Loading...
HomeMy WebLinkAbout2023_Annual Reclamation Report_83-07 RECEIVED t&tam%uNroRlmTIoN Legal Corporaft/Owner Nance: ` r sIdpPice. Mi1e Iftne: e 4- LAND QUALITY Mine Permit No- R 3— MMe Phone umber,Nr a PRING PROGRAM Mine Address(9U Address)Line 1: Mine Address Line 1 .6t u rtL /y,Ld- State: Nr Zip Code: County: vt Facility Coordinates: Latitude- Longitude: River Basin: Ramble Oftial/Augrodzed Contaco Invoke Contact Name/Tide: 10,d ej L La c&w,eLdC& Check if same as Responsible Official/Authorized Contact Mailing Address Line L• 6 3 61) Ae i!L -I mame Title: � Mailing Address Line 2• Mailing Address line L- City/State/zlp Code:t.aU r tL iLL N e- 2 ;S j MaIllngAddress tine 2: Primary Phone No.�/d �No. City: State: Zip Cade-- Secondary Phone No. Primary Phone No. Fax No. Email Address: Secondary Phone No. Email Address: Is the site Active? Yes No Estimate land to be newly d s arbed by muting in the 2024 calendar If mine is now Inactive,when dId miningyear. Aces stop? - - Date. Check here if no new acreage vras W be affected In 2024- Is this stoppage permanent? Yes No List by category the total amount of distrubed and unriedaineed land If yes,do you wish to have this mine site released from present at Oft site at the end of the 2023 calendar year. your reclamation bond? Yes No TAILINGS PONDS 0 Acres 00w STOCK PILES Acres Was new land affected in 2023? Yes ' No WASTE PILES Cf ayes L� a PLANT AREA Acres if yes how much? Acres MINE EXCAVA71ON t L- Acres - is neap on file current? .- Yes _No-- TOTAL DISTURBED AREA AT-SITE: _Acres If the map Is not crew rerk submit updated map showing "Note:WASTE PILES should include ovedmrden storaWd'aposal affected acreage. areas and berms. State and describe the amount and type of reclamation carried out In 2023 calendar year. Check here If no reclamation completed in 2023: Signature of Responsible Official/Authorized Contact: )0&44 r Date: Print Name: _ Pa,L. G l?L�Yla/ Title: Q t vh,r� "Complete and return by September X 2024,with the annual fee,and two copies of this form along with two copies of an updated mine map(if needed). Shaded-areas are not required but are useful to the Mtning Program.