Loading...
HomeMy WebLinkAboutMap 6 - Castle HayneUNDISTURBED BUFFER - PHASE 2 AREA CC W W ca fG W m Cr z N W N Q S a z Q N W Q z a z W W 3 W m W z J a 31- Ib/ 111 AA 0MS♦z 20' UNEXCAVATED BUFFER CC w W W LL W LL � m to WW m a N X z z H N 3H TO 1V SLOPE 2H TO 1V SLOPE OVERALL EXCAVATION DEPTH IN PHASE 1 WILL VARY FROM 36' TO 8' 3H TO 1V SLOPE - WILL VARY IN HIGHT 20' ACCESS AROUND POND EXCAVATION DEPTH IN PHASE 1 NEAR DIVISION LINE BETWEEN PHASE 1 AND PHASE 2 UNDISTURBED BUFFER WILL VARY FROM 28' TO 10' \L WATER DEPTH WILL BE +/- 7' 2H TO 1 V SLOPE NOT TO SCALE CROSS — SECTION ADJACENT TO DIVISION LINE BETWEEN PHASE 1 AND UNDISTURBED BUFFER PHASE 2 i 0 J W u. L7 z N X W m --3Iz, 2-147 —9 , '49 b /. W V Q W Ln N 0 z O z H N X W RECLAIMED LAKE WATER SURFACE FINAL WATER DEPTH WILL SE +/- 7' / 4P gel tS� � � ,7 J 00 bDd/ TYPICAL SS -SEC AA —A NOTE: THE SOUTH SIDE (A) OF THE TYPICAL CROSS-SECTION AA - A WILL APPLY ALONG THE SOUTH SIDE OF THE PHASE 1 MINE AREA. THE HEIGHT OF THE FINAL EXCAVATED SLOPE WILL VARY ACCORDING TO THE ELEVATION OF THE EXISTING GROUND SURFACE IN ANY PARTICULAR LOC,4TION ALONG THE SOUTH SIDE WHERE THE 30' UNDISTURBED BUFFER AND THE 20' UNEXCAVATED BUFFER EXISTS. 3H TO 1V SLOPE b„"r a;o1 17° 0/ 780 / 2H TO 1V SLOPE 1 /17— Epp/ gv)I 89a, SCALE: HORIZONTAL -1" = 40' VERTICAL -1" = 8' 3H TO IV SLOPE s ' 0 HILTON PROPERTIES, LP MODIFICATION OF MINING PERMIT HILTON PROPERTIES MINE — PERMIT NO. 65-35 NEW HANOVER COUNTY RECEIVED JAN 212015 DRAWN BY: LESLIE SCHNEIDER (AS DIRECTED BY FLOYD WILLIAMS, PG, CPESC) DATE MAP COMPLETED: NOVEMBER 25, 2013 WILLIAMS REVISIONS: SEPTEMBER 21,2013, MARCH 23,2013 1-I4-�4101.5' .� SHEET 2 OF 2 Environmental & Geological Services, PLLC 4120 Sedgewood Drive - Unit 104 Raleigh, NC 27612 (1-800-240-8550)