Loading...
HomeMy WebLinkAboutWake-061 Final ReportDAM HYDRAULIC CAPACITY ASSESSMENT REPORT EDGEHILL FARM DAM WAKE-061 WAKE COUNTY, NC PREPARED BY: WITHERSRAVENEL, INC. FEBRUARY 2020     EXECUTIVE SUMMARY  A hydraulic capacity analysis was completed for the Edgehill Farm Dam in Wake County, North Carolina.  The  purpose of the study was to analyze the  existing  potential of the dam for overtopping during  predetermined specified rainfall events.  The analyses were completed using the United States Army  Corps of Engineers developed software Hydrologic Engineering Center – Hydrologic Modeling System  (HEC‐HMS)  in  combination  with  Arc‐GIS  to  develop  required  input parameters.  The rainfall events  included in the analyses consist of 24‐hour durations with return periods of 25 years, 50 years, 100 years,  200 years, 500 years and 1000 years.    Results of the analyses indicate that this structure overtopped (reservoir water surface elevations exceed  the lowest surveyed top‐of‐dam elevation) for the 500‐year and 1000‐year storm events. The analysis  indicates that the structure was hydraulically adequate for the 25‐year, 50‐year, 100‐year, and 200‐year  events.  Data, input parameters and final results can be found on the attached summary sheets and in the  appendices of this report as well as in the associated electronic file in which all program files are stored.             ELEVATION STORAGE  (ACRE‐FT)ELEVATION STORAGE  (ACRE‐FT) 415.0 0.0 422.0 63.9 415.5 3.2 422.5 69.9 416.0 7.1 423.0 76.1 416.5 11.0 423.5 82.5 417.0 15.1 424.0 89.1 417.5 19.2 424.5 96.0 418.0 23.4 425.0 103.0 418.5 27.7 425.5 110.3 419.0 32.3 426.0 117.8 419.5 37.0 426.5 125.5 420.0 42.0 427.0 133.6 420.5 47.2 421.0 52.5 421.5 58.1 EDGEHILL FARM DAM 1/23/2020 SUMMARY OF HYDRAULIC CAPACITY RESULTS EDGEHILL FARM DAM; WAKE‐061 ANALYSIS PERFORMED BY: TADD ALEXANDER, WITHERSRAVENEL 24 HOUR ‐ 500 YEAR EVENT, 9.23 INCHES, ELEVATION 418.4 (0.2 FT OVERTOPPING) 24 HOUR ‐ 50 YEAR EVENT, 6.66 INCHES, ELEVATION 417.4 (0.8 FT FREEBOARD) 24 HOUR ‐ 1000 YEAR EVENT, 10 INCHES, ELEVATION 418.7 (0.5 FT OVERTOPPING) 415.00 CONTROL ELEVATIONSPILLWAY NRCS‐NOAA 17  minutes WAKE‐061 Twin 36‐inch CPP Barrels TYPE Primary 0.15  Sq. Mi. Rainfall Distribution Methods =  Lag Time =  Curve Number =  Drainage Area =  78 24 HOUR ‐ 25 YEAR EVENT, 5.93 INCHES, ELEVATION 417.1 (1.1 FT FREEBOARD) 24 HOUR ‐ 200 YEAR EVENT, 8.18 INCHES, ELEVATION 418 (0.2 FT FREEBOARD) 24 HOUR ‐ 100 YEAR EVENT, 7.41 INCHES, ELEVATION 417.7 (0.5 FT FREEBOARD) SUMMARY OF INPUT PARAMETERS TOP OF DAM ELEVATION = 418.17