HomeMy WebLinkAbout2023_Annual Reclamation Report_51-47 KECEIVED
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES OCT 2 9 2024
DIVISION OF ENERGY,MINERALAND LAND RESOURCES
MINING PROGRAM LAND QUALITY
2023 Annual Reclamation Report MINING PROGRAM
GENERAL INFORMATION
Legal Corporate/Owner Nam l+/ p
Mine Name: r +
Mine Permit No• - Mine Phone Nymber,If any: 5.
Mine Address(911 Address)Line 1:_ 4/,��„p r�
Mine Address Line -
City: State: Nr Zip Code: 7 County:
Facility Coordinates: Latitude• 957� , /0 0 �
� � Longitude: 7 River Basin:
Responsible Off cial/Authorized Contact: Invoice Contact:
Name/Title; A5hk. 5Pal, ff��i0mincl Check if same as Responsible Official/Authorized Contact
Mailing Address Line 1: _ �9 I�rl+r$I'� z Name Title:
Mailing Address Line 2: ,//LL n/'� 1, �7 Mailing Address Line 1:
City/State/Zip Code3gdb rp/a /y y -S75-77 Mailing Address Line 2:
Primary Phone No.7r/- -/j9.Z"o. City: State: Zip Code:
Secondary Phone No. Primary Phone No. Fax No.
Email Address: S1n�a rant 1j �g /fC rr rasp Secondary Phone No.
Email Address:
Is the site Active? Llll� Yes _No Estimate land to a newly disturbed by mining in the 2024 calendar
r
If mine is now inactive,when did mining stop? Year. (i Acres
Date: Check here if no new acreage was to be affected in 2024:_
Is this stoppage permanent? —Yes —No List by category the total amount of disturbed and unreclaimed land
If yes,do you wish to have this mine site released from present at this site at the end of the 2023 calendar year.
your reclamation bond? —Yes _No TAILINGS PONDS J
/ Acres
Was new land affected in 2023? ✓ Yes No STOCK PILES _ d Acres
WASTE PILES _ D Acres
If yes,how much? f PLANTAREA Acres MINE EXCAVATION Acres
---- `'!!--]]'' Acres
Is map on file current? _-yes ,_No TOTAL DISTURBED AREA AT SITE: Acres
If the map is not current,submit updated map showing "Note:WASTE PILES should include overburden storage/disposal
affected acreage. areas and berms.
State and describe the amount and type of reclamatyyn carried yyut In 2023 calendar year: h I,QaCur�ec.(
la Hd c /.I no� 3 : (� S e 7"Ie l� ct sta/e� U✓� �z �l e•�L r vac e diri8
Check here if no reclamation completed in 2023: c"{/�
Signature of Responsible Official/Authorized Contact; LFI �i9�.�✓ Ct' ( T f Date:
Print Name: �s�1•Py spf� Title:
"Complete and return by September 1,2024,with the annual fee,and two copies of this form along with two copies of an updated mine
map(if needed).
Shaded areas are not required but are useful to the Mining Program.