Loading...
HomeMy WebLinkAboutFigure 43_KMM Water Balance Flowsheet rev 2024-09-14 Figure 43 - Kings Mountain Mine Water Balance Flowsheet NC-DV6 OVERBURDEN y\`cl STOCKPILE ACCESS ROAD AND BATTLE ACCESS ROAD FACILITY 1 O WATERSHED SOUTH CREEK NPI GROUND ROAD AND BATTLE Overtop WATERSHEDS� pond Pumpout WATERSHEDS GROUND ROAD BATTLE ss p"m m WATERSHEDS GROUND ROAD — O g —M�---�E--- m WATERSHEDS 3L2 gpm / = 5.7 gpm 6 y Overtop --MIRE h M EXISTING U 5.9 gpm e a SED POND 62 AND 63 O6 �63 I z I a a NC-P43c 17.2 gpm RAILROAD I = a 1= 229Pm Oa9e CULVERTS POND M81 z v I c z z 157 gpm Z'o eeK 1 z I --�---�---� \ / I a 12.9 gpm m n SOUTH CREEK yy O MULTI-PLATE ARCH M \ 7.7 gpm / I vertop a'I U U CULVERTNo NC-DV4&5 I l*—NC-CULV-P43— s t g z z �y RSF-A RUN-ON v PIT PERIMETER POND 73 (Do' bJ6 NC-H51 WATERSHEDS o HAUL ROAD AND RAILROAD ' I Overtop c I s CORRIDOR WATERSHEDS I v A o` 1 0 I PIT PERIMETER POND 71 ROCK STORAGE z i PHASE 1&2 PIT ONLY FACILITY X C-NWR51a-g 1 PAG Contact Water I UNDIVERTED PIT_ ` 'o NC-DV61 _ 80gpm —M�� WATERSHED a) 12 gpm I HAUL ROAD I KINGS CREEK RSF-A RUN-ON I 1 l� +�11 WATERSHEDS o WATERSHED WATERSHED � I Overtop I I a a I A a O RSF COLLECTION POND 51 I I = = Overtop OVERBURDEN z Oz \ , STOCKPILE I PIT PERIMETER POND 72 CARDIO HILL FACILITY 3 ROCK STORAGE I AND PIT O C-NWR61a-f FACILITY A , L— 10.6 gpm (REMOVED IN PIT PHASE 3) UNDIVERTED PIT \ / PERIMETER ---—Pill -CULV-H21— 150 m -- co WATERSHEDS WATERSHEDS Overtop 06J43�pm E I Pit Sump Pumpout a NC-P25a PiE--- Pff-- p�---PIPE---p�---Pff---M�— PIPE---PIPE---pI s\ SED POND 64 j m gp OPEN PIT �Qd Non-Process Contact Water O 7.8 sP I ci z - Overtop I I HAUL ROAD OVERBURDEN w SEDIMENT POND 1 E 58 pm WATERSHEDS PIT SUMP E z zOf I WATERSHEDS m N \ 9 / STOCKPILE m w> = NC-CULV-H43— FACILITY 2 o x= wUU I WATER � z - NC-P64& w RSF COLLECTION POND 61 TREATMENT11 Dischar e _ Overtop(D PLANT Flow M�oring\ I WE SEDIMENT POND 1 Overtop KMSW8 \ Pond 1 Kings Creek Drainage s SOUTH CREEK RESERVOIR �J Release I I Pond Pumpout Flow Monitoring � Pond I Pumpout 3 � KMSW3 O gO Overtop Overtop 2 ORE SORTING AREA I I WATERSHEDS I 1 j POND M11 POND M12 E z s 1 L— 1 Pond Pumpout LEGEND � � I —MM--- _MIRE---MIRE---PPE---MIRE---fma MPE —PIPE---PPE---MIRE---MIRE---PIPE--�ayP� N R=7 �— gg I� I w U dt Contact Water Pipeline s Pond Pumpout I W Non-Contact Water Stream Pumped Flow —MPE MIRE —PPE —PIPE —MIRE —PIPE —PPE APE —MIRE —MPIIIW] —�LgP Open Water L-- Treated Effluent i O m O 4i?M "' N Non-Process Contact Water Stream ��JJ — —� — — — —M� — E — — � I f PFE _ Upset Condition Overtopping Flow 1 I Overto / PROCESS AREA overtop N PAG Contact Water Stream O - Flow Monitoring Location Raw PIPWEate2t0— t Use Pill i WATERSHEDS Monitored Flow Release 9P I PONDS C01&CO2 ---PPE Water Transfer Pipeline O I I POND CO3 \ / CREEK Off-site Discharge Culvert O P �\ � NCG02 Discharge Location Overto NC-H42a Non-contact Water Channel ID Flow Monitoring 03 28�0E�pm Contributing Watershed KMSW7 —, O� WSB-1 Release C-NWR61a Contact Water Channel ID .10e KINGS CREEK WATER STORAGE BASIN 1 WATERSHED 7.8 gpm Average Annual Flow(50th percentile year) 2100 gpm REVISIONS DESIGN:DPH REVIEWED:JO PREPARED BY: DRAWING TITLE: REV. DESCRIPTION DATE DRAWN:DPH APPROVED:JO KINGS MOUNTAIN MINING PROJECT A ISSUED FOR CLIENT REVIEW 06/25/2024 COORDINATE SYSTEM: � Sr consulting KINGS MOUNTAIN STORM WATER MANAGEMENT Figure revised by ERM on September 14, 2024 0 ISSUED FOR PERMIT 07/03/2024 N/A PREPARED FOR: FLOWSHEET KINGS MOUNTAIN DATE: REVISION: DRAWING NO.: Jk ALBEMARLE MINING PROJECT 07 0 IF THE ABOVE BAR Operated by: SRK PROJECT N NO.: FIGURE 4 3 DOES NOT MEASURE 1 INCH, FILENAME:SRK Surface Water Flowsheet 03JUL2024.dwg THE DRAWING SCALE IS ALTERED Albemarle-Lithium USPR000576.1800 C:\Users\dhoekstra\SRK Consulting\NA USPR000576 Albemarle Corporation Kings Mountain 2022 Pre Feasibility Study-Internal\0300_Hydrology\Wbal Flowsheet\SRK Surface Water Flowsheet 03JUL2024.dwg