Loading...
HomeMy WebLinkAbout2023_Annual Reclamation Report_61-06 1"KtL;LIVCL1 DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES AUG 2 8 2024 DIVISION OF ENERGY,MINERAL AND LAND RESOURCES MINING PROGRAM LAND QUALITY 2023 Annual Reclamation Report MINING PROGRAM GENERAL INFORMATION Legal Corporate/Ow er Name:—::rLI P— Grp. Mine Name• i r e fm b k^k%%A AA i 4 a Mine Permit Noy C,al—b 62 Mine Phone Number,if any: Mine Address(911 Address)Line 1: to i l�!P d 4n�'tt i i-se, Mine Address Line City: State: Nr Zip Code: :29 7 77 County: M Facility Coordinates: Latitude: Longitude: River Basin: Responsible Offidal/Authorized Contact: Invoice Contact: Name/Title- &1PM4 Check if same as Responsible Official/Authorized Contact Mailing Address Line 1: fjQ4 6tia Ad Name Title: Mailing Address Line 2: Mailing Address line 1: City/State/Zip Coyd�e:�nr f Mailing Address Line 2: Primary Phonge2 -- 6 Fax No. City: State: Zip Code: Secondary Phone No. Primary Phone No. Fax No. Email Address: ro a i, a l ASecondary Phone No. Cv r p_ W41 Email Address: Is the site Active? Yes No Estimate land to be newly disturbed by mining in the 2024 calendar year. Acres If mine is now inactive,when did mining stop? Date: Check here if no new acreage was to be affected in 2024: Is this stoppage permanent? Yes No List by category the total amount of disturbed and unreclaimed land present at this site at the end of the 2023 calendar year. If yes,do you wish to have this mine site released from your reclamation bond? Yes No TAILINGS PONDS �� 5 Acres STOCK PILES Acres Was new land affected in 2023? _�Yes No WASTE PILES Acres SPLANT AREA �_/,�_Acres If yes,how much? Acres MINE EXCAVATION ��.-= Acres Is map on file current? ✓ Yes No TOTAL DISTURBED AREA AT SITE: Acres If the map is not current,submit updated map showing "Note:WASTE PILES should include overburden storage/disposal affected acreage. areas and berms. State and describe the amount and type of reclamation carried out in 2023 calendar year: 1 SenAT I A �v o Lail, 2 o i 0( I/le Le)re Check here if no reclamation completed in 2023: 0 Signature of Responsible Official/Authorized Contact: Date: Print Name: 1 T P �f Title: 4.01 e "Complete and return by September 1,2024,with the annual fee,and two copies of this form along with two copies of an updated mine map(if needed). Shaded areas are not required but are useful to the Mining Program.