Loading...
HomeMy WebLinkAbout20240425_DWR Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM SECTIONTHIS TO BE OUT BY DEIVILR DEMLR PERMIT: 54-73 Project Action New Modification Transfer Release Applicant Name: Ernie Everett Site Prep X Applicant's Email: bevwill@suddenlinkmail.com County: Project Name: Delaney Pit YES NO Date Commencing Have land disturbing activities started?? L X Latitude: 35.3002 Longitude: -77.4794 Please return comments to (at DEMLR CO): Adam Parr adam.parr@deq.nc.gov Comments due by: = 04/29/2024 SECTION • TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? El X Is the RO concerned that the operation, as proposed, would violate standards of water quality? F I X Comments: Does this mine (or previous owner) have DWR back fees to pay? X (If Yes, amount): Watershed/Stream Name & Classification: I Drainage connects to the Neuse River, correlating section is C;NSW DWR Compliance Status of Mine: New (Complaint) 401 Wetland Cert. required? Ll 1 0 401 Wetland Cert. existing? I 0 (If Yes, Permit#): Does DWR RO have enough information to determine if a 401 certification is required? H-11 Central Coastal Plain Capacity Use Area (CCPCUA). Required? I X Central Coastal Plain Capacity Use Area (CCPCUA). Existing? I I 0 (If Yes, Permit#): Does DWR RO have enough information to determine if a CCPCUA is required? X Is an O & M Plan needed? Ll X Are wetlands disturbed at this site? X Does DWR RO suspect or know of nearby wetlands to the site? X Is a wetland delineation required prior to DWR issuing the permit? X JD Consultant Onsite Offsite Stream Determination Needed? X Stream Determination Completed? I 0 Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? Rev November 2021 r0 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Buffer Determination Needed? X Buffer Determination Completed? X Recycle system permit existing? LI X (If Yes, Permit#): New Recycle System permit required? Enough information to determine? X Non-discharge permit existing? (If Yes, Permit#): Will wastewaters discharge to HQW waters with a 7Q10=0? LI I X 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or ❑ I 0 because DWR requires more information)? Has Violation O&M Requirements HQW/7Q10 Concerns IT- Pay back fees or renew DWR permit LI Other Please describe the reason to hold the permit: RO contact: Hold Until: Mine must wait to dewater until an O&M plan is approved? ❑ I 0 ( - CentralOffice Date Regional Office I Date DWR RO Surface Water Brooks Sherman 04/22/2024 RO Aquifer Protection Section Rev November 2021 r0