HomeMy WebLinkAboutNorth American Emerald Docs 112818& rz�c� MaTioN
North Carolina Denartment of Em ironment and Natural Resources
Division of Land Resources, Land Quality Section
Single Facility Acreage History Report
Sele(tion Criteria:
Pern it No. 02-06.
Permit No. 02-06 Mine Name: North American Emerald ✓line
County: Alexander Original Issue Date: 3/15/2000 Fxl:irationDate: 9/9/9999
Region: Mooresville Regional Office Business: North American Emerald Mines
New Affected
New Reclaimed
Year Total
Pond
Stkpls
Berms
Plt/Rds Exc
Total
2002 0
2004 0
0
0
0
0 0
0
2007 3
0
0
0
0 0
0
2009 0
0
0
0
0 0
0
2010 0
0
0
0
0 0
0
2011 0
0
0
0
0 0
0
2013 0
0
0
0
0 0
0
2015 0
0
0
0
0 0
0
Currently
Affected
Pm j
Stk
Berms Plt/Rds
Exc
Total
1
2
2 0
2
6
3 0
7
15
3
1
3 8
5
20
C
5
0 4
14
23
4
0 4
14
22
0
2 0
7
10
I
0
2 0
7
10
0
2 0
7
10
0
2 0
7
10
I
0
2 0
7
10
November 28, 2018
State of North Carolina
Department of Environmental Quality
Division of Energy, Mineral and Lane F[esources
Mining Section
ANNUAL RECLAMATION REPORT FOR '02017 CALENDAR
YEAR
North-Caralina GeneraLStatutes-7_4-55-and the Mining Regulations -require that ' by JuGy 1 of eac"ear,-the-operator - --
shall file a report of activities completed during the preceding year on a form piescri:)ed by the Department, which
will include all of the following:"
PRINT OR TYPE
Name of Mine: North American Emerald Mine Mining Permit No.: 02-06
Name of Company/Owner on Permit Document- North American (Emerald Mines
Official Mailing Address- 531 Duncan Lane
Hiddenite NC 28636 _
Telephone: (828) 635-8080 Check if change of addres 3 xr telephone (show changes):
1. If mine is now inactive, when did mining stop? Date: __..
Is this stoppage permanent? Yes No
If yes, do you wish to have this mine site released from your -eclamation bond?
2. Was new land affected in 2016?
If yes, how much?
Is map on file current? _DL Yes
_ Yes
acres
No
If not, submit updated map showing affected acreage
3. Estimate land to be newly disturbed by mining in the 2018 calendar year:
acres
Check here if no new acreage is to be affected in 2018: Cl
Yes No
*4. List by category the total amount of disturbed and unreclaimed land present at this site at the
end of the 2016 calendar year.
----
(A) TAILINGS PONDS: acres (D) PLANT AREA: _ acres
(B) STOCK PILES- acres (E) MINE EXCAVATION: acres
3
(C) *WASTE PILES: �a acres Prc«VII _A,1 C,1h '`� j(� )
TOTAL DISTURBED ARE, AT SITE 2% acres
*NOTE: WASTE PILES should include overburden storage disposal areas and berms.
5. State and describe the amount and type of reclamation carried out in the 2017 calendar year:
Check here if no reclamation completed in 2017: ❑
Signature of Company Officer/Owner:
Print Name: North American Emerald Mines
Title: cj,3� r Vyt a-yr\
Date: 2a 2-0 L 9
*Complete and return by July 1, 2018, with the annual fee, and two copies of this form along
with two copies of an updated mine map (see note below) for each permitted mining operation
to:
Land Quality Section
NCDEQ
1612 Mail Service Center
Raleigh, NC 27699-1612
FAILURE TO FILE THIS FORM BY THE DATE SPECIFIED MAY RESULT IN THE
ASSESSMENT OF CIVIL PENALTIES AND COULD RESULT IN THE REVOCATION OF YOUR
MINING PERMIT. SHOULD YOU HAVE ANY QUESTIONS, PLEASE CALL (919) 707-9220.
NOTE: If your operation was idle in 2017, or no new acreage was affected by mining, and no
areas were reclaimed in 2017, you do not have to send an updated mine map. Also, if
you have completed a permit action since January 1, 2017 (which involved updating your
mine map), you do not have to send an updated mine map. However, the ANNUAL
RECLAMATION REPORT form must be completed for all mines under permit.
For DEMLR use:
Amount Received:
Date Received:
Enter into IBEAM by:
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
MINING SECTION
Notes:
State of North Carolina
Department of Environment and Witural Resources
Division of Land ResoL KIM
ANNUAL RECLAMATION REPORT FOR 2 01113"CALENDAR YEAR
North Carolina General Statutes 74-55 and the Mining Regulations require that "I hE� mine operator shall, by February 1 of each
year during the life of the permitted operation, and within 30 days of completion or tern- i iation of mining on an area under permit,
file with the Department a mining reclamation report on a form prescribed by the Eep irtment.'
PLEASE PRINT OR TYPE_ -
Name of Mine: Uk' e--11"(A7i County: Cj' f C• �y ' Mining Permit No.:
� � ' �03 River B-.sin (dame:
iv�iriiny Derri�'it EXp,rat;Cn Date: '�
/�/!✓ `pry. /�� �i'l �r%n2T� ��/�-4J ?'/I �/
Name of Company/Owner on Permit Document:
Official Mailing Address:
City:
Zip Code:
Check if change of addr(!ss or telephone: ElTelephone:
1. If mine is now inactive, when did mining stop? Date:
Is this stoppage permanent? _ Yes
If yes, do you wish to have this mine site released from your i at;Ii:imation bond? Yes No
2. Was new land affected in 2016?
If yes, how much?
Yes
acres
is map on file current! Yes No
If not, submit updated map showing affected acreage.
Estimate land to be newly disturbed by mining in the 2017 calendar year:
Check here if no new acreage is to be affected in 2017 E—]
acres
List by category the total amount of disturbed and unreclaimed land present at this site at the end of
the 2016 calendar year.
A TAILINGS PONDS: � � � acres (D) PLANT AREA: acres
() )
(
B) STOCK PILES: acres (E) MINE EXCAVATION- acres
(C) *WASTE PILES: acres TOT,'kL. DISTURBEDdr c�
AREA @ S ITI_: acres
*NOTE: WASTE PILES should include overburden stoi age)disposal areas and berms.
5. State and describe the amount and type of reclamation carried out in the 2016 calendar year:
Check here if no reclamation completed in 2016:
Signature of Company Officer/Owner:
Print Name: _S � 'c_ S
Title: _C (,/-) M- avl A
Date: 1 -2- 11
*Complete and return by February 1, 2017 two copies of this form along with two copies of an
updated mine map (see note below) for each permitted mining operation to:
Land Quality Section
DEMLR
1612 Mail Service Center
Raleigh, NC 27699-1612
FAILURE TO FILE THIS FORM BY THE DATE SPECIFIED MAY RESULT IN THE ASSESSMENT OF
CIVIL PENALTIES AND COULD RESULT IN THE REVOCATION OF YOUR MINING PERMIT.
SHOULD YOU HAVE ANY QUESTIONS, PLEASE CALL (919) 707-9220.
NOTE: If your operation was idle in 2016, or no new acreage was affected by mining, and no areas
were reclaimed in 2016, you do not have to send an updated mine map. Also, if you have
completed a permit action since January 1, 2016 (which involved updating your mine map),
you do not have to send an updated mine map. However, the blue report form must be
completed for all mines under permit.
769 copies of this public document were printed at a cost of $91.80 or $0.12 per copy. 11/2016
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
LAND QUALITY SECTION