Loading...
HomeMy WebLinkAboutFigure 41 Phase 1 Construction Stormwater Plan 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 TCF LEGEND: (TYP.) S. BATTLEGROUND AVE. PERIMETER RIP-RAP � i� -�- PROPOSED TOE OF FILL SLOPE A CHANNEL (TYP.) �% i� � ��� _ PROPOSED TOP OF CUT SLOPE FLOW PATH POND OUTLET PIPE PHASE 3B � 11111017DISCHARGE TO — DEVELOPMENT PHASE BOUNDAR EXISTING GROUND ' LIMITS OF DISTURBANCE \ \\ OVERBURDEN �\ \ POND OUTLET PIPE (LOD) \ STOCKPILE ��A DISCHARGE TO FACILITY EXISTING CULVERT PHASE-3A �� (OSF-1) �\ \� - _ (AREA=63 AC.) i GROWTH MEDIA ---- J I I111 STOCKPILE ROCK CONSTRUCTION 1 ENTRANCE & EXIT SEDIMENT (PRACTICE 6.06) 10 POND 3A t�l i i i RECB EROSION CONTROL BLANKET (PRACTICE 6.17) SUPER SILT FENCE/COMPOST TCF ,��� - ®� , /� \ - SEDIMENT FILTER SOCK (CFS) (TYP.) i� PROPOSED 18 \ PROPOSED 18" / I_ �' POND 3B (PRACTICE 6.66.6.62) CULVERT, - � f' CULVERT OSF SEDIMENT 1 CFS/ POND OUTLET PIPE SEDIMENT BASIN WITH SKIMMER POND 1 (TYP.) �i� _� \\ DISCHARGE TO (PRACTICE 6.61) i ---_ r^ l \ EXISTING GROUND NOTE: STORMWATER ENTERING THE _________ \\ RIPRAP LINED CHANNEL PROPOSED 18" OPEN PIT IS DISCHARGED VIA (PRACTICE 6.21) CULVERT PUMPS AS PER NPDES PERMIT I OUTLET PROTECTION LEVEL lil PERIMETER RIP-RAP �� OVERBURDEN � SPREADER (PRACTICE 6.4) STOCKPILE I CHANNEL TYP. ✓�i ( 1� FACILITY (OSF-2) I --------- DIVERSION BERM 1 / SOUTH / \ - 1 / CREEK CFS S ) DRAINAGE AREA f �p PIT PUMP AND PIPING E CONTRIBUTING TO it CULVERT 24-INCH CULVERT TEMPORARY CONSTRUCTION DISCHARGE (5.7 ACRES) FENCE (TCF) it / it RS� / ,.' i/ �i � \\�� \®\\�� 0 CULVERT DRAIN �, I I PERMANENT OUTFALL RSF-A i ! i ���A �. I INSTALL 24" - STORMWATER �� li .����� I I CULVERT SRK ROAD V COLLECTION / I TEMPORARY OUTFALL CHANNEL �\ �� DITCH vv v SOUTH CREEK / i i/i i RSF-X — \ //� -TORMWATER \ ��� \ \� OLLECTION V11i/ . %�� C SEDIMENT - v � �_- � POND DITCH TIN MINE ROAD �� ` ��� // \ �� �1 ` % G RSF-X POND OUTLET PIPE `� II DISCHARGE TO ; KINGS CREEK EXISTING STORM DRAINAGE FEATURE CFS n J �� (TYP.) CENTER H SEDIMENT POND WRC-61 � / l� / O/ /PROPOSED 24 � --- �=--- -- RC I -- - :.CB ------- RECB CULVERT \ � �_ �� --- _� �� _ — ------ -----____________— ---- _ I I SEDIMENT II SOUTH CREEK PHASE 1A I POND Al �� SEDIMENT ��� SEDIMENT RESERVOIR ap I POND A5 �\ HOLIDAY INN DRIVE I PERIMETER RIP-RAP �� — ,� POND w I SEDIMENT __/ I PHASE-1 C CHANNEL (TYP.) ��-'�-___ --� � --— WRC-51 POND OUTLET PIPE DISCHARGE SEDIMENT POND A2 -099- - PHASE-113 f (AREA=21 AC.) 1 �■ ------------- AREA=27.5 AC.) SEDIMENT OSF SEDIMENT TO SOUTH CREEK � POND A3 ( I POND A4 — �t OVERBURDEN STOCKPILE I ---:--w,; ------ - POND 3 POND OUTLET PIPE DISCHARGE _ __ __ __ _ _�— FACILITY OSF-3 TO SOUTH CREEK POND OUTLET PIPE POND-- 1 - RECB =_- - RECB _______ DISCHARGE TO KINGS CREEK ��,P ) �-1 ��,P ) 1-85 - ------ -------I �--- _ _ _ _ _ _ K _ _ _ _ -------- KINGS CREEK I ,j INDUSTRIAL DRIVE I I I _ — — PHASE-2A I POND OUTLET PIPE SEDIMENT PHASE-2B (AREA=38.5 AC.) DISCHARGE TO I POND 131 (AREA=13.4 AC.) \\\ � KINGS CREEK v �� I SEDIMENT SEDIMENT I I L /r'MISC. WASTE ��_ ` ��\ POND B2 POND B3 l STORAGE _- - - -� I TOE OF _ _ ------------------------ POND OUTLET PIPE SLOPE — DISCHARGE TO I - �� ` I -=----------------- - I KINGS CREEK KINGS CREEK POND-CO2 M OUTLET PIPE POND OUTLET PIPE y� - -[:-DISCHARGE TO WATER STORAGE I - - — DISCHARGE TO J EXISTING GROUND i EXISTING GROUND BASIN (WSB-1) �% I _ SEE ENLARGED DRAWING NUMBER N (H371132-5200-222-270-0002) FOR CONSTRUCTION STORMWATER MANAGEMENT L� ---- PLAN FOR DUKE'S SUBSTATION PAD / GALILEE CHURCH--,,""," ROAD OVERALL SITE DRAINAGE PLAN SCALE: 1"=400'-0" ""�YORK ROAD P HATCH ___ -- ALBEMARLETM KINGS MOUNTAIN DRAFTSPERSON E. MORENO NR 03 18 24 C 0 R P 0 R A T 1 0 N 348 HOLIDAY INN DRIVE DESIGNER E. MORENO NR 03 1 8 24 KINGS MOUNTAIN, NC 28286 CHECKER S. ALUGUVELU AL,gjgv A,l,v,SVLAr^,� 2024-07-12 This drawing is the confidential property of Albemarle Corporation and is issued with the express understanding and agreement that it DESIGN COORD. T. KAISER ai/--*V,T`' 2024-07-1 --- is not to be copied or reproduced,or used in any way detrimental to the interest of Albemarle Corporation and is to be returned on request. ISSUED F 0 R PERMITTING RESP. ENG. S. ALUGuvELu � SY 024.07.1 ___ __= MINING AND CONCENTRATOR FACILITY LEAD DISC. ENG. S. ALUGUVELLI Oyu ,S °" ___ MINE SELECT PHASE ENG. MANAGER NOTCONSTRUCTION F 0 R PRO,J. MANAGER K. YOUNG C ELM SRA TPK 07/11/24- 7- ISSUED FOR PERMITTING PHASE 1 CONSTRUCTION STORMWATER PLAN C ROLE NAME SIGNATURE DATE B ISSUED FOR PERMITTING ELM SRA TPK 04/03/24 JOB NO. DRAFTER: DRAWING NO. KM61-Cl-GA-00105 SHT. 1 of 1 REVISION R INTERNAL&CLIENT REVIEW KM22040 E. MORENO HATCH DRAWING NUMBER: H371132-4000-222-270-0003 A ELM SRA TPK 03/29/24--- SCALE- DATE C REV# DESCRIPTION CADD CHK'D APPR'D DATE AS NOTED 03/18/24 FIGURE 41