HomeMy WebLinkAboutWAYNE-031 Final Report DAM HYDRAULIC CAPACITY ASSESSMENT REPORT H. F. LEE INACTIVE ASH POND DAM #1 WAYNE-031 WAYNE COUNTY, NC PREPARED BY: TYLER MCEWEN, PE 2020 EXECUTIVE SUMMARY A hydraulic capacity analysis was completed for the H.F. Lee Station Inactive Ash Pond Dam #1 in Wayne County, North Carolina. The purpose of the study was to analyze the existing potential of the dams for overtopping during predetermined specified rainfall events. The analyses were completed using the United States Army Corps of Engineers developed software Hydrologic Engineering Center – Hydrologic Modeling System (HEC-HMS) in combination with ArcGIS to develop required input parameters. The rainfall events included in the analyses consist of 24- hour durations with return periods of 25 years, 50 years, 100 years, 200 years, 500 years and 1000 years. Results of the analyses indicate that this structure is not hydraulically adequate for all of the above rainfall events. The dam is overtopped by 0.0 – 0.1 feet during these events. Data, input parameters and final results can be found on the attached summary sheets and in the appendices of this report as well as in the associated electronic file in which all program files are stored. The elevation-storage calculation does not include the storage below the normal pool elevation for this study. All elevations in this report are based on North American Vertical Datum of 1988 (NAVD88). Drainage Area (Sq. Mi.)= Curve Number = Lag Time (min.)= Rainfall Distribution Methods = N/A Emergency N/A STORAGE (ACRE-FT) 164.6 1.1 ELEVATION N/A STORAGE (ACRE-FT) 62.3 87.8 NOT TO SCALE 85.0 139.084.0 77.0 78.0 79.0 80.0 37.9 17.7 113.483.0 5.3 82.0 0.0 0.5 SUMMARY SHEET OF HYDRAULIC CAPACITY RESULTS H.F. Lee Inactive Ash Pond Dam #1, WAYNE-031 SPILLWAY ANALYSIS PERFORMED BY: TYLER MCEWEN, PE, NCDEQ-DEMLR 24 HOUR - 1000 YEAR EVENT, 15.10 INCHES, MAX W.S. ELEVATION 78.8 (0.1 FT OVERTOPPING) 24 HOUR - 500 YEAR EVENT, 13.2 INCHES, MAX W.S. ELEVATION 78.8 (0.1 FT OVERTOPPING) 24 HOUR - 200 YEAR EVENT, 11.00 INCHES, MAX W.S. ELEVATION 78.8 (0.1 FT OVERTOPPING) TOP OF DAM ELEVATION = 78.7 FT NAVD88 75.0 76.0 24 HOUR - 100 YEAR EVENT, 9.52 INCHES, MAX W.S. ELEVATION 78.7 (0.0 FT OVERTOPPING) ELEVATION (FT NAVD88)TYPE N/A Principal ELEVATION 81.0 24 HOUR - 50 YEAR EVENT, 8.21 INCHES, MAX W.S. ELEVATION 78.7 (0.0 FT OVERTOPPING) 24 HOUR - 25 YEAR EVENT, 7.03 INCHES, MAX W.S. ELEVATION 78.7 (0.0 FT OVERTOPPING) SUMMARY OF INPUT PARAMETERS NRCS-NOAA 0.045 99 1 H.F. LEE INACTIVE ASH POND DAM #1 WAYNE-031 June 30, 2020                         APPENDIX A  Watershed Boundary    Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO,USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, OrdnanceSurvey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMapcontributors, and the GIS User Community H.F. Lee Inactive Ash Pond Dam #1 - WAYNE-031Watershed Boundary .Drainage Area: 0.045 Square Miles Legend Watershed Boundary 0 0.15 0.30.075 Miles                         APPENDIX B  Time of Concentration Calculation    The StreamStats did not produce a “longest flow path” for WAYNE-031. The lag time is assumed to be 1 minute for the HEC-HMS modeling.                         APPENDIX C  NRCS Curve Number Summary Sheet    The entire watershed is composed of the inactive ash pond. The curve number is assumed to be 99.                         APPENDIX D  Hyetograph Results Used for Analyses    0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 0 2 4 6 8 10 12 14 16 18 20 22 24Cumulative Inches of RainHours Hyetographs for 24-Hour Rainfall Distributions 25YR 50YR 100YR 200YR 500YR 1000YR                         APPENDIX E  NOAA ATLAS 14 RAINFALL TABLE    Point precipitation frequency estimates (inches) NOAA Atlas 14 Volume 2 Version 3 Data type: Precipitation depth Time series type: Partial duration Project area: Ohio River Basin Location name (ESRI Maps): Goldsboro, NC, USA Station Name: - Latitude: 35.3813° Longitude: -78.1102° Elevation (USGS): 71.96 ft PRECIPITATION FREQUENCY ESTIMATES by duration for ARI (years):1 2 5 10 25 50 100 200 500 1000 5-min:0.441 0.515 0.589 0.663 0.742 0.807 0.867 0.925 0.994 1.06 10-min:0.704 0.824 0.943 1.06 1.18 1.28 1.38 1.47 1.57 1.67 15-min:0.88 1.04 1.19 1.34 1.5 1.63 1.74 1.85 1.98 2.09 30-min:1.21 1.43 1.69 1.94 2.22 2.45 2.67 2.88 3.15 3.39 60-min:1.51 1.8 2.17 2.53 2.96 3.32 3.67 4.04 4.52 4.95 2-hr:1.77 2.12 2.62 3.1 3.71 4.25 4.8 5.39 6.2 6.94 3-hr:1.88 2.26 2.8 3.34 4.04 4.69 5.35 6.08 7.11 8.07 6-hr:2.25 2.7 3.35 4.01 4.86 5.66 6.48 7.39 8.69 9.9 12-hr:2.64 3.17 3.95 4.75 5.81 6.79 7.83 8.99 10.7 12.2 24-hr:3.03 3.68 4.75 5.66 7.02 8.19 9.5 11 13.2 15.1 2-day:3.51 4.24 5.42 6.43 7.91 9.19 10.6 12.1 14.5 16.5 3-day:3.73 4.51 5.72 6.75 8.25 9.53 10.9 12.5 14.7 16.7 4-day:3.96 4.77 6.02 7.07 8.59 9.88 11.3 12.8 15 16.9 7-day:4.64 5.58 6.98 8.13 9.78 11.1 12.6 14.2 16.4 18.3 10-day:5.3 6.35 7.82 9.03 10.7 12.1 13.6 15.2 17.5 19.3 20-day:7.18 8.56 10.4 11.9 13.9 15.6 17.3 19.2 21.7 23.8 30-day:8.96 10.6 12.7 14.3 16.5 18.3 20.1 21.9 24.5 26.4 45-day:11.3 13.4 15.8 17.6 20.2 22.2 24.2 26.2 29 31.1 60-day:13.6 16 18.7 20.7 23.4 25.5 27.5 29.6 32.3 34.4 Date/time (GMT): Thu Jul 2 15:23:06 2020 pyRunTime: 0.0114109516144                         APPENDIX F  Outlet Works Rating Curves    There is no free flow spillway for this inactive ash pond. The site is monitored due to the highly sensitive nature of materials contained in the pond. The pond also faces external flood risks due to the ash pond’s proximity to the Neuse River. There is no discharge rating curve for WAYNE-031.