HomeMy WebLinkAbout20220922_InspRptt North Carolina Department of Environment and Natural Resources,
Division of Energy, Mineral, and Land Resources, Land Quality Section
MINE INSPECTION REPORT
❑X PERMITTED MINE SITE ❑ UNPERMITTED MINE SITE
1. MINE NAME: Massengill Mine 2.MINE LOCATION: Devils Racetrack Road
3. COUNTY: Johnston 4. RIVER BASIN: Neuse 5. CASE:
6. OPERATOR: Mid-East Services,Inc.
7. ADDRESS: 910 S Clinton Ave,Dunn,NC 28334
8. MINING PERMIT#: 51-52 ❑ N/A 9. PERMIT EXPIRATION DATE: LOM ❑ N/A
10. PERSON(S) CONTACTED AT SITE: Marc Phillips
11. PICTURES? ❑X Yes ❑No TAKEN BY: Lauren Garcia
12. TYPE OF INSPECTION:
❑ A. Initial Inspection(Unpermitted Mine Sites)
1. Size of affected land: ac. (attach sketch map)
2. How was this area measured? Measured by:
❑X B. Routine Inspection(Permitted Mine Sites)
C. Follow-up Inspection
13. Date of last inspection: 07/26/2016
14. Any mining since that date? ❑X Yes ❑ No If yes,cite evidence of such mining activity:
Mining activity has occurred since 2016.Mining operators have been offsite since atleast 2021.
15. Was mine operating at time of inspection? ❑ Yes N No If yes, explain: Mining activity is complete
and reclamation activities have nearly been completed.Operators have been offsite for atleast a year.
16. Is the mine in compliance with the Operating Conditions of the Permit? 0 Yes
❑ No ❑ N/A If no, explain:
17. Is the mine in compliance with the Reclamation Conditions of the Permit? ® Yes ❑ No ❑N/A If
no,explain: Reclamation activities have nearly been completed. Several slopes along the lake have been stabilized with
millet.Once permanent ground cover has been established,the mine will have met all reclamation conditions.
18. Is there any off-site damage? A. ❑ Yes B. ❑X No C. ❑ None observed
If A,describe the type and severity of the damage: N/A
If B or C,is there potential for offsite damage? ❑ Yes ❑X No Explain: N/A
19. Corrective measures needed and/or taken: N/A
20. Other recommendations and comments: Establish permanant ground cover.
21. Is the Annual Reclamation Report+/- map accurate? ❑X Yes ❑ No (Explain) ❑ Not Reviewed ❑N/A
22. Follow-up inspection needed? N Yes ❑ No Proposed date once ground cover is established.
23. No. of additional pages of Inspection Report 0 24. Copy of Report sent to operator Yes
INSPECTED BY: Lauren Garcia/Joe Dupree DATE 09/22/2022
Telephone No: (919)-791-4200
Copy to file Copy to operator Copy to Mining Specialist
-
r
a
.E
«z
--
-
j y j
low, 4'
-��' ` ,k � max• `-� � '_�kw`t1�`'"
\ s
4 r,• r Woo
. � 0,
v
h r t
a
44,WA 4 �
alp" a.. Yoh'- 't- •:.^ -;'�"� .ram. c t
rah `� ` ��`�'� 1`�"°:�"�' s�S:s• '� u.--.� .. � I rr�I,k
4
5 n a
�4
v
- � �' •c are -..a'" �x"a�ai'�T-��. � `� -
f`
a
s
� t
- ��=- - -
_._
:�,
�� F �F �. �R� 3� '��, 's Wa -�,3 �`x. .f� 1�,�.xs s.�.�
_ „� �,: .�?g¢;� a � - �' F �F�^!.��3�nar .S a s ,�r%"� tw� �n.tr,
_ Y p� f� ��� 4e�� Yfdvi � � Fp xy 44 A •;�
- - ` �k---
it l
_
'�' J cn'�.�, ,.J+` ,��'.r, �9�.:� •1. � i -ir bW� �+'q � ,,rt_ .g 7 '��t�ti t t
"'+ia'�.a*k .h. :s11+`'•�r��`,, d`CT? -ig' 'v3 � t( _