HomeMy WebLinkAbout2023_Annual Reclamation Report_33-24 (Corrected) DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
• DIVISION OF ENERGY,MINERAL AND LAND RESOURCES
MINING PROGRAM
2023 Annual Reclamation Report
GENERAL INFORMATION
Legal Corporate/Owner Name•: •Ir{ 11 / 0{`+^Qa,,, �ri Mine Name: 1-1-xJK.�ffl� ,�G'�' Yr••Y
Mine Permit No: `'� Mine Phone Number,if any: CC
Mine Address(911 Address)Line 1: DD
Mine Address Line"
City: /' - rc State: Nr Zip Code: a� +��� County:
Facility Coordinates: Latitude: —1SS'100 Longitude:T7 ' River Basin: j f�•
Responsible Off' I I/Authorized Contact: Invoice Contact:
Name/Title: n e7e7 Ap / '/sal V Check if same as Responsible Official/Authorized Contact
Mailing Address Line 1: I� LJuJd' 1 d 1 7 Name Title: `
. Iq VWt g f'(1•l.Gf'"e rSc"
Mailing Address Line 2: Mailing Address Line 1: iI uD .45%X 1 A/,7
City/State/Zip Code: 1 )r'O hJQ, ,,271AP Mailing Address Line 2:
Primary Phone No.dQLa9q/rpx No. City: • Ji 14 IT / State: \�L Zip Code:
Secondary Phone No. c // Primary Phone No. y,,t Fr23 kgjI Fay. . -/V,4
Email Address:,eA 0? C4,d6�(-Pr1dy",Ia;a. Secondary Phone No. qq
Email Address: Gt(/t'✓I t> Crt/1�t�^SYn Lc. �•'Z
Is the site Active? V Yes _No Estimate land to be newly disturbed by mining in the 2024 calendar
year. __Acres
If mine is now inactive,when did mining stop?
Date: Check here if no new acreage was to be affected in 2024:
Is this stoppage permanent? Yes —No List by category the total amount of disturbed and unreclaimed land
present at this site at the end of the 2023 calendar year.
If yes,do you wish to have this mine site release from V
your reclamation bond? _Yes _No TAILINGS PONDS � Acres
STOCKPILES /.. y) Acres
Was new land affected in 20237 Yes V'�No- WASTE PILES 5 Acres
PLANT AREA /„ D Acres
If yes,how much? Acres MINE EXCAVATION fig. 0 Acres
Is map on file current? Yes No TOTAL DISTURBED AREA AT SITE: s .+ 5- Acres
If the map is not current,submit updated map showing "Note:WASTE PILES should include overburden storage/disposal
affected acreage. areas and berms.
State and describe the amount and type of reclamation carried out in 2023 calendar year:
Check here if no reclamation completed in 2023: 11 // G
Signature of Responsible Official/Authorized Contact: JJ J'p' Date:
Print Name: �1XP.�' S• /Dt'C.�'S C,/1 Title:
"Complete and return by September 1,2024,with the annual fee,and two copies of this form along with two copies of an updated mine
map(if needed).
Shaded areas are not required but are useful to the Mining Program.