Loading...
HomeMy WebLinkAbout13-04 adilet 2020 o'"`swc nN R. y GOY COOPER Governor MICHAEL S.REGAN Secretary BRIAN WRENN NORTH CAROLINA Acting Director - Environmental Quality June 9, 2020 Certified Mail Return Receipt Requested 7016 2140 0000 4367 6454 Mr. Tony Johnson Vulcan Construction Materials LLC 11020 David Taylor Drive, Suite 400 Charlotte, North Carolina 28262 RE: Gold Hill Quarry Mining Permit No. 13-04 Cabarrus County Yadkin River Basin Dear Mr. Johnson: We have reviewed the modification request you/your company submitted for the referenced mine site. In order for this office to complete its review of the referenced project in accordance with GS 74-50 and 51 of the Mining Act of 1971, please provide the additional or revised information in accordance with the following comments: 1. Provide proof, such as copies of the signed return receipts from certified mail that Sparkle Properties LLC and Jason H and Rebecca D Cline have been properly notified. 2. Provide proof that your company has obtained the necessary Certification for the impacts to the stream. 3. Provide cross sections for each phase of the Western Storage Area. Label the slopes on the cross sections. Include a detailed description of the material placement including lift heights and staged seeding. Provide time frames for temporary and permanent stabilization. 4. Provide details regarding the elimination of the basinds, such as when and how they will be eliminated. Basins must only be removed when the areas draining into them are completely stabilized. 5. Provide additional sediment control measures for Phase 1 construction (Sheet 3 of 9). North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699 1612 919.707.9200 Certified Mail Mr. Johnson Page 2 6. Extend the temporary diversion ditches in Phase 2 and Phase 3 up to Phase 1 construction drawings. 7. Provide sediment ontrol for the small section that flows south. 8. Provide plunge pools for the slope drains. 9. Provide wattles and matting along the long benches Please note, this office may request additional information, not included in this letter, as the mining application review progresses. Be advised that our review cannot be completed until all of the items listed above have been fully addressed. In order to complete the processing of your application, please forward two (2) copies of the requested information to my attention at the following address: Division of Energy, Mineral and Land Resources Department of Environmental Quality 1612 Mail Service Center Raleigh, NC 27699-1612 As required by 15A NCAC 5B.0113, you are hereby advised that you have 180 days from the date of your receipt of this letter to submit all of the requested information. If you are unable to meet this deadline and wish to request additional time, you must submit information, in writing, to the Director clearly indicating why the deadline cannot be met and request that an extension of time be granted. If an extension of time is not granted, a decision will be made to grant or deny the mining permit based upon the information currently in the Department's files at the end of the 180-day period. The preceding statement cites the maximum time limit for your response, we encourage you to provide the additional information requested by this letter as soon as possible. Your prompt response will help us to complete processing your application sooner. Please contact me at (919) 707-9220 if you have any questions. 4incere'y, �t(/�� dith A. Wehner Assistant State Mining Specialist cc: Mr. zahid Khan