Loading...
HomeMy WebLinkAbout20241101_ADI_Reply PO Box 29682 804.784.6300 800.898.LUCK Richmond VA23242-0682 804.784.6390 Fax www.luckstone.com LUCKUSTONE_ IGNITING HUMAN POTENTIAL �'�-•� OF�j��ToR 01 Zof��® '�vglFRpRoc Mr.Adam Parr �/� 10/26/2024 NC DEQ Division of Energy,Mineral and Land Resources 512 North Salisbury Street Raleigh,North Carolina 27699 RE: Permit Modification—Response to Comments Mine Permit No.53-26,Sanford Quarry,Lee County Dear Mr.Parr, Luck Stone was provided a letter from the North Carolina Department of Environmental Quality(NCDEQ),dated September 4th 2024,with comments pertaining to a permit modification for Sanford Quarry in Lee County,NC. Luck Stone has completed the following responses to the permit modification comments. Please review the following NCDEQ comments,the appropriate Luck Stone response and all attachments: 1. Please note that all sediment and erosion control measures(culverts/ditches,basins,construction entrance,etc)and construction/maintenance details,including those requested below,must be shown on the Mine Maps.Though the City of Sanford has approved the plans for the South Carter Industrial Site,a sediment and erosion assessment must also be approved by the regional office for the mining permit as a whole.The mine application must stand on its own and therefore this information must be included on the mine plans as well. Luck Stone Response—Detailed design and construction plans associated with the entrance road to the quarry were submitted with the June 5,2024 response to the NCDEQ. While the county had approved this design,we were unaware the plans were not formally reviewed by NCDEQ prior to this mine permit modification submittal. Regardless,the previously submitted package should include all requested items. 2. Please clarify if additional culverts,pipes,or diversion ditches are planned for installation along the access road. a. Provide design calculations for culverts and storm sewers(include HW,TW,and outlet velocities). b. Provide adequate pipe inlet and outlet protection for the culverts. Luck Stone Response—Detailed design and construction plans associated with the entrance road to the quarry were submitted with the June 5, 2024 response to the NCDEQ. The previously submitted package should include all requested items. 3. Provide perimeter erosion and sediment control measures around the existing and proposed access road to prevent erosion and sediment from transporting outside of the permit boundaries. Luck Stone Response—Detailed design and construction plans associated with the entrance road to the quarry were submitted with the June 5, 2024 response to the NCDEQ. The previously submitted package should include all requested items. 4. Provide a plan detail and specific construction sequence for the installation of the proposed bridge across the wetlands onto the site.Ensure any additional temporary work area necessary for this installation is shown on the plans. Luck Stone Response—Detailed design and construction plans associated with the bridge phase of construction have been attached with this response package. 5. The USACE 404 permit that was submitted appears to be for the South Carter Industrial Site and that project does not address the installation of the bridge over the wetlands.Please provide proof that land disturbing activities have been approved to build a bridge over the wetlands. Luck Stone Response—The approved USACE 404 permit related to the entrance road has been attached with this package. A separate application is currently under review for all future impacts associated with development of the site. This review is near completion and will be submitted upon approval. No work within any jurisdictional waters will begin prior to all necessary approvals. 6. Please provide construction and maintenance details for the access road proposed, including the roadway material. Luck Stone Response—Detailed design and construction plans associated with the entrance road to the quarry were submitted with the June 5,2024 response to the NCDEQ. The previously submitted package should include all requested items. 7. Please provide a construction entrance from the access road onto NC Highway 87(or the access point that connects exposed sediment areas to paved surfaces)to prevent sediment tracking from the site onto the public roadway. Luck Stone Response—Detailed design and construction plans associated with the entrance road to the quarry were submitted with the June 5, 2024 response to the NCDEQ. The previously submitted package should include all requested items. 8. Please submit a seeding specification/schedule for reclamation. Luck Stone Response—A seeding specification/schedule has been included on an updated reclamation plan map. This updated map has been included in this response package. Thank you for your kind assistance in this matter. If you have any questions and/or comments,please contact me at 804- 514-8670. Sincerely, 7J--; 7 L,-C, Brian Parker Construction Engineer,Luck Stone Corporation