Loading...
HomeMy WebLinkAboutFigure 36-A KMM_SWMP_Addendum2.1 with Outfalls PERIMETER pJ�j N POND71 0��� LEGEND LAYDOWN AREA SEDIMENT FENCE NCG02 DISCHARGE PERIMETER POINT ID �� .. POND 72 PROPERTY 201 NCG02 TEMPORARY LINE DISCHARGE POINT ID GROWTH MEDIA / STORAGE LAYDOWN / AREA / -- TRUCK MAINTENANCE SHOP MINE PIT I � WAREHOUSE- I / - o � 9P EXISTING ROM PAD FACILITY/LABORATORY 'J� NATURAL GAS LINE RE-ROUTE oREADY LINE HAUL ROAD o � CONCENTRATE 0 / \ \� RAIL LOADOUT EXISTING I / PROCESS BOOSTER PUMP FACILITY z ,o (_4 OVERBURDEN STORAGE - FACILITY 2 (OSF-2) SED POND 1 ., °� / OVERBURDEN u ® .<<Ci STOCKPILE STORAGE � SEDIMENT _ do P / FACILITY 1 (OSF-1) WETLAND AREA FENCE (TYP.) RAIL CAR U I Ul 0 SETBACK FUELING STATION . .. & INFRA STORAGE 00, OSF-1 WATER SOUTH CREEK CULVERT RUSHING FACILITIE o C MANAGEMENT PONDS � � _ _ � --o; � 063 MUD O z --- ! GRADEOTO DRAIN KING' S CREEK o � / � 062 0 CONCENTRATE TRUCK � f SOUTH CREEK i <� __ __ LOADING BUILDING HAUL ROAD SRO O O ECKDAM K - a o\\0000'' ROCK STORAGE 1 � FACILITY X �0 NCENTRAT R - - FACILITIES ��• ��„ � o�i�� ��� '��� �'i� III ill I I I I I I� IIII �I I I Q��� / / / 0 1` ROCK -WRC POND 51 STORAGE Q- 0 C FACILITY A G OJ�� / / 003 C- ♦' WATER STORAGE � 005 ( BASIN 1 CURRENT/ / / OUTLINE) WRC POND 61 6 EXISTING 230kV - POWERLINE ALIGNMENT � - OSF-3 WATER _ MANAGEMENT POND WETLAND AREA SETBACK o ♦ / - __------- / PROPOSED WATER \` , STORAGE X EMBANKMENT SEDIMENT VERBURDEN STORAGE ------- � - FACILITY 3 (OSF-3)FENCE (TYP.) MAX WATER LEVEL LAYDOW , YARD PMP EVENT PROPOSED TOE (845 FT AMSL) - BUTTRESS \ 230/24.9KV ELECTRICAL PROPOSED LL SUBSTATION SPIWAY REVISIONS DESIGN: EL/JO REVIEWED: DPH PREPARED BY: DRAWING TITLE: ISSUE: REV. DESCRIPTION DATE DRAWN:EL APPROVED:JO SITE LOCATION MAP WITH TEMPORARY 0 ISSUED FOR PERMITTING 07/02/2024 Srk consultingDATE: COORDINATE SYSTEM: SURFACE WATER MANAGEMENT AND 7/2/2024 NC83F PREPARED FOR: SEDIMENT CONTROL FEATURES SRK PROJECT NO.: REVISION: PROJECT: USPR576.800 0 0 250 500 1000 KINGS MOUNTAIN MINING PROJECT DRAWING NO. FEET IF THE ABOVE BAR .1 ALBEMARLE KINGS MOUNTAIN MINING PROJECT DOES NOT MEASURE 1 INCH, Operated by: FIGURE 36-A FILE NAME: Site Map_Rev 8_Silt Fencing_Linked.dwg THE DRAWING SCALE IS ALTERED Albemarle-Lithium C:\Users\elynn\SRK Consulting\NA USPR000576 Albemarle Corporation Kings Mountain 2022 Pre Feasibility Study-GIS\04 CAD\20240619_Simplified SiteMap\Site Map_Rev 8—Silt Fencing_Linked.dwg