Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Map 8 - Castle Hayne
UNDISTURBED BUFFER - PHASE 2 AREA I20' UNEXCAVATED BUFFER z W LL Lu a m 0 w m tr H 0 z N W Ln Q x a 0 z Q N w h Q x a z W W 3 W m W z J ) b' AA O*M S L OVERALL EXCAVATION DEPTH IN PHASE 1 WILL VARY FROM 36' TO 8' �. 3H TO 1V SLOPE - WILL NARY IN HIGHT i 20' ACCESS AROUND POND j ! ttt j EXCAVATION DEPTH IN PHASE 1 NEAR DIVISION LINE BETWEEN PHASE 1 AND PHASE 2 UNDISTURBED BUFFER WILL VARY FROM 28' TO 10' \L WATER DEPTH WILL BE +/- 7' 2H TO 1 V SLOPE NOT TO SCALE CROSS - SECTION ADJACENT TO DIVISION LINE BETWEEN PHASE 1 AND UNDISTURBED BUFFER PHASE 2 3H TO 1V SLOPE 2H TO 1V SLOPE J I P/`! j6�` �001 NOTE: THE SOUTH SIDE (A) OF THE TYPICAL CROSS-SECTION AA - A WILL APPLY ALONG THE SOUTH SIDE OF THE PHASE 1 MINE AREA. THE HEIGHT OF THE FINAL EXCAVATED SLOPE WILL VARY ACCORDING TO THE ELEVATION OF THE UXISTING GROUND SURFACE IN ANY PARTICULAR LOCATION ALONG THE SOUTH SIDE WHERE THE 30' UNDISTURBED BUFFER AND THE 20' UNEXCAVATED BUFFER EXISTS. W sa'. Q RECLAIMED LAKE WATER SURFACE 3H TO 1V SLOPE FINAL WATER DEPTH WILL BE i/- 7' 2H TO 1V SLOPE 3n`6�' �dn©� ?,.a `0s SDI S`aDr 6ao` b�9 D 76D't' TYPICAL CROSS-SECTION AA A SCALE: HORIZONTAL —1" = 40' VERTICAL —1" = W W C LL LL LL LL m -� o m W � Q m Q u _N W C1 Z G a ! O O N M 4 �✓ .32.1 3H TO 1V SLOPE �ar,l 2i zol5 HILTON PROPERTIES, LP MODIFICATION OF MINING PERMIT HILTON PROPERTIES MINE— PERMIT NO. 65-35 NEW HANOVER COUNTY DRAWN BY: LESLIE SCHNEIDER (AS DIRECTED BY FLOYD WILLiAMS, PG, CPESC) DATE MAP COMPLETED: NOVEMBER 25, 2013 WILLIAMS Environmental & Geological Services, PLLC REVISIONS: smem ER121.2013,MARCH23,2013 4120 Sedgewood Drive- Unit 104 Raleigh, NC 27612 (1-800-240-8550) SHEET 2 OF 2