HomeMy WebLinkAboutFigure 29_End of Operations - LOM Ph 3 �o O `day e�\ea P4� Shelby Project Location
Gastonia
Rd
� Ito Charlotte
North Carolina
93 o I` 1 7 South Carolina
Perimeter Pit Backslope Contours
Pond M71 Pit Backslope Boundary
h4rSfO Pt� �aGe� Dewatering 1 C,,=Permit Boundary
�ac9 Storage Y O NC Jurisdictional Waters 50 Foot Buffer
Heavy Electric r f } Property Charging Station P Y Setback
No Buffer
Lay down Area ,
l � Q i0 Proposed Walking Path
Perimeter Open Pit / \�C ®Undisturbed Enhanced Evergreen Buffer
Truck Maintenance Shop Pond M72 / ®Undisturbed Naturally Vegetated Property Buffer
Lube Storage Utility AreaRool Room 216 f 0 Q Undisturbed Planted Vegetated Buffer
W&F Shop Laydown Area
Q Vegetated Berm
Mine Change HouselCanteen Mine Design Feature
Mine Offices ( Growth �.�
Warehouse + Media01
Open Pit Contour
® Storage yob a�0� /> r\,,Overburden Storage Facility Contour
4 �o GS r\,j Rock Storage Facility Contour
1 �o fr
North Gate o00 } �1 d/'D (]Open Pit
N
�d P Security Offices Ready Line Wash Bay& ^oo \ �� I ❑Overburden Storage Facility
e Water Recir.Area oo ?? 1
`aG Fire Water Tanks ) o, -� I I II 1 Q Rock Storage Facility
&Pumps t� y Truck Fuel Station /�, Tech Center Gatel� I Mine Stockpile Area
Dominion Gast Collection Weighing yap \ Security�Office II
G Metering Station Pond M81 4if ��
P,te 6 'm y 1 South Gate I -�Y —Run-of-Mine Pad
Tire Yard ♦..� � �Dewatering Storage
4 p ♦ Run-of-Mine Security Office
oJOa Q� ' �^ r ♦ 0 Growth Media Storage
Water Truck II - Pad /�/� Laydown Area
f Tailin sLoadout Fill Area Note 3
haw �;mms s1 ` Build ng�� Overburden ♦ ��she�� Infrastructure
0 Misc.Waste Storage ! Fence Line
Storage Facility-2� 1 a�� I ♦ ,t —Pipe Line
Overburden �0°o Bed Pond'b Collection I I Plant Feed I Processing Features and Infrastructure
-o �—i 91 010 •---/ I 85 ♦ -� .I —
fy �Storaga O S,�e Pond M12 Stockpile Area II 161 Proposed 44kV Route
97a y
Faalit 1 d Existing Building
>y— 9ao 062 ® ey°r �c Laydown
South Creek Conv Secondary +Proposed Building
c - SedP7 Arch Culvert Fueling gtan / I Crusher Collection o
063�g 76 O "�"" \\�C/ i• Pond CO3 / �Proposed Dam —
� &Infra Stora a Tertiary
-- I Transportation
S�ond 63 � � Crusher Tooling Q I Crusher d
x Y Area&rSho It Flotation
/ p ♦ Existing Road
p 1 � Sorting Building .,
Concentrator�Truek\� I Building Rea9e\ Riprap Diffuser � Railroad m
Load-OutBuildiog I IrJ Storage �� \ RrockfCheckdam E
Rock=Stora e
IV" ♦ r Haul Road
g Concentrator,- Y r �� r'7� � , ♦ Electricals Electrical Building �Site Road
�Facilit �X Load-Out Bins Natural Gas Building I x
y ZJ V//' i Metering Station Concentrator Gate/Security Office Hydrology
collection Pond M11 'F I Future DMS Building
a
Collection 0 • Outfall Location
o Ponc C01 DMS Building N p`L / - 9 —Conduits and Culverts
� o a I Wa se n Filtration Building 2-Drainage
E
Rock-Storage ��
��\ 5tie I � Raw Compressor Building �Named Flowline
Faclli4 JAIL III < Water Pump
I ConcentratorOffcel Pond Y
00/ �� 1 iii Ill Laydownl Q CariteenlChan a House Water Storage Basin 1
XF St 1140J J��i,, II �t �. Water•Storage I g d g
J WRC Pond 51 m� Concentrator Water
,�9 1080� I,f Collection PondCO2 �� Basin 1� Treatment Plant Notes:
_ yQ -Note 1:Permit Boundary updated by ERM on September 3 2024. x
fJ�11JJ i I(h , // Dam Note 2:Mine phases were provided by SRK on April 19 2024.
005 t Note 3:Area excluded from the ermi boundaryexisting
960 064 IIy �Emb�ankment ,♦ facilities are not related to mining activity in Noth Carolina.
Sed Pond 64
WRC Pond 61�� II ♦' N
m
0 Sto aged I } +/1 0 0.2 0.4
a
F.acility 3 II ,� ,��' l Miles
0 ♦ /J ��� /( 1 inch = 0.2 mile when printed at 11"x17"
III Gene Rd a z
T I cdg� Figure 29
Sequence Map: End of Operations g
(End of Mining Year 9.4) LOM Ph 3
Kings Mountain Lithium Mine
Albemarle
Kings Mountain ��` Q
o ea City Cleveland County, 1zo
o a0e Lake o North Carolina g