HomeMy WebLinkAbout20201124_F-EmoryBOARD OF
Frank Emory, Chairman
Charlie Dun, Jr., Vice -Chairman
Michael Haddock, Commissioner
Sondra ]pock Riggs, Commissioner
James Harper, Commissioner
April Aycock, Commissioner
Charlie Gray, Commissioner
November 20, 2020
Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Qualify
1612 Mail Service Center, Raleigh, North Carolina 27699-1612
Rrf171NIr7-'D
1110U 2 4 2020
DENR-LAND QUALIT`!
STORNTWATER PERMITTING
Re: Application for Surface Mining Permit, 540 Scott Farm Lane, Pollocksville, Jones County
To whom it may concern:
I am writing on behalf of the Jones County Board of Commissioners to request that the Department hold a
public hearing, pursuant to N.C. Gen. Stat. 74-51(c), to hear comments from Jones County citizens and
other interested parties relating to the application for new surface mining permit referenced above. The
proposed sand mine project will be located near a residential area, and numerous residents have contacted
our Board members to express concerns about the possible impacts of the project. These possible impacts
include, but are not limited to: traffic increases, declining property values, visual impacts from the
destruction of natural landscaping, air pollution, groundwater contamination, surface water contamination,
noise, structural foundation damage from any blasting that may occur, and the potential increase in the
scale of the project.
Additionally, our Board received communications from residents located near the proposed mine project
expressing concerns that the applicant previously demonstrated a failure to comply with applicable
regulations in a previous project. One resident forwarded to our attention a February 23, 2017 Facility
Compliance Inspection Report which I attached to this letter. It is important to our Board that our citizens
have the opportunity to voice their concerns to the Department and to receive information about any
measures that will be taken to alleviate their concerns. I respectfully request that you afford our citizens
this opportunity.
Sincerely,
Frank Emory
ry
Chairman, Jones County Board of Commissioners
418 Hwy 58 North, Unit A o Trenton o North Carolina o 28585 o Phone: (252) 448-7571 o Fax: (252) 448-1072 o www.jonescomttync.gov
FACILITY COMPLIANCE INSPECTION REPORT
Waste Management
ENVIRONMENTAL QUALITY
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
LCm
X
YW
Transfer
Compost
SLAS
COUNTY:Onslow
MSWLF
PERMIT NO.: 67A-LCID-
Closed
HIIW
While
Incin
T&.P
F"
MSWLF
goods
FILE TYPE: COMPLIANCE
CDLF
TiTeTaLPi
Tire
Industrial
DEMO
SDTF
Collection
Monotill
I
I Landfill
Date of Inspection: 15 February 2018
FACILITY NAME AND ADDRESS:
Morton Trucking Company LCID Landfill
Highway 17
Jacksonville, NC
Date of Last Inspection: 23 February 2017
GPS COORDINATES: N: 34.79724 E:-077.35295
FACILITY CONTACT NAME AND PHONE NUMBER:
Tim Morton
910.346.9068
FACILITY CONTACT ADDRESS
Morton Trucking Company
121 Garnet Lane
Jacksonville, NC 28546
Attn: Tim Morton
E-mail: tmortonAbizec.rr.com
PARTICIPANTS:
Tim Morton; Morton Trucking Company
Ray Williams; NCDEQ-Solid Waste
STATUS OF PERMIT:
Active; Permit to Construct (PTC) Phases A, B, and C (Lateral Expansion Area) and Permit to Operate (PTO)
Vertical Expansion issued 21 August 2013, expires 22 August 2018. A complete permit review request including
updated Facility, operations, and waste screening plans is due on or before 21 February 2018. This request must
comply with the Rules and Regulations in effect at the time of the application.
PURPOSE OF SITE VISIT:
Comprehensive Facility Compliance Inspection
STATUS OF PAST NOTED VIOLATIONS:
1) 15A NCAC 13B .0566 (1) states "Operational plans shall be approved and followed as specified for the
facility." RESOLVED
2) 15A NCAC 13B .0566 (4) states "Adequate soil cover shall be applied monthly, or when the active area reaches
one acre in size, whichever occurs first" RESOLVED
3) 15A NCAC 13B .0566 (5) states "120 calendar days after completion of any phase of disposal operations, or
upon revocation of a permit, the disposal area shall be covered with a minimum of one foot of suitable soil cover
sloped to allow surface water runoff in a controlled manner. The Division may require further action in order to
correct any condition which is or may become injurious to the public health, or a nuisance to the community."
RESOLVED
4) 15A NCAC 13B .0566 (6) states "Adequate erosion control measures, structures, or devices shall be utilized
to prevent silt from leaving the site and to prevent excessive on site erosion." UNRESOLVED
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
67A INS P 0180? 15
Page 2 of 3
5) 15A NCAC 13B .0566 (7) states "Provisions for a ground cover sufficient to restrain erosion must be
accomplished within 30 working days or 120 calendar days upon completion of any phase of landfill
development." UNRESOLVED
OBSERVED VIOLATIONS:
6) 15A NCAC 13B .0566 (1) states "Operational plans shall be approved and followed as specified for the
facility."
7) 15A NCAC 13B .0566 (6) states "Adequate erosion control measures, structures, or devices shall be utilized
to prevent silt from leaving the site and to prevent excessive on site erosion."
8) 15A NCAC 13B .0566 (7) states "Provisions for a ground cover sufficient to restrain erosion must be
accomplished within 30 working days or 120 calendar days upon completion of any phase of landfill
development."
Please see the ADDITIONAL COMMENTS section below for details concerning the violations listed above.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
ADDITIONAL COMMENTS:
1) This Facility is a Land Clearing and Inert Debris (LCID) Landfill.
2) This Facility is recorded with the Onslow County Register of Deeds at: Book #1094; Page #778.
3) This Facility is permitted to receive land clearing waste, yard trash, untreated and unpainted wood,
uncontaminated soil, and inert debris such as unpainted rock, brick, concrete, and concrete block.
4) This Facility is secured by means of a locked gate at the Facility entrance.
5) Proper signage is posted at the Facility entrance listing the Facility contact name and telephone number,
accepted waste types, and hours of operation.
6) This Facility maintains a perimeter access road around the toe of the landfill for maintenance and site
inspection. The perimeter access road is being well maintained at this time.
7) The Facility access road is of all-weather construction and is being maintained in overall good condition.
8) The permitted disposal area has been marked to identify the permitted landfill footprint.
9) The waste type in the landfill was reviewed. The waste type being disposed is LCID waste only.
10) This Facility is currently operating with one active working area. All disposal operations have been restricted
to the primary disposal area and the secondary disposal area is in the process of being capped. *Please
continue workingto o compact, cover, and close the secondary working areas and ensure that this Facility
operates with only one active working
11) Soil is stockpiled in an area adjacent to the working face for use in cover and grading activities.
12) The active working area appears to be covered monthly as required. *Please continue ensure that all waste is
covered with one foot of suitable soil monthly, or when the active working area reaches one acre in size,
whichever comes first.
13) The outside slopes in the inactive areas of the landfill have been covered and graded. *As per our
conversation, please seed and mulch all newly covered areas to establish a groundcover suitable to prevent
erosion of your landfill cap system.
14) Most of the small trees and other woody vegetation noted in the previous Facility Compliance Inspection
Report as having been established on the outside slopes have been removed. *Please continue working to
remove all woody vegetation and small trees from the landfill cap system. Facility Personnel were on -site
working to clear the remaining vegetation from the outside slopes during this Facility Compliance Inspection.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
67A IN.YP 101.NOII�
Page 3 of 3
s
toe
15) Portions of the outside slopes were lacking sufficient cover to prevent the erosion of your landfill cap system.
*Please continue working to repair these sparse areas by seeding and mulching to establish a groundcover
suitable to prevent erosion of your landfill cam sy tem.
^71
16) Grading and drainage improvements around the toe and the outside slopes of the landfill are ongoing.
17) *Corrective measures are required as a result of this Facility Compliance Inspection Report.
Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report.
Digitally signed by Ray
Ray Williams
Williams Date:2018.02.19
15:26:50-05'00'
Ray'Widiiams: EnvimmnentaCSentorSpeciafut Phone: 252.948.3955 E-mail: ray.williamsna.ncderingov
Regional Representative
Delivered on: 19 February 2018 by X Electronic delivery US Mail Certified No. L j
cc: Andrew Hammonds; Eastern District Supervisor/SWS: andrew.hammonds(?a,nedenr.gov
D Scott Bost; Onslow County Solid Waste Director: scoff bost(a)onslowcountync.gov
C: \2018\Onslow\Facilities\67A\Inspection\67A_INSP_20180215
NCDEQ DWM Laserfiche Online Document Management System: htm://edws.deg.nc.eov/WmteManagementtWelcome.aspx
mA Go Greenl Thank you for helping NCDEQ be environmentally responsible.