HomeMy WebLinkAboutAppendix C.D - WTP Block Flow Diagram 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
SODIUM /�
HYPOCHLORITE A
SULFURIC ACID
CAUSTIC
PAG SEEPAGE WATER B
PROCESS PLANT REUSE WATER
TO PROCESS PLANT
EXCESS WATER
BACK—UP PROCESS
WATER SUPPLY
MICA PROCESS C
WATER TANK
VENDOR PACKAGE
ANTI—SCALANT
PROCESS AREA AERATION
STORMWATER BLOWER SKID P10
1 \ 1
WTP FEED TANK AERATION TANKF I Fr-,
1 1
COAGULANT \
— — — — — — — — — — — — � — — VENDOR PACKAGE
1 \ 1
VENDOR PACKAGE
1 1 REVERSE
WTP OUTDOOR SUMP 1 STATIC MIXER 1 ; \ ; — — OSMOSIS
FLOCCULANT SYSTEM #1 —3
POLYMER F
1 1
1 1 1 \ 1 WATER STORAGE BASIN 1
1 1
VENDOR PACKAGE
1
1 1
— — WATER
CLARIFIED WATER TANK TREATMENT
ULTRAFILTER 1 1 TREATED WATER TANK
1 -7//
CLARIFIER
SYSTEM #1 —3
1 1
1 1
OUTFALL TO
REACTION TANK 1 \ 1 KINGS CREEK
1 \ 1
1 1 H
1 1 BRINE
MAGNETIC DRUM REVERSE L - -
SHEAR MIX OSMOSIS
SYSTEM #1 —2
1 1
1 1
RO BRINE TO
COAGULANT FLOCCULANT OFF—SITE DISPOSAL J
POLYMER
1
1 1
VENDOR PACKAGE
LREACTION TANK & BALLASTED CLARIFIER SYSTEM 1 1
1 1
1
SLUDGE STORAGE TANK I
1 1
WTP FILTER PRESS L
1 RAPID MIX FLOCCULATION 1
SECTION SECTION
1 1
1 1
LAMELLA CLARIFIER FILTER M
CAKE
CLARIFIER SYSTEM DROP
— — — — — — — — — — — — — — — — — — —
K EY:
N
PAG — POTENTIAL ACID GENERATING ROLL—OFF BOX WASTE
NOTES:
1. VENDORS TO ADVISE ON FINAL CONFIGURATION OF WATER
TREATMENT PLANT AND RECOMMENDED CHEMICALS. P
2. PUMPS, MATERIAL HANDLING, CHEMICAL DOSING, BACKWASH AND
CLEANING ARE NOT SHOWN IN THE DRAWING. Fl LET C H WTP INDOOR SUMP
`� ��������ATM KINGS MOUNTAIN
DRAFTSPERSON J. EYLER NR 07 25 23 J)1C 0 R P 0 R A T 1 0 N 348 HOLIDAY INN DRIVE
ISSUED FOR PERMITTING DESIGNER L. LINGUIST NR 07 25/23 KINGS MOUNTAIN, NC28286 Q
CHECKER A. LYN N L-q—,Alzxa� -2024-05-15 This drawing is the confidential property of Albemarle Corporation and is issued with the express understanding and agreement that it
Appendix C-4 Water Treatment Plant Block Flow Diagram.
DESIGN COORD. K. PIOTROWSKI Plot ws4 , K 2024-05-15 is not to be copied or reproduced,or used in anyway detrimental to the interest of Albemarle Corporation and is to be returned on request.
RESP. ENG. L. LINGUIST L_ury2024-05-15 APPENDIX C-4 KM - MINING AND CONCENTRATOR FACILITY
PRELIMINARY LEAD DISC' ENG' L. LINGUIST L-arry2024-05-15 E ISSUED FOR INTERNAL/CLIENTREVIEW PL AL LL 05/09/24 WATER TREATMENT PLANT
ENG. MANAGER ISSUED FOR SELECT
PROD. MANAGER K. YOUNG 2024-05-15 D JE LA LL 12/12/23 MINE SELECT PHASE
C FOR CLIENT REVIEW JE LA LL 09/13/23 BLOCK FLOW DIAGRAM
NOT F 0 R C 0 N ST R U CT I 0 ROLE NAME SIGNATURE DATE B FOR CLIENT REVIEW JE LA LL 08/08/23 JOB NO. DRAFTER: DRAWING NO. SHT. 1 of 1 REVISION R
FOR INTERNAL REVIEW KM22040 J. EYLER
A JE KP LL 07128/23 SCALE: DATE KM60-PR-BF-00200 E
HATCH DRAWING NUMBER: H37113200002102520002
REV# DESCRIPTION CADD CHK'D APPR'D DATE NTS 07/25/23