HomeMy WebLinkAboutAppendix M - Letter from City of KM on Sewer availability KINGS MOUNTAIN
NORTH CAROLINA
hiving.&vated.
April 17, 2024
Joseph Olivieri
Electrical Engineer V
Albemarle
joseph.olivieri@albemarle.com
(Via email only)
Subject: Sewer Availability—Albemarle Lithium Mine—Kings Mountain
The proposed Albemarle lithium mine in Kings Mountain is within the utility service area of the
city of Kings Mountain. Wastewater from the proposed site could be treated at the Pilot Creek
Wastewater Treatment Facility(NPDES #NC0020737). The Pilot Creek WTF has a permitted
capacity of 6.0 MGD. The current Average Daily Flow to the WTF is 1.47 MGD, and an
additional 1.76 MGD has been allocated to pending development, leaving 2.77 MGD of
available capacity.
The proposed discharge will require an industrial pretreatment permit. We anticipate the
following permit limits:
Parameter Standard RO 75% PROPOSED Notes
LIMIT
LIMITS BASED
ON CURRENT
INDUSTRIAL
FLOW 118,000 GPD 120,000 GPD LOAD - 10 SIU'S
WITH PLANT
FLOW AT 3.0
MGD
BOD N/A MONITOR TENTATIVE
TSS 10 mg/1 MONITOR TENTATIVE
NH3 85 mg/1 MONITOR TENTATIVE
As 0.025 mg/1 0.02 mg/I TENTATIVE
Cd 0.007 mg/1 MONITOR TENTATIVE
Cr 0.337 mg/1 0.3 mg/1 TENTATIVE
Cu 0.19 mg/I 0.2 mg/I TENTATIVE
CN N/A 0.03 mg/I TENTATIVE
Pb 0.025 mg/I 0.03 mg/I TENTATIVE
Hg 0.006 mg/I 0.001 mg/I TENTATIVE
Moly 0.037 mg/I 0.05 mg/I TENTATIVE
Ni 5.963 mg/I 0.01 mg/I TENTATIVE
Se 0.013 mg/I 0.02 mg/I TENTATIVE
Ag 0.0000166 mg/I 0.0001 mg/I TENTATIVE
Zn 3.923 mg/I 0.5 mg/I TENTATIVE
Phos- Total 1.265 mg/I 5 mg/I TENTATIVE
Chlorides N/A MONITOR TENTATIVE
Thallium 0.003 mg/I 0.01 mg/I TENTATIVE
Sulfates 1814.3 mg/I MONITOR TENTATIVE
The route to serve the site with sewer has not been determined at this time. Once the route has
been determined, the existing sewer system beyond the proposed connection point will be
evaluated to determine if any additional improvements are required to accommodate the flows
from the site. Albemarle may be required to participate in any such improvements.
Please contact me at 980-396-5807 if you have any questions or need additional information.
Sincerely,
Digitally signed by
/ LMatt Echols
/,,,/ �—Date: 2024.04.17
13:06:11-04'00'
Matt Echols, PE
City Engineer
CC: Jim Palenick, City Manager
Rick Duncan, Public Infrastructure Director
Kevin Hodges, Pretreatment Coordinator
City of Kings Mountain I City Hall 1 101 W Gold St. Kings Mountain,NC 28086
Phone:704-734-0333 1 info@cityofkm.com I www.cityofkm.com