Loading...
HomeMy WebLinkAbout78-52_Routing_DWR Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM SECTIONTHIS TO BE OUT BY DEIVILR DEMLR PERMIT: 78-52 Project Action New Modification Transfer Release Applicant Name: Hole of Hope LLC X Applicant's Email: a1lotclearing@aol.com County: Robeson Project Name: Williams Dirt and Sand YES NO Date Commencing Have land disturbing activities started?? X Latitude: 34.8664 Longitude: -79.0440 Please return comments to (at DEMLR CO): Corey Clayton corey.clayton@deq.nc.gov Comments due by: = 11/21/2024 SECTION • TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? El F-1 Is the RO concerned that the operation, as proposed, would violate standards of water quality? Comments: Does this mine (or previous owner) have DWR back fees to pay? (If Yes, amount): Watershed/Stream Name & Classification: DWR Compliance Status of Mine: 401 Wetland Cert. required? I I ❑ 401 Wetland Cert. existing? I ❑ (If Yes, Permit#): Does DWR RO have enough information to determine if a 401 certification is required? Central Coastal Plain Capacity Use Area (CCPCUA). Required? Ll Central Coastal Plain Capacity Use Area (CCPCUA). Existing? I I ❑ (If Yes, Permit#): Does DWR RO have enough information to determine if a CCPCUA is required? Is an O & M Plan needed? ❑ Are wetlands disturbed at this site? I ❑ Does DWR RO suspect or know of nearby wetlands to the site? Is a wetland delineation required prior to DWR issuing the permit? JD Consultant Onsite Offsite Stream Determination Needed? Stream Determination Completed? Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? Rev November 2021 r0 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Buffer Determination Needed? Buffer Determination Completed? Recycle system permit existing? (If Yes, Permit#): New Recycle System permit required? Enough information to determine? Non-discharge permit existing? (If Yes, Permit#): Will wastewaters discharge to HQW waters with a 7Q10=0? 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or ❑ I ❑ because DWR requires more information)? Has Violation O&M Requirements ❑ HQW/7Q10 Concerns IT- Pay back fees or renew DWR permit ❑ Other Please describe the reason to hold the permit: RO contact: Hold Until: Mine must wait to dewater until an O&M plan is approved? ( - CentralOffice Date Regional Office I Date DWR RO Surface Water RO Aquifer Protection Section Rev November 2021 r0