Loading...
HomeMy WebLinkAboutFigure 42 Phase 2 Construction Stormwater Plan 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ♦% ��� TCF S. BATTLEGROUND AVE. LEGEND. PERIMETER RIP-RAP � � ���'��\``` PROPOSED TOE OF FILL SLOPE A CHANNEL (TYP.) ♦/ / _ _ �♦ / � ��_ _-______---- --- �-� PROPOSED TOP OF CUT SLOPE ♦ ------ ���O / I I FLOW PATH ♦ / ♦ `� \\� / I / _ POND OUTLET PIPE � ♦�♦ ```���`��� / � DISCHARGE TO PHASE 3B — — —EXISTING GROUND DEVELOPMENT PHASE BOUNDAR 1 1 1 \ \ 1 LIMITS OF DISTURBANCE \ OVERBURDEN \ \ POND OUTLET PIPE STOCKPILE DISCHARGE TO ,/ ��i (LOD) \ \ EXISTING CULVERT PHASE-3A �� GROWTH MEDIA OSF-1 \ \ \ ROCK CONSTRUCTION ( ) -'- O (AREA=63 AC.) STOCKPILE �- ENTRANCE & EXIT SEDIMENT l I j (PRACTICE 6.06) POND 3A EROSION CONTROL BLANKET (PRACTICE 6.17) C OSF SEDIMENT POND 1A SUPER SILT FENCE/COMPOST TCF �� ♦ I 1� - FILTER SOCK CFS ♦ ♦ SEDIMENT (CFS) (TYP.) j PROPOSED 18" � � ®Ii� \ PROPOSED 18 11 _ /-/ POND 36 (PRACTICE 6.66.6.62) CULVERT CULVERT — 10, �� I ��_��•` "" / / CFS �� ��� �♦ / POND OUTLET PIPEMM SEDIMENT BASIN WITH SKIMMER OSF SEDIMENT / L DISCHARGE TO ( ) / / I POND 1 �P i ♦ PRACTICE 6.61 V ,., EXISTING GROUND = NOTE: STORMWATER ENTERING THE D --------- RIPRAP LINED CHANNEL l � y__�� I 1♦ \ PROPOSED 18" OPEN PIT IS DISCHARGED VIA (PRACTICE 6.21) / __ _ ��` j I CULVERT PUMPS AS PER NPDES PERMIT OUTLET PROTECTION LEVEL PERIMETER RIP-RAP lr --------- OVERBURDEN I SPREADER (PRACTICE 6.4) STOCKPILE I CHANNEL (TYP.) FACILITY (OSF-2) 1 1 ------ DIVERSION BERM SOUTH1 I / CREEK / J/ ; \\ I CFS (TYP.) E 1 DRAINAGE AREA PIT PUMP AND PIPING �j \ CONTRIBUTING TO I CULVERT j //N /�/ ; ; i �- 24-INCH CULVERT TEMPORARY CONSTRUCTION FENCE (TCF) DISCHARGE (5.7 ACRES) �. `� �� 0 CULVERT DRAIN RSF-A / / � ��� I I INSTALL 24" FRENCH DRAIN STORMWATERCULVERT \ COLLECTION / �� F SRK ROAD A / CHANNEL \ .� � ♦ l� _ — — — _ STORM SEWER/OUTLET V DITCH , io or / �/ /// /// � �� �� ��� ., � ♦ 4 � ��� �� �� o -- j V �� �� ♦ ♦ �, STRUCTURE RSF-X \ SOUTH CREEK �� STORMWATER \ �� �� i♦ SEDIMENT - V A PERMANENT OUTFALL \ / COLLECTION ` POND \ / �/ DITCH ��� ♦ \ TEMPORARY OUTFACE TIN MINE ROAD � �\ / 1 ' OSF SEDIMENT , POND 2 POND OUTLET PIPE ��� ��` _ '� ✓ j ! I DISCHARGE TO �� / ♦I�♦ �� KINGS CREEK DRAINIAGE SFEOATURE CFS I , ;.� �� / 1 TECH CENTER SEDIMENTPOND WRC-61 H� / / _(TYP.) 1 PROPOSED 24" � / / I ' _ _ --- REC ------ --__-- = RECB B _ � RECB CULVERT ® •__ — _ SOUTH CREEK PHASE-1A I ' ��\ RESERVOIR --- ---------- FRENCH DRAIN �1 �� SEDIMENT m SEDIMENT POND \\ HOLIDAY INN DRIVE I PERIMETER RIP-RAP � ` —► / POND W 2A (FUTURE ( ) �-� = =�� WRC-51 SEDIMENT POND 1A m I PHASE-113 j L=::::::: PHASE-1C \\\\ CHANNEL TYP. ` POND OUTLET PIPE DISCHARGE \'� I I (AREA=27.5 AC.) � � OPERATIONAL I � (AREA=21 AC.) (FUTURE OPERATIONAL \ I POND M-12 I i— \\ - OSF SEDIMENT TO SOUTH CREEK - OVERBURDEN STOCKPILE POND 3 POND M-1 1) POND OUTLET PIPE DISCHARGE — ----1- -------------------�- FACILITY OSF-3 TO SOUTH CREEK -___ _ RECB ______—_____ ____ ______ __ POND OUTLET PIPE RECB -_---- -------- - DISCHARGE TO POND-M11 ECB I I CFS LOD DIVERSION BERM KINGS CREEK (TYP.) j� (TYP.) (TYP.) 1-85 ------------ ----_-----I --- _ _ K KINGS CREEK I I ,I INDUSTRIAL DRIVE CFS woo- I �, I I i (TYP.) PHASE-2A I I POND OUTLET PIPE TEMP SEDIMENT \` (AREA=38.5 AC.) TOP OF DISCHARGE TO I POND B1 \ I CUT CLOPE KINGS CREEK - PHASE-213 �\ I I (AREA=13.4 AC.) I TEMP L --- � ` TEMP SEDIMENT MP SEDIMENT i � MISC. WASTE �� �� POND B2 POND B3 I I STORAGE ---- _-W, TOE OF - v 0------ II POND OUTLET PIPE SLOPE �- DISCHARGE TO --- I TOP OF CUT CLOPE KINGS CREEK KINGS CREEK `- ---J � __ I TOE OF I SLOPE — — -- POND-CO2T, - _ - IPOND OUTLET PIPE - i POND OUTLET PIPE DISCHARGE TO DISCHARGE TO WATER STORAGE EXISTING GROUND EXISTING GROUND BASIN (WSB-1) SEE ENLARGED DRAWING NUMBER (H371132-5200-222-270-0002) FOR - N CONSTRUCTION STORMWATER MANAGEMENT 1 PLAN FOR DUKE'S SUBSTATION PAD GALILEE CHURCH I ROAD OVERALL SITE DRAINAGE PLAN � �YORK ROAD P -------------- SCALE: 1"=400'-0" HATCH ___ -- ALBEMARLETM KINGS MOUNTAIN DRAFTSPERSON E. MOPENO NR 03 28 24 C 0 R P 0 R A T 1 0 N 348 HOLIDAY INN DRIVE DESIGNER E. MOPENO NR 03 28 24 --- KINGS MOUNTAIN, NC 28286 CHECKER S. ALUGUVELU tag—eua,,sr 024-07-12 This drawing is the confidential property of Albemarle Corporation and is issued with the express understanding and agreement that it DESIGN COORD. T. KAISER -r�,� 024-07-12 is not to be copied or reproduced,or used in any way detrimental to the interest of Albemarle Corporation and is to be returned on request. - ISSUED F 0 R PERMITTING RESP. ENG. S ALuGUVE2u '^^� Sr ' 024-07.12 --- __= MINING AND CONCENTRATOR FACILITY LEAD DISC. ENG. S. ALUGUVE221 u sr ___ MINE SELECT PHASE ENG. MANAGER NOT FOR CONSTRUCTION PRoJ. MANAGER K. YOUNG C ISSUED FOR PERMITTING o24-07-12 PHASE 2 CONSTRUCTION STORMWATER PLAN ELM SRA TPK 07/11/24 ROLE NAME SIGNATURE DATE B ISSUED FOR PERMITTING ELM SRA TPK 04/03/24 JOB NO. DRAFTER: DRAWING NO. KM61-Cl-GA-00106 SHT. 1 of 1 REVISION R DATE A INTERNAL&CLIENT REVIEW ELM SRA TPK 0 KM22040 E. MORENO HATCH DRAWING NUMBER: H371132-4000-222-270-0004 --- SCALE- DATE FIGURE 4 2 C REV# DESCRIPTION CADD CHK'D APPR'D DATE AS NOTED 03/28/24