HomeMy WebLinkAbout20241025_ADI_60-09 ROY COOPER
Governor
MARY PENNY KELLEY 0Secretory
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Interim Director Ent fronwittaf Quafffy
October 25,2024
Certified Mail
Return Receipt Reuested
Certified Mail#7022 0410 0003 1066 4118
Jay Nivens
Martin Marietta Materials,Inc.
8701 Red Oak Boulevard, Suite 540
Charlotte,NC 28217
RE: Mallard Creek Quarry
Mining Permit No. 60-09
Mecklenburg County
Yadkin-Pee Dee River Basin
Dear Mr.Nivens:
We have reviewed the modification request your company submitted for the referenced mine site. In order for this
office to complete its review of the referenced project in accordance with N.C.G.S. §74-50 and§74-51 of the Mining
Act of 1971,please provide the additional or revised information in accordance with the following comments:
1. Please clarify the location of relocated building and provide erosion and sediment control measures.
2. Please clarify that three settling cells can handle the load of the previous four cells.
Please note, this office may request additional information, not included in this letter, as the mining application
review progresses. Be advised that our review cannot be completed until all of the items listed above have been
hilly addressed.
In order to complete the processing of your application,please forward two(2)copies of the requested information
to my attention at the following address:
Division of Energy, Mineral and Land Resources
Department of Environmental Quality
1612 Mail Service Center
Raleigh,NC 27699-1612
D_E QJ� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
512 North Salisbury Street 1 1612 Mall Service Center I Raleigh,North Carolina 27699-I612
919.707.9200
�rana:wxma
Certified Mail
#7022 0410 0003 1066 4118
Page 2
If hand delivering or delivering by shipping company(e.g.,FedEx,UPS),please deliver to our physical address:
Division of Energy, Mineral,and Land Resources
Department of Environmental Quality
512 N. Salisbury Street, 5th Floor
Raleigh,NC 27604
As required by 15A NCAC 513.0113, you are hereby advised that you have 180 days from the date of your receipt
of this letter to submit all of the requested information. If you are unable to meet this deadline and wish to request
additional time,you must submit information, in writing,to the Director clearly indicating why the deadline cannot
be met and request that an extension of time be granted. If an extension of time is not granted, a decision will be
made to grant or deny the mining permit based upon the information currently in the Department's files at the end
of the 180-day period.
Though the preceding statement cites the maximum time limit for your response, we encourage you to provide the
additional information requested by this letter as soon as possible. Your prompt response will help us to complete
processing your application sooner.
Please contact me at(919) 707-9220 if you have any questions.
Sincerely,
Kelly Jonas
Assistant State Mining Engineer
cc: Jerry Eplin, PE, Mooresville Regional Office