Loading...
HomeMy WebLinkAbout2023_Annual Reclamation Report_16-89 (� RECEIVED DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES SEP 0 3 2024 �_ DIVISION OF ENERGY,MINERAL AND LAND RESOURCES LAND QUALITY V MINING PROGRAM 2023 Annual Reclamation Report MINING PROGRAM GENERAL INFORMATION Legal Corporate/Owner Name: The Yard Barber,Inc. Mine Name:TYS Stella Mine Mine Permit No:16-89 Mine Phone Number,If any:2523938873 Mine Address(911 Address)Line 1: 124 Morristown rd Mine Address Line 2.211 Stella rd City: Stella State: NC Zip Code: 28582 County: Carteret Facility Coordinates: Latitude:34.78814 Longitude: -77.132240 River Basin: White oak River Responsible Official/Authorized Contact: Invoice Contact Name/Title: Michael Andrew Barber Check if same as Responsible Official/Authorized Contact Mailing Address Line 1: Po tax 4562 Name Title: Mailing Address Line 2: Mailing Address Line 1: City/State/Zip Code: Emerald Isle NC 28594 Mailing Address Line 2: Primary Phone No. 2522416869 Fax No. City: State: Zip Code: Secondary Phone No. 2523938873 Primary Phone No. Fax No. Email Address: andrew@theyardbarber.com Secondary Phone No. Email Address: Is the site Active? a Yes O—No Estimate land to be newly disturbed by mining in the 2024 calendar year. 4.0 Acres If mine is now inactive,when did mining stop? Check here if no new acreage was to be affected in 2024:II Date: Is this stoppage permanent? Yes No List by category the total amount of disturbed and unreclaimed land present at this site at the end of the 2023 calendar year. If yes,do you wish to have thi ^ine site rel ed from your reclamation bond? ( 1 Yes Ij No TAILINGS PONDS Acres V STOCK PILES Acres Was new land affected in 2023? ,Yes �,No WASTE PILES Acres PLANT AREA Acres Ifyes,howmuch? 0.10 Acres MINE EXCAVATION 0.10 Acres Is map on file current? _G)L Yes C No TOTAL DISTURBED AREA AT SITE: 0.10 Acres If the map is not current,submit updated map showing I "Note:WASTE PILES should include overburden storage/disposal affected acreage. areas and berms. State and describe the amount and type of reclamation carried out in 2023 calendar year: Mine activity was very limited in 2023. Entrance road into mine was started in December 2023. First day of digging was December 26th. Dirt was not hauled out until Jan 2024. Check here if no reclamation completed in 2023: Ll Signature of Responsible Official/Authorized Contact: Date: 8i2612024 Print Name: Micheal Andrew Barber Title: President "Complete and return by September 1,2024,with the annual fee,and two copies of this form along with two copies of an updated mine map(if needed). Shaded areas are not required but are useful to the Mining Program.