HomeMy WebLinkAboutFigures 31 thru 35_Mine Layout Map Series-81°22'25" -81°22'20" -81*22'15" -81*22'10" -81°22'5" -81*22' -81°21'55" -81021'50" -81°21'45" -81021'40" -81021'35" -81021'30" -81°21'25" -81021'20"
A/
N
I I �
2
M I Laydown Area �
�I I4j,♦I
I
I
Q-d 3 II I a
9 ®' ♦ II 5
Perimeter Pond M72
G0 (0.2 acres)
All
Laydown Area
(t.2 aCreS) i,i-Permit Boundary
Q NC Jurisdictional Waters 50 Foot Buffer
Property Setback
0 No Buffer
d Q Proposed Walking Path
m -LubeStorage ®Undisturbed Enhanced Evergreen Buffer
a Ge
atgl Utility !a& CZ Undisturbed Naturally Vegetated Property Buffer
Growth Media
c� \� 21s Tool Roomy orage Q Undisturbed Planted Vegetated Buffer
Q- ,� St
Mine Change (8.5 acres) / ®Vegetated Berm
HouselCanteen Truck
Maintenance Mine Design Feature
PJe f Mine Offices Shop Shop
Jnd o Warehouse OpenlPit f\j Open Pit Contour
3racres)� Overburden Storage Facility Contour
(1�0
5 f\j Rock Storage Facility Contour
0
Q Open Pit
in \ 3pp Q Overburden Storage Facility
Ready Line 3pp Q Rock Storage Facility
Q2p Wash Bay R Water Mine Stockpile Area
Opp
Recirculation Area 'r4p Q Growth Media Storage
North Gate ppp Laydown Area
SeCUrity Office Fire Water Tanks \
And Pumps / ssp Infrastructure
Light Vehicle -)t- Fence Line rc
Wash Say
Station ) Processing Features and Infrastructure
fn Dominion Gas 0 \ ) �O
in Metering Station Collection Bp —Proposed 44kV Route
in 10 Pond M81 ey d Existing Building
9 p
(2.6 acres) d4/ 90
♦ f>o \ o +Proposed Building
Pie , do Q Ground Disturbance Area and Pads
nd 6 q ♦ Transportation g
d °� ♦ Tire Yard E
FQ 1, $$ Existing Ingress/Egress r
♦
x Proposed Ingress/Egress o
Existing Road _
Misc.Waste Railroad
Tailings Storage Haul Road
1 Loadout
' ' 204 Building I Site Road m'
t♦ ♦ .0 — ; Hydrology x
�;mmg Sk ♦ Outfall Location 5
- Temporary Outfall Location _
y Water Truck/ —Conduits and Culverts
Concentrate
�1,ll Area�Orburden Stora aDrainage
960 Rail�Loadout g � 2i- 9 m
N /.} 960 Facility 2 (34.0-aT'cre`s) - 2r Named Flowline g
t� ' t✓Pond
� l000 p2o Sed Pond 1
1000 (1.2 acres) NNote 1:Permit Boundary updated by ERM on September 3 2024. x
Note 2:Project Features are based on Draft Sile Layout Rev K
grovided by Hatch on July 18 2024.
q80 -dote 3 Outfall locations received from SRK on January 3 2024. s
Overbu rden-Storage Note 4:Area excluded from the permit boundary existing
010 facilities are not related to mining activity in North Carolina. _
Facility-1-(1.4:6_acres) 960 92g 900
Sao N E
Sao 0 0.08 0.16 12
N Sed Pond'62 062 Conveyor Miles
(0.4 acres) Rail Car Fueling Statiioin s
M Sod Pond 63 South Greek &Infrastruc`ture Storage
(0.8 acres) Arch Culvert 1 inch = 0.08 mile when printed at 11 x17
06
--—-
--------
063
------ � Figure 31 q
t 930 Kings Mountain Mine Site Layout g
spurn e; �9so 9pp Page 1 of 5 x
�9 PPf ROCK k Storage=Facility Kings Mountain Lithium Mine
99°56 7Tacr S Albemarle g
i Rock,St6ra e�Facilit (_ ) �`
g y � Kings Mountain J1
11 1050 Cleveland Count d
acres) �I o County,
1oti 900
North Carolina g
960 99� 1060
-81°22'20" -81'22'15" -81'22'10" -81°22'5" -81°22' -81*21'55" -81°21'50" -81°2145" -81°21'40" -81°21'35" -81*21'30" -81°21'25" -81°21'20"
-81°21'50" -81°21'45" -81*21'40" -81°21'35" -81°21'30" -81°21'25" -81021'20" -81021'15" -81021'10" -81°21'5" -81°21' -81°20'55" -81°20'50"
♦ 1 I
�� ♦♦♦ +�� iti ♦i j�
4I ♦♦ y
Mill �P ♦♦
� Cr ♦♦ r II I
0,
v �e'/r ♦♦ I
If
a O^ ♦♦♦ , , 3III %I ♦Ia
M s,
J �
♦♦ Perimeter PondM71 L',';' Permit Boundary
♦ (0.2 acres) # Q INC Jurisdictional Waters 50 Foot Buffer
0 - !� �� Property Setback
07 I #� No Buffer
Q Proposed Walking Path
Pt� end I` Drg Undisturbed Naturally Vegetated Property Buffer
Stora
ta° I Cle
I g
/ \ Ve etated Berm
M �acg I (2.8 acres) Heary Electrc� ®
216I Charging Stan!
�. Mine Design Feature
v! �\j Open Pit Contour
* f\j Overburden Storage Facility Contour
1
♦ 1 Q Open Pit
I
Overburden Storage Facility
III Mine Stockpile Area
— Run-of-Mine Pad
II Laydown Area I
II (2.3 acres) Dewatering Storage
I♦ I Q Growth Media Storage
♦♦♦ /X Laydown Area
♦ l Infrastructure
-x- Fence Line
0
Perimeter Pond M72 1 Processing Features and Infrastructure
M (0.2 acres) — Proposed 44kV Route zi
d Existing Building _
Laydown Area
(1.2 acres) + Proposed Building -
_ f Q Ground Disturbance Area and Pads
r
0 en Pl Transportation
n Existing Ingress/Egress
/LubeStorage (41'4013% acres) r _
�{ Proposed Ingress/Egress
Existing Road
utility Area& Growth Media
1001 Room; Storage Railroad g
M Mine Change (8.5acres) I Haul Road E
House/Canteen Truck g
W&F Maintenance ,
Site Road
Offices Shop Shop m,
Warehouse J
Hydrology e
—Conduits and Culverts
2- Drainage
0 3po 2, Named Flowline g
4& Pond
as Line 760
Wash Bay&Water Q841p NNote 1:Permit Boundary updated by ERM on September 3 2024.
♦ Note 2:Project Features are based on Draft Sile Layout Rev K x
Recirculation Area 0 ♦ rovided by Hatch on July 18 2024.
60p ♦♦ -dote 3:Outfall locations received from SRK on Januaexistiry 3 2024. s
♦ Note 4:Area excluded from the
permit boundary ng
66p ♦ ♦ _ facilities are not related to minin actiwl in North Carolina. _
N E
Foel Kings _ 0 0.08 0.16
Stadon ^
M 1 9d Bpo �r�♦ 1. ♦ Miles
4i 900 ♦ � � � � Tech Center Gatel s
M �'o �' ♦ Securit Office E
da .46 1 ` i( 1 inch = 0.08 mile when printed at 11"x17"
Tire Ya7G ` ♦�`\ Lwash gacle / z
MPOp � Run-of,Mine Figure 32 g
411" ` Pad Kings Mountain Mine Site Layout g
Miac.waate I ��� p Page 2 of 5
Tailings Storage I m
Loadout g6� /� I Kings Mountain Lithium Mine
Building Overburden Storage ; o , Albemarle
Note 4
Faciiity'2 (34.0 acres) , �� Kings Mountain Q
�000� ro 8 Cleveland County, ��� -
Z?
North Carolina zr
-81°21150" -81°21'45" -81°21'40" -81°21'35" -81*21'30" -81°21'25" -81°21'20" -81°21'15" -81*21'l0" -81°21'5" -81°21' -81o20'55" -81o20'50"
-81°22'20" -81*22'15" -81*22'10" -81°22'5" -81°22' -81021'55" -81°21'50" -81021'45" -81021'40" -81021'35" -81°21'30" -81021'25" -81021'20" -81021'15"
>0 960_Ovefburden-Storage
980 -Ov_erburden Storage �• 010 *. �s I
960 I - 94o Facility 2'(34:0 acres) ,
Facility_1.(14.6 acres) �� 2
or
`-O 94° Sed'Pond'62 Convey I ,
(0.4 acres) 082 Rail Car Fueling Station � 1 �.i,. ~�� �
ro Sed Pond 63 $outh:Greek &Infrastructure Storage iI j
(0:8 acres) Afch Culvert 4j ♦� y
-cl 067
_ -------
------- 063 v
a- ♦ 3 �10, 5,
90� �
N
Permit Boundary
II I I ❑ NC Jurisdictional Waters 50 Foot Buffer
Property Setback
No Buffer
' Q Proposed Walking Path
06° ge, ® Undisturbed Enhanced Evergreen Buffer
� Rock Stora Fa cility
� Undisturbed Naturally Vegetated Property Buffer
X (56c7 acres) Q Undisturbed Planted Vegetated Buffer
Vegetated Berm
u Mine Design Feature
Overburden Storage Facility Contour
Rock Storage Facility Contour
^°,o ❑ Overburden Storage Facility
�oyo ,� ❑ Rock Storage Facility
M o r! Infrastructure
Rock Storage Facility %a
In \'tl III oo .� Fence Line
A(7 i.0 acres)
N�
o i Processing Features and Infrastructure
ono ♦ f — Proposed 44kV Route m
1170 °O ��°
'SOS o .�� + Proposed Building
9°° fir! ❑ Ground Disturbance Area and Pads
Transportation
M 1110 WROPond51 ,� Existing Ingress/Egress
loao Proposed Ingress/Egress o
1050 _ Railroad
990 ul /
lozo I 1ee�' � Haul Road y
°o° I s ♦ ♦ Site Road
w 930 930 �/ 064 �' Hydrology E
M 900 Sed Pond64 ♦ 9 Outfall Location
(0:7 acres) 5
� ♦� � �� ' — Conduits and Culverts _
WRC Pond 6' a
1.z acres) 900 85 2- Drainage
��� Named Flowline g
Overburden Storage �♦ �� io Pond x
Facility -1'`3 (6. � ae/res) *�, Notes:
b — / ♦ Note 1:Permit Boundary updated by ERM on September 3 2024.
N o o I If- -Note 2:Project Features are based on Draft Site Layout Rev K x
oti �o° rovided by Hatch on July 18 2024.
♦, ♦ dote 3:out fall locations received from SRK on January 3 2024. s
M , ♦ I' Note 4:Area excluded from the permit boundary existing
# .f► facilities are not related to mining activity in North Carolina. _
♦ °o ♦ ,� N E
0 0.08 0.16 12
\� m
Miles
♦ g
1 inch = 0.08 mile when printed at 11"x17"
M ' Gage Rd Saee� Figure 33 g
Kings Mountain Mine Site Layout g
Page 3 of 5 x
cd9� Kings Mountain Lithium Mine
Albemarle
Kings Mountain ` Q
N . Cleveland County, 1 -
North Carolina g
M
-81°22'20" -81*22'15" -81*22'10" -81°22'5" -81.22' -81°21'55" -81°2115011 -81°21'45" -81°21'40" -81°2l'35" -81°21'30" -81°2l'25" -81°21'20" -81°21'15"
-81°21'25" -81*2120" -81021'15" -81°21'10" -81°21'5" -81021' -81020'55" -81020'50" -81°20'45" -81020'40" -81020'35" -81020'30" -81020'25" -81°20'20"
QJa 1 '
�n
,4# y
I
aoo Open Pit % 3
360 (,140:3 acres')
Holiday Inn
80 lt`! Drive Re-Route
so0 ,�♦ ` ,1 ,,1 x}, Permit Boundary
Q NC Jurisdictional Waters 50 Foot Buffer
r
�_ I .
� - �-Kings-Creek Property Setback,
No Buffer
®Undisturbed Naturally Vegetated Property Buffer
I
I�� ♦I II i p Undisturbed Planted Vegetated Buffer
Tech Center el South Gate Security
ry Mine Design Feature
♦, � �� � Security Officeke (Trucking and Delivery))
"� ♦, i r Open Pit Contour
Light vehicle (\,j Rock Storage Facility Contour
♦ Wash Bay
Run-Of_Mlne ,I Sound Wall / , Q Open Pit
Pad t r I Rock Storage Facility
Mine Stockpile Area
Q 1
Run-of-Mine Pad
O , Laydown Area
Note it ��, j Primary Infrastructure
�Cmsher Fence Line
D `1
Roo'oin
�
� —Pipe Line R
WaterTruck� /�\ _ o f- Processing Features and Infrastructure o
—Proposed 44kV Route
Fill Area/ Electr ial Trowerr p
Sorter Building
I� Reject Bins �all, �j —Proposed Dam Contour
�. ConcentratorGate/ d Existing Building
Sect Po..d 1 o
=202 , 85 SecurityOfOce , , +Proposed Building o
n (1.2 acres) I # �/ I� ,� Proposed Dam
N
Truck Weighing
♦ // I Plant Feed j Q Ground Disturbance Area and Pads
M Colle-
010 LigMVehidle� � Stockpile Area � 1 Transportation q
O ♦/,7ai Existing Ingress/Egress
Collection Pond CO3 >II n Proposed Ingress/Egress
Crusher Sizing , (1.4 acres)
.aydown sc eensf' �� , Existing Road
(0.4a� Sorting sizing Seconds i ,1 Railroad
s
Screen / ry 1 -Haul Road
� Electrical
/ CNSher / Rotatory Magnetic
Rail Car Fueling Station O ^ Building
&Infrastructure Storage �+� /� l Te�iln! / I Separation .Site Road
/ \ ElecMcal rY / Dryer v�
-uu) - Bu`il-ding CfUsher , g
Crusher Tooling , /� I Hydrology E
Area&Shop Sorting I Coon.ntrotoroor
a
Sorting ficelCanteeri] , • Outfall Location x
!I House II Temporary Outfall Location 5
Sorting
_ ByPass Re�genl
i2ocic�Storage Facility �EIeCUlcal o.Soort�ing Dispensing DMS Riprap Diffuser —Conduits and Culverts o
Bu'Iding B� Uilding Building 2-Drainage
o�X� 56:7 acres) Grinding 1
a9 , o Area Thmke Gg Filtration ; 2,Named Flowline g
or"O� Concentrate I _Electrical Flotation Areal Building I ♦Pond
Building x
g `
rnlcli ioaa-out Building Future DMS I � I 40 Water Storage Basin 1 f
Ni suiiding , Compressor Building
N �o y- Reagent Building Rockfill,Checkdam 1 Notes:
a ' ,M I%I Storage / Note 1:Permit Boundary updated by ERM on September 3 2024.
M o 1 Concentrator Water I Note 2:Project Features are based on Draft Sile Layout Rev K x
�o content ate 1 Electriczll I rowded by Hatch on July 18 2024.
Lozd=ou`t�Bin�s f! Collect!on Pond M11� Natural Gas BUildin° Treatment Plant dote 3:Out
locations received from SRK on January 3 2024. s
r. Metering Station 0 I -Note 4:Area excluded from the permit boundary existing
20t j (0.1 acres) \ I I facilities are not related to mining activity in North Carolina.
• Fine Tails Conveyor � I m
�r Transfer Tower Water Storage �. 0 0.08 0.16 12
r a
t ,1 (16.7 acres) ,• �a Miles g
1 inch = 0.08 mile when printed at 11"x17"
{ Colledtion Pond C01 Gr s
(1.0 acres) �
�a
Figure 34 g
Concentrator Electric/Pipe Utility Corridor I Kings Mountain Mine Site Layout g
Concentrator Warehouse Page 4 of 5
1,. Maintenance Shop Kings Mountain Lithium Mine
! I� Albemarle
oaa Kings Mountain �` g
Cleveland County,
203 North Carolina 11 g
ool
r
-81°21'20" -81°21'15" -81*21-10" -81°21'5" -81°21' -81°20'55" -81°20'50" -81°20'45" -81"20'40" -81°20'35" -81°20'30" -81°20'25" -81"20'20"
_ -81°21'20" -81021'15" -81°21'10" -81°21'5" -81°21' -81°20'55" -81°20'50" -81°20'45" -81020'40" -81020'35" -81020'30" -81020'25" -81°20'20"
0
Crusher Tooling
Area 8 p a Sorting II Concentrator I �♦ y
- � g �!M>McelCa noteuesneJ Dispensin g DMS
prap
II ISorting Bins Undersize Chan
RocRcSo aFacili orti� "gel'
47!1) M I ByP Diffuser 9.
Ri
s Electrical S igXA&-7 acre Building yBuilding +I 2
Building 1 ♦ r♦�
96� o�, Area t ;.,/Thickerilhg Filtration 4# q�I
_Electrical Areal Building
Concentrate I Flotation
ti..-.�- Building`
Truck Load-Out .I ��."Building-; .' � Future DMS 411, ♦ 4*
9g0 Building Compressor
Building f
N p I Storage Building Roc kfill�Checkdam 3 5Ia
o i` \ +
Con�trator Water %♦ I/
Concentrate + �• +
t Natural tai Electrical! ..
LoadAut Bins Collection Pond M1L Buidin �Treatmenl Plant � ♦
Metering Station 9
�201 r' (0.1 ages) I ♦ � /
j Fine Tails Conveyor
Transfer Tower +� Water Storage ♦ r'_j' Permit Boundary
'� Basin 1 I NC Jurisdictional Waters 50 Foot Buffer
r r Property Setback
acres') II �a No Buffer
85 + r
M + I Undisturbed Naturally Vegetated Property Buffer
f Collection Pond-1 0 0 Undisturbed Planted Vegetated Buffer
f j (1.0 acres)'
Mine Design Feature
Concentrator Electric/Pipe Utility Corridor � � (\/ Rock Storage Facility Contour
I.' Concentrator Warehouse
+ Maintenance shop � 0 Rock Storage Facility
II f! II Mine Stockpile Area
N /aa I r Laydown Area
/ Infrastructure
Line
+f 203 Fence L
III If , 003 Pipe Line
f Laydown Area I ���Raw ater Pump Processing Features and Infrastructure
Day.�elStation/
rf (,1.0 acres) � � W II (� —
rt• m \J I Proposed 44kV Route
Proposed Dam Contour
o Collection Pond CO2 a
N ,F� (oz acres) o"° + Proposed Building _
MQ<°� III 1s1 Proposed Dam
005 I O Ground Disturbance Area and Pads
Dam Transportation
Proposed
Embankment { Existing Ingress/Egress
Proposed Ingress/Egress E
Still ing'Basin I Existing Road
WSB-1 Current Outline
0
N I (830ftAMSL) Haul Road _
Site Road
" I Executive Club Lake Hydrology
00, Maximum Water Level
(845 ft AMSL) Outfall Location g
Temporary Outfall Location m'
— Conduits and Culverts g
2- Drainage
N �x 2, Named Flowline
r Sed Pond
j� ♦ Pond
(0.3acres) g
r Water Storage Basin 1 Y
Notes:
Note 1:Permit Boundary updated by ERM on September 3 2024.
L Note 2:Project Features are based on Draft Site Layout Rev K x
230124.9kV Electrical rovided by Hatch on July 18 2024.
Substation Rd 0 dote 3:Outfall locations received from SRK on January 3 2024. s
it
/ gee
GrUCG� } facilitiesAare not relatedrto miningeactiivity in North Carole a. rn
Ga\\ N E
0 0.08 0.16 12
�to95.G
to
M
Miles
g
�a 1 inch = 0.08 mile when printed at 11 rrx17"
s
Figure 35 g
Kings Mountain Mine Site Layout
3
N Page 5 of 5
Kings Mountain Lithium Mine
c Albemarle
rov Kings Mountain ��`1 Q
yes Cleveland County, zo
�o< North Carolina g
A pi
-81'21'20" -81"21'15" -81*21'10" -81°21'5" -81°21' -81°20'55" -81°20'50" -81°20'45" -81°20'40" -81°20'35" -81°20'30" -81°20'25" -81°20'20" -81°20'15"