HomeMy WebLinkAbout2023_Annual Reclamation Report_49-13 RECEIVED
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES AUG 2 2 ZOR
DIVISION OF ENERGY,MINERAL AND LAND RESOURCES
MINING PROGRAM
2023 Annual Reclamation Report LAND QUALITY
GENERAL INFORMATION MINING PROGRAM
Legal Corporate/Owner Name: Michael B. Foster
Mine Name: Iredell Pit No. 2
Mine Permit No- 49-13 Mine Phone Number,if any:
Mine Address(911 Address)Line 1: 279 Wike Lane
Mine Address Line 2:
;ity: Statesville State: NC Zip Code: 28677 County: -Iredell
Facility Coordinates: Latitude: Longitude: River Basin: Catawba
Responsible Official/Authorized Contact: Invoice Contact:
Namefrjtle: Eric Potts- / Production M= Check if same as Responsible Official/Authorized Contact %
Mailing Address Line 1: Statesville Brick Co Name Title:
Mailing Address Line 2: P 0 Boo 471 Mailing Address line 1:
City/State/Zip Code: Statesville, NC 28687 Mailing Address Line 2:
Primary Phogft.872-4123 Fax No. City: State: Zip Code:
Secondary Phone No. Primary Phone No. Fax No:
Email Address: regs@statesvi llebr1ck.com Secondary Phone No.
Email Address:
Is the site Active? % Yes No Estimate land to be newly disturbed by mining in the 2024 calendar
year. Acres
If mine Is now inactive,when did mining stop?
Date: Check here If no new acreage was to be affected in 2024: %
Is this stoppage permanent? Yes No List by category the total amount of disturbed and unreclaimed land
present at this site at the end of the 2023 calendar year.
If yes,do you wish to have this mine site released from
your reclamation bond? Yes No TAILINGS PONDS .89 Acres
STOCK PILES O Acres
Was new land affected in 2023? Yes % No WASTE PILES 2 Acres
PLANT AREA 0 Acres
If yes,how much? Acres MINE EXCAVATION 21.51 Acres
Is map on file current? X Yes No TOTAL DISTURBED AREA AT SITE: 26.4 Acres
If the map is not current,submit updated map showing "Note:WASTE PILES should include overburden storage/disposal
affected acreage. areas and berms.
State and describe the amount and type of reclamation carried out in 2023 calendar year:
Check here if no reclamation completed in 2023:
Signature of Responsible Official/Authorized Contact: Date: 08/16/24
Print Name: Nicholas Foster Title: Engineering & Gov.Compliance
"Complete and return by September 1,2024,with the annual fee,and two copies of this form along with two copies of an updated mine
map(if needed).
Shaded areas are not required but are useful to the Mining Program.