Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
7-Snow Camp Plan Sheet 301
LEGEND EXISTING PROPERTY LINE - - PROPOSED PROPERTY LINE - - EXISTING BUILDING f L_J PROPOSED BUILDING 0 MINE PERIMETER PROPOSED SECURITY FENCE x x x x TEMPORARY DIVERSION DITCH TD>- TEMPORARY SILT FENCE PROPOSED ENERGY DISSIPATOR TEMPORARY CHECK DAM • MINE HAUL ROAD DISTURBED AREA F J STONE OUTLET p TEMP. SLOPE DRAIN STONE INLET PROTECTION �. S.D.O. STORM DRAINAGE OUTLET \ \� // ��= SKIMMER BASIN #2/S.D.0 #2 PERIMETER SECURITY )� l� �ER l D.0 SKIMMER BASIN �1 \ \ J FENCE TO CLEAR SPAN 3 S 3 G ��\\\_ JURISDICTIONAL AREA # / I I # STONE OUTLET (TYP.) SEE DETAIL 7/C502 /i SKIMMER BASIN #1 ///��� _ SKIMMER BASIN / ` /S.D.O #1 \\�� / `SG° �/ - #16/S.D.O. #16 t / / CONTRACTOR TO PROVIDE CURLEX I j�� EXCELSIOR MATTING ACROSS THE I /// LIMITS OF 1I 1 , ENTIRE LENGTH & WIDTH OF ALL I /// DISTURBANCE �p 1- -\ \ I / /� /// r I SKIMMER BASIN SLOPES 3H:1V AND STEEPER I \ // //// //\� \\\ #12/S.D.O #12 V \� �` x -STONE OUTLET (TYP.) \ \\ 1\\\�\\���\\ SEE DETAIL 7/C502 J \ PERIMETER SECURITY -AJ LIMITS OF �- / \ FENCE TO CLEAR SPAN DISTURBANCE 1 JURISDICTIONAL AREA DIISTURBANCE = / ///Ul TEMP. SEDIMENT \ LSKIMMER�' #11/S.D.O A#1 'FENCE (TYP.) 1I SEE DETAIL 2/C501 0 I 1 I TEMP. SEDIMENT � ../ FENCE (TYP.) W W TAILINGS POND #1- \\\ I \� / / \ CO500'x100' ` 1 I SEE DETAIL 2/C50I 5 O m J 50' UNDISTURBED N BUFFERTAILINGS POND #2/ � 500'x100' \ SKIMMER BASIN Z LIMITS OF \ I I \ \\ \ \\\ I \ \ #22/S.D.O. #22 / �I DISTURBANCE \\\\ \ LIMITS OF DISTURBANCE' SKIMMER BASIN #10/S.D.O. \ \ 65.00 LF \ \\ \ / / / \ ���A4 (STORM DRAINAGE OUTLET) ) # 10 SE \ OF 15" RCP / \ 50' UNDISTURBED ��/ / j \ \ I / � \ ,� - BUFFER , / / % / SKIMMERE / SKIMMER SED.O A 1I3 \ / 6 1 I I I II I\ I I po\ \ \ �. LIMITS OF / #8/S.D.O I I DISTURBANCE / C o 0 / N� i LIMITS OF \ \ `620 \__ \ SKIMMER BASIN SO, IST BANCE A,✓ �\ \ SKIMMER BASIN/ #15/S.D.0 #15) // \Sp (�,y \ \ #23/S.D.O. #23 SEE DETAIL 2/C501 TOTAL DISTURBED AREA = 86.34 ACRES EROSION CONTROL SEQUENCE NOTES 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL AND PERMIT. 2. CONTACT EROSION CONTROL INSPECTOR TO ESTABLISH A PRE CONSTRUCTION CONFERENCE AND INSPECTION SCHEDULE. SELF INSPECTION ----- EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTING LAND -DISTURBING ACTIVITIES, LARGER THAN ONE (1) ACRE MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING ON APPROVED FORMS, THE PHASES ARE AS FOLLOWS: 1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 2. CLEARING AND GRUBBING OF EXISTING GROUND COVER. 3. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS. 4. INSTALLATION OF STORM DRAINAGE FACILITIES. 5. COMPLETION OF CONSTRUCTION OF DEVELOPMENT. 6. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. 3. CLEAR SITE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL MEASURES AS FOLLOWS: A. TEMPORARY CONSTRUCTION ENTRANCE/EXIT AT CLARK ROAD. B. THIS SITE HAS TEMPORARY SKIMMER BASINS AND SEDIMENT BASINS AS SHOWN. C. TEMPORARY DIVERSION BERMS D. TEMPORARY SILT FENCING AND STONE OUTLETS E. SEED EMBANKMENTS AND DISTURBED AREAS OF DEVICES (INCLUDING "CLEAN" WATER DIVERSION) UPON COMPLETION OF CONSTRUCTION. SEE GROUND STABILIZATION CRITERIA BELOW FOR MORE INFORMATION. 4. BEGIN CLEARING, GRUBBING, AND STRIPPING OF SITE AS REQUIRED. EARTHEN -MATERIAL STOCKPILES ON -SITE FOR LATER DISTRIBUTION AND/OR REMOVAL. AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC WASTE, AND HAZARDOUS OR TOXIC WASTE SHALL BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS (UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE), AND WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES. 5. BEGIN SITE GRADING. MAINTAIN EROSION CONTROL DEVICES IN ACCORDANCE WITH THE MAINTENANCE PLAN. INSTALL ADDITIONAL EROSION CONTROL MEASURES AS REQUIRED. 6. INSTALL STORM DRAINAGE SYSTEM AND UTILITIES. STORM PIPING MUST BE INSTALLED TO THE POINT WHERE IT ENTERS EACH DEVICE. COMPLETION OF PIPING WILL ONLY BE ALLOWED ONCE THE SITE HAS BEEN DEEMED STABLE BY THE EROSION CONTROL INSPECTOR. INSTALL PROTECTION AROUND ALL INLETS AS STORM DRAIN SYSTEM IS INSTALLED. DESCRIPTION STABILIZATION STABILIZATION TIMEFRAME TIMEFRAME EXCEPTIONS PERMANENT DIKES, SWALES, DITCHES, & 7 DAYS NONE SLOPES SLOPES STEEPER THAN 7 DAYS IF SLOPES ARE 10' OR LESS IN 3:1 LENGTH & ARE NOT STEEPER THAN 2:1, 14 DAYS ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES> 50' FLATTER IN LENGTH ALL OTHER AREAS WITH SLOPES 14 DAYS NONE FLATTER THAN 4:1 -/ STONE OUTLET (TYP.) ( SKIMMER--, #6 \ , = f TEMPORARY DIVERSION I 1 \ \ DITCH (TYP.) / n SEE DETAIL 7/C502 i \ / - BASIN 1\-u• ►qi ,� _ � / 50' UNDISTURBED, � - #5/S.D.O. - \ �� SEE DETAIL 3/C502 / / / BUFFER LIMITS OF / / #5 -610 _ \ / >/ / / / / / � / �� - SKIMMER BASIN 7. PRIOR TO THE CONTRACTOR DEMOBILIZING FROM THE SITE (AT APPROXIMATELY 45 DAYS PRIOR TO \ / DISTURBANCE �� SKIMMER BASIN / / I I I 21/S.D.O. 21 / 40 SKIMMER BASIN #7/ #27/S.D.O #27 / / / / / / / J # , # \� / DEMOBILIZATION), THE FINANCIAL RESPONSIBLE PARTY (OR THEIR DESIGNEE) WILL NOTIFY THE ENGINEER AND THE 70.00 LF S.D.O #7 % / / / / / / / / // / // / / / I / / l 1 DESIGNATED EROSION CONTROL INSPECTOR H THEIR ANTICIPATED DATE TO LEAVE THE SITE. ES ON SITE SKIMMER BASIN � OF 15" RCP' / � / / / // � / I I 'INSPECTION WILL BE CONDUCTED PRIOR TO THE LEAVE DATE BY THE ENGINEER AND/OR THE DESIGNATED EROSION # 14/S.D.O # 14 \ � / PROP. / CONTROL INSPECTOR TO MAKE CERTAIN ALL ACTIONS ITEMS HAVE BEEN ADDRESSED BY THE CONTRACTOR. /� KEYSTONE STRSTRUCTURAL PLATE ARCH IN SKIMMER BASIN /// \ / B0 FFER UNDISTURBED / // / /�/� / / I J 8. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED \ LIMITS OF - WALL #24/S.D.O. #24 / ( - I/ /J OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY / DISTURBANCE 1' �W II I I METAL 24' SPAN x 10'-4" , _ T� 1` J I �p / / I hem j� \ l AFTER FINAL INSPECTION AND APPROVAL BY ENGINEER. SKIMMER RISE BRIDGE CULVERT BY BASIN \\ CONTECH CONSTRUCTION 1 / SKIMMER BASIN EROSION CONTROL MAINTENANCE PLAN (CONTRACTOR MUST INCLUDE MAINTENANCE IN BASE BID) s / 64.00 LF o / LIMITS OF uA 7S.D.0 #4 PRODUCTS d \� #20/S.D.O. #20, / / j ^,�w��� j / ` I 1. INSPECT ALL SEDIMENTATION AND EROSION CONTROL DEVICES FOR STABILITY AND FUNCTION EACH WEEK OF 15" RCP DISTURBANCE ` / MIN NG LIMITS X / � - � / /� / I \ \ / AND FOLLOWING EACH RAINFALL EVENT. 2. REMOVE SILT/SEDIMENT FROM TEMPORARY DEVICES WHEN ACCUMULATED VOLUME HAS REACHED 50% ��\ \ \ SKIMMER BASIN \ / / / / / CAPACITY. \ LIMITS OF TEMP. CHECK DAM 3. REMOVED ACCUMULATED SILT/SEDIMENT FROM BEHIND TEMPORARY SEDIMENT FENCE WHEN DEPTH DISTURBANCE (TYP.) --- \ \ I I / / 139.73 LF EXCEEDS APPROXIMATELY 0.5'. REPAIR AND REPLACE SILT FENCE AS NECESSARY. / SEE DETAIL 4/C501 / ` \ \ ro�� OF 18" RCP / / _ \ \ 48.03 LF \ LIMITS OF / \ r -- / TEMP. SEDIMENT \ / / 1� Q 4. SEED AND STABILIZE TEMPORARY DIVERSION BERMS IMMEDIATELY AFTER CONSTRUCTION INCLUDING OF 15" RCP \ \ \ \\ \ \ DISTURBANCE ) \ LIMITS OF L FENCE (TYP.) / I "CLEAN" WATER DIVERSION BERMS. RE-GRADE/REPAIR BERMS AS REQUIRED. J 26.90 LF/ SKIMMER BASIN `OF 15" RCP #18/S.D.0 #18 \ 70.00 LF OF FES 2 \ \ \ , oP° I 1 I I / / \ \ 15" RCP LIMITS OF DISTURBANCE PROP. SEPTIC 80' OF / \ / \ I FIELD 24" RCP x I / / / ) •Y. / ` 1 \ \ \, TEMPORARY / I TEMP. SEDIMENT 6, \ \ / FES 1 CONSTRUCTION I ( FENCE (TYP.) o. \ ( SEE DETAIL 2/C501 I I 1 \ SO' ENTRANCE/EXIT / _ 1 SKIMMER BASIN SKIMMER BASIN I ( t° \ \ \ \ / , I #25/MINE \ STRFq� STUR6 0) N 1v c 0- a E m U 0 C.D im 7o M Y U o � R U U O a a � co Cn U rn � o� CV op o cv M L0 M 0 hi rn CV F- /. 06 >- w L (6 Ca m / / DRAINAGE OUTLET) \ \ \ /� / D SWD.O #25 ATERINGeUFFER TEI STONE PIPE INLET \ \ \ \ \ #17 PROTECTION \ \ \ \ \ / -� �_ SEE E / C� C^ ' 1 \ \\\ \ I \ \ \ J \ 630 i \ \ LIMITS OF \ C y DISTURBANCE II cz O �- I I AD \ \ o I mIM J ---10 1 I \ \ STORMWATER SEWER CALCULATIONS AND DESIGN TABLE INLET Q BASED ON 4 "/HOUR STORMRFTITRN PERIOD: 10 Yr for (TOC=5 Minuted TYPE GRATE RIM FROM TO INLET AREA (Ac.) INLET Q CFS TOTAL AREA (Ac.) I (in/hr) C Q CFS GRATE RIM/ THROAT FROM IN (ft) TO INV. (ft) APPROX, LENGTH (ft) SLOPE % N D(THEO.) (inches) PIPE SIZE (inches) PIPE MATERIAL N/A FES 1 FES 2 7.91 9.49 7.910 7.04 0.30 16.71 N/A 612.59 611.79 80.00 1.00 0.013 21.40 24 RCP 840.14 DI DI2 0.45 0.90 0.450 7.04 0.50 1.58 N/A 630.25 626.95 126.90 2.60 0.013 7.39 15 RCP 840.14 D12 FES 13 0.19 0.61 0.64 7.04 0.80 3.60 N/A 626.95 624.48 48.03 5.14 0.013 8.86 15 RCP N/A FES 3 FES 4 4.24 5.09 4.240 7.04 0.30 8.95 N/A 600.24 597.31 70.00 4.19 0.013 12.95 15 RCP N/A FES 5 FES 6 2.51 3.01 2.510 7.04 0.30 5.30 N/A 630.50 628.00 70.00 3.57 0.013 10.96 15 RCP N/A FES 7 FES 8 5.52 6.62 5.520 7.04 0.30 11.66 N/A 617.75 616.00 139.73 1.25 0.013 17.93 18 RCP N/A FES 9 FES 10 0.31 0.37 0.308 7.04 0.30 0.65 N/A 611.00 607.00 65.00 6.15 0.013 4.51 15 RCP N/A FES 11 FES 12 3.24 3.89 3.240 7.04 0.30 6.84 N/A 609.60 606.92 64.00 4.19 0.013 11.71 15 RCP I REINFORCED CONCRETE PIPE (RCP) TO BE CLASS IM PIPE JOINTS PER ASTM C443; TYPE 2 PIPE INS TALILATION AS TM C1479 DROP INLETS 1 & 2 TO BENCDOT STANDARD 840.14 \ FLARED END SECTION (FES) \ DISTURBANCE SEE DETAIL 2/C501 \ \ Y �- �63 l/ \\ 5. CONTRACTOR SHALL APPOINT AN ON -SITE INSPECTOR AND MAINTAIN RECORDS OF INSPECTIONS IN O ACCORDANCE WITH THE PROVISION OF THE GENERAL NPDES STORMWATER DISCHARGE PERMIT FOR \\\ �\ CONSTRUCTION ACTIVITIES. TEMP. SEDIMENT \ FENCE TYP. \ / I o ( ) r 1 ,p � \�\�� DETAILED CONSTRUCTION SEQUENCE SEE DETAIL 2/C501 SKIMMER (BASIN I / 1 ' 1 "� °O\� 1. CONSTRUCT THE TEMPORARY SURGE STONE CONSTRUCTION ENTRANCE/EXIT OFF CLARK ROAD. / ^/ 2. INSTALL SILT FENCE AND STONE OUTLETS FROM CLARK ROAD TO THE SOUTH SIDE OF THE STREAM \ \ \\ \ ( LOCATED AT 16+87. SILT FENCE TO BE LOCATED ON BOTH SIDES OF THE ROAD AND SOUTH BANKS OF THE STREAM. 3. INSTALL SKIMMER BASIN 6 AND SKIMMER BASIN 7 AND THEIR ASSOCIATED TEMPORARY DIVERSION DITCHES AND SLOPE DRAIN (IF CALLED FOR). SEDIMENT �- -- � / � \ G �� 4. INSTALL IMPERVIOUS CLEAN WATER DIKE AND BYPASS PUMPING SYSTEM AS SHOWN ON SHEET C402. JCE (TYP.) \ 6 � / t5� �o, �,\ \\\ INSTALL THE PERMANENT 54" PIPE AND ENDWALLS AT STATION 16+87. IL 2/C501 1P S 5. APPLY 10" STONE BASE LAYER TO ENTRANCE ROAD AND COMPACT. 06 6'6'�\ \ `6,76. BACKFILL, PREPARE SLOPES AND OTHER DISTURBED AREAS AND STABILIZE. 7. INSTALL SILT FENCE AND STONE OUTLETS ALONG NORTH SIDE OF THE STREAM. / / I`� z �� 8. INSTALL SILT FENCE AND STONE OUTLETS AROUND THE EXISTING STREAM BUFFER AND PROPERTY � BOUNDARY (WHERE DENOTED ON PLANS). INSTALL SKIMMER BASINS 4, 5, 13, 11, 3, 2, 1, 12, 8, AND I \ \ \ RF \ \T��e�T UU�(/ 10 AND THEIR ASSOCIATED TEMPORARY DIVERSION DITCHES AND SLOPE DRAINS (IF CALLED FOR). \ 1 \ \ \ \JO\, 9. PLACE ALL SILT FENCE AND STONE OUTLETS DOWN SLOPE OF ALL PROPOSED BERMS. y 10. BEGIN GRADING THE INITIAL MINE AREA, MOVE AND PLACE MATERIAL FOR BERMS. PLACE AND J l I \ \SF ��Cj� \ `- �, �J �_ IT�� ✓ ti��j . COMPACT MATERIAL FOR PLANT AND STOCKPILE AREA. ALL BERMS SHALL BE CONSTRUCTED AND STABILIZED WITHIN 1 YEAR OF STARTING MINING ACTIVITIES. 11. CONSTRUCT TAILINGS PONDS BEFORE MINING OPERATION BEINGS. C 12. SEED AND MULCH ALL AREAS THAT ARE NOT COVERED WITH ASPHALT OR STONE. 13. STABILIZE ALL CHANNELS AND SLOPES WITH MATTING AS NOTED ON THE PLANS. \ \ \ \ \ �0 SEEDING NOTE: R T B� NDA Y \ \ \ \ �\ \ \ \ \ �'A� °� \ SEED MIXTURE, SEEDING RATE, AND SOIL AMENDMENTS TO / l BE APPROVED BY AN ENVIRONMENTAL PROFESSIONAL AND P SUBMITTED TO OWNER AND ENGINEER PRIOR TO \ APPLICATION. SEED MIXTURE TO BE A MIXTURE OF RED CLOVER, CREEPING RED FESCUE, AND A GRAIN, SUCH AS, OAT, WHEAT, OR RYE. 100 U lU 1> U N00 I 0, aea Powered by partnership. 615 St. George Square Suite 300 Winston-Salem, NC 27103 336-842-4065 C#0430 labellapc.com F T 0� F�RGoN F T © 2019 LaBella Associates ALAMANCE AGGREGATES, LLC Mr. Chad Threatt, VP Snow Camp Mine NO: DATE: DESCRIPTION: REVISIONS PROJECT NUMBER: 2190335 DRAWN BY: KCG/ATC REVIEWED BY: PAS ISSUED FOR: REVIEW DATE: 5/28/19 DRAWING NAME OVERALL SEDIMENTATION & EROSION CONTROL PLAN DRAWING NUMBER: C301