HomeMy WebLinkAbout20240718_affected_area_table From: Michael Blaklev
To: Parr,Adam
Subject: [External] Havelock Mine
Date: Thursday,July 18,2024 3:32:02 PM
Attachments: 2024.07.18-Havelock Mine-Revised Table.odf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
Adam
Please find attached the adjusted table with corrected area for the processing area
and haul roads.
If you have any questions or need additional information please feel free to contact
me.
Thanks
Michael
Michael T. Blakley
Drafting and Design Services, Inc.
6728 Carbonton Rd
Sanford, NC 27330
(919)499-8759
PROPOSED MINING AREAS
PIT #1 46.2 AC
PIT #2 9.0 AC
PIT #3 30.3 AC
TOTAL MINE EXCAVATION 85.5 AC
TAILINGS/SEDIMENT PONDS 4.6 AC
PROCESSING AREA/HAUL ROADS 5. 1 AC
OTHER MISC. AREA 7.5 AC
(BERMS, TEMP. DIVERSIONS, ETC.)
TOTAL AFFECTED AREA 102.7 AC
UNDISTURBED BUFFER 468.7 AC
PERMIT AREA 571 .4 AC