Loading...
HomeMy WebLinkAbout2023_Annual Reclamation Report_43-33 DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY,MINERAL AND IAND RESOURCES MINING PROGRAM 2023 Annual Reclamation Report. GENERAL INFORMATION Legal Corporate//Owner artle: n Mine Name: c� Mine Permit No• Mine Phone umber ' any: Mine Address(911 Address)Line 1: Mine Address Line City: Sta e: ip Cod County: Facility Coordinates: Latitude: Longitude: River Basin: Responsible Officla Auth rize o act: Invoice Contact: Name/Title:S Check if same as Responsible Official/Authorized Contact Mailing Address Line : C�V Name Title: Mailing Address Line 2: Mailing Address Line 1: City/State/Zi C de: ailing Address Line 2: Prima Phorle, o.37a15 a N6.�1� �"'V ity: State: Zip Code: ry �j', Secondary Phone 1. Primary Phone No. Fax No. Email Address: riLdskLft5rfd on o. Email Address: Is the site Active? Yes No Estimate land to be newly disturbed by mining in the 2024 calendar year. Acres If mine is now inactive,when did mining stop? • Check here if no new acreage was to be affected in 2024: V Date: Is this stoppage permanent? Yes No List by category the total amount of disturbed and unreclaimed land present at this site at the end of the 2023 calendar year. If yes,do you wish to have this mine site released from your reclamation bond? Yes No TAILINGS PONDS r Acres STOCK PILES Acres Was new land affected in 2023? Yes No WASTE PILES Acres PLANT AREA 1 Acres If yes,how much? Acres MINE EXCAVATION Acres Is map on file current? Yes No TOTAL DISTURBED AREA AT SITE: S Acres If the map is not current,submit updated map showing "Note:WASTE PILES should include overburden storage/disposal affected acreage. areas and berms. State and describe the amount and type of reclamation carried out in 2023 calendar year: Check here if no reclamation completed in 2023: +/� Signature of Responsible Official/Authorized Contact: 4, Date: r Print Name: Title: "Complete and return by September 1,2024,with the annual fee,Ind two copies of this form along with two copies of an updated mine map(if needed). Shaded areas are not required but are useful to the Mining Program.