HomeMy WebLinkAbout20241029_Mine_Maps T
MURRELL
21
175
..1059
5M
W 1011
0
CC
994
,144t$
6
T
313 BRUCE
CONWAY
Afto
BARN
z
U)
UJ C) -V
4
66
z co
2<W
7-
0
77`31
1-, z
Z LL D
LIJ a
7,
ca Z
�00
L
TA
W
a.
D
T1,
":t4
T
046 g:
ol
01 MP�
.AW
�A
F
7 51"
J,
A.
0-1
0
I IL
4,
'k
J,
A
�A
41 V
NEV
U1,
MINING
0 T� w Aw"
AREA
zi
X
1� L
.�V
IT
14
40
q4l
WEYERHAUSER LINE
COMPANY PROP
OVERALL SITE PLAN
CARTERET FARM MINE
CARTERET FARM LLC
CARTERET COUNTY
dification: This permit modification adds 15.6 acres to the permitted a 1'=200' October 21, 2024
acres will be mined. The new mining area will be established as the
ig area is phased out. The existing mining area will then serve as a large settling
200 400 for pit discharge from the new mining area. As water is pumped from the new PAGE 1 OF 3
Feet ig area into the pond, it will occasionally overflow through rock dams as shown. PREPARED BY CAROLINA GEOLOGICAL SERVICES, INC
all
FRI
co
MAX. WITH WIRE
as (6' MAX. WITHOUT WIRE) �x
a
rTF w 91 U
o MIDDLE AND VERTICAL WIRESzo
SHALL BE 121t GAUGE MIN. u.
• io
�pV 1�xlrn t �gU rli TOP AND BOTTOM STRAND w
jW SHALL BE 10 GAUGE MIN. ' .
24" MAX. 0
(1 S" MIN.)
,Mr
z WIRE `W
y FILTRATION GEOTEXTILE W
UlI� a Q NOTES 4.
USE WIRE A MINIMUM OF 32
IN WIDTH AND WITH A MINIMUM FILTRATION GEOTEXTILE x y
OF 6 LINE WIRES WITH 12" STAY
SPACING, COMPACTED FILL: OC
USE FILTRATION GEOTEXTILE
A MINIMUM OF 36" IN WIDTH AND it 0
FASTEN ADEQUATELY TO THE WIRE —"� ;
-.
AS DIRECTED.
!�1 PROVIDE 5'-0" STEEL POST OF
THE SELF-FASTENER ANGLE STEEL � a '
4„ ST EL POST - 2`-0" DEPTH
TYPE,
FOR MECHANICAL SLICING METHOD "
INSTALLATION, GEOTEXTILE SHALL
BE A MAXIMUM OF 18" ABOVE GROUND EXTENSION.-OF GEOTEXTILE AND
SURFACE WIRE INTO TRENCH 4 F t
4ti 1605.Q1
E+AMW
A191)L R0PfD
EN i Nft. '�Ei MtT 'BGsvr.�C>AGe.� ZS (JN4"9C.AVXCa7 TSUi-�
`r'4k)iLi To-aE
"13A1ZN To ftG4VCCIZ-A/ In
e >
r v 73E C V Q E
Z a c) 'FOCL
ca N t O t' N
N �G S� W�T4✓rZ
't"emPvtzraRH
LUGr1ilUN Ot
tv-14
'�'t�a.Qr FvV. � momID%-M Ir1 fl�Z.tN L v� 1 I
... .....�....,��\ A+d ta�E � t,t� T`�1Z1 E'C�t2 St6.� cE i + — _ — — e ,_:„•= �, .� ... 4. .=
,`,�` I _ �RMt; •mot, 40'un��xcA�'�J 13v�►z 11
66 UNntSCUIRt36h 5o U N t 1,6TUTIrwo 13u 2
�\` t T2 1� N : "� '_'" 12lMGtt:tt StittNC� t l
� MtNt (� ttMtT I�
76E ?Um'z�c) �NtG v �l
�urtE'u- � � p,T�c1!3 CPonrb� a t
Att t '�
Flp��
w EN►19C, 5t-VIE Is �l0' h 11
FLOOl)PLA I+ni
f
Ac
+l
�f
3 NEw z rf
� )
21
Not to.30410 +f
t
�atn+r�•zt� strc urx ,r
pp A0'V QF-XCAVN-C6() t3 t'ERM�-C 136vntt)AR4
NOTES 00
,k
LU
1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE
�o t� TRUCKS, tom-x w'z L'u,
Z"�r 2. LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION
BY ALL CONSTRUCTION VEHICLES. o cn �-» ?^Ft ►
CATEGORY CURRENT AFFECTED PRi7PP3SED CHANGE TO TOTAL AFFECTED
3► 3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT ACREAGE AFFECTED ACREAGE ACREAGE
M TRACKING OR DIRECT FLOW OF MUD ONTO STREETS.
PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY. Tailings/Sediment Ponds
��MN �
4. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE Stockpiles
✓ CLEANED UP IMMEDIATELY.
♦f 5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF SfE
tttf
INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE tuw ''� �vtwR Waste piles
FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE. miry,,
6. NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES TO Mill Processing Areas/Haul Roads 0.70 0.50 1.20
BE DETERMINED BY .THE ENGINEER. V► r Mine Excavations 6.00 11.98 17.9$
/ �Q 7. USE GLASS 'A' STONE OR OTHER COARSE AGGREGATE APPROVED a 1W4 ti.
S� BY THE ENGINEER. „Rt ?t Other{Please explain)
6. INSTALL CONSTRUCTION ENTRANCES IN A WAY TO PREVENT VEHICLES
�� ? FROM BYPASSING CONSTRUCTION ENTRANCE LEAVING PROJECT SITE, c W Total Affected Acreage 6.70 12.48 19.18
0 CDP10 3: , Filter fabdo Total Permitted Acreage 8.40 15.60 24.00
i \\11vCa 60, Gro w"tion
C3 a" rr MINE
PLAN AND DETAILS
OveGN{I' @
W
z rn� (off rttletmant
�- CLASS 'A' STONE �' � 4.fk min
CARTERET FARM MINE
' a
IN. MIN, DEPTH . 91side CARTERET FARM LLC
n W a it ;0*0 Max
w a� metctllt iPi ,;.r� �,+�. � Reclamation Plan: The entire Mining Area will be left as a pond. All slopes will be
NOTE: PLACE FILTRATION GEOTEXTILE BENEATH STONE a� x raded to a 3:1 slope or flatter. All disturbed areas above static water level will be CARTERET COUNTY
m g p
' seeded according to approved Revegetation Plan. The haul roads will remain in use as 1'=100' October 21, 2024
'Min farm access roads. PAGE 2 OF 3
30 Om Sedan
1,16
�,� $��°�1 PREPARED BY CAROLINA GEOLOGICAL SERVICES, INC
ft�.T I4L4VC.d'r ,
a
15AMN
•..,. }i�.0 L •rz.r�wh
fIAV i'. RaAD
EaN'tBANC.+I<. InM�T u ��
TV
Q i
\;\
R 1T : N 7t ldt R�q�
p VdE'f 1
PIAaaPLA 100 °
20
All
,r
PC-RM%T 136UNDW14
RECLAMATION PLAN
CARTERET FARM MINE
Reclamation Plan: The entire Mining Area will be left as a pond. All slopes will be CARTERET FARM LLC
graded to a 3:1 slope or flatter. All disturbed areas above static water level will be CARTERET COUNTY
seeded according to approved Revegetation Plan. The haul roads will remain in use as 1'=100' October 21, 2024
farm access roads.
PAGE 3OF3
PREPARED BY CAROLINA GEOLOGICAL SERVICES, INC