Loading...
HomeMy WebLinkAbout2023_Annual Reclamation Report_90-01 DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY,MINERALAND LAND RESOURCES MINING PROGRAM 2023 Annual Reclamation Report GENERAL INFORMATION Legal Corporate/Owner Name: Meridian Brick LLC Site Name: Kendrick Mine Site Permit No: 90-01 Site Phone Number,if any: NSA Site Address(911 Address)Line 1: 2304 Brickyard Road Site Address Line 2: City: Monroe State: NC Zip Code: 28110 County: Union Facility Coordinates: Latitude:35.043822 Longitude:-80.621466 River Basin:Yadkin Pee-Dee Responsible Official/Authorized Contact: Invoice Contact: Name/Tltle: Check if same as Responsible Official/Authorized Contact David McKeown—Director,Environmental Compliance Name/Title: Mailing Address Line 1:5100 Brickyard Road Mailing Address Line 1: Mailing Address Line 2: Mailing Address Line 2: City:Columbia State:SC Zip Code:29203 City: State: Zip Code: Primary Phone No.803-691-3121 Fax No.803-786-9703 Primary Phone No. Fax No. Secondary Phone No.803-351-0635 Secondary Phone No. Email Address:david.mckeown@meridianbrick.com Email Address: 1. Is the site Active? Yes No 3. Estimate land to be newly disturbed by mining in the 2024 calendar year. Acres If mine is now inactive,when did mining stop? Date: Check here if no new acreage is to be affected in 2024: Is this stoppage permanent? ❑ Yes 4 No 4. List by category the total amount of disturbed and un-reclaimed If yes,do you wish to have this mine site released from your land present at this site at the end of the 2023 calendar year. reclamation bond? ❑ Yes ❑ No (A) TAILiNGSPONDS 20 Acres 2. Was new land affected in 2023? ElYes J No (B) STOCK PILES 7 Acres (C) "WASTE PILES: 1.5 Acres If yes,how much? 0 Acres (D) PLANT AREA 0 Acres (E) MINE EXCAVATION 0 Acres Is map on file current? J Yes ❑ No TOTAL DISTURBED AREA AT SITE: 28.5 Acres If the map is not current,submit updated map showing "Note:WASTE PILES should include overburden storage/disposal affected acreage. areas and berms. 5. State and describe the amount and type of reclamation carried out in 2023 calendar year: Check here if no reclamation completed in 2023: Signature of Responsible Official/Authorized Contact: v Date: 08/2112024 Print Name: 1.Da d McKeown Title:Director,Envr Compliance "Complete and return by Sept 1,2024,with the annual fee,and two copies of this form along with two copies of an updated mine map.