps, Avg. Travel Time= 0.2 min Peak Storage= 167 cf @ 12.18 hrs Average Depth at Peak Storage= 1.11' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 440.38 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 18.3' Slope= 0.0268 '/' Inlet Invert= 417.53', Outlet Invert= 417.04' w 3 0 U. Reach 3A-R: Channel 8A-2 Hydrograph ---.---_--:---.---.---.'----------'-------'L--------' ---------`------'--..-............................................-------' L---------1--------- "---------- ----------- !--------- ---------- 1--_--_---4-------------------.. i I I I I I I I 70 - -' 65.50Cfs - --� --� - --_.................._..................... - -- ------�--- - - - - - ..... 65 ....---'.. cfs .._...'--_--_-- Arg f� a7 �- . 6_11c-....t. I I i I i I i i 55 MiaxV —A 50 + t — 45 i — +', i — — — — — +---------i----------i------— —�F�q� +. 40 35 -- i.... --i --i —4— — +— a-- —+ —---- ~------�---w-------- + --� — ....._....... i I I I I A I� 30 — .......... ......i........... .}.-........ .�-..-..-...}..-..-..-}.._.._.._.�..-..-..-.{..._.._...�. _ _ _ 25 ; —� ... ...— �— a— i — —= — —---- 20 i i i i i i i 15 — -- i—+— —i--{ — -- -- i--- --E-- i i 4 — +. 10 I I I I I I 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 83 Summary for Reach 313-11: Channel 8A-3 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 3.64" for 10yr-24hr event Inflow = 65.51 cfs @ 12.18 hrs, Volume= 5.594 of Outflow = 65.50 cfs @ 12.19 hrs, Volume= 5.594 af, Atten= 0%, Lag= 0.5 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.49 fps, Min. Travel Time= 0.6 min Avg. Velocity = 1.57 fps, Avg. Travel Time= 2.1 min Peak Storage= 2,353 cf @ 12.19 hrs Average Depth at Peak Storage= 1.37' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 301.20 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 197.2' Slope= 0.0125 T Inlet Invert= 417.04', Outlet Invert= 414.57' Reach 313-R: Channel 8A-3 Hydrograph ---.-- .................. i _Li --------'Ii ---------1iI - I .....I ..-------Ii'"' --1Ii ._1Ii' --------- "-_------.."" --..._.........5.51 csi-_-_--^-_-_-_i_-_-_-i_-_-_- ------.... 70ii 655+--------- Lhfdw - .ria 65 . I I I i I 60 ; ; r Ajvg-: lo*--D Pth- i 55 Miax!V 50 i + 45 i — +, i — — — — — +--------- i---------- i------a- ----� +. i i i i i i i i I I ; 40 35 — — i i — — i +-------- ------+ — ------------ ------ ------------- — — — -I— ------ i i i I I I I IA I I 30 1--- -- r---1---�-' y/�_ i /�► 1y+���/�r ........ ... .......;...-.._..._.}._.._.....'_.._......t.._.._...}.._.._.._.1.._..-..----_-..-..�...._.._...�. V���V }/ V -2 . .. .._� 25 20 15 10 T t — — T T— —[— -- 1— — 7 — i-- —T i —• I I I I 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 84 Summary for Reach 3C-R: Channel 8A-4 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 3.64" for 10yr-24hr event Inflow = 65.50 cfs @ 12.19 hrs, Volume= 5.594 of Outflow = 65.50 cfs @ 12.19 hrs, Volume= 5.594 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 16.53 fps, Min. Travel Time= 0.0 min Avg. Velocity = 4.54 fps, Avg. Travel Time= 0.2 min Peak Storage= 171 cf @ 12.19 hrs Average Depth at Peak Storage= 0.56' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 1,493.79 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 43.3' Slope= 0.3081 T Inlet Invert= 414.57', Outlet Invert= 401.23' w 3 0 LL Reach 3C-R: Channel 8A-4 Hydrograph ---.---_--:---.---.---.'--'--'---"-'-----'L--'--'--' --'--'---`------'--..-............................................-------' 1--------- "---------- ----------- !--------- ---------- 1--_--_---4------------------.. i I I I I I I I 70 65.50 cfs .......; f t t 6I5.50 cfs __-I i I i ---------IfJ wa7 1- 4 65 I 60 I I i i i i i i -A" : lo* ID P1� 55 .........;— 50 i I 45 + - - - - - +--------- i---------- i------ • V tiw I 40 i �7 �--35 -- -- -- - ------- !-- ------ ?------ + -L------ I ------~------ 1------- �------ + -- --............ i I I I I 30 81 30 1.. {......_...-.}-..-..-..-..-..-...9 . � cfs25 apac;4 20 i i i 15 - -- ; —+— — -- — ----�------ 10 I I I I 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 85 Summary for Reach 5R: Channel 8A-1 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 3.64" for 10yr-24hr event Inflow = 65.71 cfs @ 12.17 hrs, Volume= 5.594 of Outflow = 65.50 cfs @ 12.18 hrs, Volume= 5.594 af, Atten= 0%, Lag= 0.7 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.51 fps, Min. Travel Time= 0.9 min Avg. Velocity = 2.03 fps, Avg. Travel Time= 3.4 min Peak Storage= 3,564 cf @ 12.18 hrs Average Depth at Peak Storage= 1.21' Bank -Full Depth= 3.00' Flow Area= 27.0 sf, Capacity= 324.01 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 1.0 '/' Top Width= 12.00' Length= 409.2' Slope= 0.0256 '/' Inlet Invert= 428.00', Outlet Invert= 417.53' N V 3 0 LL Reach 5R: Channel 8A-1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 86 Summary for Pond 1A-B: Existing Basin 1A (low lying greenspace) Inflow Area = 10.558 ac, 26.83% Impervious, Inflow Depth = 3.94" for 10yr-24hr event Inflow = 51.79 cfs @ 12.06 hrs, Volume= 3.470 of Outflow = 15.87 cfs @ 12.32 hrs, Volume= 2.129 af, Atten= 69%, Lag= 15.3 min Primary = 15.87 cfs @ 12.32 hrs, Volume= 2.129 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 405.84' @ 12.32 hrs Surf.Area= 26,735 sf Storage= 79,136 cf Plug -Flow detention time= 222.5 min calculated for 2.129 of (61 % of inflow) Center -of -Mass det. time= 117.5 min ( 915.7 - 798.2 ) Volume Invert Avail.Storage Storage Description #1 400.00' 154,571 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 2,623 0 0 402.00 9,204 11,827 11,827 404.00 17,449 26,653 38,480 406.00 27,541 44,990 83,470 408.00 43,560 71,101 154,571 Device Routinq Invert Outlet Devices #1 Primary 405.00' 6.3' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=15.76 cfs @ 12.32 hrs HW=405.84' TW=394.37' (Dynamic Tailwater) L1=Sharp-Crested Rectangular Weir (Weir Controls 15.76 cfs @ 2.99 fps) MAIMOMMUMMOTCY1 PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 87 Pond 1A-B: Existing Basin 1A (low lying greenspace) Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 88 Summary for Pond 1 B: Existing Basin 1 Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 3.94" for 10yr-24hr event Inflow = 74.78 cfs @ 12.03 hrs, Volume= 4.511 of Outflow = 20.09 cfs @ 12.25 hrs, Volume= 4.502 af, Atten= 73%, Lag= 13.6 min Primary = 20.09 cfs @ 12.25 hrs, Volume= 4.502 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 402.60' Surf.Area= 24,334 sf Storage= 53,379 cf Peak Elev= 405.36' @ 12.25 hrs Surf.Area= 32,887 sf Storage= 132,328 cf (78,948 cf above start) Plug -Flow detention time= 272.5 min calculated for 3.277 of (73% of inflow) Center -of -Mass det. time= 107.2 min ( 902.2 - 795.0 ) Volume Invert Avail.Storage Storage Description #1 400.00' 230,133 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 16,836 0 0 401.00 19,630 18,233 18,233 402.00 22,539 21,085 39,318 403.00 25,530 24,035 63,352 404.00 28,610 27,070 90,422 405.00 31,721 30,166 120,588 406.00 34,929 33,325 153,913 407.00 38,193 36,561 190,474 408.00 41,125 39,659 230,133 Device Routing Invert Outlet Devices #1 Primary 402.60' 24.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=20.08 cfs @ 12.25 hrs HW=405.36' TW=403.55' (Dynamic Tailwater) L1=Orifice/Grate (Orifice Controls 20.08 cfs @ 6.39 fps) MANUMMUMMOTCY1 PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 89 Pond 1 B: Existing Basin 1 Hydrograph ■ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 90 Summary for Pond 2B: 2P Inflow Area = 53.863 ac, 19.28% Impervious, Inflow Depth = 3.40" for 10yr-24hr event Inflow = 103.38 cfs @ 12.31 hrs, Volume= 15.278 of Outflow = 4.24 cfs @ 19.88 hrs, Volume= 2.773 af, Atten= 96%, Lag= 454.1 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 4.24 cfs @ 19.88 hrs, Volume= 2.773 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 391.00' Surf.Area= 1.718 ac Storage= 4.603 of Peak Elev= 397.14' @ 19.88 hrs Surf.Area= 2.487 ac Storage= 17.453 of (12.851 of above start) Flood Elev= 400.00' Surf.Area= 2.869 ac Storage= 25.105 of (20.502 of above start) Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= 534.4 min ( 1,423.7 - 889.3 ) Volume Invert Avail.Storage Storage Description #1 388.00' 25.105 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 388.00 1.345 0.000 0.000 389.00 1.471 1.408 1.408 390.00 1.600 1.536 2.943 391.00 1.718 1.659 4.603 392.00 1.833 1.775 6.378 393.00 1.955 1.894 8.272 394.00 2.077 2.016 10.288 395.00 2.204 2.140 12.428 396.00 2.340 2.272 14.701 397.00 2.469 2.404 17.105 398.00 2.599 2.534 19.639 399.00 2.732 2.665 22.304 400.00 2.869 2.800 25.105 Device Routing Invert Outlet Devices #1 Primary 390.50' 54.0" Round Culvert X 0.00 L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 390.50' / 382.00' S= 0.0850 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 15.90 sf #2 Device 1 391.00' 0.5" Vert. Orifice/Grate X 20.00 columns X 7 rows with 6.0" cc spacing C= 0.600 #3 Device 1 396.00' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #4 Secondary 397.00' 30.0' long x 28.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 91 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L1=Culvert ( Controls 0.00 cfs) �2=Orifi ce/G rate ( Controls 0.00 cfs) 3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) Secondary OutFlow Max=4.24 cfs @ 19.88 hrs HW=397.14' (Free Discharge) L4=Broad-Crested Rectangular Weir (Weir Controls 4.24 cfs @ 1.00 fps) N U 3 0 LL Pond 2B: 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ Outflow ❑ Primary ❑ Secondary BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 92 Summary for Pond 3B: Pond 3 Inflow Area = 24.751 ac, 4.10% Impervious, Inflow Depth = 3.69" for 10yr-24hr event Inflow = 88.31 cfs @ 12.14 hrs, Volume= 7.605 of Outflow = 64.22 cfs @ 12.31 hrs, Volume= 7.223 af, Atten= 27%, Lag= 9.7 min Primary = 64.22 cfs @ 12.31 hrs, Volume= 7.223 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 394.90' Surf.Area= 10,695 sf Storage= 22,165 cf Peak Elev= 399.96' @ 12.31 hrs Surf.Area= 40,842 sf Storage= 109,933 cf (87,767 cf above start) Flood Elev= 402.00' Surf.Area= 42,976 sf Storage= 173,109 cf (150,943 cf above start) Plug -Flow detention time= 155.0 min calculated for 6.715 of (88% of inflow) Center -of -Mass det. time= 73.8 min ( 889.5 - 815.6 ) Volume Invert Avail.Storage Storage Description #1 391.00' 15,607 cf Chamber 2 (outlet) (Prismatic) Listed below (Recalc) #2 392.00' 7,643 cf Chamber 1 (inlet) (Prismatic) Listed below (Recalc) #3 396.00' 225,420 cf Combined Chambers (Prismatic) Listed below (Recalc) 248,669 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 391.00 1,446 0 0 392.00 2,583 2,015 2,015 393.00 3,801 3,192 5,207 394.00 5,119 4,460 9,667 395.00 6,761 5,940 15,607 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 392.00 1,032 0 0 393.00 1,971 1,502 1,502 394.00 3,048 2,510 4,011 395.00 4,215 3,632 7,643 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 396.00 13,953 0 0 397.00 17,143 15,548 15,548 398.00 22,159 19,651 35,199 399.00 26,581 24,370 59,569 400.00 30,000 28,291 87,860 402.00 32,000 62,000 149,860 404.00 43,560 75,560 225,420 BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 93 Device Routing Invert Outlet Devices #1 Primary 394.90' 36.0" Round Culvert L= 265.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 394.90' / 391.60' S= 0.0125 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 394.90' 8.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 397.90' 5.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 399.50' 20.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=64.19 cfs @ 12.31 hrs HW=399.96' TW=392.92' (Dynamic Tailwater) L1=Culvert (Inlet Controls 64.19 cfs @ 9.08 fps) P4=S =Orifice/Grate (Passes < 3.65 cfs potential flow) =Sharp -Crested Rectangular Weir (Passes < 44.27 cfs potential flow) harp -Crested Rectangular Weir (Passes < 20.22 cfs potential flow) Pond 3B: Pond 3 Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 94 Summary for Subcatchment 1S-A: To Basin 1A Runoff = 91.06 cfs @ 12.03 hrs, Volume= 5.559 af, Depth= 4.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (ac) CN Description 4.327 98 Paved roads w/curbs & sewers, HSG C 0.180 98 Paved roads w/curbs & sewers, HSG C 0.502 98 Water Surface, HSG C 0.683 77 Woods, Poor, HSG C 0.242 77 Woods, Poor, HSG C 0.584 77 Woods, Poor, HSG C 0.045 74 >75% Grass cover, Good, HSG C 0.098 74 >75% Grass cover, Good, HSG C 0.051 74 >75% Grass cover, Good, HSG C 0.128 86 <50% Grass cover, Poor, HSG C 0.529 74 >75% Grass cover, Good, HSG C 6.353 87 Dirt roads, HSG C 13.722 89 Weighted Average 8.713 63.50% Pervious Area 5.009 36.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.8 150 0.0260 0.52 Sheet Flow, sheet from LS stockpile Fallow n= 0.050 P2= 3.54" 3.8 675 0.0330 2.92 Shallow Concentrated Flow, Concentrated from stockpile Unpaved Kv= 16.1 fps 0.3 125 0.0100 6.22 7.63 Pipe Channel, 15" rcp culv 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.011 Concrete pipe, straight & clean 1.5 260 0.0310 2.83 Shallow Concentrated Flow, culvert to ditch Unpaved Kv= 16.1 fps 0.8 218 0.0180 4.73 23.65 Trap/Vee/Rect Channel Flow, ditch to culv Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.2 250 0.0480 17.06 41.03 Pipe Channel, Final pipe 21.0" Round Area= 2.4 sf Perim= 5.5' r= 0.44' n= 0.011 Concrete pipe, straight & clean 11.4 1,678 Total BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 95 fl Subcatchment 1S-A: To Basin 1A Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 96 Summary for Subcatchment 1S-B: To Basin 1A Runoff = 63.14 cfs @ 12.06 hrs, Volume= 4.277 af, Depth= 4.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (ac) CN Description 0.169 74 >75% Grass cover, Good, HSG C 1.793 98 Paved roads w/curbs & sewers, HSG C 0.632 98 Roofs, HSG C 0.053 98 Roofs, HSG C 0.956 74 >75% Grass cover, Good, HSG C 0.355 98 Water Surface, HSG C 6.600 87 Dirt roads, HSG C 10.558 89 Weighted Average 7.725 73.17% Pervious Area 2.833 26.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.4 150 0.0200 0.47 Sheet Flow, stkpile area Fallow n= 0.050 P2= 3.54" 0.5 66 0.0200 2.28 Shallow Concentrated Flow, sktpile area Unpaved Kv= 16.1 fps 0.6 110 0.0360 2.85 Shallow Concentrated Flow, grass after stkpile Grassed Waterway Kv= 15.0 fps 3.3 518 0.0270 2.65 Shallow Concentrated Flow, Unpaved areas around bldg 12 Unpaved Kv= 16.1 fps 0.4 193 0.0240 8.83 10.84 Pipe Channel, Stm pipe 1st leg 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 Concrete pipe, finished 0.2 127 0.0260 10.38 18.35 Pipe Channel, 2nd leg of pipe 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.012 Concrete pipe, finished 0.9 280 0.0040 4.93 15.50 Pipe Channel, 3rd leg stm pipe 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 3.6 265 0.0300 1.21 Shallow Concentrated Flow, grassed area within lowlying area Short Grass Pasture Kv= 7.0 fps 14.9 1,709 Total MANUMMUMMOTCY1 PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 97 Subcatchment 1S-B: To Basin 1A w 0 LL Hydrograph 70 i 1 ------..._ ........ t + t t F.. t F + + + t f -} + -t a 60 i i i i i i i i It- -;4----------- I --------- ?----- ------- ii ----------1--------- i --------aI -------- i 55 i--teain -- ? -- , r 50 u o----------t------ ------ -,-- -c 45 i i i iRliln # Me14 7-7-Alf lf 40 35 30 i i i I ! ( i i I i i i i -;-- ,--- ! ,--- ; ;-----;------;....... ------.--------�---'i----_- - rein 25 i i i i i i i i i i — Ic ! .-..-----.}-..-._...._.4....._........................:....................i....-..-....+.._.._.._.i....._.._.+...-...----F..........-.;.......----.._.._...._..._.-._;_....._....._.....?....._....._....._i.-......_.... i 20 0= ; 15 i 10 i i i i i i i i i ! i ! 5 r 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 98 Summary for Subcatchment 2S-A: Direct to 2P Runoff = 36.69 cfs @ 11.95 hrs, Volume= 1.782 af, Depth= 4.43" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (sf) CN Description 66,516 98 Water Surface, HSG C 83,461 74 >75% Grass cover, Good, HSG C 60,505 87 Dirt roads, HSG C 210,482 85 Weighted Average 143,966 68.40% Pervious Area 66,516 31.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum TOC Subcatchment 2S-A: Direct to 2P Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 99 Summary for Subcatchment 3S-B: To Pond 3 Runoff = 36.29 cfs @ 12.07 hrs, Volume= 2.488 af, Depth= 4.75" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (sf) CN Description 11,911 98 Water Surface, HSG C 25,046 77 Woods, Poor, HSG C 31,514 98 Roofs, HSG C 820 98 Roofs, HSG C 204,485 87 Dirt roads, HSG C 273,776 88 Weighted Average 229,531 83.84% Pervious Area 44,245 16.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 150 0.0050 0.27 Sheet Flow, Sheet flow in NE direection from bldg 12 Fallow n= 0.050 P2= 3.54" 1.8 142 0.0070 1.35 Shallow Concentrated Flow, "flat" conc flow Unpaved Kv= 16.1 fps 4.4 791 0.0350 3.01 Shallow Concentrated Flow, Flow to pond 3 Unpaved Kv= 16.1 fps 15.5 1,083 Total BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 100 Subcatchment 3S-B: To Pond 3 Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 101 Summary for Subcatchment 3S-C: LS area to Pond 3 Runoff = 81.32 cfs @ 12.17 hrs, Volume= 6.976 af, Depth= 4.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (ac) CN Description 18.466 86 excludes recirc ponds 18.466 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 150 0.0400 0.62 Sheet Flow, sheet flow NW corner Fallow n= 0.050 P2= 3.54" 20.2 3,152 0.0260 2.60 Shallow Concentrated Flow, Flow thru LS plant to pond 3 Unpaved Kv= 16.1 fps 24.3 3,302 Total 3 a LL Subcatchment 3S-C: LS area to Pond 3 Hydrograph _ - ---•--•---------------•---- •---- - _ _ - - - - - - - _ I i i ! i � i I i I _I i ! 90 } — — t t--------- + ------ F---------t F +---------t ?-------- I ------- --------- +--------•- 85 St32 cs — ..... 80 _ t --- U- I 75 70 i z;)yr� _ -r-...... ..... - - - -- - { - -- -�-- F--a-- - - -. 65 Ra-6o#`f Ate- =-1 i rt- —i- ,----,-- -- - 6o 55 i i I ; i i i i ! 1C Off iV � 11'1� 6.97 50 i - -;—ie -— -�- -_ -- -s--5.. 45 T ------ ----- �---r------- ---r- - r -- -r- -r---- la-i---w- 40 4----t-------- ------ 4------- I------- ------ r-----t------ 2-- - -� -- - 35 � i r-- -i-- -! -- r ---- �� 7 30 ! i i - , 25 -------' ---..... ....-- ------------......... .......... ;....... ..... ..... -------- -----t-..._.....__..._...._.....__...---------.-....._.....__..._j..................?---------;-....._..� ._... __ .... 20 ---fi---------4- ----- - - - - - - C - - - -j-- - -j - - - j - - r - - - t- - - 15 i i ---_-_- ------ -_--_- ------- -_-_----_-_--_-_-_-_t_-_-_-- -_-_-- -- -- -r- - -- -r-- -r-- ---- 10a............... ...... ...... ..... ..... . µ —1 — - - — — —1- —= - —1— - — 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 102 Summary for Reach 1A-R: 36" Pipe Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 4.19" for 25yr-24hr event Inflow = 50.66 cfs @ 12.25 hrs, Volume= 8.486 of Outflow = 50.65 cfs @ 12.26 hrs, Volume= 8.486 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 8.24 fps, Min. Travel Time= 0.3 min Avg. Velocity = 1.45 fps, Avg. Travel Time= 1.9 min Peak Storage= 1,033 cf @ 12.26 hrs Average Depth at Peak Storage= 2.44' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 51.09 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 168.0' Slope= 0.0050 T Inlet Invert= 392.52', Outlet Invert= 391.68' N 0 3 0 LL Reach 1A-R: 36" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 1_ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 103 Summary for Reach 1 B-R: 36" Pipe to 2P Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 4.19" for 25yr-24hr event Inflow = 50.65 cfs @ 12.26 hrs, Volume= 8.486 of Outflow = 35.65 cfs @ 12.10 hrs, Volume= 8.486 af, Atten= 30%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.71 fps, Min. Travel Time= 0.2 min Avg. Velocity = 1.09 fps, Avg. Travel Time= 1.1 min Peak Storage= 530 cf @ 12.15 hrs Average Depth at Peak Storage= 3.00' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 35.40 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 75.0' Slope= 0.0024 7' Inlet Invert= 391.68', Outlet Invert= 391.50' N 0 3 0 LL Reach 1 B-R: 36" Pipe to 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 1_ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paoe 104 Summary for Reach 1 R: 24" Pipe Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 4.85" for 25yr-24hr event Inflow = 22.83 cfs @ 12.25 hrs, Volume= 5.551 of Outflow = 22.83 cfs @ 12.26 hrs, Volume= 5.551 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 14.18 fps, Min. Travel Time= 0.3 min Avg. Velocity = 2.75 fps, Avg. Travel Time= 1.7 min Peak Storage= 459 cf @ 12.26 hrs Average Depth at Peak Storage= 1.02' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.18 cfs 24.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 285.0' Slope= 0.0325 '/' Inlet Invert= 402.60', Outlet Invert= 393.34' N V 3 0 LL Reach 1 R: 24" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) [ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 105 Summary for Reach 3A-R: Channel 8A-2 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 4.53" for 25yr-24hr event Inflow = 81.07 cfs @ 12.18 hrs, Volume= 6.976 of Outflow = 81.08 cfs @ 12.18 hrs, Volume= 6.976 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.63 fps, Min. Travel Time= 0.0 min Avg. Velocity = 2.16 fps, Avg. Travel Time= 0.1 min Peak Storage= 194 cf @ 12.18 hrs Average Depth at Peak Storage= 1.25' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 440.38 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 18.3' Slope= 0.0268 '/' Inlet Invert= 417.53', Outlet Invert= 417.04' N U 3 0 LL Reach 3A-R: Channel 8A-2 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 106 Summary for Reach 313-11: Channel 8A-3 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 4.53" for 25yr-24hr event Inflow = 81.08 cfs @ 12.18 hrs, Volume= 6.976 of Outflow = 81.06 cfs @ 12.19 hrs, Volume= 6.976 af, Atten= 0%, Lag= 0.5 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.83 fps, Min. Travel Time= 0.6 min Avg. Velocity = 1.67 fps, Avg. Travel Time= 2.0 min Peak Storage= 2,739 cf @ 12.19 hrs Average Depth at Peak Storage= 1.53' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 301.20 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 197.2' Slope= 0.0125 T Inlet Invert= 417.04', Outlet Invert= 414.57' N U 3 0 LL Reach 313-R: Channel 8A-3 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 107 Summary for Reach 3C-R: Channel 8A-4 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 4.53" for 25yr-24hr event Inflow = 81.06 cfs @ 12.19 hrs, Volume= 6.976 of Outflow = 81.07 cfs @ 12.19 hrs, Volume= 6.976 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 17.73 fps, Min. Travel Time= 0.0 min Avg. Velocity = 4.82 fps, Avg. Travel Time= 0.1 min Peak Storage= 198 cf @ 12.19 hrs Average Depth at Peak Storage= 0.63' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 1,493.79 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 43.3' Slope= 0.3081 T Inlet Invert= 414.57', Outlet Invert= 401.23' N U 3 0 LL Reach 3C-R: Channel 8A-4 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paoe 108 Summary for Reach 5R: Channel 8A-1 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 4.53" for 25yr-24hr event Inflow = 81.32 cfs @ 12.17 hrs, Volume= 6.976 of Outflow = 81.07 cfs @ 12.18 hrs, Volume= 6.976 af, Atten= 0%, Lag= 0.6 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 8.02 fps, Min. Travel Time= 0.9 min Avg. Velocity = 2.17 fps, Avg. Travel Time= 3.1 min Peak Storage= 4,127 cf @ 12.18 hrs Average Depth at Peak Storage= 1.37' Bank -Full Depth= 3.00' Flow Area= 27.0 sf, Capacity= 324.01 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 1.0 '/' Top Width= 12.00' Length= 409.2' Slope= 0.0256 '/' Inlet Invert= 428.00', Outlet Invert= 417.53' N V 3 0 LL Reach 5R: Channel 8A-1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 109 Summary for Pond 1A-B: Existing Basin 1A (low lying greenspace) Inflow Area = 10.558 ac, 26.83% Impervious, Inflow Depth = 4.86" for 25yr-24hr event Inflow = 63.14 cfs @ 12.06 hrs, Volume= 4.277 of Outflow = 27.84 cfs @ 12.25 hrs, Volume= 2.935 af, Atten= 56%, Lag= 11.4 min Primary = 27.84 cfs @ 12.25 hrs, Volume= 2.935 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 406.22' @ 12.25 hrs Surf.Area= 29,321 sf Storage= 89,788 cf Plug -Flow detention time= 195.9 min calculated for 2.935 of (69% of inflow) Center -of -Mass det. time= 98.1 min ( 890.5 - 792.5 ) Volume Invert Avail.Storage Storage Description #1 400.00' 154,571 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 2,623 0 0 402.00 9,204 11,827 11,827 404.00 17,449 26,653 38,480 406.00 27,541 44,990 83,470 408.00 43,560 71,101 154,571 Device Routinq Invert Outlet Devices #1 Primary 405.00' 6.3' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=27.79 cfs @ 12.25 hrs HW=406.22' TW=394.95' (Dynamic Tailwater) L1=Sharp-Crested Rectangular Weir (Weir Controls 27.79 cfs @ 3.61 fps) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 110 Pond 1A-B: Existing Basin 1A (low lying greenspace) Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 111 Summary for Pond 1 B: Existing Basin 1 Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 4.86" for 25yr-24hr event Inflow = 91.06 cfs @ 12.03 hrs, Volume= 5.559 of Outflow = 22.83 cfs @ 12.25 hrs, Volume= 5.551 af, Atten= 75%, Lag= 13.6 min Primary = 22.83 cfs @ 12.25 hrs, Volume= 5.551 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 402.60' Surf.Area= 24,334 sf Storage= 53,379 cf Peak Elev= 405.90' @ 12.26 hrs Surf.Area= 34,596 sf Storage= 150,301 cf (96,922 cf above start) Plug -Flow detention time= 240.6 min calculated for 4.323 of (78% of inflow) Center -of -Mass det. time= 101.3 min ( 890.5 - 789.2 ) Volume Invert Avail.Storage Storage Description #1 400.00' 230,133 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 16,836 0 0 401.00 19,630 18,233 18,233 402.00 22,539 21,085 39,318 403.00 25,530 24,035 63,352 404.00 28,610 27,070 90,422 405.00 31,721 30,166 120,588 406.00 34,929 33,325 153,913 407.00 38,193 36,561 190,474 408.00 41,125 39,659 230,133 Device Routing Invert Outlet Devices #1 Primary 402.60' 24.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=22.82 cfs @ 12.25 hrs HW=405.89' TW=403.62' (Dynamic Tailwater) L1=Orifice/Grate (Orifice Controls 22.82 cfs @ 7.26 fps) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 112 0 Pond 1 B: Existing Basin 1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Primary BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 113 Summary for Pond 2B: 2P Inflow Area = 53.863 ac, 19.28% Impervious, Inflow Depth = 4.31" for 25yr-24hr event Inflow = 108.86 cfs @ 12.32 hrs, Volume= 19.350 of Outflow = 12.87 cfs @ 15.00 hrs, Volume= 6.846 af, Atten= 88%, Lag= 160.9 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 12.87 cfs @ 15.00 hrs, Volume= 6.846 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 391.00' Surf.Area= 1.718 ac Storage= 4.603 of Peak Elev= 397.29' @ 15.00 hrs Surf.Area= 2.507 ac Storage= 17.837 of (13.234 of above start) Flood Elev= 400.00' Surf.Area= 2.869 ac Storage= 25.105 of (20.502 of above start) Plug -Flow detention time= 871.6 min calculated for 2.243 of (12% of inflow) Center -of -Mass det. time= 303.1 min ( 1,179.2 - 876.1 ) Volume Invert Avail.Storage Storage Description #1 388.00' 25.105 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 388.00 1.345 0.000 0.000 389.00 1.471 1.408 1.408 390.00 1.600 1.536 2.943 391.00 1.718 1.659 4.603 392.00 1.833 1.775 6.378 393.00 1.955 1.894 8.272 394.00 2.077 2.016 10.288 395.00 2.204 2.140 12.428 396.00 2.340 2.272 14.701 397.00 2.469 2.404 17.105 398.00 2.599 2.534 19.639 399.00 2.732 2.665 22.304 400.00 2.869 2.800 25.105 Device Routing Invert Outlet Devices #1 Primary 390.50' 54.0" Round Culvert X 0.00 L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 390.50' / 382.00' S= 0.0850 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 15.90 sf #2 Device 1 391.00' 0.5" Vert. Orifice/Grate X 20.00 columns X 7 rows with 6.0" cc spacing C= 0.600 #3 Device 1 396.00' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #4 Secondary 397.00' 30.0' long x 28.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 114 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L1=Culvert ( Controls 0.00 cfs) �2=Orifi ce/G rate ( Controls 0.00 cfs) 3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) Secondary OutFlow Max=12.87 cfs @ 15.00 hrs HW=397.29' (Free Discharge) L4=Broad-Crested Rectangular Weir (Weir Controls 12.87 cfs @ 1.46 fps) I N U 3 0 LL Pond 2B: 2P Hydrograph --1--t--1--t--t.--....................................................�............�..... t t - t----1-----------------------E------ , 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ Outflow ❑ Primary ❑ Secondary BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 115 Summary for Pond 3B: Pond 3 Inflow Area = 24.751 ac, 4.10% Impervious, Inflow Depth = 4.59" for 25yr-24hr event Inflow = 109.21 cfs @ 12.14 hrs, Volume= 9.464 of Outflow = 69.58 cfs @ 12.34 hrs, Volume= 9.082 af, Atten= 36%, Lag= 12.0 min Primary = 69.58 cfs @ 12.34 hrs, Volume= 9.082 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 394.90' Surf.Area= 10,695 sf Storage= 22,165 cf Peak Elev= 400.58' @ 12.34 hrs Surf.Area= 41,555 sf Storage= 128,642 cf (106,477 cf above start) Flood Elev= 402.00' Surf.Area= 42,976 sf Storage= 173,109 cf (150,943 cf above start) Plug -Flow detention time= 135.7 min calculated for 8.573 of (91 % of inflow) Center -of -Mass det. time= 66.0 min ( 875.4 - 809.3 ) Volume Invert Avail.Storage Storage Description #1 391.00' 15,607 cf Chamber 2 (outlet) (Prismatic) Listed below (Recalc) #2 392.00' 7,643 cf Chamber 1 (inlet) (Prismatic) Listed below (Recalc) #3 396.00' 225,420 cf Combined Chambers (Prismatic) Listed below (Recalc) 248,669 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 391.00 1,446 0 0 392.00 2,583 2,015 2,015 393.00 3,801 3,192 5,207 394.00 5,119 4,460 9,667 395.00 6,761 5,940 15,607 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 392.00 1,032 0 0 393.00 1,971 1,502 1,502 394.00 3,048 2,510 4,011 395.00 4,215 3,632 7,643 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 396.00 13,953 0 0 397.00 17,143 15,548 15,548 398.00 22,159 19,651 35,199 399.00 26,581 24,370 59,569 400.00 30,000 28,291 87,860 402.00 32,000 62,000 149,860 404.00 43,560 75,560 225,420 BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 116 Device Routing Invert Outlet Devices #1 Primary 394.90' 36.0" Round Culvert L= 265.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 394.90' / 391.60' S= 0.0125 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 394.90' 8.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 397.90' 5.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 399.50' 20.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=69.54 cfs @ 12.34 hrs HW=400.57' TW=393.69' (Dynamic Tailwater) L1=Culvert (Inlet Controls 69.54 cfs @ 9.84 fps) P4=S =Orifice/Grate (Passes < 3.88 cfs potential flow) =Sharp -Crested Rectangular Weir (Passes < 63.86 cfs potential flow) harp -Crested Rectangular Weir (Passes < 72.84 cfs potential flow) I Pond 3B: Pond 3 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Primary BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 117 Summary for Subcatchment 1S-A: To Basin 1A Runoff = 116.94 cfs @ 12.02 hrs, Volume= 7.276 af, Depth= 6.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (ac) CN Description 4.327 98 Paved roads w/curbs & sewers, HSG C 0.180 98 Paved roads w/curbs & sewers, HSG C 0.502 98 Water Surface, HSG C 0.683 77 Woods, Poor, HSG C 0.242 77 Woods, Poor, HSG C 0.584 77 Woods, Poor, HSG C 0.045 74 >75% Grass cover, Good, HSG C 0.098 74 >75% Grass cover, Good, HSG C 0.051 74 >75% Grass cover, Good, HSG C 0.128 86 <50% Grass cover, Poor, HSG C 0.529 74 >75% Grass cover, Good, HSG C 6.353 87 Dirt roads, HSG C 13.722 89 Weighted Average 8.713 63.50% Pervious Area 5.009 36.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.8 150 0.0260 0.52 Sheet Flow, sheet from LS stockpile Fallow n= 0.050 P2= 3.54" 3.8 675 0.0330 2.92 Shallow Concentrated Flow, Concentrated from stockpile Unpaved Kv= 16.1 fps 0.3 125 0.0100 6.22 7.63 Pipe Channel, 15" rcp culv 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.011 Concrete pipe, straight & clean 1.5 260 0.0310 2.83 Shallow Concentrated Flow, culvert to ditch Unpaved Kv= 16.1 fps 0.8 218 0.0180 4.73 23.65 Trap/Vee/Rect Channel Flow, ditch to culv Bot.W=2.00' D=1.00' Z= 3.0 7' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.2 250 0.0480 17.06 41.03 Pipe Channel, Final pipe 21.0" Round Area= 2.4 sf Perim= 5.5' r= 0.44' n= 0.011 Concrete pipe, straight & clean 11.4 1,678 Total BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 118 Subcatchment 1S-A: To Basin 1A Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 119 Summary for Subcatchment 1S-B: To Basin 1A Runoff = 81.41 cfs @ 12.06 hrs, Volume= 5.599 af, Depth= 6.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (ac) CN Description 0.169 74 >75% Grass cover, Good, HSG C 1.793 98 Paved roads w/curbs & sewers, HSG C 0.632 98 Roofs, HSG C 0.053 98 Roofs, HSG C 0.956 74 >75% Grass cover, Good, HSG C 0.355 98 Water Surface, HSG C 6.600 87 Dirt roads, HSG C 10.558 89 Weighted Average 7.725 73.17% Pervious Area 2.833 26.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.4 150 0.0200 0.47 Sheet Flow, stkpile area Fallow n= 0.050 P2= 3.54" 0.5 66 0.0200 2.28 Shallow Concentrated Flow, sktpile area Unpaved Kv= 16.1 fps 0.6 110 0.0360 2.85 Shallow Concentrated Flow, grass after stkpile Grassed Waterway Kv= 15.0 fps 3.3 518 0.0270 2.65 Shallow Concentrated Flow, Unpaved areas around bldg 12 Unpaved Kv= 16.1 fps 0.4 193 0.0240 8.83 10.84 Pipe Channel, Stm pipe 1st leg 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 Concrete pipe, finished 0.2 127 0.0260 10.38 18.35 Pipe Channel, 2nd leg of pipe 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.012 Concrete pipe, finished 0.9 280 0.0040 4.93 15.50 Pipe Channel, 3rd leg stm pipe 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 3.6 265 0.0300 1.21 Shallow Concentrated Flow, grassed area within lowlying area Short Grass Pasture Kv= 7.0 fps 14.9 1,709 Total BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 120 w 0 LL Subcatchment 1S-B: To Basin 1A Hydrograph —t —r — --1-- -- -- J --1-- 1-- — 90 ; i I i i i i i i I i 85 81.41 cfs i i i i i i i -- - —}- - -- - *— j ---- ---- ---- --- ---- -- - — 80 75 1 OOyr- 4hr Rainfall =7 67' 70 1 1 ; I I 1 I 'i� pp 65 i i -0 af ,-Rf- Are*7 60 - - __..... ; _-4t------4-------------------r-------k------ ,r- - -{r- -9lof V-�IUe99rC 55 i i i i --- - t 1 r-- r-- r---'--- r--y 1 �i I50 1 i ------------- - --Ei ....!....... I Bn --------------{------ -nano i 45 i i i iF � i --� -..... = -- L W1 e — - 40 - - - - - - - i -- - - - - i -- - - -i- ----a ------ ---- a---------+..-------- + - - - -------- -- i 35 ------ 1-- ..... {- - - -- -- --- ----�---4---4--------------+-----?------- -- = `� • , - I 30 1 1 i 2520 i I t I i i i i i I I 15 i 10 --------------- `'-_--_-...------- ------- '--_-_--...---- --------------- ' 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 121 Summary for Subcatchment 2S-A: Direct to 2P Runoff = 48.02 cfs @ 11.95 hrs, Volume= 2.374 af, Depth= 5.90" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (sf) CN Description 66,516 98 Water Surface, HSG C 83,461 74 >75% Grass cover, Good, HSG C 60,505 87 Dirt roads, HSG C 210,482 85 Weighted Average 143,966 68.40% Pervious Area 66,516 31.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum TOC Subcatchment 2S-A: Direct to 2P Hydrograph 50 i 48.02 cfs i i i i i i I 1+24-h ' 45 -------2hr i _ I 4, � Rhin#�I� 7' 40 35 -- j; `, , i i f 1 V r• ; I i is u o olume 2. f - r ---- --�-- 4} 30 ; ; R naff Qep;th�5. O" ---------- = ------ - -4--------- ;----------t-------------------}---------; -;----------I ----;---- ---- - -m 25 �------� n--1-- i-- , iTC, 5. 20 i I I I 5 i --i --i —i i ---- — - --- -- 15 i 10 iA.. i 5 0j 0 5 20 25 30 35 40 45 50 55 60 65 k 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 122 Summary for Subcatchment 3S-B: To Pond 3 Runoff = 47.01 cfs @ 12.07 hrs, Volume= 3.271 af, Depth= 6.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (sf) CN Description 11,911 98 Water Surface, HSG C 25,046 77 Woods, Poor, HSG C 31,514 98 Roofs, HSG C 820 98 Roofs, HSG C 204,485 87 Dirt roads, HSG C 273,776 88 Weighted Average 229,531 83.84% Pervious Area 44,245 16.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 150 0.0050 0.27 Sheet Flow, Sheet flow in NE direection from bldg 12 Fallow n= 0.050 P2= 3.54" 1.8 142 0.0070 1.35 Shallow Concentrated Flow, "flat" conc flow Unpaved Kv= 16.1 fps 4.4 791 0.0350 3.01 Shallow Concentrated Flow, Flow to pond 3 Unpaved Kv= 16.1 fps 15.5 1,083 Total BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 123 Subcatchment 3S-B: To Pond 3 Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 124 Summary for Subcatchment 3S-C: LS area to Pond 3 Runoff = 106.58 cfs @ 12.17 hrs, Volume= 9.251 af, Depth= 6.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (ac) CN Description 18.466 86 excludes recirc ponds 18.466 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 150 0.0400 0.62 Sheet Flow, sheet flow NW corner Fallow n= 0.050 P2= 3.54" 20.2 3,152 0.0260 2.60 Shallow Concentrated Flow, Flow thru LS plant to pond 3 Unpaved Kv= 16.1 fps 24.3 3,302 Total I Subcatchment 3S-C: LS area to Pond 3 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paoe 125 Summary for Reach 1A-R: 36" Pipe Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 5.70" for 100yr-24hr event Inflow = 72.62 cfs @ 12.21 hrs, Volume= 11.525 of Outflow = 51.09 cfs @ 12.10 hrs, Volume= 11.525 af, Atten= 30%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 8.23 fps, Min. Travel Time= 0.3 min Avg. Velocity = 1.53 fps, Avg. Travel Time= 1.8 min Peak Storage= 1,188 cf @ 12.10 hrs Average Depth at Peak Storage= 3.00' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 51.09 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 168.0' Slope= 0.0050 T Inlet Invert= 392.52', Outlet Invert= 391.68' N V 3 0 LL Reach 1A-R: 36" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 1_ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paoe 126 Summary for Reach 1 B-R: 36" Pipe to 2P Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 5.70" for 100yr-24hr event Inflow = 51.09 cfs @ 12.10 hrs, Volume= 11.525 of Outflow = 35.40 cfs @ 12.05 hrs, Volume= 11.525 af, Atten= 31%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.71 fps, Min. Travel Time= 0.2 min Avg. Velocity = 1.15 fps, Avg. Travel Time= 1.1 min Peak Storage= 530 cf @ 12.05 hrs Average Depth at Peak Storage= 3.00' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 35.40 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 75.0' Slope= 0.0024 7' Inlet Invert= 391.68', Outlet Invert= 391.50' N V 3 0 LL Reach 1 B-R: 36" Pipe to 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) C-' Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paoe 127 Summary for Reach 1 R: 24" Pipe Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 6.36" for 100yr-24hr event Inflow = 26.29 cfs @ 12.27 hrs, Volume= 7.268 of Outflow = 26.29 cfs @ 12.27 hrs, Volume= 7.268 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 14.67 fps, Min. Travel Time= 0.3 min Avg. Velocity = 2.91 fps, Avg. Travel Time= 1.6 min Peak Storage= 511 cf @ 12.27 hrs Average Depth at Peak Storage= 1.11' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.18 cfs 24.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 285.0' Slope= 0.0325 '/' Inlet Invert= 402.60', Outlet Invert= 393.34' N V 3 0 LL Reach 1 R: 24" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 128 Summary for Reach 3A-R: Channel 8A-2 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 6.01" for 100yr-24hr evenl Inflow = 106.27 cfs @ 12.18 hrs, Volume= 9.251 of Outflow = 106.27 cfs @ 12.18 hrs, Volume= 9.251 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 8.25 fps, Min. Travel Time= 0.0 min Avg. Velocity = 2.35 fps, Avg. Travel Time= 0.1 min Peak Storage= 235 cf @ 12.18 hrs Average Depth at Peak Storage= 1.45' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 440.38 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 18.3' Slope= 0.0268 '/' Inlet Invert= 417.53', Outlet Invert= 417.04' I Reach 3A-R: Channel 8A-2 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 129 Summary for Reach 313-11: Channel 8A-3 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 6.01" for 100yr-24hr evenl Inflow = 106.27 cfs @ 12.18 hrs, Volume= 9.251 of Outflow = 106.25 cfs @ 12.18 hrs, Volume= 9.251 af, Atten= 0%, Lag= 0.4 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 6.30 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.83 fps, Avg. Travel Time= 1.8 min Peak Storage= 3,325 cf @ 12.18 hrs Average Depth at Peak Storage= 1.77' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 301.20 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 197.2' Slope= 0.0125 T Inlet Invert= 417.04', Outlet Invert= 414.57' I Reach 313-R: Channel 8A-3 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 130 Summary for Reach 3C-R: Channel 8A-4 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 6.01" for 100yr-24hr evenl Inflow = 106.25 cfs @ 12.18 hrs, Volume= 9.251 of Outflow = 106.26 cfs @ 12.18 hrs, Volume= 9.251 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 19.34 fps, Min. Travel Time= 0.0 min Avg. Velocity = 5.24 fps, Avg. Travel Time= 0.1 min Peak Storage= 238 cf @ 12.18 hrs Average Depth at Peak Storage= 0.73' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 1,493.79 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 43.3' Slope= 0.3081 T Inlet Invert= 414.57', Outlet Invert= 401.23' I Reach 3C-R: Channel 8A-4 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 131 Summary for Reach 5R: Channel 8A-1 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 6.01" for 100yr-24hr evenl Inflow = 106.58 cfs @ 12.17 hrs, Volume= 9.251 of Outflow = 106.27 cfs @ 12.18 hrs, Volume= 9.251 af, Atten= 0%, Lag= 0.6 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 8.71 fps, Min. Travel Time= 0.8 min Avg. Velocity = 2.37 fps, Avg. Travel Time= 2.9 min Peak Storage= 4,982 cf @ 12.18 hrs Average Depth at Peak Storage= 1.60' Bank -Full Depth= 3.00' Flow Area= 27.0 sf, Capacity= 324.01 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 1.0 7' Top Width= 12.00' Length= 409.2' Slope= 0.0256 T Inlet Invert= 428.00', Outlet Invert= 417.53' I Reach 5R: Channel 8A-1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 132 Summary for Pond 1A-B: Existing Basin 1A (low lying greenspace) Inflow Area = 10.558 ac, 26.83% Impervious, Inflow Depth = 6.36" for 100yr-24hr event Inflow = 81.41 cfs @ 12.06 hrs, Volume= 5.599 of Outflow = 46.48 cfs @ 12.21 hrs, Volume= 4.257 af, Atten= 43%, Lag= 8.8 min Primary = 46.48 cfs @ 12.21 hrs, Volume= 4.257 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 406.72' @ 12.21 hrs Surf.Area= 33,309 sf Storage= 105,380 cf Plug -Flow detention time= 169.5 min calculated for 4.255 of (76% of inflow) Center -of -Mass det. time= 83.2 min ( 868.4 - 785.2 ) Volume Invert Avail.Storage Storage Description #1 400.00' 154,571 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 2,623 0 0 402.00 9,204 11,827 11,827 404.00 17,449 26,653 38,480 406.00 27,541 44,990 83,470 408.00 43,560 71,101 154,571 Device Routinq Invert Outlet Devices #1 Primary 405.00' 6.3' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=46.23 cfs @ 12.21 hrs HW=406.71' TW=395.52' (Dynamic Tailwater) L1=Sharp-Crested Rectangular Weir (Weir Controls 46.23 cfs @ 4.28 fps) BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Pace 133 Pond 1A-B: Existing Basin 1A (low lying greenspace) Hydrograph ■ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 134 Summary for Pond 1 B: Existing Basin 1 Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 6.36" for 100yr-24hr event Inflow = 116.94 cfs @ 12.02 hrs, Volume= 7.276 of Outflow = 26.29 cfs @ 12.27 hrs, Volume= 7.268 af, Atten= 78%, Lag= 14.9 min Primary = 26.29 cfs @ 12.27 hrs, Volume= 7.268 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 402.60' Surf.Area= 24,334 sf Storage= 53,379 cf Peak Elev= 406.73' @ 12.28 hrs Surf.Area= 37,300 sf Storage= 180,151 cf (126,772 cf above start) Plug -Flow detention time= 212.9 min calculated for 6.040 of (83% of inflow) Center -of -Mass det. time= 96.4 min ( 878.4 - 782.0 ) Volume Invert Avail.Storage Storage Description #1 400.00' 230,133 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 16,836 0 0 401.00 19,630 18,233 18,233 402.00 22,539 21,085 39,318 403.00 25,530 24,035 63,352 404.00 28,610 27,070 90,422 405.00 31,721 30,166 120,588 406.00 34,929 33,325 153,913 407.00 38,193 36,561 190,474 408.00 41,125 39,659 230,133 Device Routing Invert Outlet Devices #1 Primary 402.60' 24.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=26.26 cfs @ 12.27 hrs HW=406.72' TW=403.71' (Dynamic Tailwater) L1=Orifice/Grate (Orifice Controls 26.26 cfs @ 8.36 fps) BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 135 1 1 • r 11 •1 :1 1 .1 1 1 1 1 1 1 1 �1 1 .1 1 :1 •1 ■ Inflow ❑ Primary BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 136 Summary for Pond 2B: 2P Inflow Area = 53.863 ac, 19.28% Impervious, Inflow Depth = 5.80" for 100yr-24hr event Inflow = 121.30 cfs @ 12.05 hrs, Volume= 26.039 of Outflow = 47.30 cfs @ 13.99 hrs, Volume= 13.535 af, Atten= 61 %, Lag= 116.6 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 47.30 cfs @ 13.99 hrs, Volume= 13.535 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 391.00' Surf.Area= 1.718 ac Storage= 4.603 of Peak Elev= 397.70' @ 13.99 hrs Surf.Area= 2.561 ac Storage= 18.876 of (14.273 of above start) Flood Elev= 400.00' Surf.Area= 2.869 ac Storage= 25.105 of (20.502 of above start) Plug -Flow detention time= 457.0 min calculated for 8.932 of (34% of inflow) Center -of -Mass det. time= 179.4 min ( 1,044.4 - 865.0 ) Volume Invert Avail.Storage Storage Description #1 388.00' 25.105 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 388.00 1.345 0.000 0.000 389.00 1.471 1.408 1.408 390.00 1.600 1.536 2.943 391.00 1.718 1.659 4.603 392.00 1.833 1.775 6.378 393.00 1.955 1.894 8.272 394.00 2.077 2.016 10.288 395.00 2.204 2.140 12.428 396.00 2.340 2.272 14.701 397.00 2.469 2.404 17.105 398.00 2.599 2.534 19.639 399.00 2.732 2.665 22.304 400.00 2.869 2.800 25.105 Device Routing Invert Outlet Devices #1 Primary 390.50' 54.0" Round Culvert X 0.00 L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 390.50' / 382.00' S= 0.0850 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 15.90 sf #2 Device 1 391.00' 0.5" Vert. Orifice/Grate X 20.00 columns X 7 rows with 6.0" cc spacing C= 0.600 #3 Device 1 396.00' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #4 Secondary 397.00' 30.0' long x 28.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 137 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L1=Culvert ( Controls 0.00 cfs) �2=0 rifi ce/G rate ( Controls 0.00 cfs) 3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) Secondary OutFlow Max=47.29 cfs @ 13.99 hrs HW=397.70' (Free Discharge) L4= Broad -Crested Rectangular Weir (Weir Controls 47.29 cfs @ 2.24 fps) 3 0 LL Pond 2B: 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow ■ Primary ■ Secondary BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 138 Summary for Pond 3B: Pond 3 Inflow Area = 24.751 ac, 4.10% Impervious, Inflow Depth = 6.07" for 100yr-24hr event Inflow = 143.04 cfs @ 12.14 hrs, Volume= 12.523 of Outflow = 78.85 cfs @ 12.38 hrs, Volume= 12.140 af, Atten= 45%, Lag= 14.3 min Primary = 78.85 cfs @ 12.38 hrs, Volume= 12.140 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 394.90' Surf.Area= 10,695 sf Storage= 22,165 cf Peak Elev= 401.77' @ 12.38 hrs Surf.Area= 42,743 sf Storage= 165,692 cf (143,526 cf above start) Flood Elev= 402.00' Surf.Area= 42,976 sf Storage= 173,109 cf (150,943 cf above start) Plug -Flow detention time= 114.5 min calculated for 11.626 of (93% of inflow) Center -of -Mass det. time= 58.7 min ( 860.1 - 801.4 ) Volume Invert Avail.Storage Storage Description #1 391.00' 15,607 cf Chamber 2 (outlet) (Prismatic) Listed below (Recalc) #2 392.00' 7,643 cf Chamber 1 (inlet) (Prismatic) Listed below (Recalc) #3 396.00' 225,420 cf Combined Chambers (Prismatic) Listed below (Recalc) 248,669 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 391.00 1,446 0 0 392.00 2,583 2,015 2,015 393.00 3,801 3,192 5,207 394.00 5,119 4,460 9,667 395.00 6,761 5,940 15,607 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 392.00 1,032 0 0 393.00 1,971 1,502 1,502 394.00 3,048 2,510 4,011 395.00 4,215 3,632 7,643 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 396.00 13,953 0 0 397.00 17,143 15,548 15,548 398.00 22,159 19,651 35,199 399.00 26,581 24,370 59,569 400.00 30,000 28,291 87,860 402.00 32,000 62,000 149,860 404.00 43,560 75,560 225,420 BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 139 Device Routing Invert Outlet Devices #1 Primary 394.90' 36.0" Round Culvert L= 265.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 394.90' / 391.60' S= 0.0125 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 394.90' 8.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 397.90' 5.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 399.50' 20.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=78.78 cfs @ 12.38 hrs HW=401.76' TW=394.73' (Dynamic Tailwater) L1=Culvert (Inlet Controls 78.78 cfs @ 11.15 fps) P4=S =Orifice/Grate (Passes < 4.29 cfs potential flow) =Sharp -Crested Rectangular Weir (Passes < 104.78 cfs potential flow) harp -Crested Rectangular Weir (Passes < 221.89 cfs potential flow) N 3 0 E • • ' • • . 0 oil .1 i 1 1 I 11 .1 /I I! 1 1 1 1 1 •1 1 •1 1 :1 •1 ❑ Inflow ❑ Primary 2P Subcat Reach Pon Link BASIN 2 emergency spillway PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 2 Summary for Pond 2B: 2P Inflow Area = 53.863 ac, 19.28% Impervious, Inflow Depth = 5.80" for 100yr-24hr event Inflow = 121.30 cfs @ 12.05 hrs, Volume= 26.039 of Outflow = 47.30 cfs @ 13.99 hrs, Volume= 13.535 af, Atten= 61 %, Lag= 116.6 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 47.30 cfs @ 13.99 hrs, Volume= 13.535 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 391.00' Surf.Area= 1.718 ac Storage= 4.603 of Peak Elev= 397.70' @ 13.99 hrs Surf.Area= 2.561 ac Storage= 18.876 of (14.273 of above start) Flood Elev= 400.00' Surf.Area= 2.869 ac Storage= 25.105 of (20.502 of above start) Plug -Flow detention time= 457.0 min calculated for 8.932 of (34% of inflow) Center -of -Mass det. time= 179.4 min ( 1,044.4 - 865.0 ) Volume Invert Avail.Storage Storage Description #1 388.00' 25.105 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 388.00 1.345 0.000 0.000 389.00 1.471 1.408 1.408 390.00 1.600 1.536 2.943 391.00 1.718 1.659 4.603 392.00 1.833 1.775 6.378 393.00 1.955 1.894 8.272 394.00 2.077 2.016 10.288 395.00 2.204 2.140 12.428 396.00 2.340 2.272 14.701 397.00 2.469 2.404 17.105 398.00 2.599 2.534 19.639 399.00 2.732 2.665 22.304 400.00 2.869 2.800 25.105 Device Routing Invert Outlet Devices #1 Primary 390.50' 54.0" Round Culvert X 0.00 L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 390.50' / 382.00' S= 0.0850 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 15.90 sf #2 Device 1 391.00' 0.5" Vert. Orifice/Grate X 20.00 columns X 7 rows with 6.0" cc spacing C= 0.600 #3 Device 1 396.00' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #4 Secondary 397.00' 30.0' long x 28.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 BASIN 2 emergency spillway PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 3 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L1=Culvert ( Controls 0.00 cfs) �2=0 rifi ce/G rate ( Controls 0.00 cfs) 3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) Secondary OutFlow Max=47.29 cfs @ 13.99 hrs HW=397.70' (Free Discharge) L4= Broad -Crested Rectangular Weir (Weir Controls 47.29 cfs @ 2.24 fps) 3 0 LL Pond 2B: 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow ■ Primary ■ Secondary 1S-B 1A-B To Basin 1A Existing Bz sin 1A (low lying gre qnspace) 1S-A 41R 1A-R To Basin 1A Existing Basin 1 24" Pipe Subcat Reach Pon Link Pot d 3 2S-A Direct to 2\ 1 B-R\\\\YYY 26 36" Pipe 36" Pipe to 2P 2P To Outfall 002 iC LS area Pond 3 5R Chan 8A-1 3A-R Chant-2 3B-R Chan 8A-3 Channel 8A-4 BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 2 Summary for Subcatchment 1S-A: To Basin 1A Runoff = 36.56 cfs @ 12.03 hrs, Volume= 2.131 af, Depth= 1.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (ac) CN Description 4.327 98 Paved roads w/curbs & sewers, HSG C 0.180 98 Paved roads w/curbs & sewers, HSG C 0.502 98 Water Surface, HSG C 0.683 77 Woods, Poor, HSG C 0.242 77 Woods, Poor, HSG C 0.584 77 Woods, Poor, HSG C 0.045 74 >75% Grass cover, Good, HSG C 0.098 74 >75% Grass cover, Good, HSG C 0.051 74 >75% Grass cover, Good, HSG C 0.128 86 <50% Grass cover, Poor, HSG C 0.529 74 >75% Grass cover, Good, HSG C 6.353 87 Dirt roads, HSG C 13.722 89 Weighted Average 8.713 63.50% Pervious Area 5.009 36.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.8 150 0.0260 0.52 Sheet Flow, sheet from LS stockpile Fallow n= 0.050 P2= 3.54" 3.8 675 0.0330 2.92 Shallow Concentrated Flow, Concentrated from stockpile Unpaved Kv= 16.1 fps 0.3 125 0.0100 6.22 7.63 Pipe Channel, 15" rcp culv 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.011 Concrete pipe, straight & clean 1.5 260 0.0310 2.83 Shallow Concentrated Flow, culvert to ditch Unpaved Kv= 16.1 fps 0.8 218 0.0180 4.73 23.65 Trap/Vee/Rect Channel Flow, ditch to culv Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.2 250 0.0480 17.06 41.03 Pipe Channel, Final pipe 21.0" Round Area= 2.4 sf Perim= 5.5' r= 0.44' n= 0.011 Concrete pipe, straight & clean 11.4 1,678 Total MAIMOMMUMMOTCY1 PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 3 Subcatchment 1S-A: To Basin 1A Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 4 Summary for Subcatchment 1S-B: To Basin 1A Runoff = 25.19 cfs @ 12.07 hrs, Volume= 1.640 af, Depth= 1.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (ac) CN Description 0.169 74 >75% Grass cover, Good, HSG C 1.793 98 Paved roads w/curbs & sewers, HSG C 0.632 98 Roofs, HSG C 0.053 98 Roofs, HSG C 0.956 74 >75% Grass cover, Good, HSG C 0.355 98 Water Surface, HSG C 6.600 87 Dirt roads, HSG C 10.558 89 Weighted Average 7.725 73.17% Pervious Area 2.833 26.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.4 150 0.0200 0.47 Sheet Flow, stkpile area Fallow n= 0.050 P2= 3.54" 0.5 66 0.0200 2.28 Shallow Concentrated Flow, sktpile area Unpaved Kv= 16.1 fps 0.6 110 0.0360 2.85 Shallow Concentrated Flow, grass after stkpile Grassed Waterway Kv= 15.0 fps 3.3 518 0.0270 2.65 Shallow Concentrated Flow, Unpaved areas around bldg 12 Unpaved Kv= 16.1 fps 0.4 193 0.0240 8.83 10.84 Pipe Channel, Stm pipe 1st leg 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 Concrete pipe, finished 0.2 127 0.0260 10.38 18.35 Pipe Channel, 2nd leg of pipe 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.012 Concrete pipe, finished 0.9 280 0.0040 4.93 15.50 Pipe Channel, 3rd leg stm pipe 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 3.6 265 0.0300 1.21 Shallow Concentrated Flow, grassed area within lowlying area Short Grass Pasture Kv= 7.0 fps 14.9 1,709 Total MAIMOMMUMMOTCY1 PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 5 Subcatchment 1S-B: To Basin 1A Hydrograph 28 -----t------------t-------'r-------t------'r------t-------t------- 1 --t- - - r 26 25 19 cfs I ! I i I i ( iType 11 ( I 24 i 22 I ; L= .96"r } r+ 4 r...Rainfall .. 1-1 1 1 1 1 1 1 1 1 20 I e = t i F F -u -off eat .5 8_ c 18 1 1 Rklnb Any 16 i 1 i 1 i 1 i i i i -. - -- -- 14 12 10 .LLLL2 c__- 4i 8 �` IN= ----------j----- +----- 6 4 2 r 0 0 5 45 50 55 60 65 70 75 80 85 90 95 10 1� �O 25 30 35 40 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 6 Summary for Subcatchment 2S-A: Direct to 2P Runoff = 13.48 cfs @ 11.96 hrs, Volume= 0.626 af, Depth= 1.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (sf) CN Description 66,516 98 Water Surface, HSG C 83,461 74 >75% Grass cover, Good, HSG C 60,505 87 Dirt roads, HSG C 210,482 85 Weighted Average 143,966 68.40% Pervious Area 66,516 31.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum TOC Subcatchment 2S-A: Direct to 2P Hydrograph 15 14 I 13.cfs 48 -- -... i i i i i ---+---------- - f---------}---------------------------L------- -- + a---------- f 13 ! i i ! i ! I I ! 11 L�hr fi 12 i i 1 i i i yr+ n �i ' i J'-r- , -_--_--L--_--.- ; .-...--1.------ L------ - ---- ;L-_--_-1-_---_L_-_-.{�- /�-i �_n_- ! Q -J-- ;of 'Y 0 M1,1 e i g 4----------4--------- - -} - ' + ' - -+ - - -�' - ' ii a I i I 1 u OOfae h-1.5 --� - - �- ---- ------ - L------a------ ---� -- -- t- t-- - - --; a - I Q:--j I 1 ; 1 1 I 1 � I t 1 T 6 ....._..._........ ..._..L.......... i..................i.._.._.._........... L.......... .L.......... L.......... 1..._.._...L.._.._.._i......_.._. ..._.._..i.._..._.._i....__ 5 i ------------- i 1 i i i i i i 1 i i i ..._ _--_-_1---_-_--_--_-y.-_--_-_ _-_- _- I---------- -- -.�-_-_---..--.---.---_ - - 4 i I I i i T 1 3 _{............. I I F 1 L 1- L a !-_---_--_-� 5--_---_-- 1 ...---r---------- ---------r .--------- r -------I - ------ r 2 i ( i I ''/// 60 65 70 75 80 85 90 95 ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 7 Summary for Subcatchment 3S-B: To Pond 3 Runoff = 14.11 cfs @ 12.07 hrs, Volume= 0.934 af, Depth= 1.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (sf) CN Description 11,911 98 Water Surface, HSG C 25,046 77 Woods, Poor, HSG C 31,514 98 Roofs, HSG C 820 98 Roofs, HSG C 204,485 87 Dirt roads, HSG C 273,776 88 Weighted Average 229,531 83.84% Pervious Area 44,245 16.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 150 0.0050 0.27 Sheet Flow, Sheet flow in NE direection from bldg 12 Fallow n= 0.050 P2= 3.54" 1.8 142 0.0070 1.35 Shallow Concentrated Flow, "flat" conc flow Unpaved Kv= 16.1 fps 4.4 791 0.0350 3.01 Shallow Concentrated Flow, Flow to pond 3 Unpaved Kv= 16.1 fps 15.5 1,083 Total BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 8 w 0 LL Subcatchment 3S-B: To Pond 3 Hydrograph i i i i i ` ......._... _ } ;----------t---------- ti--_--_--_-F --------- ----------- }--------- --- i i 4.11 cfs 4 '` i i i i� 3 ' 2 -� i fir$- 4hfi a-:n ti 31 1 I ......._...-----.....__ ________._k--------- ------ I-------------4.----------F----------4-.----- _________-F-----. }. 1 I i ur�of i► a=2 ;- i7,6- - —, —;--, u ,- —f -- --r- 0lu --' 8 fi , [a1'1� i f ep� h—i .7 ---f-------+----------------t----------------f-------a-------- ----i------- 7 ! ; ; ; ; qw _ert 1083' ' 6 ; j i j i i i i {- I 1 1...... - - - --� -- - -- ---- - -� n r - - t------r- - -t - - - - 1 I 1 5 µ 4 '----------i ' - ; ------ 1--------i---------------------------- ----- ------1------ --- - --- - t-- 3..... _............ ........ 1.._.._.._i.......... l._.._..__i...._.._..1.._.._.._i....._. _.T..._. _.i .................... 1..._.._..i.._..._.._._..._.._1_..._..__i........... i.. II I i I i 2 t-- t-- i --f— F—F- 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 9 Summary for Subcatchment 3S-C: LS area to Pond 3 Runoff = 29.67 cfs @ 12.18 hrs, Volume= 2.506 af, Depth= 1.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr lyr-24hr Rainfall=2.96" Area (ac) CN Description 18.466 86 excludes recirc ponds 18.466 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 150 0.0400 0.62 Sheet Flow, sheet flow NW corner Fallow n= 0.050 P2= 3.54" 20.2 3,152 0.0260 2.60 Shallow Concentrated Flow, Flow thru LS plant to pond 3 Unpaved Kv= 16.1 fps 24.3 3,302 Total 32 30 28 26 24 22 20 18 a 16 1L 14 12 10 8 6 4 2 0 0 Subcatchment 3S-C: LS area to Pond 3 Hydrograph - - - + - - — - ....... ....... ........__.;...-----......__....._...:.........._..._... - ...._...................,...... } - - - -------------------a-- i — i 29.67 cfs i j i i i +------------- --1------ - i -} -} — j-- -- I I I I I i - -- �- -- -- '- -- i }---------- I I ---------a I I ---------- ------- i i i -4---------+---------- F---------- I E 4 E F } TYp �� I r IV rt --- -..... - -- ------- t------ 4- --}-- -r - -t-- -r-- - 1� A eO=4 - niffo unI1 Z. mow„ ,D6;a --------------...... ......--r•--------T-----------------------------•----------------- L---------------- --------Off I•�G1" ---------}--- -... i j }-------'r - r -- -' - - - - i I I i i i i low j _ =�3 2' I i i I I i I i i I ' -- - - - ---- -i - - -r-- -r-- -- -- r-- t-- I I .._.._.._.I._.._. _. i I i I I ; ; ---- . -i— �-- —� —� ---j — --{- —� --1 -4— --� - 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 10 Summary for Reach 1A-R: 36" Pipe Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth > 1.20" for lyr-24hr event Inflow = 10.15 cfs @ 12.26 hrs, Volume= 2.421 of Outflow = 10.15 cfs @ 12.26 hrs, Volume= 2.421 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.63 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.19 fps, Avg. Travel Time= 2.3 min Peak Storage= 303 cf @ 12.26 hrs Average Depth at Peak Storage= 0.91' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 51.09 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 168.0' Slope= 0.0050 T Inlet Invert= 392.52', Outlet Invert= 391.68' f E N U 3 0 LL Reach 1A-R: 36" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 11 Summary for Reach 1 B-R: 36" Pipe to 2P Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth > 1.20" for lyr-24hr event Inflow = 10.15 cfs @ 12.26 hrs, Volume= 2.421 of Outflow = 10.15 cfs @ 12.27 hrs, Volume= 2.421 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 4.32 fps, Min. Travel Time= 0.3 min Avg. Velocity = 0.90 fps, Avg. Travel Time= 1.4 min Peak Storage= 176 cf @ 12.27 hrs Average Depth at Peak Storage= 1.10' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 35.40 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 75.0' Slope= 0.0024 '/' Inlet Invert= 391.68', Outlet Invert= 391.50' f f N U 3 0 LL Reach 1 B-R: 36" Pipe to 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 12 Summary for Reach 1 R: 24" Pipe Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth > 1.86" for lyr-24hr event Inflow = 10.15 cfs @ 12.25 hrs, Volume= 2.123 of Outflow = 10.15 cfs @ 12.26 hrs, Volume= 2.123 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 11.42 fps, Min. Travel Time= 0.4 min Avg. Velocity = 2.30 fps, Avg. Travel Time= 2.1 min Peak Storage= 253 cf @ 12.26 hrs Average Depth at Peak Storage= 0.65' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.18 cfs 24.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 285.0' Slope= 0.0325 '/' Inlet Invert= 402.60', Outlet Invert= 393.34' f E N U 3 0 LL Reach 1 R: 24" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 13 Summary for Reach 3A-R: Channel 8A-2 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 1.63" for lyr-24hr event Inflow = 29.62 cfs @ 12.19 hrs, Volume= 2.506 of Outflow = 29.62 cfs @ 12.19 hrs, Volume= 2.506 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.61 fps, Min. Travel Time= 0.1 min Avg. Velocity = 1.63 fps, Avg. Travel Time= 0.2 min Peak Storage= 97 cf @ 12.19 hrs Average Depth at Peak Storage= 0.71' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 440.38 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 18.3' Slope= 0.0268 '/' Inlet Invert= 417.53', Outlet Invert= 417.04' N U 3 0 LL Reach 3A-R: Channel 8A-2 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow 0 Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 14 Summary for Reach 313-11: Channel 8A-3 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 1.63" for lyr-24hr event Inflow = 29.62 cfs @ 12.19 hrs, Volume= 2.506 of Outflow = 29.61 cfs @ 12.20 hrs, Volume= 2.506 af, Atten= 0%, Lag= 0.5 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 4.32 fps, Min. Travel Time= 0.8 min Avg. Velocity = 1.26 fps, Avg. Travel Time= 2.6 min Peak Storage= 1,351 cf @ 12.20 hrs Average Depth at Peak Storage= 0.88' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 301.20 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 197.2' Slope= 0.0125 T Inlet Invert= 417.04', Outlet Invert= 414.57' N U 3 0 LL Reach 313-R: Channel 8A-3 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow 0 Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 15 Summary for Reach 3C-R: Channel 8A-4 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 1.63" for lyr-24hr event Inflow = 29.61 cfs @ 12.20 hrs, Volume= 2.506 of Outflow = 29.62 cfs @ 12.20 hrs, Volume= 2.506 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 12.61 fps, Min. Travel Time= 0.1 min Avg. Velocity = 3.70 fps, Avg. Travel Time= 0.2 min Peak Storage= 102 cf @ 12.20 hrs Average Depth at Peak Storage= 0.35' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 1,493.79 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 43.3' Slope= 0.3081 T Inlet Invert= 414.57', Outlet Invert= 401.23' N U 3 0 LL Reach 3C-R: Channel 8A-4 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 16 Summary for Reach 5R: Channel 8A-1 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 1.63" for lyr-24hr event Inflow = 29.67 cfs @ 12.18 hrs, Volume= 2.506 of Outflow = 29.62 cfs @ 12.19 hrs, Volume= 2.506 af, Atten= 0%, Lag= 0.9 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.80 fps, Min. Travel Time= 1.2 min Avg. Velocity = 1.63 fps, Avg. Travel Time= 4.2 min Peak Storage= 2,088 cf @ 12.19 hrs Average Depth at Peak Storage= 0.76' Bank -Full Depth= 3.00' Flow Area= 27.0 sf, Capacity= 324.01 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 1.0 7' Top Width= 12.00' Length= 409.2' Slope= 0.0256 T Inlet Invert= 428.00', Outlet Invert= 417.53' N U 3 0 LL Reach 5R: Channel 8A-1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 17 Summary for Pond 1A-B: Existing Basin 1A (low lying greenspace) Inflow Area = 10.558 ac, 26.83% Impervious, Inflow Depth = 1.86" for lyr-24hr event Inflow = 25.19 cfs @ 12.07 hrs, Volume= 1.640 of Outflow = 0.51 cfs @ 18.11 hrs, Volume= 0.298 af, Atten= 98%, Lag= 362.3 min Primary = 0.51 cfs @ 18.11 hrs, Volume= 0.298 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 405.09' @ 18.11 hrs Surf.Area= 22,925 sf Storage= 60,389 cf Plug -Flow detention time= 576.8 min calculated for 0.298 of (18% of inflow) Center -of -Mass det. time= 425.1 min ( 1,244.5 - 819.4 ) Volume Invert Avail.Storage Storage Description #1 400.00' 154,571 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 2,623 0 0 402.00 9,204 11,827 11,827 404.00 17,449 26,653 38,480 406.00 27,541 44,990 83,470 408.00 43,560 71,101 154,571 Device Routinq Invert Outlet Devices #1 Primary 405.00' 6.3' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=0.51 cfs @ 18.11 hrs HW=405.09' TW=392.86' (Dynamic Tailwater) L1=Sharp-Crested Rectangular Weir (Weir Controls 0.51 cfs @ 0.95 fps) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 18 Pond 1A-B: Existing Basin 1A (low lying greenspace) Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 19 Summary for Pond 1 B: Existing Basin 1 Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 1.86" for lyr-24hr event Inflow = 36.56 cfs @ 12.03 hrs, Volume= 2.131 of Outflow = 10.15 cfs @ 12.25 hrs, Volume= 2.123 af, Atten= 72%, Lag= 13.4 min Primary = 10.15 cfs @ 12.25 hrs, Volume= 2.123 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 402.60' Surf.Area= 24,334 sf Storage= 53,379 cf Peak Elev= 404.06' @ 12.25 hrs Surf.Area= 28,807 sf Storage= 92,242 cf (38,862 cf above start) Plug -Flow detention time= 527.4 min calculated for 0.898 of (42% of inflow) Center -of -Mass det. time= 145.1 min ( 961.3 - 816.2 ) Volume Invert Avail.Storage Storage Description #1 400.00' 230,133 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 16,836 0 0 401.00 19,630 18,233 18,233 402.00 22,539 21,085 39,318 403.00 25,530 24,035 63,352 404.00 28,610 27,070 90,422 405.00 31,721 30,166 120,588 406.00 34,929 33,325 153,913 407.00 38,193 36,561 190,474 408.00 41,125 39,659 230,133 Device Routing Invert Outlet Devices #1 Primary 402.60' 24.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=10.14 cfs @ 12.25 hrs HW=404.06' TW=403.25' (Dynamic Tailwater) L1=Orifice/Grate (Orifice Controls 10.14 cfs @ 4.12 fps) ATIRMOMMUMMOTCY1 PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 20 Pond 1 B: Existing Basin 1 Hydrograph ■ Inflow ■ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 21 Summary for Pond 2B: 2P Inflow Area = 53.863 ac, 19.28% Impervious, Inflow Depth = 1.44" for lyr-24hr event Inflow = 25.50 cfs @ 12.47 hrs, Volume= 6.484 of Outflow = 0.98 cfs @ 24.44 hrs, Volume= 4.208 af, Atten= 96%, Lag= 718.6 min Primary = 0.98 cfs @ 24.44 hrs, Volume= 4.208 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 391.00' Surf.Area= 1.718 ac Storage= 4.603 of Peak Elev= 393.94' @ 24.44 hrs Surf.Area= 2.069 ac Storage= 10.156 of (5.553 of above start) Flood Elev= 400.00' Surf.Area= 2.869 ac Storage= 25.105 of (20.502 of above start) Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= 1,893.0 min ( 2,850.6 - 957.6 ) Volume Invert Avail.Storage Storage Description #1 388.00' 25.105 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 388.00 1.345 0.000 0.000 389.00 1.471 1.408 1.408 390.00 1.600 1.536 2.943 391.00 1.718 1.659 4.603 392.00 1.833 1.775 6.378 393.00 1.955 1.894 8.272 394.00 2.077 2.016 10.288 395.00 2.204 2.140 12.428 396.00 2.340 2.272 14.701 397.00 2.469 2.404 17.105 398.00 2.599 2.534 19.639 399.00 2.732 2.665 22.304 400.00 2.869 2.800 25.105 Device Routing Invert Outlet Devices #1 Primary 390.50' 54.0" Round Culvert L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 390.50' / 382.00' S= 0.0850 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 15.90 sf #2 Device 1 391.00' 0.5" Vert. Orifice/Grate X 20.00 columns X 7 rows with 6.0" cc spacing C= 0.600 #3 Device 1 396.00' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #4 Secondary 397.00' 30.0' long x 28.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 22 Primary OutFlow Max=0.98 cfs @ 24.44 hrs HW=393.94' (Free Discharge) L1=Culvert (Passes 0.98 cfs of 82.25 cfs potential flow) �2=0 rifi ce/G rate (Orifice Controls 0.98 cfs @ 5.97 fps) 3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) N U 3 0 LL Pond 2B: 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow ■ Primary ■ Secondary BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 23 Summary for Pond 3B: Pond 3 Inflow Area = 24.751 ac, 4.10% Impervious, Inflow Depth = 1.67" for 1yr-24hr event Inflow = 40.10 cfs @ 12.15 hrs, Volume= 3.439 of Outflow = 15.10 cfs @ 12.51 hrs, Volume= 3.437 af, Atten= 62%, Lag= 21.6 min Primary = 15.10 cfs @ 12.51 hrs, Volume= 3.437 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 394.90' Surf.Area= 10,695 sf Storage= 22,165 cf Peak Elev= 398.73' @ 12.51 hrs Surf.Area= 36,365 sf Storage= 75,811 cf (53,645 cf above start) Flood Elev= 402.00' Surf.Area= 42,976 sf Storage= 173,109 cf (150,943 cf above start) Plug -Flow detention time= 226.1 min calculated for 2.928 of (85% of inflow) Center -of -Mass det. time= 114.3 min ( 953.2 - 838.8 ) Volume Invert Avail.Storage Storage Description #1 391.00' 15,607 cf Chamber 2 (outlet) (Prismatic) Listed below (Recalc) #2 392.00' 7,643 cf Chamber 1 (inlet) (Prismatic) Listed below (Recalc) #3 396.00' 225,420 cf Combined Chambers (Prismatic) Listed below (Recalc) 248,669 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 391.00 1,446 0 0 392.00 2,583 2,015 2,015 393.00 3,801 3,192 5,207 394.00 5,119 4,460 9,667 395.00 6,761 5,940 15,607 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 392.00 1,032 0 0 393.00 1,971 1,502 1,502 394.00 3,048 2,510 4,011 395.00 4,215 3,632 7,643 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 396.00 13,953 0 0 397.00 17,143 15,548 15,548 398.00 22,159 19,651 35,199 399.00 26,581 24,370 59,569 400.00 30,000 28,291 87,860 402.00 32,000 62,000 149,860 404.00 43,560 75,560 225,420 BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 1 yr-24hr Rainfall=2.96" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 24 Device Routing Invert Outlet Devices #1 Primary 394.90' 36.0" Round Culvert L= 265.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 394.90' / 391.60' S= 0.0125 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 394.90' 8.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 397.90' 5.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 399.50' 20.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=15.06 cfs @ 12.51 hrs HW=398.73' TW=391.77' (Dynamic Tailwater) L1=Culvert (Passes 15.06 cfs of 51.94 cfs potential flow) P4=S =Orifice/Grate (Orifice Controls 3.14 cfs @ 9.00 fps) =Sharp -Crested Rectangular Weir (Weir Controls 11.92 cfs @ 2.98 fps) harp -Crested Rectangular Weir ( Controls 0.00 cfs) Pond 3B: Pond 3 Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 25 Summary for Subcatchment 1S-A: To Basin 1A Runoff = 47.04 cfs @ 12.03 hrs, Volume= 2.769 af, Depth= 2.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (ac) CN Description 4.327 98 Paved roads w/curbs & sewers, HSG C 0.180 98 Paved roads w/curbs & sewers, HSG C 0.502 98 Water Surface, HSG C 0.683 77 Woods, Poor, HSG C 0.242 77 Woods, Poor, HSG C 0.584 77 Woods, Poor, HSG C 0.045 74 >75% Grass cover, Good, HSG C 0.098 74 >75% Grass cover, Good, HSG C 0.051 74 >75% Grass cover, Good, HSG C 0.128 86 <50% Grass cover, Poor, HSG C 0.529 74 >75% Grass cover, Good, HSG C 6.353 87 Dirt roads, HSG C 13.722 89 Weighted Average 8.713 63.50% Pervious Area 5.009 36.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.8 150 0.0260 0.52 Sheet Flow, sheet from LS stockpile Fallow n= 0.050 P2= 3.54" 3.8 675 0.0330 2.92 Shallow Concentrated Flow, Concentrated from stockpile Unpaved Kv= 16.1 fps 0.3 125 0.0100 6.22 7.63 Pipe Channel, 15" rcp culv 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.011 Concrete pipe, straight & clean 1.5 260 0.0310 2.83 Shallow Concentrated Flow, culvert to ditch Unpaved Kv= 16.1 fps 0.8 218 0.0180 4.73 23.65 Trap/Vee/Rect Channel Flow, ditch to culv Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.2 250 0.0480 17.06 41.03 Pipe Channel, Final pipe 21.0" Round Area= 2.4 sf Perim= 5.5' r= 0.44' n= 0.011 Concrete pipe, straight & clean 11.4 1,678 Total MAIMOMMUMMOTCY1 PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 26 Subcatchment 1S-A: To Basin 1A Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 27 Summary for Subcatchment 1S-B: To Basin 1A Runoff = 32.48 cfs @ 12.07 hrs, Volume= 2.131 af, Depth= 2.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (ac) CN Description 0.169 74 >75% Grass cover, Good, HSG C 1.793 98 Paved roads w/curbs & sewers, HSG C 0.632 98 Roofs, HSG C 0.053 98 Roofs, HSG C 0.956 74 >75% Grass cover, Good, HSG C 0.355 98 Water Surface, HSG C 6.600 87 Dirt roads, HSG C 10.558 89 Weighted Average 7.725 73.17% Pervious Area 2.833 26.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.4 150 0.0200 0.47 Sheet Flow, stkpile area Fallow n= 0.050 P2= 3.54" 0.5 66 0.0200 2.28 Shallow Concentrated Flow, sktpile area Unpaved Kv= 16.1 fps 0.6 110 0.0360 2.85 Shallow Concentrated Flow, grass after stkpile Grassed Waterway Kv= 15.0 fps 3.3 518 0.0270 2.65 Shallow Concentrated Flow, Unpaved areas around bldg 12 Unpaved Kv= 16.1 fps 0.4 193 0.0240 8.83 10.84 Pipe Channel, Stm pipe 1st leg 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 Concrete pipe, finished 0.2 127 0.0260 10.38 18.35 Pipe Channel, 2nd leg of pipe 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.012 Concrete pipe, finished 0.9 280 0.0040 4.93 15.50 Pipe Channel, 3rd leg stm pipe 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 3.6 265 0.0300 1.21 Shallow Concentrated Flow, grassed area within lowlying area Short Grass Pasture Kv= 7.0 fps 14.9 1,709 Total MAIMOMMUMMOTCY1 PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 28 Subcatchment 1S-B: To Basin 1A w c+. 0 LL Hydrograph -- 36 ---�------------;------i-----F------+------F------+------;------------'------1----4----�----'---f----�-- 34 -- i 32.48 ds i 32 30 ! -- - -- - r 11 yr+2aln 28 - - - - ...... )------------ )------- 4--4------- {------- i------- 4------- 4------ ------------*----- ------ {-------{ ------a - 26 _ 24 ! !ff i RiunOff i o M. 2: 11:11 iaf 22 --- - ... t- -- --t- - - --r-- .. ------t-- -r-- --- t — -- -- r---'--- r-- y 20 ! ! ! !n 18 16 - - - ..... �- - - - - - - - --}------- ------ �-------i------ i--------— W— -e� 14 12 _-_--L--..... �_--_-_-_--_--_--_-__-_--_-L-_--_-1-_-_--_L_-_--_L-_-_--1-_-_---_-_--_- ------------ _-_-_-_1_-_-_--L---� 10 _....---4--------- i--- --—7.--_--_--_4_----------------;---_--_-}-----!--_- - i $ ....--';.--------- ------.?'--_----'!.-----_--!'.---_--_--'?.--_--_--_i'------------ --_----{---------- ?----_--{_-_- --!._-_--_--'--_- 6 I I ! I ! ! I I I I I ! I ! ! I I I 4 ! 2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 29 Summary for Subcatchment 2S-A: Direct to 2P Runoff = 17.86 cfs @ 11.96 hrs, Volume= 0.837 af, Depth= 2.08" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (sf) CN Description 66,516 98 Water Surface, HSG C 83,461 74 >75% Grass cover, Good, HSG C 60,505 87 Dirt roads, HSG C 210,482 85 Weighted Average 143,966 68.40% Pervious Area 66,516 31.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum TOC Subcatchment 2S-A: Direct to 2P Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 30 Summary for Subcatchment 3S-B: To Pond 3 Runoff = 18.35 cfs @ 12.07 hrs, Volume= 1.222 af, Depth= 2.33" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (sf) CN Description 11,911 98 Water Surface, HSG C 25,046 77 Woods, Poor, HSG C 31,514 98 Roofs, HSG C 820 98 Roofs, HSG C 204,485 87 Dirt roads, HSG C 273,776 88 Weighted Average 229,531 83.84% Pervious Area 44,245 16.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 150 0.0050 0.27 Sheet Flow, Sheet flow in NE direection from bldg 12 Fallow n= 0.050 P2= 3.54" 1.8 142 0.0070 1.35 Shallow Concentrated Flow, "flat" conc flow Unpaved Kv= 16.1 fps 4.4 791 0.0350 3.01 Shallow Concentrated Flow, Flow to pond 3 Unpaved Kv= 16.1 fps 15.5 1,083 Total BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 31 Subcatchment 3S-B: To Pond 3 Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 32 Summary for Subcatchment 3S-C: LS area to Pond 3 Runoff = 39.44 cfs @ 12.17 hrs, Volume= 3.325 af, Depth= 2.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.57" Area (ac) CN Description 18.466 86 excludes recirc ponds 18.466 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 150 0.0400 0.62 Sheet Flow, sheet flow NW corner Fallow n= 0.050 P2= 3.54" 20.2 3,152 0.0260 2.60 Shallow Concentrated Flow, Flow thru LS plant to pond 3 Unpaved Kv= 16.1 fps 24.3 3,302 Total Subcatchment 3S-C: LS area to Pond 3 Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 33 Summary for Reach 1A-R: 36" Pipe Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 1.75" for 2yr-24hr event Inflow = 13.83 cfs @ 12.25 hrs, Volume= 3.550 of Outflow = 13.83 cfs @ 12.25 hrs, Volume= 3.550 af, Atten= 0%, Lag= 0.4 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 6.14 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.26 fps, Avg. Travel Time= 2.2 min Peak Storage= 378 cf @ 12.25 hrs Average Depth at Peak Storage= 1.07' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 51.09 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 168.0' Slope= 0.0050 T Inlet Invert= 392.52', Outlet Invert= 391.68' 1 1 1 1 1 1 N U 3 0 LL Reach 1A-R: 36" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 34 Summary for Reach 1 B-R: 36" Pipe to 2P Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 1.75" for 2yr-24hr event Inflow = 13.83 cfs @ 12.25 hrs, Volume= 3.550 of Outflow = 13.83 cfs @ 12.25 hrs, Volume= 3.550 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 4.70 fps, Min. Travel Time= 0.3 min Avg. Velocity = 0.95 fps, Avg. Travel Time= 1.3 min Peak Storage= 221 cf @ 12.25 hrs Average Depth at Peak Storage= 1.30' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 35.40 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 75.0' Slope= 0.0024 7' Inlet Invert= 391.68', Outlet Invert= 391.50' 1 1 1 1 1 1 N U 3 0 LL Reach 1 B-R: 36" Pipe to 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 35 Summary for Reach 1 R: 24" Pipe Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 2.41" for 2yr-24hr event Inflow = 13.82 cfs @ 12.24 hrs, Volume= 2.761 of Outflow = 13.83 cfs @ 12.25 hrs, Volume= 2.761 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 12.43 fps, Min. Travel Time= 0.4 min Avg. Velocity = 2.40 fps, Avg. Travel Time= 2.0 min Peak Storage= 317 cf @ 12.25 hrs Average Depth at Peak Storage= 0.77' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.18 cfs 24.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 285.0' Slope= 0.0325 '/' Inlet Invert= 402.60', Outlet Invert= 393.34' 1 1 1 1 1 1 N V 3 0 LL Reach 1 R: 24" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 1_ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 36 Summary for Reach 3A-R: Channel 8A-2 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.16" for 2yr-24hr event Inflow = 39.31 cfs @ 12.19 hrs, Volume= 3.325 of Outflow = 39.31 cfs @ 12.19 hrs, Volume= 3.325 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 6.13 fps, Min. Travel Time= 0.0 min Avg. Velocity = 1.75 fps, Avg. Travel Time= 0.2 min Peak Storage= 117 cf @ 12.19 hrs Average Depth at Peak Storage= 0.84' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 440.38 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 18.3' Slope= 0.0268 '/' Inlet Invert= 417.53', Outlet Invert= 417.04' N U 3 0 LL Reach 3A-R: Channel 8A-2 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow G outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 37 Summary for Reach 313-11: Channel 8A-3 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.16" for 2yr-24hr event Inflow = 39.31 cfs @ 12.19 hrs, Volume= 3.325 of Outflow = 39.30 cfs @ 12.20 hrs, Volume= 3.325 af, Atten= 0%, Lag= 0.5 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 4.72 fps, Min. Travel Time= 0.7 min Avg. Velocity = 1.36 fps, Avg. Travel Time= 2.4 min Peak Storage= 1,643 cf @ 12.20 hrs Average Depth at Peak Storage= 1.03' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 301.20 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 197.2' Slope= 0.0125 T Inlet Invert= 417.04', Outlet Invert= 414.57' N U 3 0 LL Reach 313-R: Channel 8A-3 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow 0 outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 38 Summary for Reach 3C-R: Channel 8A-4 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.16" for 2yr-24hr event Inflow = 39.30 cfs @ 12.20 hrs, Volume= 3.325 of Outflow = 39.30 cfs @ 12.20 hrs, Volume= 3.325 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 13.91 fps, Min. Travel Time= 0.1 min Avg. Velocity = 3.97 fps, Avg. Travel Time= 0.2 min Peak Storage= 122 cf @ 12.20 hrs Average Depth at Peak Storage= 0.41' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 1,493.79 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 43.3' Slope= 0.3081 T Inlet Invert= 414.57', Outlet Invert= 401.23' N U 3 0 LL Reach 3C-R: Channel 8A-4 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow G outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 39 Summary for Reach 5R: Channel 8A-1 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.16" for 2yr-24hr event Inflow = 39.44 cfs @ 12.17 hrs, Volume= 3.325 of Outflow = 39.31 cfs @ 12.19 hrs, Volume= 3.325 af, Atten= 0%, Lag= 0.8 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 6.38 fps, Min. Travel Time= 1.1 min Avg. Velocity = 1.75 fps, Avg. Travel Time= 3.9 min Peak Storage= 2,521 cf @ 12.19 hrs Average Depth at Peak Storage= 0.89' Bank -Full Depth= 3.00' Flow Area= 27.0 sf, Capacity= 324.01 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 1.0 7' Top Width= 12.00' Length= 409.2' Slope= 0.0256 T Inlet Invert= 428.00', Outlet Invert= 417.53' N U 3 0 LL Reach 5R: Channel 8A-1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 40 Summary for Pond 1A-B: Existing Basin 1A (low lying greenspace) Inflow Area = 10.558 ac, 26.83% Impervious, Inflow Depth = 2.42" for 2yr-24hr event Inflow = 32.48 cfs @ 12.07 hrs, Volume= 2.131 of Outflow = 1.72 cfs @ 13.61 hrs, Volume= 0.789 af, Atten= 95%, Lag= 92.6 min Primary = 1.72 cfs @ 13.61 hrs, Volume= 0.789 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 405.19' @ 13.61 hrs Surf.Area= 23,458 sf Storage= 62,836 cf Plug -Flow detention time= 359.5 min calculated for 0.789 of (37% of inflow) Center -of -Mass det. time= 235.7 min ( 1,047.7 - 812.0 ) Volume Invert Avail.Storage Storage Description #1 400.00' 154,571 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 2,623 0 0 402.00 9,204 11,827 11,827 404.00 17,449 26,653 38,480 406.00 27,541 44,990 83,470 408.00 43,560 71,101 154,571 Device Routinq Invert Outlet Devices #1 Primary 405.00' 6.3' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=1.72 cfs @ 13.61 hrs HW=405.19' TW=393.26' (Dynamic Tailwater) L1=Sharp-Crested Rectangular Weir (Weir Controls 1.72 cfs @ 1.43 fps) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 41 Pond 1A-B: Existing Basin 1A (low lying greenspace) Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 42 Summary for Pond 1 B: Existing Basin 1 Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 2.42" for 2yr-24hr event Inflow = 47.04 cfs @ 12.03 hrs, Volume= 2.769 of Outflow = 13.82 cfs @ 12.24 hrs, Volume= 2.761 af, Atten= 71 %, Lag= 12.7 min Primary = 13.82 cfs @ 12.24 hrs, Volume= 2.761 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 402.60' Surf.Area= 24,334 sf Storage= 53,379 cf Peak Elev= 404.42' @ 12.24 hrs Surf.Area= 29,930 sf Storage= 102,839 cf (49,460 cf above start) Plug -Flow detention time= 393.5 min calculated for 1.536 of (55% of inflow) Center -of -Mass det. time= 128.4 min ( 937.2 - 808.7 ) Volume Invert Avail.Storage Storage Description #1 400.00' 230,133 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 16,836 0 0 401.00 19,630 18,233 18,233 402.00 22,539 21,085 39,318 403.00 25,530 24,035 63,352 404.00 28,610 27,070 90,422 405.00 31,721 30,166 120,588 406.00 34,929 33,325 153,913 407.00 38,193 36,561 190,474 408.00 41,125 39,659 230,133 Device Routing Invert Outlet Devices #1 Primary 402.60' 24.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=13.81 cfs @ 12.24 hrs HW=404.42' TW=403.37' (Dynamic Tailwater) L1=Orifice/Grate (Orifice Controls 13.81 cfs @ 4.60 fps) MAIMOMMUMMOTCY1 PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 43 Pond 1 B: Existing Basin 1 Hydrograph u Inflow O Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 44 Summary for Pond 2B: 2P Inflow Area = 53.863 ac, 19.28% Impervious, Inflow Depth = 1.99" for 2yr-24hr event Inflow = 40.24 cfs @ 12.41 hrs, Volume= 8.930 of Outflow = 1.38 cfs @ 24.77 hrs, Volume= 6.040 af, Atten= 97%, Lag= 741.9 min Primary = 1.38 cfs @ 24.77 hrs, Volume= 6.040 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 391.00' Surf.Area= 1.718 ac Storage= 4.603 of Peak Elev= 394.89' @ 24.77 hrs Surf.Area= 2.190 ac Storage= 12.192 of (7.589 of above start) Flood Elev= 400.00' Surf.Area= 2.869 ac Storage= 25.105 of (20.502 of above start) Plug -Flow detention time= 4,055.4 min calculated for 1.438 of (16% of inflow) Center -of -Mass det. time= 1,877.6 min ( 2,812.7 - 935.1 ) Volume Invert Avail.Storage Storage Description #1 388.00' 25.105 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 388.00 1.345 0.000 0.000 389.00 1.471 1.408 1.408 390.00 1.600 1.536 2.943 391.00 1.718 1.659 4.603 392.00 1.833 1.775 6.378 393.00 1.955 1.894 8.272 394.00 2.077 2.016 10.288 395.00 2.204 2.140 12.428 396.00 2.340 2.272 14.701 397.00 2.469 2.404 17.105 398.00 2.599 2.534 19.639 399.00 2.732 2.665 22.304 400.00 2.869 2.800 25.105 Device Routing Invert Outlet Devices #1 Primary 390.50' 54.0" Round Culvert L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 390.50' / 382.00' S= 0.0850 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 15.90 sf #2 Device 1 391.00' 0.5" Vert. Orifice/Grate X 20.00 columns X 7 rows with 6.0" cc spacing C= 0.600 #3 Device 1 396.00' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #4 Secondary 397.00' 30.0' long x 28.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 45 Primary OutFlow Max=1.38 cfs @ 24.77 hrs HW=394.89' (Free Discharge) L1=Culvert (Passes 1.38 cfs of 112.77 cfs potential flow) �2=0 rifi ce/G rate (Orifice Controls 1.38 cfs @ 7.23 fps) 3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) N U 3 0 LL Pond 2B: 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow ■ Primary ■ Secondary BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 46 Summary for Pond 3B: Pond 3 Inflow Area = 24.751 ac, 4.10% Impervious, Inflow Depth = 2.20" for 2yr-24hr event Inflow = 53.13 cfs @ 12.15 hrs, Volume= 4.546 of Outflow = 25.41 cfs @ 12.43 hrs, Volume= 4.544 af, Atten= 52%, Lag= 17.0 min Primary = 25.41 cfs @ 12.43 hrs, Volume= 4.544 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 394.90' Surf.Area= 10,695 sf Storage= 22,165 cf Peak Elev= 399.16' @ 12.43 hrs Surf.Area= 38,120 sf Storage= 87,245 cf (65,079 cf above start) Flood Elev= 402.00' Surf.Area= 42,976 sf Storage= 173,109 cf (150,943 cf above start) Plug -Flow detention time= 192.7 min calculated for 4.035 of (89% of inflow) Center -of -Mass det. time= 104.0 min ( 934.7 - 830.6 ) Volume Invert Avail.Storage Storage Description #1 391.00' 15,607 cf Chamber 2 (outlet) (Prismatic) Listed below (Recalc) #2 392.00' 7,643 cf Chamber 1 (inlet) (Prismatic) Listed below (Recalc) #3 396.00' 225,420 cf Combined Chambers (Prismatic) Listed below (Recalc) 248,669 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 391.00 1,446 0 0 392.00 2,583 2,015 2,015 393.00 3,801 3,192 5,207 394.00 5,119 4,460 9,667 395.00 6,761 5,940 15,607 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 392.00 1,032 0 0 393.00 1,971 1,502 1,502 394.00 3,048 2,510 4,011 395.00 4,215 3,632 7,643 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 396.00 13,953 0 0 397.00 17,143 15,548 15,548 398.00 22,159 19,651 35,199 399.00 26,581 24,370 59,569 400.00 30,000 28,291 87,860 402.00 32,000 62,000 149,860 404.00 43,560 75,560 225,420 BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 2yr-24hr Rainfall=3.57" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 47 Device Routing Invert Outlet Devices #1 Primary 394.90' 36.0" Round Culvert L= 265.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 394.90' / 391.60' S= 0.0125 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 394.90' 8.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 397.90' 5.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 399.50' 20.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=25.34 cfs @ 12.43 hrs HW=399.16' TW=392.06' (Dynamic Tailwater) L1=Culvert (Passes 25.34 cfs of 56.56 cfs potential flow) P4=S =Orifice/Grate (Orifice Controls 3.33 cfs @ 9.54 fps) =Sharp -Crested Rectangular Weir (Weir Controls 22.01 cfs @ 3.67 fps) harp -Crested Rectangular Weir ( Controls 0.00 cfs) '• • '• RI n inflow •1 1 I 1 I�� f %1 ` 1 1 1 1 �1 1 •1 1 :1 •1 ❑ Inflow ❑ Primary BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 48 Summary for Subcatchment 1S-A: To Basin 1A Runoff = 62.56 cfs @ 12.03 hrs, Volume= 3.735 af, Depth= 3.27" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (ac) CN Description 4.327 98 Paved roads w/curbs & sewers, HSG C 0.180 98 Paved roads w/curbs & sewers, HSG C 0.502 98 Water Surface, HSG C 0.683 77 Woods, Poor, HSG C 0.242 77 Woods, Poor, HSG C 0.584 77 Woods, Poor, HSG C 0.045 74 >75% Grass cover, Good, HSG C 0.098 74 >75% Grass cover, Good, HSG C 0.051 74 >75% Grass cover, Good, HSG C 0.128 86 <50% Grass cover, Poor, HSG C 0.529 74 >75% Grass cover, Good, HSG C 6.353 87 Dirt roads, HSG C 13.722 89 Weighted Average 8.713 63.50% Pervious Area 5.009 36.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.8 150 0.0260 0.52 Sheet Flow, sheet from LS stockpile Fallow n= 0.050 P2= 3.54" 3.8 675 0.0330 2.92 Shallow Concentrated Flow, Concentrated from stockpile Unpaved Kv= 16.1 fps 0.3 125 0.0100 6.22 7.63 Pipe Channel, 15" rcp culv 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.011 Concrete pipe, straight & clean 1.5 260 0.0310 2.83 Shallow Concentrated Flow, culvert to ditch Unpaved Kv= 16.1 fps 0.8 218 0.0180 4.73 23.65 Trap/Vee/Rect Channel Flow, ditch to culv Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.2 250 0.0480 17.06 41.03 Pipe Channel, Final pipe 21.0" Round Area= 2.4 sf Perim= 5.5' r= 0.44' n= 0.011 Concrete pipe, straight & clean 11.4 1,678 Total BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 49 Subcatchment 1S-A: To Basin 1A Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 50 Summary for Subcatchment 1S-B: To Basin 1A Runoff = 43.28 cfs @ 12.06 hrs, Volume= 2.874 af, Depth= 3.27" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (ac) CN Description 0.169 74 >75% Grass cover, Good, HSG C 1.793 98 Paved roads w/curbs & sewers, HSG C 0.632 98 Roofs, HSG C 0.053 98 Roofs, HSG C 0.956 74 >75% Grass cover, Good, HSG C 0.355 98 Water Surface, HSG C 6.600 87 Dirt roads, HSG C 10.558 89 Weighted Average 7.725 73.17% Pervious Area 2.833 26.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.4 150 0.0200 0.47 Sheet Flow, stkpile area Fallow n= 0.050 P2= 3.54" 0.5 66 0.0200 2.28 Shallow Concentrated Flow, sktpile area Unpaved Kv= 16.1 fps 0.6 110 0.0360 2.85 Shallow Concentrated Flow, grass after stkpile Grassed Waterway Kv= 15.0 fps 3.3 518 0.0270 2.65 Shallow Concentrated Flow, Unpaved areas around bldg 12 Unpaved Kv= 16.1 fps 0.4 193 0.0240 8.83 10.84 Pipe Channel, Stm pipe 1st leg 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 Concrete pipe, finished 0.2 127 0.0260 10.38 18.35 Pipe Channel, 2nd leg of pipe 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.012 Concrete pipe, finished 0.9 280 0.0040 4.93 15.50 Pipe Channel, 3rd leg stm pipe 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 3.6 265 0.0300 1.21 Shallow Concentrated Flow, grassed area within lowlying area Short Grass Pasture Kv= 7.0 fps 14.9 1,709 Total BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 51 Subcatchment 1S-B: To Basin 1A Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 52 Summary for Subcatchment 2S-A: Direct to 2P Runoff = 24.45 cfs @ 11.95 hrs, Volume= 1.160 af, Depth= 2.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (sf) CN Description 66,516 98 Water Surface, HSG C 83,461 74 >75% Grass cover, Good, HSG C 60,505 87 Dirt roads, HSG C 210,482 85 Weighted Average 143,966 68.40% Pervious Area 66,516 31.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum TOC 3 0 LL Subcatchment 2S-A: Direct to 2P Hydrograph 1 ; 26 --- i 24.45 WS .---, . I i--,---.- 24 II 24hr -- -± - -----t------ +-------t------- k------- t- -- I-------t------ F------ +------- i - +------ 22 I �— Irsf 11- .4T I ; ; ; ; ; ; 20 -! -- - ' ---- a4 �-2 110- $ 5 I- --; --�-- -;- --{-- -; - - �— f 18 i i ; ; i i i - -------------f --+- - - ---- - - -+- -F- D rr _/ ,�, cn . 16 i i i I i i i ino 14 i i ; i I i i i i T` i �h • v - -.... -- - - i i------ -- 12 nI -_--_- i-_--_-_ _-_--_---_--_-y-_-_--_r_-_--_ r-_-_--;-_-_--y-_-_--_- ----_ -_--_' ---- 10I I I C, _ 5 j g 6 4 fI -----.-------.---'i�-.-------.-----.-tII ---.-..----'--.i'r.----'-------.------"-------'------ifI ----�i ---fI ----.---.-----.-y..-------"-t}ii --.---.---.-----ti -----;i'r .--_-----'�- 2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 53 Summary for Subcatchment 3S-B: To Pond 3 Runoff = 24.66 cfs @ 12.07 hrs, Volume= 1.659 af, Depth= 3.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (sf) CN Description 11,911 98 Water Surface, HSG C 25,046 77 Woods, Poor, HSG C 31,514 98 Roofs, HSG C 820 98 Roofs, HSG C 204,485 87 Dirt roads, HSG C 273,776 88 Weighted Average 229,531 83.84% Pervious Area 44,245 16.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 150 0.0050 0.27 Sheet Flow, Sheet flow in NE direection from bldg 12 Fallow n= 0.050 P2= 3.54" 1.8 142 0.0070 1.35 Shallow Concentrated Flow, "flat" conc flow Unpaved Kv= 16.1 fps 4.4 791 0.0350 3.01 Shallow Concentrated Flow, Flow to pond 3 Unpaved Kv= 16.1 fps 15.5 1,083 Total BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 54 26 24 22 20 18 .- 16 N 3 14 LL 12 10 8 6 4 2 0 Subcatchment 3S-B: To Pond 3 Hydrograph I • • _i. mom • Vol _ �_• n6ff Jul I gal 'Us I/ �i i 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff MAIMOMMUMMOTMI PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment 3S-C: LS area to Pond 3 Runoff = 54.07 cfs @ 12.17 hrs, Volume= 4.579 af, Depth= 2.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 5yr-24hr Rainfall=4.47" Area (ac) CN Description 18.466 86 excludes recirc ponds 18.466 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 150 0.0400 0.62 Sheet Flow, sheet flow NW corner Fallow n= 0.050 P2= 3.54" 20.2 3,152 0.0260 2.60 Shallow Concentrated Flow, Flow thru LS plant to pond 3 Unpaved Kv= 16.1 fps 24.3 3,302 Total 60_ 55_ 50- 45- 40- N 35- 3 30- LL 25 - 20- 15- 10- 5- Subcatchment 3S-C: LS area to Pond 3 Hydrograph I i ! ////////"!/////////////////////////////////////////////////////////////////////// 60 65 70 75 80 85 9 ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 56 Summary for Reach 1A-R: 36" Pipe Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 2.60" for 5yr-24hr event Inflow = 24.77 cfs @ 12.40 hrs, Volume= 5.260 of Outflow = 24.75 cfs @ 12.41 hrs, Volume= 5.260 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.17 fps, Min. Travel Time= 0.4 min Avg. Velocity = 1.34 fps, Avg. Travel Time= 2.1 min Peak Storage= 580 cf @ 12.41 hrs Average Depth at Peak Storage= 1.47' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 51.09 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 168.0' Slope= 0.0050 T Inlet Invert= 392.52', Outlet Invert= 391.68' N V 3 0 LL Reach 1A-R: 36" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 57 Summary for Reach 1 B-R: 36" Pipe to 2P Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 2.60" for 5yr-24hr event Inflow = 24.75 cfs @ 12.41 hrs, Volume= 5.260 of Outflow = 24.76 cfs @ 12.41 hrs, Volume= 5.260 af, Atten= 0%, Lag= 0.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.42 fps, Min. Travel Time= 0.2 min Avg. Velocity = 1.01 fps, Avg. Travel Time= 1.2 min Peak Storage= 343 cf @ 12.41 hrs Average Depth at Peak Storage= 1.85' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 35.40 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 75.0' Slope= 0.0024 7' Inlet Invert= 391.68', Outlet Invert= 391.50' N V 3 0 LL Reach 1 B-R: 36" Pipe to 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 58 Summary for Reach 1 R: 24" Pipe Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 3.26" for 5yr-24hr event Inflow = 17.60 cfs @ 12.25 hrs, Volume= 3.727 of Outflow = 17.60 cfs @ 12.25 hrs, Volume= 3.727 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 13.26 fps, Min. Travel Time= 0.4 min Avg. Velocity = 2.54 fps, Avg. Travel Time= 1.9 min Peak Storage= 378 cf @ 12.25 hrs Average Depth at Peak Storage= 0.88' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.18 cfs 24.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 285.0' Slope= 0.0325 '/' Inlet Invert= 402.60', Outlet Invert= 393.34' 1 1 1 1 1 1 1 1 w 1 3 0 LL Reach 1 R: 24" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 59 Summary for Reach 3A-R: Channel 8A-2 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.98" for 5yr-24hr event Inflow = 53.89 cfs @ 12.18 hrs, Volume= 4.579 of Outflow = 53.90 cfs @ 12.18 hrs, Volume= 4.579 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 6.75 fps, Min. Travel Time= 0.0 min Avg. Velocity = 1.91 fps, Avg. Travel Time= 0.2 min Peak Storage= 146 cf @ 12.18 hrs Average Depth at Peak Storage= 1.00' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 440.38 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 18.3' Slope= 0.0268 '/' Inlet Invert= 417.53', Outlet Invert= 417.04' 3 0 LL Reach 3A-R: Channel 8A-2 Hydrograph r I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 71 ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 60 Summary for Reach 313-11: Channel 8A-3 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.98" for 5yr-24hr event Inflow = 53.90 cfs @ 12.18 hrs, Volume= 4.579 of Outflow = 53.89 cfs @ 12.19 hrs, Volume= 4.579 af, Atten= 0%, Lag= 0.5 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.18 fps, Min. Travel Time= 0.6 min Avg. Velocity = 1.48 fps, Avg. Travel Time= 2.2 min Peak Storage= 2,050 cf @ 12.19 hrs Average Depth at Peak Storage= 1.23' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 301.20 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 197.2' Slope= 0.0125 T Inlet Invert= 417.04', Outlet Invert= 414.57' 3 0 LL Reach 313-R: Channel 8A-3 Hydrograph - ' - I III U • 1111 f � 1 I • y 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 61 Summary for Reach 3C-R: Channel 8A-4 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.98" for 5yr-24hr event Inflow = 53.89 cfs @ 12.19 hrs, Volume= 4.579 of Outflow = 53.89 cfs @ 12.19 hrs, Volume= 4.579 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 15.49 fps, Min. Travel Time= 0.0 min Avg. Velocity = 4.31 fps, Avg. Travel Time= 0.2 min Peak Storage= 151 cf @ 12.19 hrs Average Depth at Peak Storage= 0.50' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 1,493.79 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 43.3' Slope= 0.3081 T Inlet Invert= 414.57', Outlet Invert= 401.23' N U 3 0 LL Reach 3C-R: Channel 8A-4 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 62 Summary for Reach 5R: Channel 8A-1 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 2.98" for 5yr-24hr event Inflow = 54.07 cfs @ 12.17 hrs, Volume= 4.579 of Outflow = 53.89 cfs @ 12.18 hrs, Volume= 4.579 af, Atten= 0%, Lag= 0.7 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.06 fps, Min. Travel Time= 1.0 min Avg. Velocity = 1.92 fps, Avg. Travel Time= 3.6 min Peak Storage= 3,120 cf @ 12.18 hrs Average Depth at Peak Storage= 1.08' Bank -Full Depth= 3.00' Flow Area= 27.0 sf, Capacity= 324.01 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 1.0 7' Top Width= 12.00' Length= 409.2' Slope= 0.0256 T Inlet Invert= 428.00', Outlet Invert= 417.53' N U 3 0 LL Reach 5R: Channel 8A-1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 63 Summary for Pond 1A-B: Existing Basin 1A (low lying greenspace) Inflow Area = 10.558 ac, 26.83% Impervious, Inflow Depth = 3.27" for 5yr-24hr event Inflow = 43.28 cfs @ 12.06 hrs, Volume= 2.874 of Outflow = 7.87 cfs @ 12.46 hrs, Volume= 1.532 af, Atten= 82%, Lag= 23.7 min Primary = 7.87 cfs @ 12.46 hrs, Volume= 1.532 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 405.53' @ 12.46 hrs Surf.Area= 25,152 sf Storage= 70,994 cf Plug -Flow detention time= 257.2 min calculated for 1.532 of (53% of inflow) Center -of -Mass det. time= 145.6 min ( 949.1 - 803.5 ) Volume Invert Avail.Storage Storage Description #1 400.00' 154,571 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 2,623 0 0 402.00 9,204 11,827 11,827 404.00 17,449 26,653 38,480 406.00 27,541 44,990 83,470 408.00 43,560 71,101 154,571 Device Routinq Invert Outlet Devices #1 Primary 405.00' 6.3' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=7.85 cfs @ 12.46 hrs HW=405.53' TW=393.99' (Dynamic Tailwater) L1=Sharp-Crested Rectangular Weir (Weir Controls 7.85 cfs @ 2.37 fps) PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 64 Pond 1A-B: Existing Basin 1A (low lying greenspace) Hydrograph n 1 _ n rTMIi, - 1 L Wii 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ Primary BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 65 Summary for Pond 1 B: Existing Basin 1 Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 3.27" for 5yr-24hr event Inflow = 62.56 cfs @ 12.03 hrs, Volume= 3.735 of Outflow = 17.60 cfs @ 12.25 hrs, Volume= 3.727 af, Atten= 72%, Lag= 13.1 min Primary = 17.60 cfs @ 12.25 hrs, Volume= 3.727 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 402.60' Surf.Area= 24,334 sf Storage= 53,379 cf Peak Elev= 404.95' @ 12.25 hrs Surf.Area= 31,579 sf Storage= 119,146 cf (65,767 cf above start) Plug -Flow detention time= 305.6 min calculated for 2.501 of (67% of inflow) Center -of -Mass det. time= 114.1 min ( 914.3 - 800.2 ) Volume Invert Avail.Storage Storage Description #1 400.00' 230,133 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 16,836 0 0 401.00 19,630 18,233 18,233 402.00 22,539 21,085 39,318 403.00 25,530 24,035 63,352 404.00 28,610 27,070 90,422 405.00 31,721 30,166 120,588 406.00 34,929 33,325 153,913 407.00 38,193 36,561 190,474 408.00 41,125 39,659 230,133 Device Routing Invert Outlet Devices #1 Primary 402.60' 24.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=17.60 cfs @ 12.25 hrs HW=404.95' TW=403.48' (Dynamic Tailwater) L1=Orifice/Grate (Orifice Controls 17.60 cfs @ 5.60 fps) PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 66 Pond 1 B: Existing Basin 1 Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 67 Summary for Pond 2B: 2P Inflow Area = 53.863 ac, 19.28% Impervious, Inflow Depth = 2.82" for 5yr-24hr event Inflow = 73.10 cfs @ 12.36 hrs, Volume= 12.654 of Outflow = 3.12 cfs @ 24.03 hrs, Volume= 8.825 af, Atten= 96%, Lag= 700.1 min Primary = 3.12 cfs @ 24.03 hrs, Volume= 8.825 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 391.00' Surf.Area= 1.718 ac Storage= 4.603 of Peak Elev= 396.07' @ 24.03 hrs Surf.Area= 2.349 ac Storage= 14.861 of (10.258 of above start) Flood Elev= 400.00' Surf.Area= 2.869 ac Storage= 25.105 of (20.502 of above start) Plug -Flow detention time= 3,279.8 min calculated for 4.220 of (33% of inflow) Center -of -Mass det. time= 1,876.5 min ( 2,793.5 - 917.0 ) Volume Invert Avail.Storage Storage Description #1 388.00' 25.105 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 388.00 1.345 0.000 0.000 389.00 1.471 1.408 1.408 390.00 1.600 1.536 2.943 391.00 1.718 1.659 4.603 392.00 1.833 1.775 6.378 393.00 1.955 1.894 8.272 394.00 2.077 2.016 10.288 395.00 2.204 2.140 12.428 396.00 2.340 2.272 14.701 397.00 2.469 2.404 17.105 398.00 2.599 2.534 19.639 399.00 2.732 2.665 22.304 400.00 2.869 2.800 25.105 Device Routing Invert Outlet Devices #1 Primary 390.50' 54.0" Round Culvert L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 390.50' / 382.00' S= 0.0850 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 15.90 sf #2 Device 1 391.00' 0.5" Vert. Orifice/Grate X 20.00 columns X 7 rows with 6.0" cc spacing C= 0.600 #3 Device 1 396.00' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #4 Secondary 397.00' 30.0' long x 28.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 68 Primary OutFlow Max=3.12 cfs @ 24.03 hrs HW=396.07' (Free Discharge) L1=Culvert (Passes 3.12 cfs of 139.50 cfs potential flow) �2=0 rifi ce/G rate (Orifice Controls 1.71 cfs @ 8.97 fps) 3=Sharp-Crested Rectangular Weir (Weir Controls 1.40 cfs @ 0.85 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) N U 3 0 LL Pond 2B: 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow ■ Primary ■ Secondary BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.4 7 " Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 69 Summary for Pond 3B: Pond 3 Inflow Area = 24.751 ac, 4.10% Impervious, Inflow Depth = 3.02" for 5yr-24hr event Inflow = 72.73 cfs @ 12.15 hrs, Volume= 6.238 of Outflow = 45.94 cfs @ 12.36 hrs, Volume= 6.235 af, Atten= 37%, Lag= 12.6 min Primary = 45.94 cfs @ 12.36 hrs, Volume= 6.235 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 394.90' Surf.Area= 10,695 sf Storage= 22,165 cf Peak Elev= 399.70' @ 12.36 hrs Surf.Area= 39,946 sf Storage= 102,224 cf (80,058 cf above start) Flood Elev= 402.00' Surf.Area= 42,976 sf Storage= 173,109 cf (150,943 cf above start) Plug -Flow detention time= 177.2 min calculated for 5.723 of (92% of inflow) Center -of -Mass det. time= 108.5 min ( 929.9 - 821.4 ) Volume Invert Avail.Storage Storage Description #1 391.00' 15,607 cf Chamber 2 (outlet) (Prismatic) Listed below (Recalc) #2 392.00' 7,643 cf Chamber 1 (inlet) (Prismatic) Listed below (Recalc) #3 396.00' 225,420 cf Combined Chambers (Prismatic) Listed below (Recalc) 248,669 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 391.00 1,446 0 0 392.00 2,583 2,015 2,015 393.00 3,801 3,192 5,207 394.00 5,119 4,460 9,667 395.00 6,761 5,940 15,607 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 392.00 1,032 0 0 393.00 1,971 1,502 1,502 394.00 3,048 2,510 4,011 395.00 4,215 3,632 7,643 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 396.00 13,953 0 0 397.00 17,143 15,548 15,548 398.00 22,159 19,651 35,199 399.00 26,581 24,370 59,569 400.00 30,000 28,291 87,860 402.00 32,000 62,000 149,860 404.00 43,560 75,560 225,420 BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 5yr-24hr Rainfall=4.47" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 70 Device Routing Invert Outlet Devices #1 Primary 394.90' 36.0" Round Culvert L= 265.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 394.90' / 391.60' S= 0.0125 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 394.90' 8.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 397.90' 5.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 399.50' 20.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=45.74 cfs @ 12.36 hrs HW=399.70' TW=392.51' (Dynamic Tailwater) L1=Culvert (Passes 45.74 cfs of 61.79 cfs potential flow) P4=S =Orifice/Grate (Orifice Controls 3.55 cfs @ 10.17 fps) =Sharp -Crested Rectangular Weir (Weir Controls 36.52 cfs @ 4.38 fps) harp -Crested Rectangular Weir (Weir Controls 5.67 cfs @ 1.45 fps) Pond 3B: Pond 3 Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 71 Summary for Subcatchment 1S-A: To Basin 1A Runoff = 74.78 cfs @ 12.03 hrs, Volume= 4.511 af, Depth= 3.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (ac) CN Description 4.327 98 Paved roads w/curbs & sewers, HSG C 0.180 98 Paved roads w/curbs & sewers, HSG C 0.502 98 Water Surface, HSG C 0.683 77 Woods, Poor, HSG C 0.242 77 Woods, Poor, HSG C 0.584 77 Woods, Poor, HSG C 0.045 74 >75% Grass cover, Good, HSG C 0.098 74 >75% Grass cover, Good, HSG C 0.051 74 >75% Grass cover, Good, HSG C 0.128 86 <50% Grass cover, Poor, HSG C 0.529 74 >75% Grass cover, Good, HSG C 6.353 87 Dirt roads, HSG C 13.722 89 Weighted Average 8.713 63.50% Pervious Area 5.009 36.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.8 150 0.0260 0.52 Sheet Flow, sheet from LS stockpile Fallow n= 0.050 P2= 3.54" 3.8 675 0.0330 2.92 Shallow Concentrated Flow, Concentrated from stockpile Unpaved Kv= 16.1 fps 0.3 125 0.0100 6.22 7.63 Pipe Channel, 15" rcp culv 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.011 Concrete pipe, straight & clean 1.5 260 0.0310 2.83 Shallow Concentrated Flow, culvert to ditch Unpaved Kv= 16.1 fps 0.8 218 0.0180 4.73 23.65 Trap/Vee/Rect Channel Flow, ditch to culv Bot.W=2.00' D=1.00' Z= 3.0 7' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.2 250 0.0480 17.06 41.03 Pipe Channel, Final pipe 21.0" Round Area= 2.4 sf Perim= 5.5' r= 0.44' n= 0.011 Concrete pipe, straight & clean 11.4 1,678 Total BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 72 Subcatchment 1S-A: To Basin 1A Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 73 Summary for Subcatchment 1S-B: To Basin 1A Runoff = 51.79 cfs @ 12.06 hrs, Volume= 3.470 af, Depth= 3.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (ac) CN Description 0.169 74 >75% Grass cover, Good, HSG C 1.793 98 Paved roads w/curbs & sewers, HSG C 0.632 98 Roofs, HSG C 0.053 98 Roofs, HSG C 0.956 74 >75% Grass cover, Good, HSG C 0.355 98 Water Surface, HSG C 6.600 87 Dirt roads, HSG C 10.558 89 Weighted Average 7.725 73.17% Pervious Area 2.833 26.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.4 150 0.0200 0.47 Sheet Flow, stkpile area Fallow n= 0.050 P2= 3.54" 0.5 66 0.0200 2.28 Shallow Concentrated Flow, sktpile area Unpaved Kv= 16.1 fps 0.6 110 0.0360 2.85 Shallow Concentrated Flow, grass after stkpile Grassed Waterway Kv= 15.0 fps 3.3 518 0.0270 2.65 Shallow Concentrated Flow, Unpaved areas around bldg 12 Unpaved Kv= 16.1 fps 0.4 193 0.0240 8.83 10.84 Pipe Channel, Stm pipe 1st leg 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 Concrete pipe, finished 0.2 127 0.0260 10.38 18.35 Pipe Channel, 2nd leg of pipe 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.012 Concrete pipe, finished 0.9 280 0.0040 4.93 15.50 Pipe Channel, 3rd leg stm pipe 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 3.6 265 0.0300 1.21 Shallow Concentrated Flow, grassed area within lowlying area Short Grass Pasture Kv= 7.0 fps 14.9 1,709 Total BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 74 55 50 45 40 35 30 0 LL 25 20 15 10 5 0 Subcatchment 1S-B: To Basin 1A Hydrograph i i i , i -------i-------a-- i i 51.79 ds i 1---------- +i ------------------ ----------11---------- Gi ----------ii ----------Li -----i -------- --------- Ii r i i VP ._ ...... ----------- ------ ----------i-------- ------- a i —1— -- G� — PYr1 4 i r — — an — TF=1 a uof - c O�UM-1 �.o ,3. TO of _ _.._._.... i i..........j_.._.._..1...................l._.._..__ ; I I ...........1.._.._.._ i ; ....._.._...._.._.. -.;-....._.....--. i i u 110 ... . U e p i _h...-_�-. 9 L H..J.. qHj engt _4.V nj"' i 91 , --------- -� ------ -- ` I ------+- - - i + - - + 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 75 Summary for Subcatchment 2S-A: Direct to 2P Runoff = 29.68 cfs @ 11.95 hrs, Volume= 1.423 af, Depth= 3.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (sf) CN Description 66,516 98 Water Surface, HSG C 83,461 74 >75% Grass cover, Good, HSG C 60,505 87 Dirt roads, HSG C 210,482 85 Weighted Average 143,966 68.40% Pervious Area 66,516 31.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum TOC Subcatchment 2S-A: Direct to 2P Hydrograph 29.68 cfs I I I t —iIHLw � V - ---------- -------- -I- --- 1i-----' ri, - -------- I -------------- ---------- --------- - -- - --- -- -- - --f--- -�- -a-- -�--gum€f--�4�a 2-if $�;5 -R�unff/o urnefi�2lafi ----- ------------ n Ui p �1a T{ ----- ------ - - .... ------ ----- ----- ----- ----- -------F--------- 1----- ------- � • i I i i i ------- - --+ - — — I I I I I I I I I I I i i i i i i i i A/ L A I I I I . : . . . . . . . . . . . . . . . ............... .....--. _ ............ .................. ......... __...__.. ..................... .__...... - __...__. .................. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 76 Summary for Subcatchment 3S-B: To Pond 3 Runoff = 29.64 cfs @ 12.07 hrs, Volume= 2.011 af, Depth= 3.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (sf) CN Description 11,911 98 Water Surface, HSG C 25,046 77 Woods, Poor, HSG C 31,514 98 Roofs, HSG C 820 98 Roofs, HSG C 204,485 87 Dirt roads, HSG C 273,776 88 Weighted Average 229,531 83.84% Pervious Area 44,245 16.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 150 0.0050 0.27 Sheet Flow, Sheet flow in NE direection from bldg 12 Fallow n= 0.050 P2= 3.54" 1.8 142 0.0070 1.35 Shallow Concentrated Flow, "flat" conc flow Unpaved Kv= 16.1 fps 4.4 791 0.0350 3.01 Shallow Concentrated Flow, Flow to pond 3 Unpaved Kv= 16.1 fps 15.5 1,083 Total BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 77 32= 30: 28= 26: 24 22- 20= u 18= c 16= LL 14= 12= 10: 8= 6= 4- 2 Subcatchment 3S-B: To Pond 3 Hydrograph I 1 0, 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 78 Summary for Subcatchment 3S-C: LS area to Pond 3 Runoff = 65.71 cfs @ 12.17 hrs, Volume= 5.594 af, Depth= 3.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=5.18" Area (ac) CN Description 18.466 86 excludes recirc ponds 18.466 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 150 0.0400 0.62 Sheet Flow, sheet flow NW corner Fallow n= 0.050 P2= 3.54" 20.2 3,152 0.0260 2.60 Shallow Concentrated Flow, Flow thru LS plant to pond 3 Unpaved Kv= 16.1 fps 24.3 3,302 Total N 3 0 LL Subcatchment 3S-C: LS area to Pond 3 Hydrograph 70 --_-- ... 65.71 cfs—t----t------f------F----------F------f------F----i------i --- i------t----------- .--...---.---_i--.---.---.-1------------- :.---.---.---.'-- 65 ; - ;--------+ --------- ------- ...--......-.... f-.... -..... -...-t....... Ty 1.1....2.4.-h.r..---- i: 60 -------t---- fi-----�----�---�--j--r----�----�----.�..Q-�r�24h�..�a1n#a11=1-�---.. 55 i --_--_----.-'`I_--_---_--1ii --_--_--'—I-_--_--_-Ii i--_--_--_- r ----..R---.. . Ruboff. -...- ..A 1 50 -...-....--..-..-...-...--.;. -...- .....-..._................ a --------}---......}----r- ---------- fon45 nOYe=5 59Oaf 40 i i i i i i.u._o..ff.....De.p.h.....—...*...f 4.._..... a 35 } i I i i — ;_.._._.+._.._....+..................F.._.._.._.._.._.._.:F..._.._..+.._.._.._F...._.._.+....-_.... 1a.>�...j_e.nath_.3-3.p2_-... i i I I i i i i =r... TIC 25 i i i i i Mi - -------------- ..---.. CIN 20 861 _..i _ -------}-------------------L--------------------------------------- r - --- -- -.- 15 ....-...------ — — -- T---------r -r-------- 1---------T-----------------r---------- ---------i 10 -- — ..... ...--...--...... -- + -- f --+ -- F — + --F +------} — — -------} — +--------} — 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 79 Summary for Reach 1A-R: 36" Pipe Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 3.28" for 10yr-24hr event Inflow = 35.84 cfs @ 12.31 hrs, Volume= 6.631 of Outflow = 35.88 cfs @ 12.31 hrs, Volume= 6.631 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.82 fps, Min. Travel Time= 0.4 min Avg. Velocity = 1.39 fps, Avg. Travel Time= 2.0 min Peak Storage= 770 cf @ 12.31 hrs Average Depth at Peak Storage= 1.85' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 51.09 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 168.0' Slope= 0.0050 T Inlet Invert= 392.52', Outlet Invert= 391.68' w 3 0 LL Reach 1A-R: 36" Pipe Hydrograph i 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 80 Summary for Reach 1 B-R: 36" Pipe to 2P Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 3.28" for 10yr-24hr event Inflow = 35.88 cfs @ 12.31 hrs, Volume= 6.631 of Outflow = 35.89 cfs @ 12.32 hrs, Volume= 6.631 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.71 fps, Min. Travel Time= 0.2 min Avg. Velocity = 1.05 fps, Avg. Travel Time= 1.2 min Peak Storage= 472 cf @ 12.32 hrs Average Depth at Peak Storage= 2.50' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 35.40 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 75.0' Slope= 0.0024 '/' Inlet Invert= 391.68', Outlet Invert= 391.50' N U 3 0 LL Reach 1 B-R: 36" Pipe to 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 31M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 81 Summary for Reach 1 R: 24" Pipe Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 3.94" for 10yr-24hr event Inflow = 20.09 cfs @ 12.25 hrs, Volume= 4.502 of Outflow = 20.10 cfs @ 12.26 hrs, Volume= 4.502 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 13.73 fps, Min. Travel Time= 0.3 min Avg. Velocity = 2.63 fps, Avg. Travel Time= 1.8 min Peak Storage= 417 cf @ 12.26 hrs Average Depth at Peak Storage= 0.95' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.18 cfs 24.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 285.0' Slope= 0.0325 '/' Inlet Invert= 402.60', Outlet Invert= 393.34' N U 3 0 LL Reach 1 R: 24" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 82 Summary for Reach 3A-R: Channel 8A-2 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 3.64" for 10yr-24hr event Inflow = 65.50 cfs @ 12.18 hrs, Volume= 5.594 of Outflow = 65.51 cfs @ 12.18 hrs, Volume= 5.594 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.16 fps, Min. Travel Time= 0.0 min Avg. Velocity = 2.02 fps, Avg. Travel Time= 0.2 min Peak Storage= 167 cf @ 12.18 hrs Average Depth at Peak Storage= 1.11' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 440.38 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 18.3' Slope= 0.0268 '/' Inlet Invert= 417.53', Outlet Invert= 417.04' w 3 0 U. Reach 3A-R: Channel 8A-2 Hydrograph ---.---_--:---.---.---.'----------'-------'L--------' ---------`------'--..-............................................-------' L---------1--------- "---------- ----------- !--------- ---------- 1--_--_---4-------------------.. i I I I I I I I 70 - -' 65.50Cfs - --� --� - --_.................._..................... - -- ------�--- - - - - - ..... 65 ....---'.. cfs .._...'--_--_-- Arg f� a7 �- . 6_11c-....t. I I i I i I i i 55 MiaxV —A 50 + t — 45 i — +', i — — — — — +---------i----------i------— —�F�q� +. 40 35 -- i.... --i --i —4— — +— a-- —+ —---- ~------�---w-------- + --� — ....._....... i I I I I A I� 30 — .......... ......i........... .}.-........ .�-..-..-...}..-..-..-}.._.._.._.�..-..-..-.{..._.._...�. _ _ _ 25 ; —� ... ...— �— a— i — —= — —---- 20 i i i i i i i 15 — -- i—+— —i--{ — -- -- i--- --E-- i i 4 — +. 10 I I I I I I 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 83 Summary for Reach 313-11: Channel 8A-3 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 3.64" for 10yr-24hr event Inflow = 65.51 cfs @ 12.18 hrs, Volume= 5.594 of Outflow = 65.50 cfs @ 12.19 hrs, Volume= 5.594 af, Atten= 0%, Lag= 0.5 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.49 fps, Min. Travel Time= 0.6 min Avg. Velocity = 1.57 fps, Avg. Travel Time= 2.1 min Peak Storage= 2,353 cf @ 12.19 hrs Average Depth at Peak Storage= 1.37' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 301.20 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 197.2' Slope= 0.0125 T Inlet Invert= 417.04', Outlet Invert= 414.57' Reach 313-R: Channel 8A-3 Hydrograph ---.-- .................. i _Li --------'Ii ---------1iI - I .....I ..-------Ii'"' --1Ii ._1Ii' --------- "-_------.."" --..._.........5.51 csi-_-_--^-_-_-_i_-_-_-i_-_-_- ------.... 70ii 655+--------- Lhfdw - .ria 65 . I I I i I 60 ; ; r Ajvg-: lo*--D Pth- i 55 Miax!V 50 i + 45 i — +, i — — — — — +--------- i---------- i------a- ----� +. i i i i i i i i I I ; 40 35 — — i i — — i +-------- ------+ — ------------ ------ ------------- — — — -I— ------ i i i I I I I IA I I 30 1--- -- r---1---�-' y/�_ i /�► 1y+���/�r ........ ... .......;...-.._..._.}._.._.....'_.._......t.._.._...}.._.._.._.1.._..-..----_-..-..�...._.._...�. V���V }/ V -2 . .. .._� 25 20 15 10 T t — — T T— —[— -- 1— — 7 — i-- —T i —• I I I I 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 84 Summary for Reach 3C-R: Channel 8A-4 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 3.64" for 10yr-24hr event Inflow = 65.50 cfs @ 12.19 hrs, Volume= 5.594 of Outflow = 65.50 cfs @ 12.19 hrs, Volume= 5.594 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 16.53 fps, Min. Travel Time= 0.0 min Avg. Velocity = 4.54 fps, Avg. Travel Time= 0.2 min Peak Storage= 171 cf @ 12.19 hrs Average Depth at Peak Storage= 0.56' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 1,493.79 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 43.3' Slope= 0.3081 T Inlet Invert= 414.57', Outlet Invert= 401.23' w 3 0 LL Reach 3C-R: Channel 8A-4 Hydrograph ---.---_--:---.---.---.'--'--'---"-'-----'L--'--'--' --'--'---`------'--..-............................................-------' 1--------- "---------- ----------- !--------- ---------- 1--_--_---4------------------.. i I I I I I I I 70 65.50 cfs .......; f t t 6I5.50 cfs __-I i I i ---------IfJ wa7 1- 4 65 I 60 I I i i i i i i -A" : lo* ID P1� 55 .........;— 50 i I 45 + - - - - - +--------- i---------- i------ • V tiw I 40 i �7 �--35 -- -- -- - ------- !-- ------ ?------ + -L------ I ------~------ 1------- �------ + -- --............ i I I I I 30 81 30 1.. {......_...-.}-..-..-..-..-..-...9 . � cfs25 apac;4 20 i i i 15 - -- ; —+— — -- — ----�------ 10 I I I I 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 85 Summary for Reach 5R: Channel 8A-1 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 3.64" for 10yr-24hr event Inflow = 65.71 cfs @ 12.17 hrs, Volume= 5.594 of Outflow = 65.50 cfs @ 12.18 hrs, Volume= 5.594 af, Atten= 0%, Lag= 0.7 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.51 fps, Min. Travel Time= 0.9 min Avg. Velocity = 2.03 fps, Avg. Travel Time= 3.4 min Peak Storage= 3,564 cf @ 12.18 hrs Average Depth at Peak Storage= 1.21' Bank -Full Depth= 3.00' Flow Area= 27.0 sf, Capacity= 324.01 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 1.0 7' Top Width= 12.00' Length= 409.2' Slope= 0.0256 T Inlet Invert= 428.00', Outlet Invert= 417.53' N U 3 0 LL Reach 5R: Channel 8A-1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 86 Summary for Pond 1A-B: Existing Basin 1A (low lying greenspace) Inflow Area = 10.558 ac, 26.83% Impervious, Inflow Depth = 3.94" for 10yr-24hr event Inflow = 51.79 cfs @ 12.06 hrs, Volume= 3.470 of Outflow = 15.87 cfs @ 12.32 hrs, Volume= 2.129 af, Atten= 69%, Lag= 15.3 min Primary = 15.87 cfs @ 12.32 hrs, Volume= 2.129 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 405.84' @ 12.32 hrs Surf.Area= 26,735 sf Storage= 79,136 cf Plug -Flow detention time= 222.5 min calculated for 2.129 of (61 % of inflow) Center -of -Mass det. time= 117.5 min ( 915.7 - 798.2 ) Volume Invert Avail.Storage Storage Description #1 400.00' 154,571 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 2,623 0 0 402.00 9,204 11,827 11,827 404.00 17,449 26,653 38,480 406.00 27,541 44,990 83,470 408.00 43,560 71,101 154,571 Device Routinq Invert Outlet Devices #1 Primary 405.00' 6.3' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=15.76 cfs @ 12.32 hrs HW=405.84' TW=394.37' (Dynamic Tailwater) L1=Sharp-Crested Rectangular Weir (Weir Controls 15.76 cfs @ 2.99 fps) PB SPPP Project 2021 Type 11 24-hr 10yr--24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 87 Pond 1A-B: Existing Basin 1A (low lying greenspace) Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 88 Summary for Pond 1 B: Existing Basin 1 Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 3.94" for 10yr-24hr event Inflow = 74.78 cfs @ 12.03 hrs, Volume= 4.511 of Outflow = 20.09 cfs @ 12.25 hrs, Volume= 4.502 af, Atten= 73%, Lag= 13.6 min Primary = 20.09 cfs @ 12.25 hrs, Volume= 4.502 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 402.60' Surf.Area= 24,334 sf Storage= 53,379 cf Peak Elev= 405.36' @ 12.25 hrs Surf.Area= 32,887 sf Storage= 132,328 cf (78,948 cf above start) Plug -Flow detention time= 272.5 min calculated for 3.277 of (73% of inflow) Center -of -Mass det. time= 107.2 min ( 902.2 - 795.0 ) Volume Invert Avail.Storage Storage Description #1 400.00' 230,133 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 16,836 0 0 401.00 19,630 18,233 18,233 402.00 22,539 21,085 39,318 403.00 25,530 24,035 63,352 404.00 28,610 27,070 90,422 405.00 31,721 30,166 120,588 406.00 34,929 33,325 153,913 407.00 38,193 36,561 190,474 408.00 41,125 39,659 230,133 Device Routing Invert Outlet Devices #1 Primary 402.60' 24.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=20.08 cfs @ 12.25 hrs HW=405.36' TW=403.55' (Dynamic Tailwater) L1=Orifice/Grate (Orifice Controls 20.08 cfs @ 6.39 fps) MANUMMUMMOTCY1 PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 89 Pond 1 B: Existing Basin 1 Hydrograph ■ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 90 Summary for Pond 2B: 2P Inflow Area = 53.863 ac, 19.28% Impervious, Inflow Depth = 3.49" for 10yr-24hr event Inflow = 103.38 cfs @ 12.31 hrs, Volume= 15.656 of Outflow = 8.13 cfs @ 15.96 hrs, Volume= 11.787 af, Atten= 92%, Lag= 219.0 min Primary = 8.13 cfs @ 15.96 hrs, Volume= 11.787 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 391.00' Surf.Area= 1.718 ac Storage= 4.603 of Peak Elev= 396.19' @ 15.96 hrs Surf.Area= 2.364 ac Storage= 15.142 of (10.540 of above start) Flood Elev= 400.00' Surf.Area= 2.869 ac Storage= 25.105 of (20.502 of above start) Plug -Flow detention time= 2,470.2 min calculated for 7.185 of (46% of inflow) Center -of -Mass det. time= 1,479.2 min ( 2,382.8 - 903.6 ) Volume Invert Avail.Storage Storage Description #1 388.00' 25.105 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 388.00 1.345 0.000 0.000 389.00 1.471 1.408 1.408 390.00 1.600 1.536 2.943 391.00 1.718 1.659 4.603 392.00 1.833 1.775 6.378 393.00 1.955 1.894 8.272 394.00 2.077 2.016 10.288 395.00 2.204 2.140 12.428 396.00 2.340 2.272 14.701 397.00 2.469 2.404 17.105 398.00 2.599 2.534 19.639 399.00 2.732 2.665 22.304 400.00 2.869 2.800 25.105 Device Routing Invert Outlet Devices #1 Primary 390.50' 54.0" Round Culvert L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 390.50' / 382.00' S= 0.0850 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 15.90 sf #2 Device 1 391.00' 0.5" Vert. Orifice/Grate X 20.00 columns X 7 rows with 6.0" cc spacing C= 0.600 #3 Device 1 396.00' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #4 Secondary 397.00' 30.0' long x 28.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 91 Primary OutFlow Max=8.13 cfs @ 15.96 hrs HW=396.19' (Free Discharge) L1=Culvert (Passes 8.13 cfs of 141.99 cfs potential flow) �2=0 rifi ce/G rate (Orifice Controls 1.74 cfs @ 9.13 fps) 3=Sharp-Crested Rectangular Weir (Weir Controls 6.39 cfs @ 1.42 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) I w 3 0 LL Pond 2B: 2P Hydrograph no 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) LInflow wrydary BASIN 2 REPORT PB SPPP Project 2021 Type/1 24-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 92 Summary for Pond 3B: Pond 3 Inflow Area = 24.751 ac, 4.10% Impervious, Inflow Depth = 3.69" for 10yr-24hr event Inflow = 88.31 cfs @ 12.14 hrs, Volume= 7.605 of Outflow = 64.22 cfs @ 12.31 hrs, Volume= 7.602 af, Atten= 27%, Lag= 9.7 min Primary = 64.22 cfs @ 12.31 hrs, Volume= 7.602 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 394.90' Surf.Area= 10,695 sf Storage= 22,165 cf Peak Elev= 399.96' @ 12.31 hrs Surf.Area= 40,842 sf Storage= 109,933 cf (87,767 cf above start) Flood Elev= 402.00' Surf.Area= 42,976 sf Storage= 173,109 cf (150,943 cf above start) Plug -Flow detention time= 164.6 min calculated for 7.093 of (93% of inflow) Center -of -Mass det. time= 103.3 min ( 918.9 - 815.6 ) Volume Invert Avail.Storage Storage Description #1 391.00' 15,607 cf Chamber 2 (outlet) (Prismatic) Listed below (Recalc) #2 392.00' 7,643 cf Chamber 1 (inlet) (Prismatic) Listed below (Recalc) #3 396.00' 225,420 cf Combined Chambers (Prismatic) Listed below (Recalc) 248,669 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 391.00 1,446 0 0 392.00 2,583 2,015 2,015 393.00 3,801 3,192 5,207 394.00 5,119 4,460 9,667 395.00 6,761 5,940 15,607 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 392.00 1,032 0 0 393.00 1,971 1,502 1,502 394.00 3,048 2,510 4,011 395.00 4,215 3,632 7,643 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 396.00 13,953 0 0 397.00 17,143 15,548 15,548 398.00 22,159 19,651 35,199 399.00 26,581 24,370 59,569 400.00 30,000 28,291 87,860 402.00 32,000 62,000 149,860 404.00 43,560 75,560 225,420 BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 10yr-24hr Rainfall=5.18" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 93 Device Routing Invert Outlet Devices #1 Primary 394.90' 36.0" Round Culvert L= 265.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 394.90' / 391.60' S= 0.0125 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 394.90' 8.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 397.90' 5.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 399.50' 20.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=64.19 cfs @ 12.31 hrs HW=399.96' TW=392.91' (Dynamic Tailwater) L1=Culvert (Inlet Controls 64.19 cfs @ 9.08 fps) P4=S =Orifice/Grate (Passes < 3.65 cfs potential flow) =Sharp -Crested Rectangular Weir (Passes < 44.27 cfs potential flow) harp -Crested Rectangular Weir (Passes < 20.22 cfs potential flow) Pond 3B: Pond 3 Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 94 Summary for Subcatchment 1S-A: To Basin 1A Runoff = 91.06 cfs @ 12.03 hrs, Volume= 5.559 af, Depth= 4.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (ac) CN Description 4.327 98 Paved roads w/curbs & sewers, HSG C 0.180 98 Paved roads w/curbs & sewers, HSG C 0.502 98 Water Surface, HSG C 0.683 77 Woods, Poor, HSG C 0.242 77 Woods, Poor, HSG C 0.584 77 Woods, Poor, HSG C 0.045 74 >75% Grass cover, Good, HSG C 0.098 74 >75% Grass cover, Good, HSG C 0.051 74 >75% Grass cover, Good, HSG C 0.128 86 <50% Grass cover, Poor, HSG C 0.529 74 >75% Grass cover, Good, HSG C 6.353 87 Dirt roads, HSG C 13.722 89 Weighted Average 8.713 63.50% Pervious Area 5.009 36.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.8 150 0.0260 0.52 Sheet Flow, sheet from LS stockpile Fallow n= 0.050 P2= 3.54" 3.8 675 0.0330 2.92 Shallow Concentrated Flow, Concentrated from stockpile Unpaved Kv= 16.1 fps 0.3 125 0.0100 6.22 7.63 Pipe Channel, 15" rcp culv 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.011 Concrete pipe, straight & clean 1.5 260 0.0310 2.83 Shallow Concentrated Flow, culvert to ditch Unpaved Kv= 16.1 fps 0.8 218 0.0180 4.73 23.65 Trap/Vee/Rect Channel Flow, ditch to culv Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.2 250 0.0480 17.06 41.03 Pipe Channel, Final pipe 21.0" Round Area= 2.4 sf Perim= 5.5' r= 0.44' n= 0.011 Concrete pipe, straight & clean 11.4 1,678 Total BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 95 fl Subcatchment 1S-A: To Basin 1A Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 96 Summary for Subcatchment 1S-B: To Basin 1A Runoff = 63.14 cfs @ 12.06 hrs, Volume= 4.277 af, Depth= 4.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (ac) CN Description 0.169 74 >75% Grass cover, Good, HSG C 1.793 98 Paved roads w/curbs & sewers, HSG C 0.632 98 Roofs, HSG C 0.053 98 Roofs, HSG C 0.956 74 >75% Grass cover, Good, HSG C 0.355 98 Water Surface, HSG C 6.600 87 Dirt roads, HSG C 10.558 89 Weighted Average 7.725 73.17% Pervious Area 2.833 26.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.4 150 0.0200 0.47 Sheet Flow, stkpile area Fallow n= 0.050 P2= 3.54" 0.5 66 0.0200 2.28 Shallow Concentrated Flow, sktpile area Unpaved Kv= 16.1 fps 0.6 110 0.0360 2.85 Shallow Concentrated Flow, grass after stkpile Grassed Waterway Kv= 15.0 fps 3.3 518 0.0270 2.65 Shallow Concentrated Flow, Unpaved areas around bldg 12 Unpaved Kv= 16.1 fps 0.4 193 0.0240 8.83 10.84 Pipe Channel, Stm pipe 1st leg 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 Concrete pipe, finished 0.2 127 0.0260 10.38 18.35 Pipe Channel, 2nd leg of pipe 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.012 Concrete pipe, finished 0.9 280 0.0040 4.93 15.50 Pipe Channel, 3rd leg stm pipe 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 3.6 265 0.0300 1.21 Shallow Concentrated Flow, grassed area within lowlying area Short Grass Pasture Kv= 7.0 fps 14.9 1,709 Total MANUMMUMMOTCY1 PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HydroCAD® 10.00-20 s/n 06105 © 2017 HydroCAD Software Solutions LLC Page 97 Subcatchment 1S-B: To Basin 1A w 0 LL Hydrograph 70 i 1 ------..._ ........ t + t t F.. t F + + + t f -} + -t a 60 i i i i i i i i It- -;4----------- I --------- ?----- ------- ii ----------1--------- i --------aI -------- i 55 i--teain -- ? -- , r 50 u o----------t------ ------ -,-- -c 45 i i i iRliln # Me14 7-7-Alf lf 40 35 30 i i i I ! ( i i I i i i i -;-- ,--- ! ,--- ; ;-----;------;....... ------.--------�---'i----_- - rein 25 i i i i i i i i i i — Ic ! .-..-----.}-..-._...._.4....._........................:....................i....-..-....+.._.._.._.i....._.._.+...-...----F..........-.;.......----.._.._...._..._.-._;_....._....._.....?....._....._....._i.-......_.... i 20 0= ; 15 i 10 i i i i i i i i i ! i ! 5 r 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 98 Summary for Subcatchment 2S-A: Direct to 2P Runoff = 36.69 cfs @ 11.95 hrs, Volume= 1.782 af, Depth= 4.43" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (sf) CN Description 66,516 98 Water Surface, HSG C 83,461 74 >75% Grass cover, Good, HSG C 60,505 87 Dirt roads, HSG C 210,482 85 Weighted Average 143,966 68.40% Pervious Area 66,516 31.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum TOC Subcatchment 2S-A: Direct to 2P Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 99 Summary for Subcatchment 3S-B: To Pond 3 Runoff = 36.29 cfs @ 12.07 hrs, Volume= 2.488 af, Depth= 4.75" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (sf) CN Description 11,911 98 Water Surface, HSG C 25,046 77 Woods, Poor, HSG C 31,514 98 Roofs, HSG C 820 98 Roofs, HSG C 204,485 87 Dirt roads, HSG C 273,776 88 Weighted Average 229,531 83.84% Pervious Area 44,245 16.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 150 0.0050 0.27 Sheet Flow, Sheet flow in NE direection from bldg 12 Fallow n= 0.050 P2= 3.54" 1.8 142 0.0070 1.35 Shallow Concentrated Flow, "flat" conc flow Unpaved Kv= 16.1 fps 4.4 791 0.0350 3.01 Shallow Concentrated Flow, Flow to pond 3 Unpaved Kv= 16.1 fps 15.5 1,083 Total BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 100 40 38 36 34 32 30 28 26 24 u 22 3 20 LL 18 16 14 12 10 8 6 4 2 0 Subcatchment 3S-B: To Pond 3 Hydrograph i • I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 101 Summary for Subcatchment 3S-C: LS area to Pond 3 Runoff = 81.32 cfs @ 12.17 hrs, Volume= 6.976 af, Depth= 4.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr-24hr Rainfall=6.13" Area (ac) CN Description 18.466 86 excludes recirc ponds 18.466 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 150 0.0400 0.62 Sheet Flow, sheet flow NW corner Fallow n= 0.050 P2= 3.54" 20.2 3,152 0.0260 2.60 Shallow Concentrated Flow, Flow thru LS plant to pond 3 Unpaved Kv= 16.1 fps 24.3 3,302 Total 3 a LL Subcatchment 3S-C: LS area to Pond 3 Hydrograph _ - ---•--•---------------•---- •---- - _ _ - - - - - - - _ I i i ! i � i I i I _I i ! 90 } — — t t--------- + ------ F---------t F +---------t ?-------- I ------- --------- +--------•- 85 St32 cs — ..... 80 _ t --- U- I 75 70 i z;)yr� _ -r-...... ..... - - - -- - { - -- -�-- F--a-- - - -. 65 Ra-6o#`f Ate- =-1 i rt- —i- ,----,-- -- - 6o 55 i i I ; i i i i ! 1C Off iV � 11'1� 6.97 50 i - -;—ie -— -�- -_ -- -s--5.. 45 T ------ ----- �---r------- ---r- - r -- -r- -r---- la-i---w- 40 4----t-------- ------ 4------- I------- ------ r-----t------ 2-- - -� -- - 35 � i r-- -i-- -! -- r ---- �� 7 30 ! i i - , 25 -------' ---..... ....-- ------------......... .......... ;....... ..... ..... -------- -----t-..._.....__..._...._.....__...---------.-....._.....__..._j..................?---------;-....._..� ._... __ .... 20 ---fi---------4- ----- - - - - - - C - - - -j-- - -j - - - j - - r - - - t- - - 15 i i ---_-_- ------ -_--_- ------- -_-_----_-_--_-_-_-_t_-_-_-- -_-_-- -- -- -r- - -- -r-- -r-- ---- 10a............... ...... ...... ..... ..... . µ —1 — - - — — —1- —= - —1— - — 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 102 Summary for Reach 1A-R: 36" Pipe Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 4.19" for 25yr-24hr event Inflow = 50.66 cfs @ 12.25 hrs, Volume= 8.486 of Outflow = 50.65 cfs @ 12.26 hrs, Volume= 8.486 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 8.24 fps, Min. Travel Time= 0.3 min Avg. Velocity = 1.45 fps, Avg. Travel Time= 1.9 min Peak Storage= 1,033 cf @ 12.26 hrs Average Depth at Peak Storage= 2.44' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 51.09 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 168.0' Slope= 0.0050 T Inlet Invert= 392.52', Outlet Invert= 391.68' N 0 3 0 LL Reach 1A-R: 36" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 1_ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 103 Summary for Reach 1 B-R: 36" Pipe to 2P Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 4.19" for 25yr-24hr event Inflow = 50.65 cfs @ 12.26 hrs, Volume= 8.486 of Outflow = 35.65 cfs @ 12.10 hrs, Volume= 8.486 af, Atten= 30%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.71 fps, Min. Travel Time= 0.2 min Avg. Velocity = 1.09 fps, Avg. Travel Time= 1.1 min Peak Storage= 530 cf @ 12.15 hrs Average Depth at Peak Storage= 3.00' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 35.40 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 75.0' Slope= 0.0024 7' Inlet Invert= 391.68', Outlet Invert= 391.50' N 0 3 0 LL Reach 1 B-R: 36" Pipe to 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 1_ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paoe 104 Summary for Reach 1 R: 24" Pipe Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 4.85" for 25yr-24hr event Inflow = 22.83 cfs @ 12.25 hrs, Volume= 5.551 of Outflow = 22.83 cfs @ 12.26 hrs, Volume= 5.551 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 14.18 fps, Min. Travel Time= 0.3 min Avg. Velocity = 2.75 fps, Avg. Travel Time= 1.7 min Peak Storage= 459 cf @ 12.26 hrs Average Depth at Peak Storage= 1.02' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.18 cfs 24.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 285.0' Slope= 0.0325 '/' Inlet Invert= 402.60', Outlet Invert= 393.34' N V 3 0 LL Reach 1 R: 24" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) [ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 105 Summary for Reach 3A-R: Channel 8A-2 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 4.53" for 25yr-24hr event Inflow = 81.07 cfs @ 12.18 hrs, Volume= 6.976 of Outflow = 81.08 cfs @ 12.18 hrs, Volume= 6.976 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 7.63 fps, Min. Travel Time= 0.0 min Avg. Velocity = 2.16 fps, Avg. Travel Time= 0.1 min Peak Storage= 194 cf @ 12.18 hrs Average Depth at Peak Storage= 1.25' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 440.38 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 18.3' Slope= 0.0268 '/' Inlet Invert= 417.53', Outlet Invert= 417.04' N U 3 0 LL Reach 3A-R: Channel 8A-2 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 106 Summary for Reach 313-11: Channel 8A-3 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 4.53" for 25yr-24hr event Inflow = 81.08 cfs @ 12.18 hrs, Volume= 6.976 of Outflow = 81.06 cfs @ 12.19 hrs, Volume= 6.976 af, Atten= 0%, Lag= 0.5 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.83 fps, Min. Travel Time= 0.6 min Avg. Velocity = 1.67 fps, Avg. Travel Time= 2.0 min Peak Storage= 2,739 cf @ 12.19 hrs Average Depth at Peak Storage= 1.53' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 301.20 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 197.2' Slope= 0.0125 T Inlet Invert= 417.04', Outlet Invert= 414.57' N U 3 0 LL Reach 313-R: Channel 8A-3 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 107 Summary for Reach 3C-R: Channel 8A-4 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 4.53" for 25yr-24hr event Inflow = 81.06 cfs @ 12.19 hrs, Volume= 6.976 of Outflow = 81.07 cfs @ 12.19 hrs, Volume= 6.976 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 17.73 fps, Min. Travel Time= 0.0 min Avg. Velocity = 4.82 fps, Avg. Travel Time= 0.1 min Peak Storage= 198 cf @ 12.19 hrs Average Depth at Peak Storage= 0.63' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 1,493.79 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 43.3' Slope= 0.3081 T Inlet Invert= 414.57', Outlet Invert= 401.23' N U 3 0 LL Reach 3C-R: Channel 8A-4 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paoe 108 Summary for Reach 5R: Channel 8A-1 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 4.53" for 25yr-24hr event Inflow = 81.32 cfs @ 12.17 hrs, Volume= 6.976 of Outflow = 81.07 cfs @ 12.18 hrs, Volume= 6.976 af, Atten= 0%, Lag= 0.6 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 8.02 fps, Min. Travel Time= 0.9 min Avg. Velocity = 2.17 fps, Avg. Travel Time= 3.1 min Peak Storage= 4,127 cf @ 12.18 hrs Average Depth at Peak Storage= 1.37' Bank -Full Depth= 3.00' Flow Area= 27.0 sf, Capacity= 324.01 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 1.0 '/' Top Width= 12.00' Length= 409.2' Slope= 0.0256 '/' Inlet Invert= 428.00', Outlet Invert= 417.53' N V 3 0 LL Reach 5R: Channel 8A-1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 109 Summary for Pond 1A-B: Existing Basin 1A (low lying greenspace) Inflow Area = 10.558 ac, 26.83% Impervious, Inflow Depth = 4.86" for 25yr-24hr event Inflow = 63.14 cfs @ 12.06 hrs, Volume= 4.277 of Outflow = 27.84 cfs @ 12.25 hrs, Volume= 2.935 af, Atten= 56%, Lag= 11.4 min Primary = 27.84 cfs @ 12.25 hrs, Volume= 2.935 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 406.22' @ 12.25 hrs Surf.Area= 29,321 sf Storage= 89,788 cf Plug -Flow detention time= 195.9 min calculated for 2.935 of (69% of inflow) Center -of -Mass det. time= 98.1 min ( 890.5 - 792.5 ) Volume Invert Avail.Storage Storage Description #1 400.00' 154,571 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 2,623 0 0 402.00 9,204 11,827 11,827 404.00 17,449 26,653 38,480 406.00 27,541 44,990 83,470 408.00 43,560 71,101 154,571 Device Routinq Invert Outlet Devices #1 Primary 405.00' 6.3' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=27.79 cfs @ 12.25 hrs HW=406.22' TW=394.95' (Dynamic Tailwater) L1=Sharp-Crested Rectangular Weir (Weir Controls 27.79 cfs @ 3.61 fps) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 110 Pond 1A-B: Existing Basin 1A (low lying greenspace) Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 111 Summary for Pond 1 B: Existing Basin 1 Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 4.86" for 25yr-24hr event Inflow = 91.06 cfs @ 12.03 hrs, Volume= 5.559 of Outflow = 22.83 cfs @ 12.25 hrs, Volume= 5.551 af, Atten= 75%, Lag= 13.6 min Primary = 22.83 cfs @ 12.25 hrs, Volume= 5.551 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 402.60' Surf.Area= 24,334 sf Storage= 53,379 cf Peak Elev= 405.90' @ 12.26 hrs Surf.Area= 34,596 sf Storage= 150,301 cf (96,922 cf above start) Plug -Flow detention time= 240.6 min calculated for 4.323 of (78% of inflow) Center -of -Mass det. time= 101.3 min ( 890.5 - 789.2 ) Volume Invert Avail.Storage Storage Description #1 400.00' 230,133 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 16,836 0 0 401.00 19,630 18,233 18,233 402.00 22,539 21,085 39,318 403.00 25,530 24,035 63,352 404.00 28,610 27,070 90,422 405.00 31,721 30,166 120,588 406.00 34,929 33,325 153,913 407.00 38,193 36,561 190,474 408.00 41,125 39,659 230,133 Device Routing Invert Outlet Devices #1 Primary 402.60' 24.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=22.82 cfs @ 12.25 hrs HW=405.89' TW=403.62' (Dynamic Tailwater) L1=Orifice/Grate (Orifice Controls 22.82 cfs @ 7.26 fps) BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 112 0 Pond 1 B: Existing Basin 1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Primary BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 113 Summary for Pond 2B: 2P Inflow Area = 53.863 ac, 19.28% Impervious, Inflow Depth = 4.40" for 25yr-24hr event Inflow = 108.86 cfs @ 12.32 hrs, Volume= 19.728 of Outflow = 25.10 cfs @ 13.80 hrs, Volume= 15.830 af, Atten= 77%, Lag= 88.7 min Primary = 25.10 cfs @ 13.80 hrs, Volume= 15.830 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 391.00' Surf.Area= 1.718 ac Storage= 4.603 of Peak Elev= 396.44' @ 13.80 hrs Surf.Area= 2.397 ac Storage= 15.754 of (11.152 of above start) Flood Elev= 400.00' Surf.Area= 2.869 ac Storage= 25.105 of (20.502 of above start) Plug -Flow detention time= 1,752.9 min calculated for 11.228 of (57% of inflow) Center -of -Mass det. time= 1,126.5 min ( 2,015.7 - 889.2 ) Volume Invert Avail.Storage Storage Description #1 388.00' 25.105 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 388.00 1.345 0.000 0.000 389.00 1.471 1.408 1.408 390.00 1.600 1.536 2.943 391.00 1.718 1.659 4.603 392.00 1.833 1.775 6.378 393.00 1.955 1.894 8.272 394.00 2.077 2.016 10.288 395.00 2.204 2.140 12.428 396.00 2.340 2.272 14.701 397.00 2.469 2.404 17.105 398.00 2.599 2.534 19.639 399.00 2.732 2.665 22.304 400.00 2.869 2.800 25.105 Device Routing Invert Outlet Devices #1 Primary 390.50' 54.0" Round Culvert L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 390.50' / 382.00' S= 0.0850 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 15.90 sf #2 Device 1 391.00' 0.5" Vert. Orifice/Grate X 20.00 columns X 7 rows with 6.0" cc spacing C= 0.600 #3 Device 1 396.00' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #4 Secondary 397.00' 30.0' long x 28.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 114 Primary OutFlow Max=25.09 cfs @ 13.80 hrs HW=396.44' (Free Discharge) L1=Culvert (Passes 25.09 cfs of 147.20 cfs potential flow) �2=0 rifi ce/G rate (Orifice Controls 1.81 cfs @ 9.46 fps) 3=Sharp-Crested Rectangular Weir (Weir Controls 23.29 cfs @ 2.18 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) N V 3 0 LL Pond 2B: 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow ■ Primary ■ Secondary BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 115 Summary for Pond 3B: Pond 3 Inflow Area = 24.751 ac, 4.10% Impervious, Inflow Depth = 4.59" for 25yr-24hr event Inflow = 109.21 cfs @ 12.14 hrs, Volume= 9.464 of Outflow = 69.58 cfs @ 12.34 hrs, Volume= 9.460 af, Atten= 36%, Lag= 12.0 min Primary = 69.58 cfs @ 12.34 hrs, Volume= 9.460 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 394.90' Surf.Area= 10,695 sf Storage= 22,165 cf Peak Elev= 400.58' @ 12.34 hrs Surf.Area= 41,555 sf Storage= 128,642 cf (106,477 cf above start) Flood Elev= 402.00' Surf.Area= 42,976 sf Storage= 173,109 cf (150,943 cf above start) Plug -Flow detention time= 143.5 min calculated for 8.947 of (95% of inflow) Center -of -Mass det. time= 93.3 min ( 902.6 - 809.3 ) Volume Invert Avail.Storage Storage Description #1 391.00' 15,607 cf Chamber 2 (outlet) (Prismatic) Listed below (Recalc) #2 392.00' 7,643 cf Chamber 1 (inlet) (Prismatic) Listed below (Recalc) #3 396.00' 225,420 cf Combined Chambers (Prismatic) Listed below (Recalc) 248,669 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 391.00 1,446 0 0 392.00 2,583 2,015 2,015 393.00 3,801 3,192 5,207 394.00 5,119 4,460 9,667 395.00 6,761 5,940 15,607 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 392.00 1,032 0 0 393.00 1,971 1,502 1,502 394.00 3,048 2,510 4,011 395.00 4,215 3,632 7,643 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 396.00 13,953 0 0 397.00 17,143 15,548 15,548 398.00 22,159 19,651 35,199 399.00 26,581 24,370 59,569 400.00 30,000 28,291 87,860 402.00 32,000 62,000 149,860 404.00 43,560 75,560 225,420 BASIN 2 REPORT PB SPPP Project 2021 Type 11 24-hr 25yr-24hr Rainfall=6.13" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 116 Device Routing Invert Outlet Devices #1 Primary 394.90' 36.0" Round Culvert L= 265.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 394.90' / 391.60' S= 0.0125 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 394.90' 8.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 397.90' 5.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 399.50' 20.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=69.54 cfs @ 12.34 hrs HW=400.57' TW=393.67' (Dynamic Tailwater) L1=Culvert (Inlet Controls 69.54 cfs @ 9.84 fps) P4=S =Orifice/Grate (Passes < 3.88 cfs potential flow) =Sharp -Crested Rectangular Weir (Passes < 63.86 cfs potential flow) harp -Crested Rectangular Weir (Passes < 72.84 cfs potential flow) I Pond 3B: Pond 3 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ❑ Inflow ❑ Primary BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 117 Summary for Subcatchment 1S-A: To Basin 1A Runoff = 116.94 cfs @ 12.02 hrs, Volume= 7.276 af, Depth= 6.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (ac) CN Description 4.327 98 Paved roads w/curbs & sewers, HSG C 0.180 98 Paved roads w/curbs & sewers, HSG C 0.502 98 Water Surface, HSG C 0.683 77 Woods, Poor, HSG C 0.242 77 Woods, Poor, HSG C 0.584 77 Woods, Poor, HSG C 0.045 74 >75% Grass cover, Good, HSG C 0.098 74 >75% Grass cover, Good, HSG C 0.051 74 >75% Grass cover, Good, HSG C 0.128 86 <50% Grass cover, Poor, HSG C 0.529 74 >75% Grass cover, Good, HSG C 6.353 87 Dirt roads, HSG C 13.722 89 Weighted Average 8.713 63.50% Pervious Area 5.009 36.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.8 150 0.0260 0.52 Sheet Flow, sheet from LS stockpile Fallow n= 0.050 P2= 3.54" 3.8 675 0.0330 2.92 Shallow Concentrated Flow, Concentrated from stockpile Unpaved Kv= 16.1 fps 0.3 125 0.0100 6.22 7.63 Pipe Channel, 15" rcp culv 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.011 Concrete pipe, straight & clean 1.5 260 0.0310 2.83 Shallow Concentrated Flow, culvert to ditch Unpaved Kv= 16.1 fps 0.8 218 0.0180 4.73 23.65 Trap/Vee/Rect Channel Flow, ditch to culv Bot.W=2.00' D=1.00' Z= 3.0 7' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.2 250 0.0480 17.06 41.03 Pipe Channel, Final pipe 21.0" Round Area= 2.4 sf Perim= 5.5' r= 0.44' n= 0.011 Concrete pipe, straight & clean 11.4 1,678 Total BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 118 Subcatchment 1S-A: To Basin 1A Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 119 Summary for Subcatchment 1S-B: To Basin 1A Runoff = 81.41 cfs @ 12.06 hrs, Volume= 5.599 af, Depth= 6.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (ac) CN Description 0.169 74 >75% Grass cover, Good, HSG C 1.793 98 Paved roads w/curbs & sewers, HSG C 0.632 98 Roofs, HSG C 0.053 98 Roofs, HSG C 0.956 74 >75% Grass cover, Good, HSG C 0.355 98 Water Surface, HSG C 6.600 87 Dirt roads, HSG C 10.558 89 Weighted Average 7.725 73.17% Pervious Area 2.833 26.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.4 150 0.0200 0.47 Sheet Flow, stkpile area Fallow n= 0.050 P2= 3.54" 0.5 66 0.0200 2.28 Shallow Concentrated Flow, sktpile area Unpaved Kv= 16.1 fps 0.6 110 0.0360 2.85 Shallow Concentrated Flow, grass after stkpile Grassed Waterway Kv= 15.0 fps 3.3 518 0.0270 2.65 Shallow Concentrated Flow, Unpaved areas around bldg 12 Unpaved Kv= 16.1 fps 0.4 193 0.0240 8.83 10.84 Pipe Channel, Stm pipe 1st leg 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 Concrete pipe, finished 0.2 127 0.0260 10.38 18.35 Pipe Channel, 2nd leg of pipe 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.012 Concrete pipe, finished 0.9 280 0.0040 4.93 15.50 Pipe Channel, 3rd leg stm pipe 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 3.6 265 0.0300 1.21 Shallow Concentrated Flow, grassed area within lowlying area Short Grass Pasture Kv= 7.0 fps 14.9 1,709 Total BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 120 w 0 LL Subcatchment 1S-B: To Basin 1A Hydrograph —t —r — --1-- -- -- J --1-- 1-- — 90 ; i I i i i i i i I i 85 81.41 cfs i i i i i i i -- - —}- - -- - *— j ---- ---- ---- --- ---- -- - — 80 75 1 OOyr- 4hr Rainfall =7 67' 70 1 1 ; I I 1 I 'i� pp 65 i i -0 af ,-Rf- Are*7 60 - - __..... ; _-4t------4-------------------r-------k------ ,r- - -{r- -9lof V-�IUe99rC 55 i i i i --- - t 1 r-- r-- r---'--- r--y 1 �i I50 1 i ------------- - --Ei ....!....... I Bn --------------{------ -nano i 45 i i i iF � i --� -..... = -- L W1 e — - 40 - - - - - - - i -- - - - - i -- - - -i- ----a ------ ---- a---------+..-------- + - - - -------- -- i 35 ------ 1-- ..... {- - - -- -- --- ----�---4---4--------------+-----?------- -- = `� • , - I 30 1 1 i 2520 i I t I i i i i i I I 15 i 10 --------------- `'-_--_-...------- ------- '--_-_--...---- --------------- ' 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 121 Summary for Subcatchment 2S-A: Direct to 2P Runoff = 48.02 cfs @ 11.95 hrs, Volume= 2.374 af, Depth= 5.90" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (sf) CN Description 66,516 98 Water Surface, HSG C 83,461 74 >75% Grass cover, Good, HSG C 60,505 87 Dirt roads, HSG C 210,482 85 Weighted Average 143,966 68.40% Pervious Area 66,516 31.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum TOC Subcatchment 2S-A: Direct to 2P Hydrograph 50 i 48.02 cfs i i i i i i I 1+24-h ' 45 -------2hr i _ I 4, � Rhin#�I� 7' 40 35 -- j; `, , i i f 1 V r• ; I i is u o olume 2. f - r ---- --�-- 4} 30 ; ; R naff Qep;th�5. O" ---------- = ------ - -4--------- ;----------t-------------------}---------; -;----------I ----;---- ---- - -m 25 �------� n--1-- i-- , iTC, 5. 20 i I I I 5 i --i --i —i i ---- — - --- -- 15 i 10 iA.. i 5 0j 0 5 20 25 30 35 40 45 50 55 60 65 k 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 122 Summary for Subcatchment 3S-B: To Pond 3 Runoff = 47.01 cfs @ 12.07 hrs, Volume= 3.271 af, Depth= 6.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (sf) CN Description 11,911 98 Water Surface, HSG C 25,046 77 Woods, Poor, HSG C 31,514 98 Roofs, HSG C 820 98 Roofs, HSG C 204,485 87 Dirt roads, HSG C 273,776 88 Weighted Average 229,531 83.84% Pervious Area 44,245 16.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 150 0.0050 0.27 Sheet Flow, Sheet flow in NE direection from bldg 12 Fallow n= 0.050 P2= 3.54" 1.8 142 0.0070 1.35 Shallow Concentrated Flow, "flat" conc flow Unpaved Kv= 16.1 fps 4.4 791 0.0350 3.01 Shallow Concentrated Flow, Flow to pond 3 Unpaved Kv= 16.1 fps 15.5 1,083 Total BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 123 Subcatchment 3S-B: To Pond 3 Hydrograph ■ Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 124 Summary for Subcatchment 3S-C: LS area to Pond 3 Runoff = 106.58 cfs @ 12.17 hrs, Volume= 9.251 af, Depth= 6.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr-24hr Rainfall=7.67" Area (ac) CN Description 18.466 86 excludes recirc ponds 18.466 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 150 0.0400 0.62 Sheet Flow, sheet flow NW corner Fallow n= 0.050 P2= 3.54" 20.2 3,152 0.0260 2.60 Shallow Concentrated Flow, Flow thru LS plant to pond 3 Unpaved Kv= 16.1 fps 24.3 3,302 Total I Subcatchment 3S-C: LS area to Pond 3 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paoe 125 Summary for Reach 1A-R: 36" Pipe Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 5.70" for 100yr-24hr event Inflow = 72.62 cfs @ 12.21 hrs, Volume= 11.525 of Outflow = 51.09 cfs @ 12.10 hrs, Volume= 11.525 af, Atten= 30%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 8.23 fps, Min. Travel Time= 0.3 min Avg. Velocity = 1.53 fps, Avg. Travel Time= 1.8 min Peak Storage= 1,188 cf @ 12.10 hrs Average Depth at Peak Storage= 3.00' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 51.09 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 168.0' Slope= 0.0050 T Inlet Invert= 392.52', Outlet Invert= 391.68' N V 3 0 LL Reach 1A-R: 36" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 1_ Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paoe 126 Summary for Reach 1 B-R: 36" Pipe to 2P Inflow Area = 24.280 ac, 32.30% Impervious, Inflow Depth = 5.70" for 100yr-24hr event Inflow = 51.09 cfs @ 12.10 hrs, Volume= 11.525 of Outflow = 35.40 cfs @ 12.05 hrs, Volume= 11.525 af, Atten= 31%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 5.71 fps, Min. Travel Time= 0.2 min Avg. Velocity = 1.15 fps, Avg. Travel Time= 1.1 min Peak Storage= 530 cf @ 12.05 hrs Average Depth at Peak Storage= 3.00' Bank -Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 35.40 cfs 36.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 75.0' Slope= 0.0024 7' Inlet Invert= 391.68', Outlet Invert= 391.50' N V 3 0 LL Reach 1 B-R: 36" Pipe to 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) C-' Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paoe 127 Summary for Reach 1 R: 24" Pipe Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 6.36" for 100yr-24hr event Inflow = 26.29 cfs @ 12.27 hrs, Volume= 7.268 of Outflow = 26.29 cfs @ 12.27 hrs, Volume= 7.268 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 14.67 fps, Min. Travel Time= 0.3 min Avg. Velocity = 2.91 fps, Avg. Travel Time= 1.6 min Peak Storage= 511 cf @ 12.27 hrs Average Depth at Peak Storage= 1.11' Bank -Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 44.18 cfs 24.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 285.0' Slope= 0.0325 '/' Inlet Invert= 402.60', Outlet Invert= 393.34' N V 3 0 LL Reach 1 R: 24" Pipe Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Inflow ❑ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 128 Summary for Reach 3A-R: Channel 8A-2 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 6.01" for 100yr-24hr evenl Inflow = 106.27 cfs @ 12.18 hrs, Volume= 9.251 of Outflow = 106.27 cfs @ 12.18 hrs, Volume= 9.251 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 8.25 fps, Min. Travel Time= 0.0 min Avg. Velocity = 2.35 fps, Avg. Travel Time= 0.1 min Peak Storage= 235 cf @ 12.18 hrs Average Depth at Peak Storage= 1.45' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 440.38 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 18.3' Slope= 0.0268 '/' Inlet Invert= 417.53', Outlet Invert= 417.04' I Reach 3A-R: Channel 8A-2 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 129 Summary for Reach 313-11: Channel 8A-3 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 6.01" for 100yr-24hr evenl Inflow = 106.27 cfs @ 12.18 hrs, Volume= 9.251 of Outflow = 106.25 cfs @ 12.18 hrs, Volume= 9.251 af, Atten= 0%, Lag= 0.4 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 6.30 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.83 fps, Avg. Travel Time= 1.8 min Peak Storage= 3,325 cf @ 12.18 hrs Average Depth at Peak Storage= 1.77' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 301.20 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 197.2' Slope= 0.0125 T Inlet Invert= 417.04', Outlet Invert= 414.57' I Reach 313-R: Channel 8A-3 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 130 Summary for Reach 3C-R: Channel 8A-4 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 6.01" for 100yr-24hr evenl Inflow = 106.25 cfs @ 12.18 hrs, Volume= 9.251 of Outflow = 106.26 cfs @ 12.18 hrs, Volume= 9.251 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 19.34 fps, Min. Travel Time= 0.0 min Avg. Velocity = 5.24 fps, Avg. Travel Time= 0.1 min Peak Storage= 238 cf @ 12.18 hrs Average Depth at Peak Storage= 0.73' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 1,493.79 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 43.3' Slope= 0.3081 T Inlet Invert= 414.57', Outlet Invert= 401.23' I 3 0 LL Reach 3C-R: Channel 8A-4 Hydrograph 19151711=1111 MEN MILIE ®� E 1111 L \.AMlL�Ue SL IUL M .___ i 7��.� ____� Mi: tztm PAPA W, Uk WIAM SM /� 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 131 Summary for Reach 5R: Channel 8A-1 Inflow Area = 18.466 ac, 0.00% Impervious, Inflow Depth = 6.01" for 100yr-24hr evenl Inflow = 106.58 cfs @ 12.17 hrs, Volume= 9.251 of Outflow = 106.27 cfs @ 12.18 hrs, Volume= 9.251 af, Atten= 0%, Lag= 0.6 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 8.71 fps, Min. Travel Time= 0.8 min Avg. Velocity = 2.37 fps, Avg. Travel Time= 2.9 min Peak Storage= 4,982 cf @ 12.18 hrs Average Depth at Peak Storage= 1.60' Bank -Full Depth= 3.00' Flow Area= 27.0 sf, Capacity= 324.01 cfs 6.00' x 3.00' deep channel, n= 0.030 Stream, clean & straight Side Slope Z-value= 1.0 7' Top Width= 12.00' Length= 409.2' Slope= 0.0256 T Inlet Invert= 428.00', Outlet Invert= 417.53' I Reach 5R: Channel 8A-1 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 132 Summary for Pond 1A-B: Existing Basin 1A (low lying greenspace) Inflow Area = 10.558 ac, 26.83% Impervious, Inflow Depth = 6.36" for 100yr-24hr event Inflow = 81.41 cfs @ 12.06 hrs, Volume= 5.599 of Outflow = 46.48 cfs @ 12.21 hrs, Volume= 4.257 af, Atten= 43%, Lag= 8.8 min Primary = 46.48 cfs @ 12.21 hrs, Volume= 4.257 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Peak Elev= 406.72' @ 12.21 hrs Surf.Area= 33,309 sf Storage= 105,380 cf Plug -Flow detention time= 169.5 min calculated for 4.255 of (76% of inflow) Center -of -Mass det. time= 83.2 min ( 868.4 - 785.2 ) Volume Invert Avail.Storage Storage Description #1 400.00' 154,571 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 2,623 0 0 402.00 9,204 11,827 11,827 404.00 17,449 26,653 38,480 406.00 27,541 44,990 83,470 408.00 43,560 71,101 154,571 Device Routinq Invert Outlet Devices #1 Primary 405.00' 6.3' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=46.23 cfs @ 12.21 hrs HW=406.71' TW=395.52' (Dynamic Tailwater) L1=Sharp-Crested Rectangular Weir (Weir Controls 46.23 cfs @ 4.28 fps) BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Pace 133 Pond 1A-B: Existing Basin 1A (low lying greenspace) Hydrograph ■ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 134 Summary for Pond 1 B: Existing Basin 1 Inflow Area = 13.722 ac, 36.50% Impervious, Inflow Depth = 6.36" for 100yr-24hr event Inflow = 116.94 cfs @ 12.02 hrs, Volume= 7.276 of Outflow = 26.29 cfs @ 12.27 hrs, Volume= 7.268 af, Atten= 78%, Lag= 14.9 min Primary = 26.29 cfs @ 12.27 hrs, Volume= 7.268 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 402.60' Surf.Area= 24,334 sf Storage= 53,379 cf Peak Elev= 406.73' @ 12.28 hrs Surf.Area= 37,300 sf Storage= 180,151 cf (126,772 cf above start) Plug -Flow detention time= 212.9 min calculated for 6.040 of (83% of inflow) Center -of -Mass det. time= 96.4 min ( 878.4 - 782.0 ) Volume Invert Avail.Storage Storage Description #1 400.00' 230,133 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 400.00 16,836 0 0 401.00 19,630 18,233 18,233 402.00 22,539 21,085 39,318 403.00 25,530 24,035 63,352 404.00 28,610 27,070 90,422 405.00 31,721 30,166 120,588 406.00 34,929 33,325 153,913 407.00 38,193 36,561 190,474 408.00 41,125 39,659 230,133 Device Routing Invert Outlet Devices #1 Primary 402.60' 24.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=26.26 cfs @ 12.27 hrs HW=406.72' TW=403.71' (Dynamic Tailwater) L1=Orifice/Grate (Orifice Controls 26.26 cfs @ 8.36 fps) BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 135 1 1 • r 11 •1 :1 1 .1 1 1 1 1 1 1 1 �1 1 .1 1 :1 •1 ■ Inflow ❑ Primary BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 136 Summary for Pond 2B: 2P Inflow Area = 53.863 ac, 19.28% Impervious, Inflow Depth = 5.89" for 100yr-24hr event Inflow = 121.30 cfs @ 12.05 hrs, Volume= 26.417 of Outflow = 57.71 cfs @ 13.31 hrs, Volume= 22.487 af, Atten= 52%, Lag= 75.3 min Primary = 57.71 cfs @ 13.31 hrs, Volume= 22.487 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 391.00' Surf.Area= 1.718 ac Storage= 4.603 of Peak Elev= 396.80' @ 13.31 hrs Surf.Area= 2.443 ac Storage= 16.606 of (12.004 of above start) Flood Elev= 400.00' Surf.Area= 2.869 ac Storage= 25.105 of (20.502 of above start) Plug -Flow detention time= 1,168.5 min calculated for 17.876 of (68% of inflow) Center -of -Mass det. time= 810.8 min ( 1,687.1 - 876.2 ) Volume Invert Avail.Storage Storage Description #1 388.00' 25.105 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 388.00 1.345 0.000 0.000 389.00 1.471 1.408 1.408 390.00 1.600 1.536 2.943 391.00 1.718 1.659 4.603 392.00 1.833 1.775 6.378 393.00 1.955 1.894 8.272 394.00 2.077 2.016 10.288 395.00 2.204 2.140 12.428 396.00 2.340 2.272 14.701 397.00 2.469 2.404 17.105 398.00 2.599 2.534 19.639 399.00 2.732 2.665 22.304 400.00 2.869 2.800 25.105 Device Routing Invert Outlet Devices #1 Primary 390.50' 54.0" Round Culvert L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 390.50' / 382.00' S= 0.0850 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 15.90 sf #2 Device 1 391.00' 0.5" Vert. Orifice/Grate X 20.00 columns X 7 rows with 6.0" cc spacing C= 0.600 #3 Device 1 396.00' 24.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #4 Secondary 397.00' 30.0' long x 28.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 137 Primary OutFlow Max=57.70 cfs @ 13.31 hrs HW=396.80' (Free Discharge) L1=Culvert (Passes 57.70 cfs of 154.05 cfs potential flow) �2=0 rifi ce/G rate (Orifice Controls 1.89 cfs @ 9.89 fps) 3=Sharp-Crested Rectangular Weir (Weir Controls 55.81 cfs @ 2.92 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=391.00' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 3 0 LL Pond 2B: 2P Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Inflow ■ Outflow ■ Primary ■ Secondary BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 138 Summary for Pond 3B: Pond 3 Inflow Area = 24.751 ac, 4.10% Impervious, Inflow Depth = 6.07" for 100yr-24hr event Inflow = 143.04 cfs @ 12.14 hrs, Volume= 12.523 of Outflow = 78.85 cfs @ 12.38 hrs, Volume= 12.519 af, Atten= 45%, Lag= 14.3 min Primary = 78.85 cfs @ 12.38 hrs, Volume= 12.519 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 394.90' Surf.Area= 10,695 sf Storage= 22,165 cf Peak Elev= 401.77' @ 12.38 hrs Surf.Area= 42,743 sf Storage= 165,692 cf (143,526 cf above start) Flood Elev= 402.00' Surf.Area= 42,976 sf Storage= 173,109 cf (150,943 cf above start) Plug -Flow detention time= 124.9 min calculated for 12.010 of (96% of inflow) Center -of -Mass det. time= 82.5 min ( 884.0 - 801.4 ) Volume Invert Avail.Storage Storage Description #1 391.00' 15,607 cf Chamber 2 (outlet) (Prismatic) Listed below (Recalc) #2 392.00' 7,643 cf Chamber 1 (inlet) (Prismatic) Listed below (Recalc) #3 396.00' 225,420 cf Combined Chambers (Prismatic) Listed below (Recalc) 248,669 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 391.00 1,446 0 0 392.00 2,583 2,015 2,015 393.00 3,801 3,192 5,207 394.00 5,119 4,460 9,667 395.00 6,761 5,940 15,607 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 392.00 1,032 0 0 393.00 1,971 1,502 1,502 394.00 3,048 2,510 4,011 395.00 4,215 3,632 7,643 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 396.00 13,953 0 0 397.00 17,143 15,548 15,548 398.00 22,159 19,651 35,199 399.00 26,581 24,370 59,569 400.00 30,000 28,291 87,860 402.00 32,000 62,000 149,860 404.00 43,560 75,560 225,420 BASIN 2 REPORT PB SPPP Project 2021 Type 1124-hr 100yr-24hr Rainfall=7.67" Prepared by 3M Printed 4/12/2021 HvdroCAD® 10.00-20 s/n 06105 © 2017 HvdroCAD Software Solutions LLC Paae 139 Device Routing Invert Outlet Devices #1 Primary 394.90' 36.0" Round Culvert L= 265.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 394.90' / 391.60' S= 0.0125 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 394.90' 8.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 397.90' 5.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 399.50' 20.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=78.78 cfs @ 12.38 hrs HW=401.76' TW=394.69' (Dynamic Tailwater) L1=Culvert (Inlet Controls 78.78 cfs @ 11.15 fps) P4=S =Orifice/Grate (Passes < 4.29 cfs potential flow) =Sharp -Crested Rectangular Weir (Passes < 104.78 cfs potential flow) harp -Crested Rectangular Weir (Passes < 221.89 cfs potential flow) Pond 3B: Pond 3 Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours)