Loading...
HomeMy WebLinkAbout20210217_ESC_calculationsCIS ENGINEERING & ENVIRONMENTAL SCIENCE COMPANY 3008 ANDERSON DRIVE, SURE 102 RALEIGH, NC 27609 February 16, 2021 Mr. Bobby McCoy Lee Brick and Tile Company P.O. Box 1027 Sanford, NC 27331 RE: Mining Permit Modification Sanford Mine (Permit No. 53-04) US Hwy 151501 Sanford, NC Dear Mr. McCoy: (919)781-7798 RECEIVED FEB 17 2021 LAND QUALITY MINING PROGRAM Engineering & Environmental Science Company (E2S) has completed the evaluation for the Mining Permit Modification for the above referenced site. The separately submitted mine maps reflect this evaluation. Following is a brief discussion of the mine and our evaluation GENERAL PROJECT INFORMATION The Sanford Mine (Mining Permit No. 53-04) is located in Lee County, Sanford, NC. The mine is bisected by US Hwy 15/501 and is located just south of the intersection with Norfolk Southern Railroad (See Attachment A, Figure 1). The Sanford Mine has 769 ac. within the mining permit limits, with 350 ac. currently allowed to be disturbed. Mining is conducted for clay to use in the brick -making process. The proposed modification for the mining permit consists of reducing the total permitted acreage to 469 ac., and reducing the affected acreage to total 103 acres. The parcel of permitted land on the west side of Hawkins Ave. has been subdivided. Approximately 300 acres of land north 6f the existing plant building will be removed from the permitted acreage. The reduction of affected acreage includes areas that are currently permitted to be affected, but have not been disturbed, and are no longer planned to be affected in the future. Also, the existing plant facility areas have been removed from the affected acreage. A proposed new mining excavation area totaling approximately 36 acres to the south of the existing Plant #4 Building will be added to the affected acreage. WETLAND AND STREAM CONSIDERATIONS Potential streams and wetlands were identified in the field by Ms. Robin Little (Licensed Soil Scientist). The locations designated as streams or wetlands were surveyed using a GPS unit. The mine maps reflect avoidance of disturbance in these areas. The runoff from the mine areas drain to Little Buffalo Creek and Petty Creek. A minimum 50ft buffer is provided along the property lines, streams, and wetlands. To access the proposed new mine excavation area, one (1) stream crossing will be required. During construction of the stream crossing, temporary silt fence and sediment traps will be installed. A 48" CMP culvert is proposed for the stream crossing. The culvert and embankment is designed to pass the 25-year rain event Several streams at the site have been impacted by roadway crossings in the past. The majority of the crossings were installed in the late 1980's and earlier. One (1) stream was impacted in approximately 2008 and included approximately 138 lineal feet of stream impact. Proposed further impact will be approximately 142 lineal feet for a total impact of approximately 280 lineal feet. EVALUATION Mining will continue as permitted in the areas where active mining is ongoing. This includes the areas upslope from Basins 28, 29 and 30 as shown on the accompanying Mine Maps. In accordance with the USDA Soil Survey of Lee County, Mayodan and Pinkston are the predominant soil types at the proposed new mine excavation area (See Figure 2). Mayodan soils are classified as Hydrologic Soil Group (HSG) B, and Pinkston soils are classified as HSG C. The SCS TR 20 Method was used to calculate the 2-year, 10-year, and 25-year rain events. Erosion control for the proposed mining area will consist of four (4) sediment basins (Basins A, B, C, and D) with a riser/barrel system with skimmers attached to the riser pipes. The proposed corrugated metal riser pipes will have skimmers attached 1 ft. above the base of pipe. One (1) skimmer basin (Basin E) with no riser is also proposed. The skimmer systems will drain the basins over a period of approximately 2-4 days. Perimeter berms will be used to divert the stormwater runoff to the basins. Trash racks will be provided for the CMP riser pipes. For each basin, an earthen secondary spillway is provided. The secondary spillway is only activated for rain events greater than the 2-year rain event. The basins can pass the 25-year rain event with one foot of freeboard. See Attachment B for calculations for these basins. 6's c i CLOSURE We appreciate serving Lee Brick and Tile on this project. Please contact us if you have any questions. Sincerely, ,oFEss'rok, T. Patrick Shillingt , P. E. President sue' D�:� 6�?q�472 Attachment A: Figures �i"�••!!�!=`�`•' ,�` Attachment B: Calculations 6's Attachmient A: Figures. E'S N Scale: 1 "= 2000' USGS COLON QUADRANGLE Topographic Map MIB n -?,..K N ENGINEERINGENVIRONMENTAL SCIENCE COMPANY 2C 3008 ANDERSON DR. SUITE 102 RALEIGH, NORTH CARbLINA 27609 (919)781.7798 n\TE USDA Soil Survey Map Scale: 1 = 2000 Lee Brick & Tile Company Sanford, NC 27330 2 Attachment B: Calculations 62S Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_7rintpage.html?lat=35.5... NOAA Atlas 14, Volume 2, Version 3 LOCedOn name: Sanford, North Carolina, USA' Latitude: 35.541°, Longitude:-79.19640 Elevation: 253.04 tt•• •.Dort.. ESRI Maps (D '• source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M swam, D. Nbdht B. LIR T Pa2ybok, MYsMa. and 0. RINy NOA4 National Wadher Service. Srwr Spring, NHrylaid PE_tabular I PE_9iaWlia 1 I Ma95_R_aerials PF tabular Let R (\,J- _nice intervals (in Inches)1 _ PDS•based Dint nets station fre uenc estimates with 90 /o confide_ p p P frequency °(y Average recurrence Interval g ears ) Duration' - -1r-�� Jl •' 10 25 50 100 _ 200__ _. 500 f 1000 . 5-min I 0 426 (0.389-0.469)i 0.604 (0.480.0.555j 0. 884 (0.5930.8Q 0.842 0.684.0.705) 0.707 (0.639-0.775)', '', 0.760 10.677-0.823 0.790 (0.709-0.867)', li 0.826 (0.738-0.BO 0.864 0.764-0948) 0.893 (0.783-0.980)I 0681 0.806 0.936 1.03 1.13 1.20 1.26 131 13T 1.41 n10-min (0.8220.748))(0.73&O.B88) (0.853.1.03)I(0934-1.13) (7.02-1.24) (108-1.31) (113-1.38) (1.77-144) (1.21150) (7.231.Sq 0.851 1.01 1.18 I 1.30 1.43 1.61 1.59 1.65 172 1.76 �15-onto (0.777-0.937 (1.0&1.30) (1.78-1.43) (1.29-1. (1 37-t66) (1 42-1.74) (1.47-1.81) (1.52 1 89) (1.5&1.94) 1.17 _(0.924.1.12) 1.40 1.68 1.88 2.11 228 2.43 2.57 2.74 2.86 30-min (1_07-4.28) (1-28-1.54) (1531_851 (1.71-207)_ (1.91-2.32) 208-250): (218267)-._(2.29-282) 2.42.3.00)_ (2.5U3.141 60•min 1. 09 279.9.38)J 3.00.3.87) (3.22-3.95) (9.47.4.31 :64.68) (1-334660) (1.60.L93 (1.e72637). (2.23289) (255.3.08 1.72 2.08 2.59 2.97 3.45 3.82 4.18 4.65 5.01 5.37 2-hr (t58-L91) 2.35-2a7 (2.6&3.29) (310.3.8 3.424.23) 3.72-4.83) (4.01-5.09) (4.3&5.55) 4.65.5.85) 3-hr 1.83 _(1.89-2.31 2.21 2.76 3( 1H 4.18 (9.73J.82) 4. 05.10) (OA&5.60) (4.94 (5.30.8.81) (1.88-2.03) (2.01-245) (2.51-3.08)J 288.3.52) (3.38.4.74) 6-hr 2.18 2.64 3.30 (3.01-3.84) 3.81 (9.484.19) 4.51 (4.07-4.95) 6.06 (4.535.54 5.62 (4.998.16) 6.20 (5.455.78) 6.99 (8.0&7.64) 7.61 (6.62-8.34)J (1.9&241 (2.41-291) W4.57 5.44 1b 9 B.88 7.86 (e_89-8.38) 8.73 (7.51.9.54 960 (830 2hr 2.59 1_. (2.883.4_58.4.34) (33.93 4.145.03) (4905.97) (5451nr3&286) .53.13 24-hr .. 6774) (6.52 25-8796) (e. 0 9�36) (8.0110.8) (8.8171.8 7B-922) 3.49 _ (3.38-9.90) 4.21 (4.n4 89 6.26 (4.905.87) 8.07 (5.81 7.18 8.06 _(7 8.98 9.89 11.2 122 2-day (3.263.75) (3.924.53) (4.89-5.8 (5.848.52) (S.6&7.71) (7.44-8.85) (8.2&9.w) 9.08.10.6) 10.2-120) (11.1-03.1) 3.70 4.45 6.63 _ 8.37 7.62 8A4 937 10.3 11.7 12.7 (3.45697), (4.764.78) (5.155.82 (5.926.83J �_(6.976.06) (7.796.04) -(88310.OJ (9A911,1) (10.7.125) (11.&19.7) _3-0ey 3.91 4.70 6.80 8.87 7.H7 8.81 978 10.8 122 13.2 4"day (3.854.19) (4.385.03) (5.416.20) 6.21-7.13)I.(7.29-8.41)J (e_.1/-9.43 (90110.5) _(9.90..8 (11.713.0) 02-144_) 4.60 6.38 6.66 7.48 8.77 9.79 10.8 11.9 13 4 14.5 7-0eV -1 4.214.81j (5_035.74) (6.124.00) (8.9&8.00) (8.1&9.36) (9.0&10.5) (10011.6) 11.0-127) (12314.3) (13.315.8) 10 aey 513 8.11 7.35 6.90-7.82) 8.32 9.63 901-10.2) 10.7 994-11.3) 11.7 (10.9-125) 12.8 (11.&13.8) 142 (1&115.1) 15.3 (t4.1-i&9) (4.835.47 5.746.51)- 8.18 9.84 (7.81-&88) 1 10.8 12.4 13.6 14.9 16.1 17.8 192 20-day6.91 (6-51.7.34) (7.89-8.88) (9.07.10.2) (10.2-11.5) (11 e-13.1 (12.7-14.5) (13.945.8) (1&0.77.1) (16.5 19.0) (17.7-20.4) 30"day a 68 (8.1 10.1 (9.6 11.8 (11 13.0 (18.313.B) 14.7 (19 &16.8) 16.0 (150.17.0)_� 17.3 (182-1&4) 18.6 (174-78.8) 20 3 18.8216) 21.6 (20.1-23.1)_J 45-de 4 1 (70.4-11.5) 12.8 (12Y-13 5) 14.6 (13.9-15.4) _- _ 18.1 �� (752-18.9); 17.9 (18.&18.8) 19 3 (182-20.3) 20.7 (18421.9 , 220 207.232) 23 H (222251) �� 25.1 (23.428.6) 13.1 15.3 17.3 18.8 20.8 22.3 23.7 26.1 27.0 28.3 60•day (12.4-03.8) (14.&16.1) (18.4-18.2) (17.8.79_8) (19.7-21.9)_ (21.123.5)I (22425.0). (23.7_28S) (25.4-285) (28.6-50.0) t Precipitation frequency (PF) estimates in this table ere based on frequency analysis of partial duration series (PDS). Numbers In parenthesis we PF estimates at loner and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence Interval) will be greater than the upper bound (or less than the lavrer bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NDAA Atlas 14 document for more information. PF graphical t of 4 9/24/2020, 1:42 PM Basin A Type 11 24-hr 2 yr Rainfall=3.62" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment IS: Watershed A Runoff — 22.43 cfs @ 12.00 hrs, Volume= 1.207 af, Depth> 2.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2 yr Rainfall=3.62" Area (ac) CN Description 2.370 86 Fallow, bare soil, HSG B _ 3.510 91 Fallow, bare soil, HSG C 5.880 89 Weighted Average 5.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) cfs) 6.4 100 0.0500 0.26 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 2.4 515 0.0500 3.60 Shallow Concentrated Flow, Unsaved Kv=16.1 fps 8.8 615 Total Basin A Type 1124-hr 2 yr Rainfall=3.62" Prepared by {enter your company name here) Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 02017 HydroCAD Software Solutions LLC Page 3 Summary for Pond A: Basin A Inflow Area = 5.880 ac, 0.00% Impervious, Inflow Depth > 2.46" for 2 yr event Inflow - 22.43 cfs @ 12.00 hrs, Volume= 1.207 of Outflow = 3.61 cfs @ 12.28 hrs, Volume= 0.805 af, Atten= 84%, Lag=17.1 min Primary = 3.61 cfs @ 12.28 hrs, Volume= 0.805 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 238.53' @ 12.28 hrs Surf.Area=18,520 sf Storage= 26,504 cf Plug -Flow detention time=188.0 min calculated for 0.805 of (67% of inflow) Center -of -Mass det. time= 87.3 min ( 892.0 - 804.7 ) Volume Invert Avail.Storage Storage Description #1 237.00' 55,377 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic feet) 237.00 15,750 0 0 238.00 17,556 16,653 16,653 239.00 19,362 18,459 35,112 240.00 21,168 20,265 55,377 Device Routing Invert Outlet Devices #1 Primary 236.00' 12.0" Round 12" CMP Barrel L= 50.0' CMP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 236.00' / 235.00' S= 0.02007' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.79 sf #2 Device 1 238.00' 18.0" Horiz.18" CMP Riser C= 0.600 Limited to weir flow at low heads #3 Device 1 237.00' 0.070 cfs 2.5" Skimmer #4 Primary 239.00' 20' Secondary Spillway, C= 3.27 Offset (feet) 0.00 4.50 24.50 29.00 Height (feet) 1.50 0.00 0.00 1.50 Primary OutFlow Max=3.61 cfs @ 12.28 hrs HW=238.53' (Free Discharge) =12" CMP Barrel (Barrel Controls 3.61 cfs @ 4.60 fps) 2=18" CMP Riser (Passes < 6.00 cfs potential flow) 3=2.5" Skimmer (Passes < 0.07 cfs potential flow) 20' Secondary Spillway ( Controls 0.00 cfs) Basin A Type 11 24-hr 90 yr Rainfall=5.28" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment IS: Watershed A Runoff - 35.76 cfs @ 12.00 hrs, Volume= 1.977 af, Depth> 4.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10 yr Rainfall=5.28" Area (ac) CN Description 2.370 86 Fallow, bare soil, HSG B 3.510 91 Fallow, bare soil, HSG C 5.880 89 Weighted Average 5.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.4 100 0.0500 0.26 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 2.4 515 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv=16.1 fps 8.8 615 Total Basin A Type 1124-hr 10 yr Rainfall=5.28" Prepared by {enter your company name here} Printed 1/26/2021 HydroCADS 10.00-20 s/n 07329 02017 HydroCAD Software Solutions LLC Page 5 Summary for Pond A: Basin A Inflow Area = 5.880 ac, 0.00% Impervious, Inflow Depth > 4.03" for 10 yr event Inflow = 35.76 cfs @ 12.00 hrs, Volume= 1.977 of Outflow = 14.04 cfs @ 12.15 hrs, Volume= 1.566 af, Atten= 61 %, Lag= 8.9 min Primary = 14.04 cfs @ 12.15 hrs, Volume= 1.566 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 239.28' @ 12.15 hrs Surf.Area=19,865 sf Storage= 40,752 cf Plug -Flow detention time=156.5 min calculated for 1.563 of (79% of inflow) Center -of -Mass det. time= 76.2 min ( 867.1 - 790.9 ) Volume Invert Avail.Storage Storage Description #1 237.00' 55,377 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sg-ft) (cubic feet) (cubic -feet) 237.00 15,750 0 0 238.00 17,556 16,653 16,653 239.00 19,362 18,459 35,112 240.00 21,168 20,265 55,377 Device Routing Invert Outlet Devices #1 Primary 236.00' 12.0" Round 12" CMP Barrel L= 50.0' CMP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 236.00' / 235.00' S= 0.0200 7' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.79 sf #2 Device 1 238.00' 18.0" Horiz.18" CMP Riser C= 0.600 Limited to weir flow at low heads #3 Device 1 237.00' 0.070 cfs 2.5" Skimmer #4 Primary 239.00' 20' Secondary Spillway, C= 3.27 Offset (feet) 0.00 4.50 24.50 29.00 Height (feet) 1.50 0.00 0.00 1.50 Primary Outflow Max=13.94 cfs @ 12.15 hrs HW=239.28' (Free Discharge) =12" CMP Barrel (Barrel Controls 4.11 cfs @ 5.23 fps) 2=18" CMP Riser (Passes < 9.61 cfs potential flow) 3=2.5" Skimmer (Passes < 0.07 cfs potential flow) =20' Secondary Spillway (Weir Controls 9.83 cfs @ 1.64 fps) Basin A Type 1124-hr 25 yr Rainfall=6.27" Prepared by {enter your company name here) Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 ©2017 H droCAD Software Solutions LLC Pa-ge 6 Summary for Subcatchment 1S: Watershed A Runoff = 43.66 cfs @ 12.00 hrs, Volume= 2.445 af, Depth> 4.99" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25 yr Rainfall=6.27" Area (ac) , CN Description 2.370 86 Fallow, bare soil, HSG B 3.510 91 Fallow, bare soil, HSG C 5.880 89 Weighted Average 5.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.4 100 0.0500 0.26 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 2.4 515 0.0500 3.60 Shallow Concentrated Flow, Unsaved Kv=16.1 fps 8.8 615 Total Watershed B Subcat Reach Aon Llnk Basin B Routing Diagram for Basin B Prepared by (enter your company name here), Printed 1/26/2021 HydroCADO 10.00-20 s/n 07329 0 2017 HydroCAD Software Solutions LLC Basin B Type // 24-hr 2 yr Rainfall=3.62" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD@ 10.00-20 s/n 07329 02017 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment IS: Watershed B Runoff = 42.34 cfs @ 11.97 hrs, Volume= 2.109 af, Depth> 2.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2 yr Rainfall=3.62" Area (ac) CN Description 5.640 86 Fallow, bare soil, HSG B 5.010 91 Fallow, bare soil, HSG C 10.650 88 Weighted Average 10.650 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.7 100 0.0500 0.63 Sheet Flow, Fallow n= 0.050 P2= 3.60" 3.4 765 0.0530 3.71 Shallow Concentrated Flow, Unsaved Kv=16.1 fps 6.1 865 Total Basin B Type ll 24-hr 2 yr Rainfall=3.62" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD@ 10.00-20 s/n 07329 02017 HydroCAD Software Solutions LLC Page 3 Summary for Pond B: Basin B Inflow Area = 10.650 ac, 0.00% Impervious, Inflow Depth > 2.38" for 2 yr event Inflow = 42.34 cfs @ 11.97 hrs, Volume= 2.109 of Outflow = 6.58 cfs @ 12.20 hrs, Volume= 1.346 af, Atten= 84%, Lag=14.2 min Primary - 6.58 cfs @ 12.20 hrs, Volume= 1.346 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 232.46' @ 12.20 hrs Surf.Area= 33,563 sf Storage= 46,794 cf Plug -Flow detention time= 202.9 min calculated for 1.346 of (64% of inflow) Center -of -Mass det. time= 98.5 min ( 904.9 - 806.4 ) Volume Invert Avail.Storage Storage Description #1 231.00' 100,962 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 231.00 30,000 0 0 232.00 32,436 31,218 31,218 233.00 34,872 33,654 64,872 234.00 37,308 36,090 100,962 Device Routing Invert Outlet Devices #1 Primary 230.00' 18.0" Round 18" CMP Barrel L= 50.0' CMP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 230.00' / 229.00' S= 0.0200'/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area=1.77 sf #2 Device 1 232.00' 24.0" Horiz. 24" CMP Riser C= 0.600 Limited to weir flow at low heads #3 Device 1 231.00' 0.110 cfs 3" Skimmer #4 Primary 233.00' 20' Secondary Spillway, C= 3.27 Offset (feet) 0.00 4.50 24.50 29.00 Height (feet) 1.50 0.00 0.00 1.50 Ri ry OutFlow Max=6.57 cfs @ 12.20 hrs HN=232.46' (Free Discharge) 8" CMP Barrel (Passes 6.57 cfs of 8.64 cfs potential flow) 2=24" CMP Riser (Weir Controls 6.46 cfs @ 2.22 fps) 3=3" Skimmer (Constant Controls 0.11 cfs) 4=20' Secondary Spillway ( Controls 0.00 cfs) Basin B Type 1l 24-hr 10 yr Rainfall=5.28" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment IS: Watershed B Runoff = 68.20 cfs @ 11.97 hrs, Volume= 3.489 af, Depth> 3.93" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10 yr Rainfall=5.28" Area (ac) CN Description 5.640 86 Fallow, bare soil, HSG B 5.010 91 Fallow, bare soil, HSG C 10.650 88 Weighted Average 10.650 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.7 100 0.0500 0.63 Sheet Flow, Fallow n= 0.050 P2= 3.60" 3.4 765 0.0530 3.71 Shallow Concentrated Flow, Unpaved Kv=16.1 fps 6.1 865 Total Basin B Type 11 24-hr 10 yr Rainfall=5.28" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD@ 10.00-20 s/n 07329 OO 2017 HydroCAD Software Solutions LLC Page 5 Summary for Pond B: Basin B Inflow Area = 10.650 ac, 0.00% Impervious, Inflow Depth > 3.93" for 10 yr event Inflow - 68.20 cfs @ 11.97 hrs, Volume= 3.489 of Outflow - 19.72 cfs @ 12.12 hrs, Volume= 2.707 af, Atten= 71 %, Lag= 9.0 min Primary = 19.72 cfs @ 12.12 hrs, Volume= 2.707 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 233.27' @ 12.12 hrs Surf.Area= 35,529 sf Storage= 74,609 cf Plug -Flow detention time=159.3 min calculated for 2.701 of (77% of inflow) Center -of -Mass det. time= 75.4 min ( 867.6 - 792.2 ) Volume Invert Avail.Storage Storage Description #1 231.00' 100,962 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 231.00 30,000 0 0 232.00 32,436 31,218 31,218 233.00 34,872 33,654 64,872 234.00 37,308 36,090 100,962 Device Routing Invert Outlet Devices #1 Primary 230.00' 18.0" Round 18" CMP Barrel L= 50.0' CMP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 230.00' / 229.00' S= 0.0200'/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area=1.77 sf #2 Device 1 232.00' 24.0" Horiz. 24" CMP Riser C= 0.600 Limited to weir flow at low heads #3 Device 1 231.00' 0.110 cfs 3" Skimmer #4 Primary 233.00' 20' Secondary Spillway, C= 3.27 Offset (feet) 0.00 4.50 24.50 29.00 Height (feet) 1.50 0.00 0.00 1.50 Primary OutFlow Max=19.26 cfs @ 12.12 hrs HW=233.26' (Free Discharge) =18" CMP Barrel (Barrel Controls 10.25 cfs @ 5.80 fps) 2=24" CMP Riser (Passes < 16.99 cfs potential flow) 3=3" Skimmer (Passes < 0.11 cfs potential flow) =20' Secondary Spillway (Weir Controls 9.01 cfs @ 1.60 fps) Basin B Type 11 24-hr 25 yr Rainfall=6.27" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 O 2017 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment IS: Watershed B Runoff = 83.55 cfs @ 11.97 hrs, Volume= 4.332 af, Depth> 4.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25 yr Rainfall=6.27" Area (ac) CN Description 5.640 86 Fallow, bare soil, HSG B 5.010 91 Fallow, bare soil, HSG C 10.650 88 Weighted Average 10.650 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.7 100 0.0500 0.63 Sheet Flow, Fallow n= 0.050 P2= 3.60" 3.4 765 0.0530 3.71 Shallow Concentrated Flow, Unpaved Kv=16.1 fps 6.1 865 Total Basin B Type 1124-hr 25 yr Rainfall=6.27" Prepared by (enter your company name here) Printed 1/26/2021 HydroCAD®10 00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Page 7 Summary for Pond B: Basin B Inflow Area = 10.650 ac, 0.00% Impervious, Inflow Depth > 4.88" for 25 yr event Inflow - 83.55 cfs @ 11.97 hrs, Volume= 4.332 of Outflow = 40.88 cfs @ 12.07 hrs, Volume= 3.540 af, Atten= 51 %, Lag= 6.4 min Primary - 40.88 cfs @ 12.07 hrs, Volume= 3.540 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 233.57' @ 12.07 hrs Surf.Area= 36,264 sf Storage= 85,498 cf Plug -Flow detention time=142.7 min calculated for 3.533 of (82% of inflow) Center -of -Mass det. time= 67.6 min ( 853.8 - 786.2 ) Volume Invert Avail.Storage Storage Description #1 231.00' 100,962 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq ft) (cubic -feet) (cubic -feet) 231.00 30,000 0 0 232.00 32,436 31,218 31,218 233.00 34,872 33,654 64,872 234.00 37,308 36,090 100,962 Device Routing Invert Outlet Devices #1 Primary 230.00' 18.0" Round 18" CMP Barrel L= 50.0' CMP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 230.00' / 229.00' S= 0.0200 ? Cc= 0.900 n= 0.025 Corrugated metal, Flow Area=1.77 sf #2 Device 1 232.00' 24.0" Horiz. 24" CMP Riser C= 0.600 Limited to weir flow at low heads #3 Device 1 231.00' 0.110 cfs 3" Skimmer #4 Primary 233.00' 20' Secondary Spillway, C= 3.27 Offset (feet) 0.00 4.50 24.50 29.00 Height (feet) 1.50 0.00 0.00 1.50 Primary OutFlow Max=39.37 cfs @ 12.07 hrs HW=233.55' (Free Discharge) =18" CMP Barrel (Barrel Controls 10.78 cfs @ 6.10 fps) 2=24" CMP Riser (Passes < 18.84 cfs potential flow) 3=3" Skimmer (Passes < 0.11 cfs potential flow) =20' Secondary Spillway (Weir Controls 28.59 cfs @ 2.22 fps) its C Watershed C Subcat Reach on Rk Basin C Routing Diagram for Basin C Prepared by {enter your company name here}, Printed 1/26/2021 IydroCArj@ 10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Basin C Type 1124-hr 2 yr Rainfall=3.62" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1 S: Watershed C Runoff - 46.01 cfs @ 11.97 hrs, Volume= 2.273 af, Depth> 2.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2 yr Rainfall=3.62" Area (ac) CN Description 6.290 86 Fallow, bare soil, HSG B 5.190 91 Fallow, bare soil, HSG C 11.480 88 Weighted Average 11.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.9 100 0.0400 0.57 Sheet Flow, Fallow n= 0.050 P2= 3.60" 3.0 825 0.0800 4.55 Shallow Concentrated Flow, Unsaved Kv=16.1 fps 5.9 925 Total Basin C Type ii 24-hr 90 yr Rainfaii=5.28" Prepared by (enter your company name here) Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment IS: Watershed C Runoff — 74.09 cfs @ 11.96 hrs, Volume= 3.761 af, Depth> 3.93" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10 yr Rainfall=5.28" Area (ac) CN Description 6.290 86 Fallow, bare soil, HSG B 5.190 91 Fallow, bare soil, HSG C 11.480 88 Weighted Average 11.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.9 100 0.0400 0.57 Sheet Flow, Fallow n= 0.050 P2= 3.60" 3.0 825 0.0800 4.55 Shallow Concentrated Flow, Unpaved Kv=16.1 fps 5.9 925 Total Basin C Type 1124-hr 10 yr Rainfall=5.28" Prepared by (enter your company name here) Printed 1/26/2021 HydroCAM 10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Page 5 Summary for Pond C: Basin C Inflow Area = 11.480 ac, 0.00% Impervious, Inflow Depth > 3.93" for 10 yr event Inflow = 74.09 cfs @ 11.96 hrs, Volume= 3.761 of Outflow = 21.14 cfs @ 12.11 hrs, Volume= 2.914 af, Atten= 71 %, Lag= 9.0 min Primary = 21.14 cfs @ 12.11 hrs, Volume= 2.914 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 243.29' @ 12.11 hrs Surf.Area= 37,883 sf Storage= 80,996 cf Plug -Flow detention time=161.9 min calculated for 2.908 of (77% of inflow) Center -of -Mass det. time= 77.7 min ( 869.8 - 792.1 ) Volume Invert Avail.Storage Storage Description #1 241.00' 148,768 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area lnc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 241.00 32,500 0 0 242.00 34,846 33,673 33,673 243.00 37,192 36,019 69,692 244.00 39,538 38,365 108,057 245.00 41,884 40,711 148,768 Device Routing Invert Outlet Devices #1 Primary 240.00' 18.0" Round 18" CMP Barrel L= 50.0' CMP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 240.00' / 239.00' S= 0.0200 7' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area=1.77 sf #2 Device 1 242.00' 24.0" Horiz. 24" CMP Riser C= 0.600 Limited to weir flow at low heads #3 Device 1 241.00' 0.110 cfs 3" Skimmer #4 Primary 243.00' 20' Secondary Spillway, C= 3.27 Offset (feet) 0.00 4.50 24.50 29.00 Height (feet) 1.50 0.00 0.00 1.50 Primary OutFlow Max=20.71 cfs @ 12.11 hrs HW=243.29' (Free Discharge) =18" CMP Barrel (Barrel Controls 10.30 cfs @ 5.83 fps) 2=24" CMP Riser (Passes < 17.16 cfs potential flow) 3=3" Skimmer (Passes < 0.11 cfs potential flow) =20' Secondary Spillway (Weir Controls 10.41 cfs @ 1.67 fps) Basin C Type 1124-hr 25 yr Rainfall=6.27" Prepared by {enter your company name here) Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 O 2017 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 1 S: Watershed C Runoff = 90.77 cfs @ 11.96 hrs, Volume= 4.670 af, Depth> 4.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25 yr Rainfall=6.27" Area (ac) CN Description 6.290 86 Fallow, bare soil, HSG B 5.190 91 Fallow. bare soil. HSG C 11.480 88 Weighted Average 11.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (fi/sec) (cfs) 2.9 100 0.0400 0.57 Sheet Flow, Fallow n= 0.050 P2= 3.60" 3.0 825 0.0800 4.55 Shallow Concentrated Flow, Unsaved Kv=16.1 fps 5.9 925 Total Basin C Type 1124-hr 25 yr Rainfall=6.27" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 O 2017 HydroCAD Software Solutions LLC Page 7 Summary for Pond C: Basin C Inflow Area = 11.480 ac, 0.00% Impervious, Inflow Depth > 4.88" for 25 yr event Inflow = 90.77 cfs @ 11.96 hrs, Volume= 4.670 of Outflow = 43.75 cfs @ 12.07 hrs, Volume= 3.811 af, Atten= 52%, Lag= 6.4 min Primary - 43.75 cfs @ 12.07 hrs, Volume= 3.811 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 243.60' @ 12.07 hrs SurF.Area= 38,611 sf Storage= 92,890 cf Plug -Flow detention time=144.9 min calculated for 3.803 of (81 % of inflow) Center -of -Mass det. time= 69.5 min ( 855.6 - 786.1 ) Volume Invert Avail.Storage Storage Description #1 241.00' 148,768 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 241.00 32,500 0 0 242.00 34,846 33,673 33,673 243.00 37,192 36,019 69,692 244.00 39,538 38,365 108,057 245.00 41,884 40,711 148,768 Device Routing Invert Outlet Devices #1 Primary 240.00' 18.0" Round 18" CMP Barrel L= 50.0' CMP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert-- 240.00' / 239.00' S= 0.0200'/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area=1.77 sf #2 Device 1 242.00' 24.0" Horiz. 24" CMP Riser C= 0.600 Limited to weir flow at low heads #3 Device 1 241.00' 0.110 cfs 3" Skimmer #4 Primary 243.00' 20' Secondary Spillway, C= 3.27 Offset (feet) 0.00 4.50 24.50 29.00 Height (feet) 1.50 0.00 0.00 1.50 r ary OutFlow Max=42.19 cfs @ 12.07 hrs HW=243.59' (Free Discharge) =18" CMP Barrel (Barrel Controls 10.84 cfs @ 6.13 fps) 2 =24" CMP Riser (Passes < 19.05 cfs potential flow) 154" Skimmer (Passes < 0.11 cfs potential flow) =20' Secondary Spillway (Weir Controls 31.35 cfs @ 2.28 fps) Watershed D Subcat Reach Aon Llnk Basin D Routing Diagram for Basin D Prepared by {enter your company name here}, Printed 1/26/2021 HydruCAD®10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Basin D Type // 24-hr 2 yr Rainfall=3. 62" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 O 2017 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment IS: Watershed D Runoff = 18.74 cfs @ 11.97 hrs, Volume= 0.953 af, Depth> 2.47" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2 yr Rainfall=3.62" Area (ac) CN Description 1.960 86 Fallow, bare soil, HSG B 2.680 91 Fallow, bare soil, HSG C 4.640 89 Weighted Average 4.640 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.3 100 0.0300 0.51 Sheet Flow, Fallow n= 0.050 P2= 3.60" 3.2 760 0.0600 3.94 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.5 860 Total Basin D Type l/ 24-hr 2 yr Rainfall=3.62" Prepared by {enter your company name here} Printed 1/26/2021 HydroCADO 10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Page 3 Summary for Pond D: Basin D Inflow Area = 4.640 ac, 0.00% Impervious, Inflow Depth > 2.47" for 2 yr event Inflow - 18.74 cfs @ 11.97 hrs, Volume= 0.953 of Outflow - 3.52 cfs @ 12.15 hrs, Volume= 0.613 af, Atten= 81 %, Lag=10.5 min Primary = 3.52 cfs @ 12.15 hrs, Volume-- 0.613 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 262.40' @ 12.17 hrs Surf.Area=15,699 sf Storage= 20,684 cf Plug -Flow detention time=190.5 min calculated for 0.611 of (64% of inflow) Center -of -Mass det. time= 88.3 min ( 891.2 - 802.9 ) Volume Invert Avaii.Storage Storage Description #1 261.00' 47,547 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 261.00 13,500 0 0 262.00 15,066 14,283 14,283 263.00 16,632 15,849 30,132 264.00 18,198 17,415 47,547 Device Routing Invert Outlet Devices #1 Primary 260.00' 12.0" Round 12" CMP Barrel L= 50.0' CMP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 260.00' / 259.00' S= 0.0200'/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.79 sf #2 Device 1 262.00' 18.0" Horiz.18" CMP Riser C= 0.600 Limited to weir flow at low heads #3 Device 1 261.00' 0.070 cfs 2.5" Skimmer #4 Primary 263.00' 20' Secondary Spillway, C= 3.27 Offset (feet) 0.00 4.50 24.50 29.00 Height (feet) 1.50 0.00 0.00 1.50 rlmary OutFlow Max=3.52 cfs @ 12.15 hrs HN=262.40' (Free Discharge) t=12" CMP Barrel (Barrel Controls 3.52 cfs @ 4.48 fps) 2=18" CMP Riser (Passes < 3.92 cfs potential flow) 3=2.5" Skimmer (Passes < 0.07 cfs potential flow) =20' Secondary Spillway ( Controls 0.00 cfs) Basin D Type 1124-hr 10 yr Rainfall=5.28" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Pape 4 Summary for Subcatchment IS: Watershed D Runoff - 29.83 cfs @ 11.97 hrs, Volume= 1.561 af, Depth> 4.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10 yr Rainfall=5.28" Area (ac) CN Description 1.960 86 Fallow, bare soil, HSG B 2.680 91 Fallow, bare soil, HSG C 4.640 89 Weighted Average 4.640 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.3 100 0.0300 0.51 Sheet Flow, Fallow n= 0.050 P2= 3.60" 3.2 760 0.0600 3.94 Shallow Concentrated Flow, Unpaved Kv=16.1 fps 6.5 860 Total Basin D Type 11 24-hr 14 yr Rainfall=5.28" Prepared by {enter your company name here) Printed 1/26/2021 HydroCAD@ 10.00-20 s/n 07329 O 2017 HydroCAD Software Solutions LLC Page 5 Summary for Pond D: Basin D Inflow Area = 4.640 ac, 0.00% Impervious, Inflow Depth > 4.04" for 10 yr event Inflow = 29.83 cfs @ 11.97 hrs, Volume= 1.561 of Outflow = 9.20 cfs @ 12.12 hrs, Volume= 1.213 af, Atten= 69%, Lag= 8.9 min Primary = 9.20 cfs @ 12.12 hrs, Volume= 1.213 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 263.18' @ 12.12 hrs Surf.Area=16,917 sf Storage= 33,302 cf Plug -Flow detention time=157.8 min calculated for 1.210 of (78% of inflow) Center -of -Mass det. time= 74.4 min ( 863.5 - 789.1 ) Volume Invert Avail.Storage Storage Description #1 261.00' 47,547 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 261.00 13,500 0 0 262.00 15,066 14,283 14,283 263.00 16,632 15,849 30,132 264.00 18,198 17,415 47,547 Device Routing Invert Outlet Devices #1 Primary 260.00' 12.0" Round 12" CMP Barrel L= 50.0' CMP, projecting, no headwall, Ke= 0.900 Inlet / Outlet 1 nvert= 260.00' / 259.00' S= 0.0200 7' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.79 sf #2 Device 1 262.00' 18.0" Horiz.18" CMP Riser C= 0.600 Limited to weir flow at low heads #3 Device 1 261.00' 0.070 cfs 2.5" Skimmer #4 Primary 263.00' 20' Secondary Spillway, C= 3.27 Offset (feet) 0.00 4.50 24.50 29.00 Height (feet) 1.50 0.00 0.00 1.50 Primary OutFlow Max=8.82 cfs @ 12.12 hrs HW=263.17' (Free Discharge) Th.=12" CMP Barrel (Barrel Controls 4.04 cfs @ 5.15 fps) 2=18" CMP Riser (Passes < 9.21 cfs potential flow) 3=2.5" Skimmer (Passes < 0.07 cfs potential flow) =20' Secondary Spillway (Weir Controls 4.78 cfs @ 1.32 fps) Basin D Type 11 24-hr 25 yr Rainfall=6.27" Prepared by (enter your company name here) Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment IS: Watershed D Runoff — 36.41 cfs @ 11.97 hrs, Volume= 1.930 af, Depth> 4.99" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25 yr Rainfall=6.27" Area (ac) CN Description 1.960 86 Fallow, bare soil, HSG B 2.680 91 Fallow, bare soil, HSG C 4.640 89 Weighted Average 4.640 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.3 100 0.0300 0.51 Sheet Flow, Fallow n= 0.050 P2= 3.60" 3.2 760 0.0600 3.94 Shallow Concentrated Flow, Unpaved Kv=16.1 fps 6.5 860 Total Basin D Type 1l 24-hr 25 yr Rainfall=6.27" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD@ 10.00-20 s/n 07329 02017 HydroCAD Software Solutions LLC Page 7 Summary for Pond D: Basin D Inflow Area = 4.640 ac, 0.00% Impervious, Inflow Depth > 4.99" for 25 yr event Inflow = 36.41 cfs @ 11.97 hrs, Volume= 1.930 of Outflow = 21.57 cfs @ 12.07 hrs, Volume= 1.579 af, Atten= 41 %, Lag= 5.7 min Primary = 21.57 cfs @ 12.07 hrs, Volume= 1.579 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 263.40' @ 12.07 hrs Surf.Area=17,261 sf Storage= 37,126 cf Plug -Flow detention time=141.5 min calculated for 1.576 of (82% of inflow) Center -of -Mass det. time= 66.8 min ( 850.0 - 783.2 ) Volume Invert Avail.Storage Storage Description #1 261.00' 47,547 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 261.00 13,500 0 0 262.00 15,066 14,283 14,283 263.00 16,632 15,849 30,132 264.00 18,198 17,415 47,547 Device Routing Invert Outlet Devices #1 Primary 260.00' 12.0" Round 12" CMP Barrel L= 50.0' CMP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 260.00' / 259.00' S= 0.0200'P Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.79 sf #2 Device 1 262.00' 18.0" Horiz.18" CMP Riser C= 0.600 Limited to weir flow at low heads #3 Device 1 261.00' 0.070 cfs 2.5" Skimmer #4 Primary 263.00' 20' Secondary Spillway, C= 3.27 Offset (feet) 0.00 4.50 24.50 29.00 Height (feet) 1.50 0.00 0.00 1.50 Primary OutFlow Max=20.56 cfs @ 12.07 hrs HW=263.39' (Free Discharge) =12" CMP Barrel (Barrel Controls 4.18 cfs @ 5.32 fps) 2=18" CMP Riser (Passes < 10.02 cfs potential flow) 3=2.5" Skimmer (Passes < 0.07 cfs potential flow) -20' Secondary Spillway (Weir Controls 16.39 cfs @ 1.90 fps) Watershed E Subcat Reach Pon Link Basin E (Skimmer) Routing Diagram for Basin E Prepared by {enter your company name here}, Printed 1/26/2021 HydroCAD®10.00-20 sin 07329 © 2017 HydroCAD Software Solutions LLC Basin E Type // 24-hr 2 yr Rainfall=3.62" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 02017 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment IS: Watershed E Runoff = 6.00 cfs @ 11.95 hrs, Volume= 0.290 af, Depth> 2.56" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2 yr Rainfall=3.62" Area (ac) CN Description 0.260 86 Fallow, bare soil, HSG B 1.100 91 Fallow, bare soil, HSG C 1.360 90 Weighted Average 1.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Basin E Type 11 24-hr 2 yr Rainfall=3.62" Prepared by {enter your company name here) Printed 1/26/2021 HydroCADO 10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Pape 3 Summary for Pond E: Basin E (Skimmer) Inflow Area = 1.360 ac, 0.00% Impervious, Inflow Depth > 2.56" for 2 yr event Inflow = 6.00 cfs @ 11.95 hrs, Volume= 0.290 of Outflow = 0.25 cfs @ 13.29 hrs, Volume= 0.108 af, Atten= 96%, Lag= 80.1 min Primary = 0.25 cfs @ 13.29 hrs, Volume= 0.108 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 253.03' @ 13.29 hrs Surf.Area= 4,732 sf Storage= 8,048 cf Plug -Flow detention time= 281.1 min calculated for 0.108 of (37% of inflow) Center -of -Mass det. time=157.2 min ( 954.8 - 797.7 ) Volume Invert Avail.Storage Storage Description #1 251.00' 18,848 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 251.00 3,200 0 0 252.00 3,956 3,578 3,578 253.00 4,712 4,334 7,912 254.00 5,468 5,090 13,002 255.00 6,224 5,846 18,848 Device Routing Invert Outlet Devices #1 Primary 250.00' 4.0" Round Culvert L= 50.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 250.00' / 249.00' S= 0.0200 'P Cc= 0.900 n= 0.010 PVC, smooth interior, Flow Area= 0.09 sf #2 Device 1 251.00' 0.038 cfs 2" skimmer #3 Primary 253.00' Asymmetrical Weir, C= 3.27 Offset (feet) 0.00 4.50 16.50 21.00 Height (feet) 1.50 0.00 0.00 1.50 Rrimary OutFlow Max=0.21 cfs @ 13.29 hrs HW=253.03' (Free Discharge) =Culvert (Passes 0.04 cfs of 0.55 cfs potential flow) 2=2" skimmer (Constant Controls 0.04 cfs) 3=Asymmetrical Weir (Weir Controls 0.17 cfs @ 0.53 fps) Basin E Type/1 24-hr 90 yr Rainfall=5.28" Prepared by (enter your company name here) Printed 1/26/2021 H droCAD®10.00-20 s/n 07329 02017 H droCAD Software Solutions LLC Page 4 Summary for Subcatchment IS: Watershed E Runoff = 9.44 cfs @ 11.95 hrs, Volume= 0.470 af, Depths 4.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10 yr Rainfall=5.28" Area (ac) CN Description 0.260 86 Fallow, bare soil, HSG B 1.100 91 Fallow, bare soil, HSG C 1.360 90 Weighted Average 1.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Basin E Type 1l 24-hr 10 yr Rainfal1=5.28" Prepared by {enter your company name here} Printed 1/26/2-021 HydroCAD®10.00-20 s/n 07329 02017 HydroCAD Software Solutions LLC Page 5 Summary for Pond E: Basin E (Skimmer) Inflow Area = 1.360 ac, 0.00% Impervious, Inflow Depth > 4.14" for 10 yr event Inflow - 9.44 cfs @ 11.95 hrs, Volume= 0.470 of Outflow = 5.79 cfs @ 12.04 hrs, Volume= 0.287 af, Aften= 39%, Lag= 5.4 min Primary = 5.79 cfs @ 12.04 hrs, Volume= 0.287 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev-- 253.27' @ 12.04 hrs Surf.Area= 4,915 sf Storage= 9,278 cf Plug -Flow detention time=176.2 min calculated for 0.287 of (61 % of inflow) Center -of -Mass det. time= 72.6 min ( 856.8 - 784.2 ) Volume Invert Avail.Storage Storage Description #1 251.00' 18,848 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 251.00 3,200 0 0 252.00 3,956 3,578 3,578 253.00 4,712 4,334 7,912 254.00 5,468 5,090 13,002 255.00 6,224 5,846 18,848 Device Routing Invert Outlet Devices #1 Primary 250.00' 4.0" Round Culvert L= 50.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 250.00' / 249.00' S= 0.0200 7' Cc= 0.900 n= 0.010 PVC, smooth interior, Flow Area= 0.09 sf #2 Device 1 251.00' 0.038 cfs 2" skimmer #3 Primary 253.00' Asymmetrical Weir, C= 3.27 Offset (feet) 0.00 4.50 16.50 21.00 Height (feet) 1.50 0.00 0.00 1.50 Primary OutFlow Max=5.59 cfs @ 12.04 hrs HW=253.26' (Free Discharge) LCulvert (Passes 0.04 cfs of 0.57 cfs potential flow) 2=2" skimmer (Constant Controls 0.04 cfs) 3=Asymmetrical Weir (Weir Controls 5.55 cfs @ 1.56 fps) Basin E Type 1124-hr 25 yr Rainfall=6.27" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 O 2017 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment IS: Watershed E Runoff — 11.47 cfs @ 11.95 hrs, Volume= 0.579 af, Depth> 5.11" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25 yr Rainfall=6.27" Area (ac) CN Description 0.260 86 Fallow, bare soil, HSG B 1.100 91 Fallow, bare soil, HSG C 1.360 90 Weighted Average 1.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Basin E Type // 24 hr 25 yr Rainfall=6.27" Prepared by (enter your company name here) Printed 1/26/2021 HydroCADO 10.00-20 s/n 07329 4 2017 HydroCAD Software Solutions LLC Pape 7 Summary for Pond E: Basin E (Skimmer) Inflow Area = 1.360 ac, 0.00% Impervious, Inflow Depth > 5.11" for 25 yr event Inflow = 11.47 cfs @ 11.95 hrs, Volume= 0.579 of Outflow - 9.92 cfs @ 12.00 hrs, Volume= 0.396 af, Atten=13%, Lag= 3.1 min Primary = 9.92 cfs @ 12.00 hrs, Volume= 0.396 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 253.38' @ 12.00 hrs Surf.Area= 4,999 sf Storage= 9,844 cf Plug -Flow detention time=156.2 min calculated for 0.396 of (68% of inflow) Center -of -Mass det. time= 59.5 min ( 838.1 - 778.6 ) Volume Invert Avail.Storage Storage Description #1 251.00' 18,848 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 251.00 3,200 0 0 252.00 3,956 3,578 3,578 253.00 4,712 4,334 70912 254.00 5,468 5,090 13,002 255.00 6,224 5,846 18,848 Device Routing Invert Outlet Devices #1 Primary 250.00' 4.0" Round Culvert L= 50.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 250.00' / 249.00' S= 0.02007' Cc= 0.900 n= 0.010 PVC, smooth interior, Flow Area= 0.09 sf #2 Device 1 251.00' 0.038 cfs 2" skimmer #3 Primary 253.00' Asymmetrical Weir, C= 3.27 Offset (feet) 0.00 4.50 16.50 21.00 Height (feet) 1.50 0.00 0.00 1.50 "3=Asymmetrical rimary OutFlow Max=9.74 cfs @ 12.00 hrs HW=253.38' (Free Discharge) =Culvert (Passes 0.04 cfs of 0.58 cfs potential flow) 0- 2=2" skimmer (Constant Controls 0.04 cfs) Weir (Weir Controls 9.70 cfs @ 1.81 fps) Watershed 1 Subcat Reach Aon Link 48" CMP Culvert for stream crossing Type 1l 24-hr 2 yr Rainfall=3.62" Prepared by (enter your company name here) Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 O 2017 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment IS: Watershed 1 Runoff = 33.16 cfs @ 12.14 hrs, Volume= 2.848 af, Depth> 0.76" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2 yr Rainfall=3.62" Area (ac) CN Description 0.930 98 Impervious 23.200 70 Woods, Good, HSG C 20.770 55 Woods, Good, HSG 6 44.900 64 Weighted Average 43.970 97.93% Pervious Area 0.930 2.07% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.2 100 0.0200 0.18 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 6.1 1,032 0.0350 2.81 Shallow Concentrated Flow, Grassed Waterway Kv=15.0 fps 3.4 1,605 0.0250 7.83 70.49 Channel Flow, Area= 9.0 sf Perim= 9.0' r=1.00' n= 0.030 Stream, clean & straight 18.7 2,737 Total Culvert for stream crossing Type 1124-hr 2 yr Rainfall=3.62" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Page 3 Summary for Pond 2P: 48" CMP Inflow Area = 44.900 ac, 2.07% Impervious, Inflow Depth > 0.76" for 2 yr event Inflow = 33.16 cfs @ 12.14 hrs, Volume= 2.848 of Outflow = 28.42 cfs @ 12.22 hrs, Volume= 2.835 af, Aften=14%, Lag= 4.9 min Primary = 28.42 cfs @ 12.22 hrs, Volume= 2.835 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 238.07' @ 12.22 hrs Surf.Area= 8,398 sf Storage= 9,190 cf Plug -Flow detention time= 6.7 min calculated for 2.835 of (100% of inflow) Center -of -Mass det. time= 4.3 min ( 897.2 - 892.9 ) _Volume Invert Avail.Storage Storage Description #1 235.50' 82,831 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 235.50 0 0 0 236.00 493 123 123 238.00 8,023 8,516 8,639 240.00 19,200 27,223 35,862 242.00 27,769 46,969 82,831 Device Routing Invert Outlet Devices #1 Primary 236.00' 48.0" Round 48" Culvert L= 84.0' CMP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 236.00' / 234.38' S= 0.0193 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area=12.57 sf #2 Primary 241.00' Asymmetrical Weir, C= 3.27 Offset (feet) 0.00 28.00 48.00 68.00 104.00 133.00 Height (feet) 0.50 0.00 0.50 0.50 0.00 0.50 rrimary OutFlow Max=28.09 cfs @ 12.22 hrs HW=238.05' (Free Discharge) 1=48" Culvert (Barrel Controls 28.09 cfs @ 6.30 fps) 2=Asymmetrical Weir ( Controls 0.00 cfs) Culvert for stream crossing Type // 24-hr 10 yr Rainfall=5.28" Prepared by {enter your company name here} Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 1 S: Watershed 1 Runoff = 87.09 cfs @ 12.12 hrs, Volume= 6.566 af, Depth> 1.75" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10 yr Rainfall=5.28" Area (ac) CN Description * 0.930 98 Impervious 23.200 70 Woods, Good, HSG C 20.770 55 Woods, Good, HSG 6 44.900 64 Weighted Average 43.970 97.93% Pervious Area 0.930 2.07% Impervious Area Tc Length Slope Velocity Capacity Description min feet ft/ft) (ft/sec) (cfs 9.2 100 0.0200 0.18 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 6.1 1,032 0.0350 2.81 Shallow Concentrated Flow, Grassed Waterway Kv=15.0 fps 3.4 1,605 0.0250 7.83 70.49 Channel Flow, Area= 9.0 sf Perim= 9.0' r=1.00' n= 0.030 Stream, clean & straight 18.7 2,737 Total Culvert for stream crossing Type 11 24-hr 10 yr Rainfall=5.28" Prepared by (enter your company name here) Printed 1/26/2021 HydroCADO 10.00-20 s/n 07329 4 2017 HydroCAD Software Solutions LLC Page 5 Summary for Pond 2P: 48" CMP Inflow Area = 44.900 ac, 2.07% Impervious, Inflow Depth > 1.75" for 10 yr event Inflow = 87.09 cfs @ 12.12 hrs, Volume= 6.566 of Outflow = 68.84 cfs @ 12.23 hrs, Volume= 6.547 af, Atten= 21 %, Lag= 6.2 min Primary = 68.84 cfs @ 12.23 hrs, Volume= 6.547 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 239.58' @ 12.23 hrs Surf.Area=16,855 sf Storage= 28,296 cf Plug -Flow detention time= 6.3 min calculated for 6.547 of (100% of inflow) Center -of -Mass det. time= 4.6 min ( 869.8 - 865.2 ) Volume Invert Avail.Storage Storage Description #1 235.50' 82,831 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 235.50 0 0 0 236.00 493 123 123 238.00 8,023 8,516 8,639 240.00 19,200 27,223 35,862 242.00 27,769 46,969 82,831 Device Routing Invert Outlet Devices #1 Primary 236.00' 48.0" Round 48" Culvert L= 84.0' CMP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 236.00' / 234.38' S= 0.0193'/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area=12.57 sf #2 Primary 241.00' Asymmetrical Weir, C= 3.27 Offset (feet) 0.00 28.00 48.00 68.00 104.00 133.00 Height (feet) 0.50 0.00 0.50 0.50 0.00 0.50 Primary OutFlow Max=68.41 cfs @ 12.23 hrs HW=239.56' (Free Discharge) t1=48" Culvert (Barrel Controls 68.41 cfs @ 7.66 fps) 2 Asymmetrical Weir ( Controls 0.00 cfs) Culvert for stream crossing Type // 24-hr 25 yr Rainfaii=6.27" Prepared by (enter your company name here) Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment IS: Watershed 1 Runoff = 124.18 cfs @ 12.12 hrs, Volume= 9.147 af, Depth> 2.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25 yr Rainfall=6.27" Area (ac) CN Description * 0.930 98 Impervious 23.200 70 Woods, Good, HSG C 20_770 55 Woods. Good. HSG B 44.900 64 Weighted Average 43.970 97.93% Pervious Area 0.930 2.07% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.2 100 0.0200 0.18 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 6.1 1,032 0.0350 2.81 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 3.4 1,605 0.0250 7.83 70.49 Channel Flow, Area= 9.0 sf Perim= 9.0' r=1.00' n= 0.030 Stream. clean & straight 18.7 2,737 Total Culvert for stream crossing Type 1124-hr 25 yr Rainfall=6.27" Prepared by {enter your company name here) Printed 1/26/2021 HydroCAD®10.00-20 s/n 07329 © 2017 HydroCAD Software Solutions LLC Page 7 Summary for Pond 2P: 48" CMP Inflow Area = 44.900 ac, 2.07% Impervious, Inflow Depth > 2.44" for 25 yr event Inflow - 124.18 cfs @ 12.12 hrs, Volume= 9.147 of Outflow = 91.48 cfs @ 12.24 hrs, Volume= 9.124 af, Atten= 26%, Lag= 7.2 min Primary = 91.48 cfs @ 12.24 hrs, Volume= 9.124 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 240.49' @ 12.24 hrs Surf.Area= 21,285 sf Storage= 45,711 cf Plug -Flow detention time= 6.5 min calculated for 9.124 of (100% of inflow) Center -of -Mass det. time= 5.1 min ( 860.4 - 855.3 ) _Volume Invert Avail.Storage Storage Description #1 235.50' 82,831 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic feet) 235.50 0 0 0 236.00 493 123 123 238.00 8,023 8,516 8,639 240.00 19,200 27,223 35,862 242.00 27,769 46,969 82,831 Device Routing Invert Outlet Devices #1 Primary 236.00' 48.0" Round 48" Culvert L= 84.0' CMP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert-- 236.00' / 234.38' S= 0.0193 T Cc= 0.900 n= 0.025 Corrugated metal, Flow Area=12.57 sf #2 Primary 241.00' Asymmetrical Weir, C= 3.27 Offset (feet) 0.00 28.00 48.00 68.00 104.00 133.00 Height (feet) 0.50 0.00 0.50 0.50 0.00 0.50 Frimary OutFlow Max=91.24 cfs @ 12.24 hrs HW=240.48' (Free Discharge) 1=48" Culvert (Barrel Controls 91.24 cfs @ 8.10 fps) 2=Asymmetrical Weir ( Controls 0.00 cfs) 7- a IT p GAP Go t 61 r V Y 1 • 1. 1 1 w�-�^s►+ 1 1 // w i to t All 0 :1 I r } r ' r 111p1 IlfI rl •..,,III � M U� , IA�tll, d � NA i ®�E�fd� / ! r �tl tlil�i�inw ilr� I i r�nx•• t' r �� r• �u� r -, + �''ggr®�',Qlr� ii n r l�t 1li�, 111a d .� ,(� � � fir.,. ►I .,�r all W �.." " .gyp' Curves may not be extrapolated. Figural 0.06b Dosign of outlot protection tram a toured plpo rowing tail. maximum tailwatar wredidon (Tw 2 0.5 d ouneter). 8.06.4 3 R•r. I W3 Temporary Sediment Trap Calculations 10- r, 5-min TC Rainfall Intensi I =7.70 in/hr Trap Total ac Disturbed ac Grass/Wood Cavg Q10 cfs Reg Area (so Size ft Reg Vol 1 0.3 0.15 0.15 0.4 0.92 401.94 30x15 540 21 0.3 0.15 0.15 0.4 0.92 401.94 30x15 540 1 3 0.2 0.15 0.05 0.45 0.69 301.46 26x13 540 4 0.2 0.15 0.05 0.45 0.69 301.46 26x13 540 During construction of the roadways and stream crossings, sediment traps must be installed. To evaluate the sediment traps, the rational design method was used. For land cover, c=0.3 for grass/wood and c=0.5 for bare soil. Assume Tc period less than 5 minutes. 10-yr 5-minute rain intensity= 7.7in/hr Example (Trap 1) Q=C*I*A Cavg=(0.15*0.5+0.15*0.3)/0.3=0.40 1=7.7 in/hr A=0.3 ac. Q=0.4*7.7*0.3=0.924 cfs Required Area=(435 sf/cfs)(0.924cfs)=401.94sf Required Volume=(3600 cu.ft./acre disturbed)(0.21 ac)= 540 cf