Loading...
HomeMy WebLinkAbout8._11526_GOLD_HILL_MINMOD_DETAIL_SHEET_8_r1 3. 3 2 18" TEE W/ INLET PIPES 1. 7' MIN COVER 2.0 LF OF 18" HPDE F B PIPE 7 25' 13.1 POE 7 OF. 7.19" � 45' BEND W/BLOCKING 22.5' BEND W/BLOCKING 7. 5' 1 15' 7. 5' 22.5' BEND W/GRAVITY BLOCKING 3/8'x 2' STEEL STRAP 3 LF OF 18' HPDE FOR INLET (L ANCHOR (PAINT ALL PIPE EACH SIDE SURFACES WITH COAL 10:1 SLOPE (TYP.) \P�e TAR EPDXY. e of o tk5 e 6®go p a o ro I- -- a ' ' a a 3/4' GALVAN I ZED - a D I I a D I I a D 1/2' D I A, ANCHOR BOLT STEEL RODS _ a a 4:1 SLOPE (TYP.) w ° I I ° a FELT° I WITH 2 HOOK l�yP 00 D a I I D D a D I I D I I I ` d I- 1. 7' MIN COVER 2� PIPE 5 18 x 18 WYE D�`___] a p I I 1 8.4 F OF 18" HPDE ® 7.1% 22.5' BEND W/BLOCKING p ° p ° -I- IF I 4 d a ° GRAVITY BLOCK 22.5' BEND W/GRAVITY PLAN VIEW BLOCKING STANDARD TEE-SECTI❑N 25' SECTI❑N AA GRAVITY BLOCK SIZE = 2' X 2' X 2' B A DEPRESSED INLET (TYP) hy60E SEE DETAIL NP 15' A 3' I I I I I= NOTES: EARTH - 3' - 1. ALL PIPE SHALL BE 18" ADS HPDE N-12 PIPE OR EQUAL. ALL CONNECTIONS SHALL BE MADE WITH SOIL TIGHT CONNECTIONS. I -I I- �� EARTH 12' 2. ALL FITTINGS SHALL BE 18" ADS HPDE N-12 FITTINGS OR EQUAL. ALL CONNECTIONS SHALL BE MADE WITH SOIL TIGHT CONNECTIONS I �_ -III_ WITH A GASKET. III= -I I I- _ _ _ _ 3. THE LENGTHS OF PIPES #2 AND #6 ARE TO BE ADJUSTED IN THE FIELD BASED ON THE HEIGHT OF THE FILL SLOPE. D a D I I 4 a p I - ---------------a----- ------�-�-- 9 II- -III III III-III III ta x to wYE ALL PIPE IS TO BE DUAL WALL, 4. FOR FILL AREAS WITH A HEIGHT OF LESS THAN 50 FEET DELETE PIPES #3, #4, #5, AND THE ASSOCIATED FITTINGS. ------ ------- EI PIPE 3 ------ a ° -I I I- 184 LF OF 18" SMOOTH CORE 18' HPDE. SEE 5. FOR FILL AREAS WITH A HEIGHT OF GREATER THAN 75 FEET, INSTALL ADDITIONAL SEGMENTS OF PIPES #3 AND #4 AND THE a ° a ° ; ; ° ° HPDE ® 7.1% 22.5' BEND W/BLOCKING NOTES FOR PIPE DESCRIPTION ASSOCIATED FITTINGS. a D D I I p D CLASS A 3000 III= 6. FILL MATERIAL AND BACKFILL SHALL BE COMPACTED TO 95% STANDARD PROCTOR. PSI CONCRETE 7. CONCRETE ANCHORS SHALL BE PROVIDED ON ALL PIPES CONSTRUCTED WITH A GRADE STEEPER THAN 15%. ANCHORS SHALL BE D ° p ° a ° , III=I I _ _ - 2 TYP ° D I I ° I-I I ° -III-III-III-I I I 22.5' BEND W/GRAVITY - 1 SPACED EVENLY APART (16' MAXIMUM). D a a �� ° ANCHOR T❑ BE 3000 PSI BLOCKING > 8. SLOPE DRAINS ARE TO BE INSTALLED IN THE OVERBURDEN STORAGE AREAS AS NEEDED, BASED ON SITE CONDITIONS. THE SLOPE ° p D ° D p CONCRETE POURED ON ° =III-, 30 1. 7' MIN COVER DRAIN SHALL BE USED IN AREAS WHERE THE UPPER INLET HAS LESS THAN 3.6 ACRES OF DRAINAGE AND THE OVERALL DRAINAGE INTO D a a a ° a D UNDISTURBED EARTH ° ° =11I- 2 � THE SYSTEM, INCLUDING SLOPE AREA, IS LESS THAN 10.2 ACRES. INSTALL ADDITIONAL DRAINS AND DIVERSION CHANNELS IF THE P`?F o500� DRAINAGE AREA EXCEEDS THE CAPACITY OF THE SYSTEM. nAQOE 3' - 0' 16' TYP 1 1. 5' X 1. 5' X 1. 5' DEEP A CONCRETE ANCHOR (TYP,) SECTI❑N BB \-22.5- BEND W/BLOCKING CONCRETE ANCHOR DETAIL THRUST BLOCKING PIPE 1 4.0 LF OF 18" HPDE ® 7.1% PLUNGE POOL SEE THE CONSTRUCTION DETAIL FOR DIMENSIONS PERMANENT HPDE SLOPE DRAIN AND STONE SIZE 1� - - - - - - - -- \ I I- - - - - - - / / 8. 0 \ \ �\�6' DIAMETER MANHOLE / ice - - - - - - - - - - � \ I 8. 0 - - - - - - - - / 1% SLOPE \I - - - - - - - 4. 0 1 / 132' TRASH RACK PR❑VIDE A SUMP FOR 820 820 /� L SEDIMENT STORAGE C❑LLECTI❑N PR❑VIDE 10' X 10' X 1' DEEP ANTI-FL❑TATI❑N BASE FOR THE MANHOLE. TEMPORARY NOTE: THE PURPOSE OF THIS DETAIL IS TO PR❑VIDE A DRAINAGE COLLECTION SYSTEM IN FILL AREAS THAT EXCEED 15 FEET OF HEIGHT. HIGHWALL BERM 1. INSTALL THE DISCHARGE BARREL, ANTI-FLOTATION BASE, OUTLET PROTECTION, TRASH RACK AND THE FIRST MANHOLE SECTION, 800 (PHASE 2) 800 2. INSTALL BACKFILL OVER THE STORM DRAINAGE PIPE. THE HEIGHT OF THE FIRST LIFT IS A MINIMUM OF 10 FEET. THE TOP OF MANHOLE SHOULD ALWAYS BE A MINIMUM OF 4 FEET BELOW THE EDGE OF THE EXTERIOR FILL SLOPE. 3. MAINTAIN A SUMP AROUND THE TOP OF THE MANHOLE TO HELP COLLECT SEDIMENT. TEMPORARY TEMPORARY 4. USE TEMPORARY DIVERSIONS TO DIVERT RUNOFF TOWARDS THE MANHOLE. ONCE THE PLACEMENT OF FILL MAKES CONSTRUCTION OF TEMPORARY DIVERSIONS HIGHWALL BERM HIGHWALL BERM WITH A 1% MINIMUM SLOPE DIFFICULT, RAISE THE FILL OVER THE DISCHARGE PIPE IN 8 FOOT HIGH LIFTS. SLOPE BENCH PHASE 2 PHASE 3 5. REMOVE THE TRASH RACK AND INSTALL ANOTHER MANHOLE SECTION MANHOLE JOINTS SHOULD BE WRAPPED WITH A SEALANT PRIOR TO BACKFILLING AGAINST SEE SLOPE DRAIN ( ) ( ) THE STRUCTURE. PROPOSED 6. REINSTALL THE TRASH RACK AND PLACE COMPACTED FILL IN THE OLD SUMP, DETAIL OVERBURDEN 7. CONTINUE TO PLACE FILL UPSTREAM OF THE RISER AND INSTALLING ADDITIONAL MANHOLE SECTIONS AS THE FILL HEIGHT INCREASES. PHASE 2 PROPOSED PROPOSED 8. ONCE THE FILL HEIGHT HAS REACHED TO PROPOSED GRADE, REMOVE THE TRASH RACK AND INSTALL A MANHOLE TOP DESIGNED FOR A YARD INLET. V) / �� OVERBURDEN OVERBURDEN CONSTRUCT THE YARD INLETS AND ANY ADDITIONAL DRAINAGE CONNECTIONS SHOWN ON THE PLANS. PHASE 3 PHASE 4 780 Ld z z - - 780 PHASE 2 o I 2:1 SLOPE (TYP.) \ PHASE 3 PHASE 4 STAGED FILL FOR MANHOLE STRUCTURES IN HIGH FILL AREAS I ' (2:1 TYP.) (FINAL SLOPE) I PHASE 2 FI LL \ PHASE 3 FI LL PHASE 4 FI L (TYP.) 1 760 \ 760 780 780 PHASE 3 & EXISTING GROUND FINAL SLOPE _ _ / (2:1 TYP.) \ \ TEMPORARY HI HWAL BERM PHASE 2 PROPOSED 2:1 SLOPE (TYP.) I \ 1 OVERBURDEN PHASE 2 & PHASE 3 SLOPE / DIVERSION 740 740 \ � BERM (TYP.) � \ / � � 760 - - - - 760 TEMPORARYI DIVERSION CHANNEL ' _ 20-1 B EXISTING 6' BOTTOM' WIDTH W/ 2:1 GROUNDPHASE 4 ' DIVERSION CHANNEL SLOPES E I I 720 720 740 740 GRADE TOE OF SLOPE TO DRAIN INTO THE CHANNEL WITH A SLOPE I BETWEEN 27. AND 57. (WIDTH / I VARIES) / 700 700 720 '11� - - 720 0+00 2+00 4+00 6+00 8+00 10+00 12+00 14+00 1 6+00 18+00 20+00 22+00 24+00 26+00 0+00 2+00 4+00 6+00 HORIZ. SCALE 1 " = 100' HORIZ. SCALE 1 " = 100' VERT. SCALE 1 " = 10' CROSS SECTION A-A VERT. SCALE 1 " = 10' \\ � CA/� MATERIAL STORAGE AREA NOTE: SLOPE GRADE LABELS ARE BASED ON TRUE PROPOSED GRADING VALUES. THE _ SEAL PROFILES LINES FOR PHASED GRADING CROSS THE FILL AREAS AT A SKEW AND CROSS SECTION B -B = 16883 THE PROFILE REFLECTS THE GRADING ALONG THE SKEW. PHASE 1 MATERIAL STORAGE AREA DocuSigned by: o 7-10-20 3AOD005E6BA648B_ alley, williams, carmen, & king, inc. GOLD HILL QUARRY 2020 PERMIT MODIFICATION REVISION No. DESCRIPTION DATE INITIAL DATE: 5-06-20 JOB NO 11526 CONSULTING ENGINEERS 1 PER NCDEQ REVIEW 7-10-20 GWW DRAWN BY: RCC SHEET N0. FIRM LICENSE No. F-0203 VULCAN CONSTRUCTION MATERIALS , LLC CHECKED BY: GWW DETAILS 8 120 SOUTH MAIN STREET P.O. BOX 1248 120 SOUTH IN 28082 P.O. BOX 1248 CABARRUS/ROWAN COUNTY, NORTH CAROLING DI526 MINMOD DET 2020.DH OF: 9