HomeMy WebLinkAbout20241029_ADI_Reply CAROLINA GEOLOGICAL SERVICES, INC
RECEIVEL
October 22, 2024 OCT 29 2024
Mr. Corey Clayton
Mr. Adam Parr pEMLR,
NCDEQ
1612 Mail Service Center
Raleigh, NC 27699-1612
Subject: Carteret Farm Mine (16-87), Carteret County, ADI response
Dear Mr. Clayton;
On behalf of Trey Rivenbark, I am writing in response to your September 18, 2024 letter
requesting additional information on the above-referenced mining permit modification
application. I will respond to each item in the order of your letter for clarity.
1. The buffers between the mining limits and the permit boundary have been clarified on the
mine map. This is a very simple mine plan, with the permit boundary defined by well
established farm ditches and the existing farm road. For clarity, the buffer has been labeled as
40 feet unexcavated.
2. These structures were addressed in the initial application, and in the previous ADI letter
response dated March 28, 2022, item 7. These structures will be removed as the excavation
extends into this area. However, they have been added to the mine map for clarity.
3. The dewatering basin is temporarily located in the southwest corner of the current mining
area. This has been added to the mine map. Since the existing mining area will be allowed to
fill with water and serve as a large pond, the dewatering basin will no longer be necessary upon
approval of this modification, and utilization of the large pond.
4. Bruce Conway Jr was sent a notification in the initial permitting process in 2022. A Notice
has been sent to Starflite Holdings. Certified Mail Receipts for both notifications are attached.
5. The acreage table has been corrected.
6. As explained in the previous ADI letter response dated March 28, 2022, according to the
NPDES permitting rules, a Pumping Operation and Monitoring Plan is required when the
pumping could possibly draw down groundwater levels to impact a nearby wetland or waterway.
According to two reviews by the US Army Corps of Engineers, there are no wetlands or streams
in the vicinity of the mining area. The only jurisdictional feature is an agricultural ditch near the
current mining area, and since the pumped water discharges into this ditch, it is impossible for it
to be impacted by any groundwater drawdown.
PO Box 429, GARNER, NC 27529
page 2
Mr. Corey Clayton
Mr. Adam Parr
7. The mining area is clearly defined by existing agricultural ditches and the existing farm road.
The precise location of these ditches is clearly and permanently recorded in existing and older
air photos, public GIS data, as well as agricultural soils maps. The mining area can be very
simply calculated by a trapezoidal area measurement and calculation. The boundaries can be
easily be marked in the field using the ditches. These boundaries can be easily confirmed at
any future date by comparison with air photos or soil maps, and subsequent confirmation by
trapezoidal area calculations.
8. As explained in the original approved mine map, the reclamation plan is simply to leave the
mining areas as ponds. However, a separate page showing only the ponds is included.
We trust that this information will allow you to complete your review of this modification
request. Please let me know if you need any additional information.
Sincerely,
James Izzell
Carolina Geological Services, Inc.
enclosures
RbY COOPER
Governor
ELIZABETH S. BISER $ ,
Secretary
WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA
Interim Director Environmental Quality
September 18,2024
Certified Mail
Return Receipt Requested
7022 0410 0003 1066 6174
Trey Rivenbark
Carteret Farm LLC
285 Cape Lookout Dr
Harkers Island,NC 28531
RE: Carteret Farm Mine
Mining Permit No. 16-87
Carteret County
White Oak River Basin
Dear Mr. Rivenbark:
We have reviewed the modification request your company submitted for the referenced mine site. In order for this
office to complete its review of the referenced project in accordance with N.C.G.S.§74-50 and§74-51 of the Mining
Act of 1971, please provide the additional or revised information in accordance with the following comments:
1. Buffers are not labeled/shown on the proposed area to add land to the permit boundary. Please indicate
the offset distance for the buffer and whether they will be unexcavated or undisturbed on the Mine Map.
2. The inspection report,and satellite imagery, indicate that a structure is inside the permit boundaries on
the north-east portion of the currently permitted area and not shown on Mine Map. Please add all
structures within the permit boundary to the Mine Map.
3. The inspection report, and satellite imagery, indicate that the dewatering basin for the existing mine is
not located as shown on the mine map. Please update the Mine Map to show the current location of the
dewatering basin.
4. Property owners Bruce Conway Jr and Starflite Holdings, both North of the acreage to be added, are
within 1,000 feet of the proposed mining permit boundary to be added to your mining permit. Please
provide proof that they have been notified such as Certified Mail receipts.
5. The acreage table values on the Mine Map don't add up. Please adjust the acreage table to indicate the
increased acreage.
6. To protect the surrounding wetlands and streams, please provide a pumping O&M plan.
7. Please clarify how acreage can be accurately calculated and how boundaries in the field can be marked
accurately.
8. Please refer to Section D of the mine permit application and provide a reclamation map that clearly
illustrates the reclamation plan for the entire site. The map should clearly illustrate the post mining use
of the entire site. It shoruld also include all italicized items listed in the application.
D_E QJ> North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 2 769 9-1612
NPw 01OFE% M: Ot,Io1aAb 919.707.9200
i.
Certified Mail
7022 0410 0003 1066 6174
Page 2
Please note, this office may request additional information, not included in this letter, as the mining application
review progresses. Be advised that our review cannot be completed until all of the items listed above have been
fully addressed.
In order to complete the processing of your application,please forward two(2)copies of the requested information
to my attention at the following address:
Division of Energy, Mineral and Land Resources
Department of Environmental Quality
1612 Mail Service Center
Raleigh,NC 27699-1612
If hand delivering or delivering by shipping company(e.g., FedEx, UPS), please deliver to our physical address:
Division of Energy,Mineral,and Land Resources
Department of Environmental Quality
512 N. Salisbury Street, 5th Floor
Raleigh,NC 27604
As required by 15A NCAC 5B.0113,you are hereby advised that you have 180 days from the date of your receipt
of this letter to submit all of the requested information. If you are unable to meet this deadline and wish to request
additional time,you must submit information,in writing,to the Director clearly indicating why the deadline cannot
be met and request that an extension of time be granted. If an extension of time is not granted, a decision will be
made to grant or deny the mining permit based upon the information currently in the Department's files at the end
of the 180-day period.
Though the preceding statement cites the maximum time limit for your response,we encourage you to provide the
additional information requested by this letter as soon as possible. Your prompt response will help us to complete
processing your application sooner.
Please contact me at(919)707-9220 if you have any questions.
Sincerely,
Ic04-ley owe OIL
Corey Clayton
Assistant State Mining Engineer
cc: Dan Sams, PE
Postal
CERTIFIED MAILO RECEIPT
O Domestic
Q
Q
APO ` zsru
M1 Cem w
$
M Pee
m 53.754 0�21
I~' Wm eNloec Fees
nm .mMyp(wyp
�tieWm Peoay,ti�PN � 13
o na.u. ww,tla, . �n nn p
p p nwi n.ar,cmaoW..y = Qr^- : Post-- Nam
p +�Ri ,Ra,akw i
❑Mux sk�uuvHmbcwp•My
p Postage
� $11,i8
Q' 0 Postageanarpq.� (14/02/2022
a
p a8
1 Sent To
ru
M .___ BCZuGE CoNww
Fat2�C Ar — -- —
ZS
U.S. Postal Service"
CERTIFIED MAILO RECEIPT
I
p m Domestic
0
aru
Be wr Q '
r. C 'iea Mail Peep
� #3.75 0511
05 r' a_a�uvkesdaafaeM1 13
❑Pmrn Hecipt TmG pA i V� V�V
p �n°m'"xse7t(°� i— Postmark
p ❑Ca2gha Maq Peetnctee�Ya'Y f $0 00
p Hero
p �Atrm SVrOv.ggSea i $—$0.00
O�9W�PAWkkW Wi i
p PosMOa $Ii,JB
U- s 04/02/2022
OM o wt�aena ."38
ru Sent w W 14A-1 j CONW
N
f�MFOOt Are, Z951
U.S. Postal Service"
Ln CERTIFIED MAIL@ RECEIPT
_111 Domestic Mail Only
FTo
,Fa)ur ,ht rir-3led Mail Fee r S _nj
mSeNIMS&Fees(cnecxeo,,,akeaBoren4� -'`j Recepl mardooPV) $ b p I111�U.R—lpt waotetnic) $ it •�NnMetl Mell ReeelcteE Del $ III PM¢!e!ktl.lult SlpreWre RegNree $Ln
ult$Igneture geeMctetl Oeptill,ioetaga and Fees ],I I/��!?il�?Fqo`�Cf�CUT5 LLC
------i."No:,oiP'6'6'oxxNo�------------- ......-
1 ENSA'i Ir
1Qn1 wul ee 4
fafLT nlL ?.BStlo