Loading...
HomeMy WebLinkAbout2023_Annual Reclamation Report_10-97 DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY,MINERAL AND LAND RESOURCES t' c� �ry MINING PROGRAM 3 4C 2023 Annual Reclamation Report GENERAL GENERAL INFORMATION Legal Corporate/Owner Name:..1— M yY1 �L-h^`b 4 Su r�• �'ur,�"�'ra����on � C o� �� �- Mine Name: AR. O A 0 z1A3 L- Mine Permit No:--� Mine Phone Number,if any: Mine Address(911 Address)Line 1: FAQ '�D�O n Mine Address Line • ����LJS city: .�U -N-ri o State: iyc' Zip Code: 8 t1 5 County: Facility Coordinates: Latitude: Longitude: River Basin: Responsible fficial/Authorized Contact: Invoice Contact: %Mj L c L e., ,10 Check if same as Responsible Official/Authorized Contact Name/Title: Mailing Address Line 1: dw M L-AA-b Rd N43 Name Title: -"---�'�-i�lfailingAii"dressl:ine�:'��' � - ! r� ai mg dress Line 1: City/State/Zip Code: 6 Ie b Iry C- a8y Mailing Address Line 2: Primary Phone No50) •'417-Iob$9ax No. /D-55b—(18 pity: State: Zip Code: •• Secondary Phone No. Primary Phone No. Fax No. Email Address: d0^r►4%. 16!2S �+^+�'�^` c o^''Secondary Phone No. Email Address: Is the site Active? Pe Yes No Estimate land to be newly disturbed by mining in the 2024 calendar year. Acres If mine is now inactive,when did mining stop? • Check here if no new acreage was to be affected in 2024: Date: Is this stoppage permanent? Yes No List byre present atthis site at he end of the 2023 calendar year.ry the total amount of disturbed and land P . If yes,do you wish to have this mine site released from U Acres your reclamation bond? Yes No TAILINGS PONDS v Acres STOCK PILES 0 Acres Was new land affected in 2023? Yes No WASTE PILES; 0 Acres PLANT AREA If yes,how much? . Acres MINE EXCAVATION .Olo _Acres TOTAL DISTURBED AREA AT SITE: O 1 Acres _. .Is map on-file current? ZYes No . ' " urrent submit updated map showing "Note:WASTE PILES should include overburden storage/disposal If the map is not c p areas and berms. affected acreage. State and describe the amount and type of reclamation carried out in 2023 calendar year: Check here if no reclamation completed in 2023: Lf Signature of Responsible Official/Authorized Contact: - Date: Print Name: �'n,� '.- ,...b Title: •Pre,,r "Complete and return by September 1,2024,with the annual fee,and two copies of this form along with two copies of an updated mine map(if needed). Shaded areas are not required but are useful to the Mining Program.