Loading...
HomeMy WebLinkAbout2023_Annual Reclamation Report_42-12 RECEIVED DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY,MINERAL AND LAND RESOURCES AUG 15 2024 MINING PROGRAM 2023 Annual Reclamation Report LAND QUALITY GENERAL INFORMATION MINING PROGRAM r Legal Corporate/ wner Name: Mine Name: I Mine Permit No* — Mine Phone Number,if any,: Mine Address(911 Address)Line 1: a2 29 M/ f ool:�U Mine Address lne 2* City: —- 6�h State:—N(' Zip Code:a7J'50 County: .4601J�.� Facility Coordinates: Latitude:77 '76P2597 LongitudA- •Z14b River Basin: Responsible Official/Authorize Contact: Invoice Contact: Name/Title: maim n ? Check if same as Responsible Official/Authorized Contact Mailing Address Line 1: /"•0 ��J Name Title: Mailing Address Line : Mailing Address Line 1: � � City/State/ZipCodek6�dxP �~ s a 7�To Mailin r�dd es;,l a 2: 7D2y 2W7117&1 City: Primary Phone Na��3 � Fax Na#.4 State: �Zip Code: Secondary Phone No. 252,5 3577Y Primary Phone No Fax Fax No.9.62- 2Z6701 Email Address:/a(,(/'Q,/'). j/�/n�ieiz f&L.&M Secondary Phone No. ff1i:Ea7,RY cam Email Address:/ AWr Is the site Active? Yes No Estimate land to be newly disturbed by mining in the 2024 calendar year. 16 Acres If mine is now inactive,when did mining stop? . / Check here if no new acreage was to be affected in 2024: Date: y Is this stoppage permanent? Yes No List by category the total amount of disturbed and unreclaimed land present at this site at the end of the 2023 calendar year. If y6,do you wish to have this mine site released from your reclamation bond? Yes No TAILINGS PONDS Acres STOCK PILES jQIP Acres Was new land affected in 2023? Yes No WASTE PILES Acres PLANT AREA Acres If yes,how much? Acres MINE EXCAVATION Acres Is map on file current? �_Yes No TOTAL DISTURBED AREA AT SITE: /' cZ!5� Acres If the map is not current,submit updated map showing "Note:WASTE PILES should include overburden storage/disposal affected acreage. areas and berms. State and describe the amount and type of reclamation carried out in 2023 calendar year: ,V 14 Check here if no reclamation completed in 2023: Signature of Responsible Official/Authorized Contact: Date: If 2,2 Print Name: Title: "Complete and return by September 1,2024,with the annual fee,and two copies of this form along with two copies of an updated mine map(if needed). Shaded areas are not required but are useful to the Mining Program.