Loading...
HomeMy WebLinkAbout20240522_DWR Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM SECTIONTHIS TO BE OUT BY DEIVILR DEMLR PERMIT: 54-74 Project Action New Modification Transfer Release Applicant Name: Smith Brewer Farms, LLC X Applicant's Email: ely@perrysinc.com County: Lenoir Project Name: Speight Pit YES NO Date Commencing Have land disturbing activities started?? 0 X Latitude: 35.4120 Longitude: -77.4990 Please return comments to (at DEMLR CO): Adam Parr adam.parr@deq.nc.gov Comments due by: = 06/10/2024 SECTION BELOW TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? El X Is the RO concerned that the operation, as proposed, would violate standards of water quality? X ET Comments: See comments below. Does this mine (or previous owner) have DWR back fees to pay? X (If Yes, amount): Watershed/Stream Name & Classification: Contentnea Creek C;Sw,NSW DWR Compliance Status of Mine: 401 Wetland Cert. required? I LJ I 0 401 Wetland Cert. existing? I 0 (If Yes, Permit#): Does DWR RO have enough information to determine if a 401 certification is required? ❑X Central Coastal Plain Capacity Use Area (CCPCUA). Required? I X Central Coastal Plain Capacity Use Area (CCPCUA). Existing? I I 0 (If Yes, Permit#): Does DWR RO have enough information to determine if a CCPCUA is required? X Is an O & M Plan needed? 1xi Are wetlands disturbed at this site? X Does DWR RO suspect or know of nearby wetlands to the site? X Is a wetland delineation required prior to DWR issuing the permit? X JD Consultant Onsite Offsite Stream Determination Needed? X Stream Determination Completed? I ❑X Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? Rev November 2021 r0 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Buffer Determination Needed? X Buffer Determination Completed? X Recycle system permit existing? LI X (If Yes, Permit#): New Recycle System permit required? X Enough information to determine? X Non-discharge permit existing? LI I X (If Yes, Permit#): Will wastewaters discharge to HQW waters with a 7Q10=0? LI I X 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or X❑ El because DWR requires more information)? Has Violation O&M Requirements X I ❑ HQW/7Q10 Concerns Pay back fees or renew DWR permit ❑ Other Please describe Please submit an O&M plan detailing how dewatering activities will be managed and the reason to developed onsite. DWR has concerns over potential impacts to adjacent surface hold the permit: waters/wetlands. RO contact: Brooks Sherman (252) 945-0205 Hold Until: Mine must wait to dewater until an O&M plan is approved? 0 ( - CentralOffice Date Regional Office I Date DWR RO Surface Water Brooks Sherman 05/22/2024 RO Aquifer Protection Section Rev November 2021 r0