HomeMy WebLinkAbout20210115 - ADI LetterROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
Certified Mail
Return Receipt Requested
7019 1120 0000 5072 4434
Mr. Scott Martino
Carolina Sunrock LLC
200 Horizon Drive, Suite 100
Raleigh, North Carolina 27615
NORTH CAROLINA
Environmental Quality
January 15, 2021
RE: Proposed Prospect Hill and Distribution Center
Caswell County
Roanoke River Basin
Dear Mr. Martino:
We have reviewed the application your company submitted for the referenced mine site and supplemental
information dated September 04, 2019, October 02, 2019, May 11, 2020, June 01, 2020, August 19, 2020,
October 21, 2020, and December 21, 2020. However, to date, this office has not received all of the information
requested in the letter dated September 16, 2020. As required by 15A NCAC 5B.0013, you are advised that you
have 180 days from the date of your receipt of that letter to submit all of the requested information. The above
referenced letter was signed for on September 21, 2020. Therefore, your deadline to submit all of the requested
information is March 20, 2021.
In order for this office to complete its review of the referenced project in accordance with G.S. §74-50 and §74-51
of the Mining Act of 1971, please provide the additional or revised information in accordance with the following
comments:
In accordance with GS §74-51(d3), the Department may deny a permit upon finding: "That the
operation will violate standards of air quality, surface water quality or groundwater quality that
have been promulgated by the Department. "
Please provide information on how the potential adverse effects to air quality referenced in the
Division of Air Quality's permit denial dated August 24, 2020 will be mitigated, such as a
subsequently approved air permit, or a statement from the Division of Air Quality stating that an
Air Permit is not required.
Please note, this office may request additional information, not included in this letter, as the mining application
review progresses. Be advised that our review cannot be completed until all of the items listed above have been
fully addressed.
D_E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center I Raleigh, North Carolina 27699-1612
enum a+axiw+
Certified Mail
Mr. Martino
Page 2
In order to complete the processing of your application, please forward two (2) copies of the requested information
to my attention at the following address:
Division of Energy, Mineral and Land Resources
Department of Environmental Quality
1612 Mail Service Center
Raleigh, NC 27699-1612
If you are unable to meet the March 20, 2021 deadline and wish to request additional time, you must submit
information, in writing, to the Director clearly indicating why the deadline cannot be met and request that an
extension of time be granted. If an extension of time is not granted or you do not respond to our request by the
March 20, 2021 deadline, a decision will be made to grant or deny the mining permit based upon the information
currently in the Departments files at the end of the 180-day period.
Though the preceding statement cites the maximum time limit for your response, we encourage you to provide the
additional information requested by this letter as soon as possible. Your prompt response will help us to complete
processing your application sooner.
Please contact me at (919) 707-9220 if you have any questions.
Sincerely,
Adam Parr
Assistant State Mining Engineer
cc: Ms. Tamera Eplin, PE