Loading...
HomeMy WebLinkAboutFigure 29_End of Operations - LOM Ph 3 �o O `day e�\ea P4� Shelby Project Location Gastonia Rd � Ito Charlotte North Carolina 93 o I` 1 7 South Carolina Perimeter Pit Backslope Contours Pond M71 Pit Backslope Boundary h4rSfO Pt� �aGe� Dewatering 1 C,,=Permit Boundary �ac9 Storage Y O NC Jurisdictional Waters 50 Foot Buffer Heavy Electric r f } Property Charging Station P Y Setback No Buffer Lay down Area , l � Q i0 Proposed Walking Path Perimeter Open Pit / \�C ®Undisturbed Enhanced Evergreen Buffer Truck Maintenance Shop Pond M72 / ®Undisturbed Naturally Vegetated Property Buffer Lube Storage Utility AreaRool Room 216 f 0 Q Undisturbed Planted Vegetated Buffer W&F Shop Laydown Area Q Vegetated Berm Mine Change HouselCanteen Mine Design Feature Mine Offices ( Growth �.� Warehouse + Media01 Open Pit Contour ® Storage yob a�0� /> r\,,Overburden Storage Facility Contour 4 �o GS r\,j Rock Storage Facility Contour 1 �o fr North Gate o00 } �1 d/'D (]Open Pit N �d P Security Offices Ready Line Wash Bay& ^oo \ �� I ❑Overburden Storage Facility e Water Recir.Area oo ?? 1 `aG Fire Water Tanks ) o, -� I I II 1 Q Rock Storage Facility &Pumps t� y Truck Fuel Station /�, Tech Center Gatel� I Mine Stockpile Area Dominion Gast Collection Weighing yap \ Security�Office II G Metering Station Pond M81 4if �� P,te 6 'm y 1 South Gate I -�Y —Run-of-Mine Pad Tire Yard ♦..� � �Dewatering Storage 4 p ♦ Run-of-Mine Security Office oJOa Q� ' �^ r ♦ 0 Growth Media Storage Water Truck II - Pad /�/� Laydown Area f Tailin sLoadout Fill Area Note 3 haw �;mms s1 ` Build ng�� Overburden ♦ ��she�� Infrastructure 0 Misc.Waste Storage ! Fence Line Storage Facility-2� 1 a�� I ♦ ,t —Pipe Line Overburden �0°o Bed Pond'b Collection I I Plant Feed I Processing Features and Infrastructure -o �—i 91 010 •---/ I 85 ♦ -� .I — fy �Storaga O S,�e Pond M12 Stockpile Area II 161 Proposed 44kV Route 97a y Faalit 1 d Existing Building >y— 9ao 062 ® ey°r �c Laydown South Creek Conv Secondary +Proposed Building c - SedP7 Arch Culvert Fueling gtan / I Crusher Collection o 063�g 76 O "�"" \\�C/ i• Pond CO3 / �Proposed Dam — � &Infra Stora a Tertiary -- I Transportation S�ond 63 � � Crusher Tooling Q I Crusher d x Y Area&rSho It Flotation / p ♦ Existing Road p 1 � Sorting Building ., Concentrator�Truek\� I Building Rea9e\ Riprap Diffuser � Railroad m Load-OutBuildiog I IrJ Storage �� \ RrockfCheckdam E Rock=Stora e IV" ♦ r Haul Road g Concentrator,- Y r �� r'7� � , ♦ Electricals Electrical Building �Site Road �Facilit �X Load-Out Bins Natural Gas Building I x y ZJ V//' i Metering Station Concentrator Gate/Security Office Hydrology collection Pond M11 'F I Future DMS Building a Collection 0 • Outfall Location o Ponc C01 DMS Building N p`L / - 9 —Conduits and Culverts � o a I Wa se n Filtration Building 2-Drainage E Rock-Storage �� ��\ 5tie I � Raw Compressor Building �Named Flowline Faclli4 JAIL III < Water Pump I ConcentratorOffcel Pond Y 00/ �� 1 iii Ill Laydownl Q CariteenlChan a House Water Storage Basin 1 XF St 1140J J��i,, II �t �. Water•Storage I g d g J WRC Pond 51 m� Concentrator Water ,�9 1080� I,f Collection PondCO2 �� Basin 1� Treatment Plant Notes: _ yQ -Note 1:Permit Boundary updated by ERM on September 3 2024. x fJ�11JJ i I(h , // Dam Note 2:Mine phases were provided by SRK on April 19 2024. 005 t Note 3:Area excluded from the ermi boundaryexisting 960 064 IIy �Emb�ankment ,♦ facilities are not related to mining activity in Noth Carolina. Sed Pond 64 WRC Pond 61�� II ♦' N m 0 Sto aged I } +/1 0 0.2 0.4 a F.acility 3 II ,� ,��' l Miles 0 ♦ /J ��� /( 1 inch = 0.2 mile when printed at 11"x17" III Gene Rd a z T I cdg� Figure 29 Sequence Map: End of Operations g (End of Mining Year 9.4) LOM Ph 3 Kings Mountain Lithium Mine Albemarle Kings Mountain ��` Q o ea City Cleveland County, 1zo o a0e Lake o North Carolina g