HomeMy WebLinkAboutFigure 36-A KMM_SWMP_Addendum2.1 with Outfalls PERIMETER pJ�j
N POND71 0��� LEGEND
LAYDOWN
AREA SEDIMENT FENCE
NCG02 DISCHARGE
PERIMETER POINT ID
�� ..
POND 72
PROPERTY 201 NCG02 TEMPORARY
LINE DISCHARGE POINT ID
GROWTH MEDIA /
STORAGE
LAYDOWN /
AREA / --
TRUCK MAINTENANCE
SHOP MINE PIT
I �
WAREHOUSE-
I / -
o �
9P EXISTING ROM PAD
FACILITY/LABORATORY 'J�
NATURAL GAS
LINE RE-ROUTE
oREADY LINE HAUL ROAD
o
� CONCENTRATE
0
/ \ \�
RAIL LOADOUT EXISTING I /
PROCESS
BOOSTER PUMP
FACILITY z
,o
(_4
OVERBURDEN STORAGE
- FACILITY 2 (OSF-2) SED POND 1 ., °� /
OVERBURDEN u ® .<<Ci STOCKPILE
STORAGE � SEDIMENT _ do P /
FACILITY 1 (OSF-1) WETLAND AREA FENCE (TYP.) RAIL CAR U I Ul 0
SETBACK FUELING STATION . ..
& INFRA STORAGE 00,
OSF-1 WATER
SOUTH CREEK
CULVERT
RUSHING FACILITIE
o C
MANAGEMENT PONDS � � _ _ �
--o;
� 063
MUD
O
z --- ! GRADEOTO DRAIN KING' S CREEK
o �
/
� 062 0
CONCENTRATE TRUCK �
f
SOUTH CREEK i <� __ __ LOADING BUILDING
HAUL ROAD
SRO O O ECKDAM K
- a
o\\0000'' ROCK
STORAGE 1 �
FACILITY X �0
NCENTRAT R
- - FACILITIES
��• ��„ � o�i�� ��� '��� �'i� III ill I I I I I I� IIII �I I I Q��� / / /
0 1` ROCK -WRC POND 51
STORAGE Q- 0 C
FACILITY A G
OJ�� / / 003
C- ♦'
WATER STORAGE
� 005 (
BASIN 1 CURRENT/ /
/ OUTLINE)
WRC POND 61 6
EXISTING 230kV
- POWERLINE ALIGNMENT
� - OSF-3 WATER
_ MANAGEMENT POND
WETLAND AREA
SETBACK
o ♦ /
-
__------- / PROPOSED WATER
\` , STORAGE
X EMBANKMENT
SEDIMENT
VERBURDEN STORAGE
------- �
- FACILITY 3 (OSF-3)FENCE (TYP.) MAX WATER LEVEL
LAYDOW ,
YARD PMP EVENT
PROPOSED TOE (845 FT AMSL)
- BUTTRESS
\ 230/24.9KV ELECTRICAL
PROPOSED
LL SUBSTATION
SPIWAY
REVISIONS
DESIGN: EL/JO REVIEWED: DPH PREPARED BY: DRAWING TITLE: ISSUE:
REV. DESCRIPTION DATE DRAWN:EL APPROVED:JO SITE LOCATION MAP WITH TEMPORARY
0 ISSUED FOR PERMITTING 07/02/2024 Srk consultingDATE:
COORDINATE SYSTEM: SURFACE WATER MANAGEMENT AND
7/2/2024
NC83F PREPARED FOR: SEDIMENT CONTROL FEATURES SRK PROJECT NO.: REVISION:
PROJECT: USPR576.800 0
0 250 500 1000 KINGS MOUNTAIN
MINING PROJECT DRAWING NO.
FEET IF THE ABOVE BAR .1 ALBEMARLE KINGS MOUNTAIN MINING PROJECT
DOES NOT MEASURE 1 INCH, Operated by: FIGURE 36-A
FILE NAME: Site Map_Rev 8_Silt Fencing_Linked.dwg
THE DRAWING SCALE IS ALTERED Albemarle-Lithium
C:\Users\elynn\SRK Consulting\NA USPR000576 Albemarle Corporation Kings Mountain 2022 Pre Feasibility Study-GIS\04 CAD\20240619_Simplified SiteMap\Site Map_Rev 8—Silt Fencing_Linked.dwg