Loading...
HomeMy WebLinkAbout20240711_DWR Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM SECTIONTHIS TO BE OUT BY DEIVILR DEMLR PERMIT: 54-75 Project Action New Modification Transfer Release Applicant Name: Big J and Little J LLC X Applicant's Email: jhmcnairy@gmail.com County: Lenoir Project Name: Sandy Bottoms Excavations Mine YES NO Date Commencing Have land disturbing activities started?? X Latitude: 35.2312 Longitude: -77.6503 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: 07/23/2024 SECTION BELOW TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? El X Is the RO concerned that the operation, as proposed, would violate standards of water quality? X Comments: Site has impacts to features mapped on USGS National and NRCS Soils,those features are deemed subject to Neuse Riparian Buffer Rules until an onsite determination is made. I saw no prior site determinations in BIMS.Additionally, proposed withdrawl rate up to 1 million gallon per day and discharge to potential waters of the state via a"canal"which is one of the mapped features.O&M plan needed to show avoidance and minimization on potential impacts to surrounding wetlands. NPDES and CCPUA permits required. Please also have applicant submit a Buffer Determination request. Does this mine (or previous owner) have DWR back fees to pay? X (If Yes, amount): Watershed/Stream Name & Classification: C,NSW Neuse River DWR Compliance Status of Mine: - 401 Wetland Cert. required? I LJ I 0 401 Wetland Cert. existing? I 0 (If Yes, Permit#): Does DWR RO have enough information to determine if a 401 certification is required? ❑X Central Coastal Plain Capacity Use Area (CCPCUA). Required? I X Central Coastal Plain Capacity Use Area (CCPCUA). Existing? I I 0 (If Yes, Permit#): Does DWR RO have enough information to determine if a CCPCUA is required? X Is an O & M Plan needed? X ❑ Are wetlands disturbed at this site? I ❑ Does DWR RO suspect or know of nearby wetlands to the site? X Is a wetland delineation required prior to DWR issuing the permit? X JD X Consultant Onsite Offsite Stream Determination Needed? 1XI Stream Determination Completed? I ❑X Does DWR RO need a statement that no wetlands/streams are disturbed for this project 0 ❑ from applicant? Rev November 2021 r0 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Buffer Determination Needed? X Buffer Determination Completed? X Recycle system permit existing? LI X (If Yes, Permit#): New Recycle System permit required? X Enough information to determine? X Non-discharge permit existing? LI I X (If Yes, Permit#): Will wastewaters discharge to HQW waters with a 7Q10=0? XLI 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or Fx_1 I ❑ because DWR requires more information)? Has Violation O&M Requirements X I ❑ HQW/7Q10 Concerns Pay back fees or renew DWR permit ❑ Other X Please describe Site has impacts to features mapped on USGS National and NRCS Soils, those features are deemed subject the reason to to Neuse Riparian Buffer Rules until an onsite determination is made. I saw no prior site determinations in hold the permit: BIMS. Additionally, proposed withdrawl rate up to 1 million gallon per day and discharge to potential waters of the state via a "canal"which is one of the mapped features. O&M plan needed to show avoidance and minimization on potential impacts to surrounding wetlands. NPDES and CCPUA permits required. Please also have applicant submit a Buffer Determination request. RO contact: Brooks Sherman Hold Until: Mine must wait to dewater until an O&M plan is approved? 0 ( - CentralOffice Date Regional Office I Date DWR RO Surface Water Brooks Sherman 07/10/2024 RO Aquifer Protection Section Rev November 2021 r0