HomeMy WebLinkAbout2023_Annual Reclamation Report_19-11 DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF ENERGY,MINERAL AND LAND RESOURCES
MINING PROGRAM
2023 Annual Reclamation Report
GENERAL INFORMATION
Legal Corporate/Owner Name: Meridian Brick LLC
Site Name: Gulf 3 Mine
Site Permit No: 19-11 Site Phone Number,if any: N/A
Site Address(911 Address)Line 1: 970 Murchison Road
Site Address Line 2:
City: Gulf State: NC Zip Code: 27256 County: Chatham
Facility Coordinates: Latitude:35.563222 Longitude:-79.308655 River Basin: Cape Fear
Responsible Offidal/Authorized Contact: Invoice Contact:
Name/Ttle: Check if same as Responsible Official/Authorized Contact
David McKeown—Director,Environmental Compliance
Name/Title:
Mailing Address Line 1:5100 Brickyard Road
Mailing Address Une 1:
Mailing Address Line 2:
Mailing Address Line 2:
City:Columbia State:SC Zip Code:29203
city: State: Zip Code:
Primary Phone No.803-691-3121 Fax No.803-786-9703
Primary Phone No. Fax No.
Secondary Phone No.803-351-0635
Secondary Phone No.
Email Address:david.mckeown@meridianbrick.com
Email Address:
1. Is the site Active? ❑ Yes No 3. Estimate land to be newly disturbed by mining in the 2024
calendar year. Acres
If mine is now inactive,when did mining stop?Date:Jan 2017
Check here if no new acreage is to be affected in 2024: 1�
Is this stoppage permanent? J Yes No
4. List by category the total amount of disturbed and un-reclaimed
If yes,do you wish to have this mine site released from your land present at this site at the end of the 2023 calendar year.
reclamation bond? ! Yes ❑ No
(A) TAILINGSPONDS 2.75 Acres
2. Was new land affected in 20237 ❑ Yes No (B) STOCKPILES 0.15 Acres
(C) "WASTE PILES: 0.45 Acres
(D) PLANT AREA 2.75 Acres
If yes,how much? 0 Acres
(E) MINE EXCAVATION 31.5 Acres
Is map on file current? Y Yes ❑ No TOTAL DISTURBED AREA AT SITE: 37.6 Acres
If the map is not current,submit updated map showing "Note:WASTE PILES should include overburden storage/disposal
affected acreage. areas and berms.
5. State and describe the amount and type of reclamation carried out in 2023 calendar year:
Permit Is in process of being transferred
Check here if no reclamation completed in 2023:
Signature of Responsible Official/Authorized Contact: !� Date: 08/21/2024
Print Name: J.David JcKeown Title:Director,Envr Compliance
"Complete and return by Sept 1,2024,with the annual fee,and two copies of this form along with two copies of an updated mine map.