Loading...
HomeMy WebLinkAbout2023_Annual Reclamation Report_10-25 Action History(UTC-05:00) Submit by Anonymous User 9/23/2024 10:40:43 AM (Start) Approve by Kelly Jonas 10/8/2024 3:01:18 PM(ARR Review- 10-25 Beaver Dam Mine) • The task was assigned to DEMLR Mining ARR Team.The due date is:October 7,2024 5:00 PM 9/23/2024 10:40:50 AM • Email was sent for reminder"Task Reminder" 10/8/2024 10:42:42 AM • Kelly Jonas assigned the task to Kelly Jonas 10/8/2024 2:46:03 PM • Kelly Jonas released the task 10/8/2024 2:53:08 PM • Kelly Jonas assigned the task to Kelly Jonas 10/8/2024 2:57:08 PM 2023 Annual Reclamation Report Complete and submit by September 1,2024 in N.C. Department of Environmental Quality-Division of Energy,Mineral,and Land Resources GENERAL INFORMATION Mining Permit No.(?) 10-25 Once the permit number is entered,click outside the field box to prompt more information to pre-populate Release Date(If Applicable) Original Issued Date Mine Data Current as of: 10/21/1991 07/30/2024 Legal Corporate/Owner Name* Barnhill Contracting Company Mine Name* Beaver Dam Mine Mine Address(You Must Enter)* (The 911 Address) Street Address Landfill Road NE Address Line 2 City State/Province/Region Bolivia NC Postal/Zip Code 28422 County* River Basin* Brunswick Lumber Dropdown list Dropdown list County Prefix Code* 10 Variable available for repository routing Facility Coordinates: Latitude:* Longitude: 34.03160 -78.26380 Responsible Official/Authorized Contact Information: Name and Title* Drew Sowers Mailing Address* PO Box 7948Rocky Mount,NC 27804 Primary Phone No.* Secondary Phone No. 2528238267 E-mail Address* dsowers@barnhillcontracting.com Invoice Contact Information: (Contact info from above is carried below-please revise if needed) Name and Title* Drew Sowers Mailing Address* PO Box 7948Rocky Mount,NC 27804 Primary Phone No.* Secondary Phone No. 2528238267 E-mail Address* dsowers@barnhillcontracting.com Is the site Active?* Yes No If the mine is now inactive,when did mining stop?* Is this stoppage permanent?* 09/30/2015 Yes No Is the map on file current?* Yes No Check here if no reclamation was completed in 2023 List by category the total amount of disturbed and unreclaimed land present at this site at the end of the 2023 calendar year: Tailings Ponds* Stock Piles* Waste Piles* 0.0 0.0 0.0 Acres Acres Acres(WASTE PILES should include overburden storage/disposal areas and berms) Plant Area* Mine Excavation* TOTAL DISTURBED AREA* 0.0 0.0 0.0 Acres Acres Acres(Calculated Sum) Is there any other supplemental information you want to upload to submit with this report? Must be.pdf format(Max size 100 MB each) (If applicable)Please explain additional attachments that were uploaded: NEW DISTURBANCE ESTIMATES FOR 2024 Check here if no new acreage to be affected in 2024 Certification and Signature* By checking the box and signing box below, I certify that: • I have given true,accurate,and complete information on this Annual Reclamation Report form and in the uploaded map document(s); • I agree that submission of this Annual Reclamation Report Upload form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act'); • I understand that an electronic signature on this form has the same legal effect and can be enforced in the same way as a written signature; • I intend to electronically sign and submit this Annual Reclamation Report form;AND • I have the authority to submit this Annual Reclamation Report on behalf of this Mining Permittee. Signature of Responsible Official/Authorized Contact:* Date* 09/23/2024 O(Jtm 6O",w Type Name* Title* Drew Sowers Project Manager Email Confirmation will be sent to:* dsowers@barnhillcontracting.com,dsowers@barnhillcontracting.com Additional E-mail Contact for Confirmation(if desired) This submission is associated with Business Process Instance ID 218956.